Amendment 0003 26R0234.pdf
PDF 825 KB Posted
- Solicitation number
- N4008526R0234
About this file
This is Amendment 0003 to a Design-Bid-Build (DBB) solicitation for Building 47 upgrades and modernization at Naval Undersea Warfare Center, Naval Station Newport, Newport, Rhode Island. The amendment, effective August 26, 2026, incorporates continuation sheets for drawings and specifications, updated attachments, wage determinations, and responses to pre-proposal inquiries.
The amendment adds seven items to the contract: continuation sheets for fire protection, fire alarm, and mechanical drawings with change number 0003; updated Attachment E containing the B47 NUWC Warehouse Price Proposal Form Revision 1; Attachment K providing existing conditions summary documentation; Attachment L containing as-built fire protection system drawings; Attachment M with dust collection shop drawings; an updated wage determination for Rhode Island (RI20260001, effective 07/30/2026) covering building, heavy, and highway construction work in multiple counties; and pre-proposal inquiry responses. Specification sections 013000, 013300, 013526, and 014500 were revised to require that the site superintendent, SSHO (Site Safety and Health Officer), and QC Manager be three separate individuals—none can hold multiple titles due to the project's size and scope. The EcoMAX dust collection system in Building B must remain functional throughout contract performance. All existing fire protection system components, water valves, and equipment noted in the as-built drawings have not been field-verified for accuracy. Prevailing wage rates are mandated per the Davis-Bacon Act with rates specified for multiple trade classifications including laborers, carpenters, electricians, plumbers, operators, and other skilled trades, with hourly rates ranging from approximately $24.79 to $64.52 plus fringes depending on classification and effective date.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
N40085-26-R-0234
SECTION SF30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The following have been added by full text:
AMENDMENT 0003
This amendment is issued to incorporate the following:
1. Provide continuation sheet for Drawings and Specifications (Enclosed)
2. Provide Updated Attachment E – B47 NUWC Warehouse Price Proposal Form REV1
3. Provide Attachment K - B47 Existing Condition
4. Provide Attachment L – B47 FP System
5. Provide Attachment M – Dust Collection Shop Drawings
6. Provide updated Wage Determination (RI20260001 07/30/2026) (Enclosed)
7. Provide PPI responses (Enclosed)
1. Continuation Sheet for Drawings and Specifications (Enclosed)
CONTRACT DRAWINGS
DWG
NO
NAVFAC
NO
CHANGE NO TITLE
FP001 12948828 0003 Fire Protection General Notes, Legends, and Abbreviations FA001 12948835 0003 Fire Alarm, General Notes, Legends, and Abbreviations M001 12948867 0003 Legends, Abbreviations, and General Notes
On NAVFAC Dwg. No. 12948828 (FP001)
CHANGE FP001 Fire Protection General Notes, Legends, and Abbreviations as follows:
GENERAL NOTES, ADD NOTE #13 “See Amendment 0003, Attachment L for As Built Fire Protection Drawings for reference only - ITEMS INDICATED NOT VERIFIED IN FIELD FOR
ACCURACY”
On NAVFAC Dwg. No. 12948835 (FA001)
CHANGE FA001 Fire Protection General Notes, Legends, and Abbreviations as follows:
GENERAL NOTES, ADD NOTE #12 “See Amendment 003, Attachment K for Existing Conditions Summary for existing conditions Fire Alarm Summary for reference only - ITEMS
INDICATED NOT VERIFIED IN FIELD FOR ACCURACY”
On NAVFAC Dwg. No. 12948867 (M001)
CHANGE M001 Legends, Abbreviations, and General Notes as follows:
GENERAL NOTES, ADD NOTE #18 “See Amendment 0003, Attachment K for Existing Conditions Summary for existing conditions Mechanical Summary for reference only - ITEMS
INDICATED NOT VERIFIED IN FIELD FOR ACCURACY”
GENERAL NOTES, ADD NOTE #19 “See Amendment 0003, Attachment M. The EcoMAX system is part of the dust collection system for the woodworking shop and connected to overall system. The system is functional and must remain in place and fully operational throughout the duration of the contract. Refer to existing conditions Dust Collection system as built documents for reference only - ITEMS INDICATED NOT VERIFIED IN FIELD FOR ACCURACY”
SPECIFICATIONS
Specification Section 013000 ADMISTRATIVE REQUIREMENTS
Paragraph 1.5 SUPERVISION
ADD the following:
“Site Super cannot be SSHO or QC Manager - The Site superintendent may NOT be the SSHO or QC Manager. Due to the size and scale of this project, 3 hat contractor oversight is required.”
Specification Section 013300 SUBMITTAL PROCEDURES
Submittal Register
ADD the following at all submittals noted with “G”:
Add “DOR” to all submittals noted with “G” – the Designer of Record shall review/accept/approve all submittals. For submittals listed as “Plan”, “Certificate”, “Report”, “Test”, “Permit”, “Workbook”, “Warranty”, require both “DOR” and “G” review/acceptance/approval.”
Specification Section 013526 GOVERNMENT SAFETDRZFY REQUIREMENTS
Paragraph 1.8.2 Roles and Responsibilities of Prime Contractor and SSHO
ADD the following:
“SSHO cannot be Site Super or QC Manager - The SSHO may NOT be the Site Super or QC Manager. Due to the size and scale of this project, 3 hat contractor oversight is required.”
Specification Section 014500 QUANLITY CONTROL
Paragraph 1.6.1.1. Roles and Responsibilities of Quality Control Manager
ADD the following:
“QC Manager cannot be Site Super or SSHO - The may NOT be the Site Super or QC Manager.
Due to the size and scale of this project, 3 hat contractor oversight is required.”
Attachment L– B47 FP System – (As Built Fire Protection Drawings)
ADD Attachment K As Built Fire Protection Drawings for reference only - ITEMS
INDICATED NOT VERIFIED IN FIELD FOR ACCURACY
Attachment K – B47 Existing Condition (Existing Conditions Summary)
ADD Attachment L Existing Conditions Summary for reference only - ITEMS INDICATED
NOT VERIFIED IN FIELD FOR ACCURACY
Updated Attachment E – B47 NUWC Warehouse Price Proposal Form REV 1
ADD Updated Attachment E – B47 NUWC Warehouse Price Proposal Form REV 1
Attachment M – Dust Collection Shop Drawings
ADD Attachment M Dust Collection shop drawings for reference only - ITEMS INDICATED NOT VERIFIED IN FIELD FOR ACCURACY. The EcoMAX system is part of the dust collection system for the woodworking shop, and connected to overall system. The system is functional and must remain in place and fully operational throughout the duration of the contract.
