26R0234 General Requirements .pdf
PDF 407 KB Posted
- Solicitation number
- N4008526R0234
About this file
This is a solicitation for design-build (DB) construction services under an Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC). Naval Facilities Engineering Systems Command (NAVFAC), Mid-Atlantic, is requesting proposals for Special Project RM25-4593 to upgrade and modernize Building 47 at Naval Undersea Warfare Center, Naval Station Newport, Newport, Rhode Island.
The project scope encompasses life safety improvements including replacement of existing fire alarm and mass notification systems with a new combined addressable system, conversion of the dry pipe sprinkler system to wet-pipe ESFR sprinklers with a new fire pump room, replacement of fire doors, installation of central emergency inverters for emergency lighting in each bay, installation of ventilation units and air curtains on overhead doors, creation of an opening in the CMU wall in Bay A for access to unoccupied space, renovation of the unoccupied space, removal of two-story office space and restroom in Bay A, combination of break room and office space in Bay C into a two-story facility, and site/civil work including new utility pole, underground PVC piping, fire water service, and sanitary sewer. Base bid includes all hazardous materials abatement and disposal. The estimated price range is $10,000,000 to $25,000,000. The base bid work duration is 365 calendar days, with an optional 365-day extension for option work totaling 730 calendar days. Liquidated damages are $2,018 per calendar day for base work and $2,781 per day for option work. The site visit is scheduled for August 13, 2026, at 1000 hours. The proposal due date is September 1, 2026, at 02:00 PM EST. Proposals must be submitted electronically in PDF format through the Procurement Integrated Enterprise Environment (PIEE) system only. Award will be made to the responsible offeror submitting the lowest-priced proposal based on a lowest-price source selection process. The contract will be awarded to one of seven eligible MACC holders: Benaka Inc., CCI Utility and Construction Services LLC, Kunj Construction Corporation, Ocean Construction Services, PEM-Harkins Joint Venture, Tantara Corporation, or J&J Contractors Inc. A bid guarantee of at least