2. Updated Attachment E – B47 NUWC Warehouse Price Proposal Form REV 1 is provided with this amendment (attached separately).
3. Attachment K - B47 Existing Condition is provided with this amendment (attached separately).
4. Attachment L - B47 FP System is provided with this amendment (attached separately).
5. Attachment M – Dust Collection Shop Drawings is provided with this amendment (attached separately).
6. Updated Wage Determination (RI20260001 07/30/2026) (Enclosed)
"General Decision Number: RI20260001 07/30/2026
State: Rhode Island
Construction Types: Building, Heavy and Highway
Counties: Rhode Island Counties of Bristol, Kent, Newport, Providence and Washington
Includes Marine Construction Projects
Modification Number Publication Date 2 01/30/2026 3 05/18/2026 4 07/30/2026
ASBE0006-006 09/01/2024
Rates Fringes
HAZARDOUS MATERIAL HANDLER (INCLUDES PREPARATION,
WETTING, STRIPPING, REMOVAL SCRAPPING, VACUUMING,
BAGGING & DISPOSING OF ALL INSULATION MATERIALS,
WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM
MECHANICAL SYSTEMS).................................$ 49.91 36.63
ASBE0006-008 09/01/2024
Rates Fringes
ASBESTOS WORKER/INSULATOR (INCLUDES APPLICATION OF
ALL INSULATING MATERIALS, PROTECTIVE COVERINGS,
COATINGS & FINISHES TO ALL TYPES OF MECHANICAL
SYSTEMS)............................................$ 49.91 36.63
BOIL0029-001 01/01/2025
Rates Fringes
BOILERMAKER.........................................$ 50.62 28.82
BRRI0003-001 06/01/2022
Rates Fringes
BRICKLAYER, STONEMASON, POINTER, CAULKER & CLEANER..$ 46.86 29.14
BRRI0003-002 09/01/2022
Rates Fringes
MARBLE SETTER, TERRAZZO WORKER & TILE SETTER........$ 46.54 30.34
BRRI0003-003 09/01/2022
Rates Fringes
MARBLE, TILE & TERRAZZO FINISHER....................$ 38.78 29.61
CARP0330-001 06/02/2025
Rates Fringes
DIVER (WHEN NOT DIVING OR TENDING THE DIVER, THE
DIVER AND DIVER TENDER SHALL RECEIVE THE PILEDRIVER
RATE. DIVER TENDERS SHALL RECEIVE $1.00 PER HOUR
ABOVE THE PILE DRIVER RATE WHEN TENDING THE DIVER.)
...................................................$ 60.83 30.50
DIVER TENDER (WHEN NOT DIVING OR TENDING THE DIVER,
THE DIVER AND DIVER TENDER SHALL RECEIVE THE
PILEDRIVER RATE. DIVER TENDERS SHALL RECEIVE $1.00
PER HOUR ABOVE THE PILE DRIVER RATE WHEN TENDING
THE DIVER.) ......................................$ 48.68 30.50
CARPENTER: INCLUDES SOFT FLOOR LAYER (WORK ON
FREE-STANDING STACKS, CONCRETE SILOS & PUBLIC
UTILITY ELECTRICAL POWER HOUSES, WHICH ARE OVER 35
FT. IN HEIGHT WHEN CONSTRUCTED: $.50 PER HOUR
ADDITIONAL. WORK ON EXTERIOR CONCRETE SHEAR WALL
GANG FORMS, 45 FT. OR MORE ABOVE GROUND ELEVATION
OR ON SETBACK: $.50 PER HOUR ADDITIONAL.)...........$ 47.88 30.50
PILEDRIVER (WORK ON FREE-STANDING STACKS, CONCRETE
SILOS & PUBLIC UTILITY ELECTRICAL POWER HOUSES,
WHICH ARE OVER 35 FT. IN HEIGHT WHEN CONSTRUCTED:
$.50 PER HOUR ADDITIONAL. WORK ON EXTERIOR CONCRETE
SHEAR WALL GANG FORMS, 45 FT. OR MORE ABOVE GROUND
ELEVATION OR ON SETBACK: $.50 PER HOUR ADDITIONAL.
THE DESIGNATED PILEDRIVER, KNOWN AS THE ""MONKEY"":
$1.00 PER HOUR ADDITIONAL...........................$ 41.53 29.35
WELDER (WORK ON FREE-STANDING STACKS, CONCRETE
SILOS & PUBLIC UTILITY ELECTRICAL POWER HOUSES,
WHICH ARE OVER 35 FT. IN HEIGHT WHEN CONSTRUCTED:
$.50 PER HOUR ADDITIONAL. WORK ON EXTERIOR
CONCRETE SHEAR WALL GANG FORMS, 45 FT. OR MORE
ABOVE GROUND ELEVATION OR ON SETBACK: $.50 PER HOUR
ADDITIONAL.) .......................................$ 48.68 30.50
CARP1121-002 04/21/2025
Rates Fringes
MILLWRIGHT..........................................$ 45.72 31.50
ELEC0099-002 06/01/2025
Rates Fringes
ELECTRICIAN (WORK OF A HAZARDOUS NATURE, OR WHERE
THE WORK HEIGHT IS 30 FT. OR MORE FROM THE FLOOR,
EXCEPT WHEN WORKING OSHA-APPROVED LIFTS: 20% PER
HOUR ADDITIONAL. WORK IN TUNNELS BELOW GROUND LEVEL
IN COMBINED SEWER OUTFALL: 20% PER HOUR
ADDITIONAL.)........................................$ 56.11 24.74
TELEDATA SYSTEM INSTALLER (WORK OF A HAZARDOUS
NATURE, OR WHERE THE WORK HEIGHT IS 30 FT. OR MORE
FROM THE FLOOR, EXCEPT WHEN WORKING OSHA-APPROVED
LIFTS: 20% PER HOUR ADDITIONAL. WORK IN TUNNELS
BELOW GROUND LEVEL IN COMBINED SEWER OUTFALL: 20%
PER HOUR ADDITIONAL.)...............................$ 42.09 19.71
ELEV0039-001 01/01/2025
Rates Fringes
ELEVATOR MECHANIC (ADDTIONAL FRINGE TO BE PAID A.
PAID HOLIDAYS: NEW YEARS DAY; MEMORIAL DAY;
INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY;
THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING
DAY; AND CHRISTMAS DAY. B. EMPLOYER CONTRIBUTES 8%
BASIC HOURLY RATE FOR 5 YEARS OR MORE OF SERVICE OF
6% BASIC HOURLY RATE FOR 6 MONTHS TO 5 YEARS OF
SERVICE AS VACATION PAY CREDIT.)....................$ 64.52 38.44
ENGI0057-001 12/01/2025
Rates Fringes
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,
SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION
WORK: GROUP 1: CRANES, LIGHTERS, BOOM TRUCKS AND
DERRICKS. (BOOM LENGTHS, INCLUDING JIBS: 150 FEET
AND OVER + $ 2.00; 180 FEET AND OVER + $ 3.00;
210 FEET AND OVER + $ 4.00; 240 FEET AND OVER + $
5.00; 270 FEET AND OVER + $ 7.00; 300 FEET AND
OVER + $ 8.00; 350 FEET AND OVER + $ 9.00; 400
FEET AND OVER + $10.00); (PAID HOLIDAYS: NEW
YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY
FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY,
VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. ANY
EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A
HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY.)
(HAZMAT WORK: $2.00 PER HOUR ADDITIONAL.
TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.).....$ 51.30 29.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,
SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION
WORK: GROUP 2: DIGGING MACHINE, ROSS CARRIER,
LOCOMOTIVE, HOIST, ELEVATOR, BIDWELL-TYPE MACHINE,
SHOT & WATER BLASTING MACHINE, PAVER, SPREADER,
GRADERS, FRONT END LOADER (3 YDS. AND OVER),
VIBRATORY HAMMER & VACUUM TRUCK, ROADHEADERS,
FORKLIFTS, ECONOMOBILE TYPE EQUIPMENT, TUNNEL
BORING MACHINES, CONCRETE PUMP AND ON SITE CONCRETE
PLANTS. (BOOM LENGTHS, INCLUDING JIBS: 150 FEET
AND OVER + $ 2.00; 180 FEET AND OVER + $ 3.00;
210 FEET AND OVER + $ 4.00; 240 FEET AND OVER + $
5.00; 270 FEET AND OVER + $ 7.00; 300 FEET AND
OVER + $ 8.00; 350 FEET AND OVER + $ 9.00; 400
FEET AND OVER + $10.00); (PAID HOLIDAYS: NEW
YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY
FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY,
VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. ANY
EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A
HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY.)
(HAZMAT WORK: $2.00 PER HOUR ADDITIONAL.
TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL)......$ 49.30 29.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,
SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION
WORK: GROUP 3: OILERS ON CRANES. (BOOM LENGTHS,
INCLUDING JIBS: 150 FEET AND OVER + $ 2.00; 180
FEET AND OVER + $ 3.00; 210 FEET AND OVER + $
4.00; 240 FEET AND OVER + $ 5.00; 270 FEET AND
OVER + $ 7.00; 300 FEET AND OVER + $ 8.00; 350
FEET AND OVER + $ 9.00; 400 FEET AND OVER +
$10.00); (PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY, CHRISTMAS DAY. ANY EMPLOYEE WHO
WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS
SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK:
$2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK:
$5.00 PER HOUR ADDITIONAL.).........................$ 44.92 29.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,
SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION
WORK: GROUP 4: OILER ON CRAWLER BACKHOE. (BOOM
LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $
2.00; 180 FEET AND OVER + $ 3.00; 210 FEET AND
OVER + $ 4.00; 240 FEET AND OVER + $ 5.00; 270
FEET AND OVER + $ 7.00; 300 FEET AND OVER + $
8.00; 350 FEET AND OVER + $ 9.00; 400 FEET AND
OVER + $10.00); (PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY, CHRISTMAS DAY. ANY EMPLOYEE WHO
WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS
SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK:
$2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK:
$5.00 PER HOUR ADDITIONAL.) ...$ 42.07 29.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,
SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION
WORK: GROUP 5: BULLDOZER, BOBCATS, SKID STEER
LOADER, TRACTOR, SCRAPER, COMBINATION LOADER
BACKHOE, ROLLER, FRONT END LOADER (LESS THAN 3
YDS.), STREET AND MOBILE-POWERED SWEEPER (3-YD.
CAPACITY), 8-FT. SWEEPER MINIMUM 65 HP). (BOOM
LENGTHS, INCLUDING JIBS: 150 FEET AND OVER +
$2.00; 180 FEET AND OVER + $ 3.00; 210 FEET AND
OVER + $ 4.00; 240 FEET AND OVER + $ 5.00; 270
FEET AND OVER + $ 7.00; 300 FEET AND OVER + $
8.00; 350 FEET AND OVER + $ 9.00; 400 FEET AND
OVER + $10.00); (PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY, CHRISTMAS DAY. ANY EMPLOYEE WHO
WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS
SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK:
$2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK:
$5.00 PER HOUR ADDITIONAL.).........................$ 48.35 29.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,
SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION
WORK: GROUP 6: WELL-POINT INSTALLATION CREW. (BOOM
LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $
2.00; 180 FEET AND OVER + $ 3.00; 210 FEET AND
OVER + $ 4.00; 240 FEET AND OVER + $ 5.00; 270
FEET AND OVER + $ 7.00; 300 FEET AND OVER + $
8.00; 350 FEET AND OVER + $ 9.00; 400 FEET AND
OVER + $10.00); (PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY, CHRISTMAS DAY. ANY EMPLOYEE WHO
WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS
SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK:
$2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK:
$5.00 PER HOUR ADDITIONAL.).........................$ 39.15 29.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,
SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION
WORK: GROUP 7: UTILITY ENGINEERS AND SIGNAL
PERSONS. (BOOM LENGTHS, INCLUDING JIBS: 150 FEET
AND OVER + $ 2.00; 180 FEET AND OVER + $ 3.00;
210 FEET AND OVER + $ 4.00; 240 FEET AND OVER + $
5.00; 270 FEET AND OVER + $ 7.00; 300 FEET AND
OVER + $ 8.00; 350 FEET AND OVER + $ 9.00; 400
FEET AND OVER + $10.00); (PAID HOLIDAYS: NEW
YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY
FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY,
VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. ANY
EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A
HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY.)
(HAZMAT WORK: $2.00 PER HOUR ADDITIONAL.
TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.)......$ 33.15 29.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,
SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION
WORK: GROUP 8: HEATER, CONCRETE MIXER, STONE
CRUSHER, WELDING MACHINE, GENERATOR AND LIGHT
PLANT, GAS AND ELECTRIC DRIVEN PUMP AND AIR
COMPRESSOR. (BOOM LENGTHS, INCLUDING JIBS: 150
FEET AND OVER + $ 2.00; 180 FEET AND OVER + $
3.00; 210 FEET AND OVER + $ 4.00; 240 FEET AND
OVER + $ 5.00; 270 FEET AND OVER + $ 7.00; 300
FEET AND OVER + $ 8.00; 350 FEET AND OVER + $
9.00; 400 FEET AND OVER + $10.00); (PAID
HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,
MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY,
COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY,
CHRISTMAS DAY. ANY EMPLOYEE WHO WORKS 3 DAYS IN THE
WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE
HOLIDAY.) (HAZMAT WORK: $2.00 PER HOUR ADDITIONAL.
TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.).....$ 45.00 29.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,
SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION
WORK: GROUP 9: BOAT & TUG OPERATOR. (BOOM LENGTHS,
INCLUDING JIBS: 150 FEET AND OVER + $ 2.00; 180
FEET AND OVER + $ 3.00; 210 FEET AND OVER + $
4.00; 240 FEET AND OVER + $ 5.00; 270 FEET AND
OVER + $ 7.00; 300 FEET AND OVER + $ 8.00; 350
FEET AND OVER + $ 9.00; 400 FEET AND OVER +
$10.00); (PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY, CHRISTMAS DAY. ANY EMPLOYEE WHO
WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS
SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK:
$2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK:
$5.00 PER HOUR ADDITIONAL.).........................$ 48.92 29.95
ENGI0057-003 12/01/2025
Rates Fringes
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION:
GROUP 1: CRANES, LIGHTERS, BOOM TRUCKS AND
DERRICKS. (BOOM LENTHS, INCLUDING JIBS: 150 FT.
AND OVER: + $ 2.00; 180 FT. AND OVER: + $ 3.00;
210 FT. AND OVER: + $ 4.00; 240 FT. AND OVER: + $
5.00; 270 FT. AND OVER: + $ 7.00; 300 FT. AND
OVER: + $ 8.00; 350 FT. AND OVER: + $ 9.00; 400
FT. AND OVER: + $10.00) (PAID HOLIDAYS: NEW YEAR'S
DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH,
VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE
WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY
FALLS SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK:
$2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00
PER HOUR ADDITIONAL.)...............................$ 50.57 29.95
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION:
GROUP 2: DIGGING MACHINE, ROSS CARRIER,
LOCOMOTIVE, HOIST, ELEVATOR, BIDWELL-TYPE MACHINE,
SHOT & WATER BLASTING MACHINE, PAVER, SPREADER,
FRONT END LOADER (3 YDS. AND OVER), VIBRATORY
HAMMER AND VACUUM TRUCK. (BOOM LENTHS, INCLUDING
JIBS: 150 FT. AND OVER: + $ 2.00; 180 FT. AND
OVER: + $ 3.00; 210 FT. AND OVER: + $ 4.00; 240
FT. AND OVER: + $ 5.00; 270 FT. AND OVER: + $
7.00; 300 FT. AND OVER: + $ 8.00; 350 FT. AND
OVER: + $ 9.00; 400 FT. AND OVER: + $10.00) (PAID
HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL
DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS
DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS
DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK
IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE
HOLIDAY.) (HAZMAT WORK: $2.00 PER HOUR ADDITIONAL.
TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.)
............................$ 48.57 29.95
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION:
GROUP 3: TELEHANDLER EQUIPMENT, FORKLIFT, CONCRETE
PUMP & ON-SITE CONCRETE PLANT. (BOOM LENTHS,
INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00; 180
FT. AND OVER: + $ 3.00; 210 FT. AND OVER: + $
4.00; 240 FT. AND OVER: + $ 5.00; 270 FT. AND
OVER: + $ 7.00; 300 FT. AND OVER: + $ 8.00; 350
FT. AND OVER: + $ 9.00; 400 FT. AND OVER: +
$10.00) (PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S
DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR
DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY &
CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN
THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR
THE HOLIDAY.) (HAZMAT WORK: $2.00 PER HOUR
ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR
ADDITIONAL.).......................................$ 48.35 29.95
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION:
GROUP 4: FIREMAN & OILER ON CRANES. (BOOM LENTHS,
INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00; 180
FT. AND OVER: + $ 3.00; 210 FT. AND OVER: + $
4.00; 240 FT. AND OVER: + $ 5.00; 270 FT. AND
OVER: + $ 7.00; 300 FT. AND OVER: + $ 8.00; 350
FT. AND OVER: + $ 9.00; 400 FT. AND OVER: +
$10.00) (PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S
DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR
DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY &
CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN
THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR
THE HOLIDAY.) (HAZMAT WORK: $2.00 PER HOUR
ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR
ADDITIONAL.)........................................$ 44.35 29.95
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION:
GROUP 5: OILER ON CRAWLER BACKHOE. (BOOM LENTHS,
INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00; 180
FT. AND OVER: + $ 3.00; 210 FT. AND OVER: + $
4.00; 240 FT. AND OVER: + $ 5.00; 270 FT. AND
OVER: + $ 7.00; 300 FT. AND OVER: + $ 8.00; 350
FT. AND OVER: + $ 9.00; 400 FT. AND OVER: +
$10.00) (PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S
DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR
DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY &
CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN
THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR
THE HOLIDAY.) (HAZMAT WORK: $2.00 PER HOUR
ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR
ADDITIONAL.)........................................$ 41.50 29.95
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION:
GROUP 6: BULLDOZER,SKID STEER LOADERS,BOBCATS,
TRACTOR, GRADER, SCRAPER,COMBINATION LOADER
BACKHOE, ROLLER, FRONT END LOADER (LESS THAN 3
YDS.), STREET AND MOBILE POWERED SWEEPER (3 YDS.
CAPACITY), 8-FT. SWEEPER (MINIMUM 65 HP). (BOOM
LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $
2.00; 180 FT. AND OVER: + $ 3.00; 210 FT. AND
OVER: + $ 4.00; 240 FT. AND OVER: + $ 5.00; 270
FT. AND OVER: + $ 7.00; 300 FT. AND OVER: + $
8.00; 350 FT. AND OVER: + $ 9.00; 400 FT. AND
OVER: + $10.00) (PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE
WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY
FALLS SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK:
$2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00
PER HOUR ADDITIONAL.)...............................$ 47.65 29.95
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION:
GROUP 7: WELL POINT INSTALLATION CREW. (BOOM
LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $
2.00; 180 FT. AND OVER: + $ 3.00; 210 FT. AND
OVER: + $ 4.00; 240 FT. AND OVER: + $ 5.00; 270
FT. AND OVER: + $ 7.00; 300 FT. AND OVER: + $
8.00; 350 FT. AND OVER: + $ 9.00; 400 FT. AND
OVER: + $10.00) (PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE
WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY
FALLS SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK:
$2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00
PER HOUR ADDITIONAL.)...............................$ 47.22 29.95
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION:
GROUP 8: HEATER, CONCRETE MIXER, STONE CRUSHER,
WELDING MACHINE, GENERATOR FOR LIGHT PLANT, GAS AND
ELECTRIC DRIVEN PUMP & AIR COMPRESSOR. (BOOM
LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $
2.00; 180 FT. AND OVER: + $ 3.00; 210 FT. AND
OVER: + $ 4.00; 240 FT. AND OVER: + $ 5.00; 270
FT. AND OVER: + $ 7.00; 300 FT. AND OVER: + $
8.00; 350 FT. AND OVER: + $ 9.00; 400 FT. AND
OVER: + $10.00) (PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE
WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY
FALLS SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK:
$2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00
PER HOUR ADDITIONAL.)...............................$ 44.54 29.95
ENGI0057-005 12/01/2025
Rates Fringes
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION
PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE
INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND
BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 1:
CRANES, PILE DRIVERS, LIGHTERS, BOOM TRUCKS,
HOISTS, DERRICKS. (ANY EMPLOYEE WHO WORKS THREE
DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE
PAID FOR THE HOLIDAY. PAID HOLIDAYS: NEW YEAR'S
DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH,
VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY & CHRISTMAS DAY.)..................$ 46.45 29.95
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION
PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE
INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND
BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 2:
DIGGING MACHINES, EXCAVATORS, LOCOMOTIVES, JOHN
HENRY'S, DIRECTIONAL DRILLING MACHINES, COLD
PLANERS, RECLAIMERS, PAVERS, SPREADERS, GRADERS,
FRONT-END LOADERS (3YDS & OVER), VACUUM TRUCK,
DRILL/BORING MACHINE OPERATORS, VERMEER SAW, WATER
BLASTER, HYDRAULIC-DEMOLITION ROBOT, ROSS CARRIERS,
CONCRETE PUMP OPERATORS, ASPHALT/MATERIAL TRANSFER
MACHINES, ROTATING TELEHANDLERS, SPMT TYPE
EQUIPMENT. (ANY EMPLOYEE WHO WORKS THREE DAYS IN
THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR
THE HOLIDAY. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY & CHRISTMAS DAY.) DAY, PRESIDENT'S
DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR
DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY &
CHRISTMAS DAY.......................................$ 44.45 29.95
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION
PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE
INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND
BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 3:
WELLPOINT INSTALLATION AND DRILL/BORING MACHINE
ASSISTANTS. (ANY EMPLOYEE WHO WORKS THREE DAYS IN
THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR
THE HOLIDAY. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY & CHRISTMAS DAY.)..................$ 39.15 29.95
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION
PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE
INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND
BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 4:
UTILITY ENGINEERS. (ANY EMPLOYEE WHO WORKS THREE
DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE
PAID FOR THE HOLIDAY. PAID HOLIDAYS: NEW YEAR'S
DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH,
VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY & CHRISTMAS DAY.)..................$ 25.75 29.95
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION
PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE
INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND
BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 5:
SIGNAL PERSONS. (ANY EMPLOYEE WHO WORKS THREE DAYS
IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID
FOR THE HOLIDAY. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY & CHRISTMAS DAY.)..................$ 33.15 29.95
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION
PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE
INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND
BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 6:
OILERS ON CRANES AND DECKHANDS. (ANY EMPLOYEE WHO
WORKS THREE DAYS IN THE WEEK IN WHICH A HOLIDAY
FALLS SHALL BE PAID FOR THE HOLIDAY. PAID
HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL
DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS
DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS
DAY.)...............................................$ 39.73 29.95
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION
PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE
INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND
BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 7:
COMBINATION LOADER / BACKHOES, FRONT-END LOADERS
(LESS THAN 3 YDS.), FORKLIFT, BULLDOZERS, SCRAPERS,
BOATS, ROLLERS, SKID STEER LOADERS (REGARDLESS OF
ATTACHMENTS), STREET SWEEPERS, MECHANICS, WELDERS,
OPERATORS IN MATERIALS YARDS, SHOPS AND GARAGES.
(ANY EMPLOYEE WHO WORKS THREE DAYS IN THE WEEK IN
WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE
HOLIDAY. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY & CHRISTMAS DAY.)..................$ 43.43 29.95
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION
PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE
INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND
BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 8:
GAS AND ELECTRIC DRIVE HEATERS, CONCRETE MIXERS,
LIGHT PLANTS, WELDING MACHINES, PUMPS AND
COMPRESSORS. (ANY EMPLOYEE WHO WORKS THREE DAYS IN
THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR
THE HOLIDAY. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY & CHRISTMAS DAY.)..................$ 38.70 29.95
IRON0037-001 09/16/2025
Rates Fringes
IRONWORKER..........................................$ 43.03 33.53
LABO0271-001 12/03/2023
Rates Fringes LABORER (BUILDING CONSTRUCTION): GROUP 1: Laborer, Carpenter Tender, Mason Tender, Cement Finisher Tender, Scaffold Erector, Wrecking Laborer, Asbestos Removal [Non-Mechanical Systems............$ 37.00 26.90 LABORER (BUILDING CONSTRUCTION): GROUP 2: Asphalt Raker, Adzemen, Pipe Trench Bracer, Demolition Burner, Chain Saw Operator, Fence & Guard Rail Erector, Setter of Metal Forms for Roadways, Mortar Mixer, Pipelayer, Riprap & Dry Stonewall Builder, Highway Stone Spreader, Pneumatic Tool Operator, Wagon Drill Operator, Tree Trimmer, Barco-Type Jumping Tamper, Mechanical Grinder Operator.........$ 37.00 26.90 LABORER (BUILDING CONSTRUCTION): GROUP 3: Pre-Cast Floor & Roof Plank Erectors.........................$ 37.00 26.90
LABORER (BUILDING CONSTRUCTION): GROUP 4: Air Track Operator, Hydraulic & Similar Self-Powered Drill, Block Paver, Rammer, Curb Setter, Powderman & Blaster.............................................$ 37.00 26.90 LABORER (BUILDING CONSTRUCTION): GROUP 5: Toxic Waste Remover.......................................$ 39.00 26.90
LABO0271-002 11/27/2022
Rates Fringes
LABORER (HEAVY AND HIGHWAY CONSTRUCTION):
COMPRESSED AIR: GROUP 1:Mucking machine operator, tunnel laborer, brake person, track person, miner, grout person, lock tender, gauge tender, miner:
motor person & all others in compressed air ........$ 55.40 24.15
LABORER (HEAVY AND HIGHWAY CONSTRUCTION):
COMPRESSED AIR: GROUP 2: Change house attendant, powder watchperson, top person on iron ............$ 52.93 24.15
LABORER (HEAVY AND HIGHWAY CONSTRUCTION):
COMPRESSED AIR: GROUP 3: Hazardous waste work within the ""HOT"" zone...............................$ 42.45 24.15
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): FREE AIR:
GROUP 1: Grout person - pumps, brake person, track person, form mover & stripper (wood & steel), shaft laborer, laborer topside, outside motorperson, miner, conveyor operator, miner welder, heading motorperson, erecting operator, mucking machine operator, nozzle person, rodperson, safety miner, shaft & tunnel, steel & rodperson, mole nipper, concrete worker, form erector (wood, steel and all accessories), cement finisher (this type of work only), top signal person, bottom person (when heading is 50' from shaft), burner, shield operator and TBM operator....................................$ 46.00 24.15
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): FREE AIR:
GROUP 2: Change house attendant, powder watchperson $ 45.00 24.15
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): FREE AIR:
GROUP 3: Hazardous waste work within the ""HOT"" zone.$ 42.45 24.15
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): GROUP 1:
Laborer; Carpenter tender; Cement finisher tender;
Wrecking laborer; Asbestos removers [non-mechanical systems]; Plant laborer; Driller in quarries........$ 33.05 24.05
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): GROUP 2:
Adzeperson; Asphalt raker; Barcotype jumping tamper; Chain saw operators; Concrete and power buggy operator; Concrete saw operator; Demolition burner; Fence and guard rail erector; Highway stone spreader; Laser beam operator; Mechanical grinder operator; Mason tender; Mortar mixer; Pneumatic tool operator; Riprap and dry stonewall builder;
Scaffold erector; Setter of metal forms for roadways; Wagon drill operator; Wood chipper operator; Pipelayer; Pipe trench bracer ...........$ 35.75 24.85
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): GROUP 3:
Air track drill operator; Hydraulic and similar powered drills; Brick paver; Block paver; Rammer and curb setter; Powderperson and blaster...........$ 36.50 24.85
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): GROUP 4:
Flagger & signaler..................................$ 29.00 24.85
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): GROUP 5:
Toxic waste remover ................................$ 33.05 24.05
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): OPEN AIR
CAISSON, UNDERPINNING WORK AND BORING CREW: BOTTOM
MAN.................................................$ 41.50 24.15
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): OPEN AIR
CAISSON, UNDERPINNING WORK AND BORING CREW: TOP MAN
& LABORER...........................................$ 35.60 24.15
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): TEST
BORING: DRILLER.....................................$ 41.95 24.15
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): TEST
BORING: LABORER.....................................$ 41.95 24.15
PAIN0011-005 06/01/2025
Rates Fringes
PAINTER (BRUSH AND ROLLER)..........................$ 39.57 26.60
PAINTER (EPOXY, TANKS, TOWERS, SWING STAGE &
STRUCTURAL STEEL)...................................$ 41.57 26.60
PAINTER (SPRAY, SAND & WATER BLASTING)..............$ 42.57 26.60
PAINTER (TAPER).....................................$ 38.82 25.80
PAINTER (WALL COVERER)..............................$ 38.57 25.80
PAIN0011-006 06/01/2024
Rates Fringes
GLAZIER (SWING STAGE: $1.00 PER HOUR ADDITIONAL.
PAID HOLIDAYS: LABOR DAY & CHRISTMAS DAY.)..........$ 41.63 26.15
PAIN0011-011 06/01/2024
Rates Fringes
PAINTER (BRIDGE WORK)...............................$ 57.85 26.40
PAIN0035-008 06/01/2011
Rates Fringes
SIGN PAINTER........................................$ 24.79 13.72
PLAS0040-001 01/01/2025
Rates Fringes
CEMENT MASON/CONCRETE FINISHER (BUILDING
CONSTRUCTION) (CEMENT MASON: WORK ON FREE SWINGING
SCAFFOLDS UNDER 3 PLANKS WIDTH AND WHICH IS 20 OR
MORE FEET ABOVE GROUND AND ANY OFFSET STRUCTURE:
$.30 PER HOUR ADDITIONAL.)..........................$ 44.75 29.10
PLAS0040-002 01/01/2025
Rates Fringes
CEMENT MASON/CONCRETE FINISHER (HEAVY AND HIGHWAY
CONSTRUCTION).......................................$ 40.45 25.30
PLAS0040-003 01/01/2025
Rates Fringes
PLASTERER...........................................$ 45.52 29.43
PLUM0051-002 08/25/2025
Rates Fringes
PLUMBERS AND PIPEFITTERS............................$ 54.34 34.50
ROOF0033-004 12/01/2025
Rates Fringes
ROOFER..............................................$ 47.49 31.44
SFRI0669-001 04/01/2025
Rates Fringes
SPRINKLER FITTER....................................$ 53.76 33.44
SHEE0017-002 06/01/2025
Rates Fringes
SHEET METAL WORKER..................................$ 44.42 41.94
TEAM0251-001 05/01/2025
Rates Fringes
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP
1: PICK-UP TRUCKS, STATION WAGONS, & PANEL TRUCKS
(ADDITIONAL FRINGE TO BE PAID: PAID HOLIDAYS: NEW
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PLUS
PRESIDENTS' DAY, COLUMBUS DAY, VETERAN'S DAY & V-J
DAY, PROVIDING THE EMPLOYEE HAS WORKED AT LEAST ONE
DAY IN THE CALENDAR WEEK IN WHICH THE HOLIDAY
FALLS. EMPLOYEE WHO HAS BEEN ON THE PAYROLL FOR 1
YEAR OR MORE BUT LESS THAN 5 YEARS AND HAS WORKED
150 DAYS DURING THE LAST YEAR OF EMPLOYMENT SHALL
RECEIVE 1 WEEK'S PAID VACATION; 5 TO 10 YEARS - 2
WEEKS' PAID VACATION; 10 OR MORE YEARS - 3 WEEK'S
PAID VACATION.) (EMPLOYEES ON THE SENIORITY LIST
SHALL BE PAID A ONE HUNDRED DOLLAR ($100.00) BONUS
FOR EVERY FOUR HUNDRED (400) HOURS WORKED, UP TO A
MAXIMUM OF FIVE HUNDRED DOLLARS ($500.00)) (ALL
DRIVERS WORKING ON A DEFINED HAZARD MATERIAL JOB
SITE SHALL BE PAID A PREMIUM OF $2.00 PER HOUR OVER
APPLICABLE RATE.) ...................$ 31.86 34.51
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP
2: TWO-AXLE ON LOW BEDS (ADDITIONAL FRINGE TO BE
PAID: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND
CHRISTMAS DAY, PLUS PRESIDENTS' DAY, COLUMBUS DAY,
VETERAN'S DAY & V-J DAY, PROVIDING THE EMPLOYEE HAS
WORKED AT LEAST ONE DAY IN THE CALENDAR WEEK IN
WHICH THE HOLIDAY FALLS. EMPLOYEE WHO HAS BEEN ON
THE PAYROLL FOR 1 YEAR OR MORE BUT LESS THAN 5
YEARS AND HAS WORKED 150 DAYS DURING THE LAST YEAR
OF EMPLOYMENT SHALL RECEIVE 1 WEEK'S PAID VACATION;
5 TO 10 YEARS - 2 WEEKS' PAID VACATION; 10 OR MORE
YEARS - 3 WEEK'S PAID VACATION.) (EMPLOYEES ON THE
SENIORITY LIST SHALL BE PAID A ONE HUNDRED DOLLAR
($100.00) BONUS FOR EVERY FOUR HUNDRED (400) HOURS
WORKED, UP TO A MAXIMUM OF FIVE HUNDRED DOLLARS
($500.00)) (ALL DRIVERS WORKING ON A DEFINED HAZARD
MATERIAL JOB SITE SHALL BE PAID A PREMIUM OF $2.00
PER HOUR OVER APPLICABLE RATE.) .....$ 32.01 34.51
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP
3: TWO-AXLE DUMP TRUCK (ADDITIONAL FRINGE TO BE
PAID: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND
CHRISTMAS DAY, PLUS PRESIDENTS' DAY, COLUMBUS DAY,
VETERAN'S DAY & V-J DAY, PROVIDING THE EMPLOYEE HAS
WORKED AT LEAST ONE DAY IN THE CALENDAR WEEK IN
WHICH THE HOLIDAY FALLS. EMPLOYEE WHO HAS BEEN ON
THE PAYROLL FOR 1 YEAR OR MORE BUT LESS THAN 5
YEARS AND HAS WORKED 150 DAYS DURING THE LAST YEAR
OF EMPLOYMENT SHALL RECEIVE 1 WEEK'S PAID VACATION;
5 TO 10 YEARS - 2 WEEKS' PAID VACATION; 10 OR MORE
YEARS - 3 WEEK'S PAID VACATION.) (EMPLOYEES ON THE
SENIORITY LIST SHALL BE PAID A ONE HUNDRED DOLLAR
($100.00) BONUS FOR EVERY FOUR HUNDRED (400) HOURS
WORKED, UP TO A MAXIMUM OF FIVE HUNDRED DOLLARS
($500.00)) (ALL DRIVERS WORKING ON A DEFINED HAZARD
MATERIAL JOB SITE SHALL BE PAID A PREMIUM OF $2.00
PER HOUR OVER APPLICABLE RATE.) .....$ 32.06 34.51
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP
4: THREE-AXLE DUMP TRUCK (ADDITIONAL FRINGE TO BE
PAID: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND
CHRISTMAS DAY, PLUS PRESIDENTS' DAY, COLUMBUS DAY,
VETERAN'S DAY & V-J DAY, PROVIDING THE EMPLOYEE HAS
WORKED AT LEAST ONE DAY IN THE CALENDAR WEEK IN
WHICH THE HOLIDAY FALLS. EMPLOYEE WHO HAS BEEN ON
THE PAYROLL FOR 1 YEAR OR MORE BUT LESS THAN 5
YEARS AND HAS WORKED 150 DAYS DURING THE LAST YEAR
OF EMPLOYMENT SHALL RECEIVE 1 WEEK'S PAID VACATION;
5 TO 10 YEARS - 2 WEEKS' PAID VACATION; 10 OR MORE
YEARS - 3 WEEK'S PAID VACATION.) (EMPLOYEES ON THE
SENIORITY LIST SHALL BE PAID A ONE HUNDRED DOLLAR
($100.00) BONUS FOR EVERY FOUR HUNDRED (400) HOURS
WORKED, UP TO A MAXIMUM OF FIVE HUNDRED DOLLARS
($500.00)) (ALL DRIVERS WORKING ON A DEFINED HAZARD
MATERIAL JOB SITE SHALL BE PAID A PREMIUM OF $2.00
PER HOUR OVER APPLICABLE RATE.) .....$ 32.11 34.51
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP
5: FOUR- AND FIVE-AXLE EQUIPMENT. (ADDITIONAL
FRINGE TO BE PAID: PAID HOLIDAYS: NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY AND CHRISTMAS DAY, PLUS
PRESIDENTS' DAY, COLUMBUS DAY, VETERAN'S DAY & V-J
DAY, PROVIDING THE EMPLOYEE HAS WORKED AT LEAST ONE
DAY IN THE CALENDAR WEEK IN WHICH THE HOLIDAY
FALLS. EMPLOYEE WHO HAS BEEN ON THE PAYROLL FOR 1
YEAR OR MORE BUT LESS THAN 5 YEARS AND HAS WORKED
150 DAYS DURING THE LAST YEAR OF EMPLOYMENT SHALL
RECEIVE 1 WEEK'S PAID VACATION; 5 TO 10 YEARS - 2
WEEKS' PAID VACATION; 10 OR MORE YEARS - 3 WEEK'S
PAID VACATION.) (EMPLOYEES ON THE SENIORITY LIST
SHALL BE PAID A ONE HUNDRED DOLLAR ($100.00) BONUS
FOR EVERY FOUR HUNDRED (400) HOURS WORKED, UP TO A
MAXIMUM OF FIVE HUNDRED DOLLARS ($500.00)) (ALL
DRIVERS WORKING ON A DEFINED HAZARD MATERIAL JOB
SITE SHALL BE PAID A PREMIUM OF $2.00 PER HOUR OVER
APPLICABLE RATE.) ...................$ 32.21 34.51
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP
6: LOW-BED OR BOOM TRAILER. (ADDITIONAL FRINGE TO
BE PAID: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL
DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY
AND CHRISTMAS DAY, PLUS PRESIDENTS' DAY, COLUMBUS
DAY, VETERAN'S DAY & V-J DAY, PROVIDING THE
EMPLOYEE HAS WORKED AT LEAST ONE DAY IN THE
CALENDAR WEEK IN WHICH THE HOLIDAY FALLS. EMPLOYEE
WHO HAS BEEN ON THE PAYROLL FOR 1 YEAR OR MORE BUT
LESS THAN 5 YEARS AND HAS WORKED 150 DAYS DURING
THE LAST YEAR OF EMPLOYMENT SHALL RECEIVE 1 WEEK'S
PAID VACATION; 5 TO 10 YEARS - 2 WEEKS' PAID
VACATION; 10 OR MORE YEARS - 3 WEEK'S PAID
VACATION.) (EMPLOYEES ON THE SENIORITY LIST SHALL
BE PAID A ONE HUNDRED DOLLAR ($100.00) BONUS FOR
EVERY FOUR HUNDRED (400) HOURS WORKED, UP TO A
MAXIMUM OF FIVE HUNDRED DOLLARS ($500.00)) (ALL
DRIVERS WORKING ON A DEFINED HAZARD MATERIAL JOB
SITE SHALL BE PAID A PREMIUM OF $2.00 PER HOUR OVER
APPLICABLE RATE.) ...................$ 32.61 34.51
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP
7: TRAILERS WHEN USED ON A DOUBLE HOOK UP (PULLING
2 TRAILERS). (ADDITIONAL FRINGE TO BE PAID: PAID
HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND
CHRISTMAS DAY, PLUS PRESIDENTS' DAY, COLUMBUS DAY,
VETERAN'S DAY & V-J DAY, PROVIDING THE EMPLOYEE HAS
WORKED AT LEAST ONE DAY IN THE CALENDAR WEEK IN
WHICH THE HOLIDAY FALLS. EMPLOYEE WHO HAS BEEN ON
THE PAYROLL FOR 1 YEAR OR MORE BUT LESS THAN 5
YEARS AND HAS WORKED 150 DAYS DURING THE LAST YEAR
OF EMPLOYMENT SHALL RECEIVE 1 WEEK'S PAID VACATION;
5 TO 10 YEARS - 2 WEEKS' PAID VACATION; 10 OR MORE
YEARS - 3 WEEK'S PAID VACATION.) (EMPLOYEES ON THE
SENIORITY LIST SHALL BE PAID A ONE HUNDRED DOLLAR
($100.00) BONUS FOR EVERY FOUR HUNDRED (400) HOURS
WORKED, UP TO A MAXIMUM OF FIVE HUNDRED DOLLARS
($500.00)) (ALL DRIVERS WORKING ON A DEFINED HAZARD
MATERIAL JOB SITE SHALL BE PAID A PREMIUM OF $2.00
PER HOUR OVER APPLICABLE RATE.)
.................................................$ 32.81 34.51
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP
8: SPECIAL EARTH-MOVING EQUIPMENT, UNDER 35
TONS.(ADDITIONAL FRINGE TO BE PAID: PAID HOLIDAYS:
NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PLUS
PRESIDENTS' DAY, COLUMBUS DAY, VETERAN'S DAY & V-J
DAY, PROVIDING THE EMPLOYEE HAS WORKED AT LEAST ONE
DAY IN THE CALENDAR WEEK IN WHICH THE HOLIDAY
FALLS. EMPLOYEE WHO HAS BEEN ON THE PAYROLL FOR 1
YEAR OR MORE BUT LESS THAN 5 YEARS AND HAS WORKED
150 DAYS DURING THE LAST YEAR OF EMPLOYMENT SHALL
RECEIVE 1 WEEK'S PAID VACATION; 5 TO 10 YEARS - 2
WEEKS' PAID VACATION; 10 OR MORE YEARS - 3 WEEK'S
PAID VACATION.) (EMPLOYEES ON THE SENIORITY LIST
SHALL BE PAID A ONE HUNDRED DOLLAR ($100.00) BONUS
FOR EVERY FOUR HUNDRED (400) HOURS WORKED, UP TO A
MAXIMUM OF FIVE HUNDRED DOLLARS ($500.00)) (ALL
DRIVERS WORKING ON A DEFINED HAZARD MATERIAL JOB
SITE SHALL BE PAID A PREMIUM OF $2.00 PER HOUR OVER
APPLICABLE RATE.) ...................$ 32.31 34.51
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP
9: SPECIAL EARTH-MOVING EQUIPMENT, 35 TONS OR
OVER. (ADDITIONAL FRINGE TO BE PAID: PAID HOLIDAYS:
NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PLUS
PRESIDENTS' DAY, COLUMBUS DAY, VETERAN'S DAY & V-J
DAY, PROVIDING THE EMPLOYEE HAS WORKED AT LEAST ONE
DAY IN THE CALENDAR WEEK IN WHICH THE HOLIDAY
FALLS. EMPLOYEE WHO HAS BEEN ON THE PAYROLL FOR 1
YEAR OR MORE BUT LESS THAN 5 YEARS AND HAS WORKED
150 DAYS DURING THE LAST YEAR OF EMPLOYMENT SHALL
RECEIVE 1 WEEK'S PAID VACATION; 5 TO 10 YEARS - 2
WEEKS' PAID VACATION; 10 OR MORE YEARS - 3 WEEK'S
PAID VACATION.) (EMPLOYEES ON THE SENIORITY LIST
SHALL BE PAID A ONE HUNDRED DOLLAR ($100.00) BONUS
FOR EVERY FOUR HUNDRED (400) HOURS WORKED, UP TO A
MAXIMUM OF FIVE HUNDRED DOLLARS ($500.00)) (ALL
DRIVERS WORKING ON A DEFINED HAZARD MATERIAL JOB
SITE SHALL BE PAID A PREMIUM OF $2.00 PER HOUR OVER
APPLICABLE RATE.) ...................$ 32.56 34.51
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP
10: TRACTOR TRAILER. (ADDITIONAL FRINGE TO BE PAID:
PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND
CHRISTMAS DAY, PLUS PRESIDENTS' DAY, COLUMBUS DAY,
VETERAN'S DAY & V-J DAY, PROVIDING THE EMPLOYEE HAS
WORKED AT LEAST ONE DAY IN THE CALENDAR WEEK IN
WHICH THE HOLIDAY FALLS. EMPLOYEE WHO HAS BEEN ON
THE PAYROLL FOR 1 YEAR OR MORE BUT LESS THAN 5
YEARS AND HAS WORKED 150 DAYS DURING THE LAST YEAR
OF EMPLOYMENT SHALL RECEIVE 1 WEEK'S PAID VACATION;
5 TO 10 YEARS - 2 WEEKS' PAID VACATION; 10 OR MORE
YEARS - 3 WEEK'S PAID VACATION.) (EMPLOYEES ON THE
SENIORITY LIST SHALL BE PAID A ONE HUNDRED DOLLAR
($100.00) BONUS FOR EVERY FOUR HUNDRED (400) HOURS
WORKED, UP TO A MAXIMUM OF FIVE HUNDRED DOLLARS
($500.00)) (ALL DRIVERS WORKING ON A DEFINED HAZARD
MATERIAL JOB SITE SHALL BE PAID A PREMIUM OF $2.00
PER HOUR OVER APPLICABLE RATE.) ...$ 32.36 34.51
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).
The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .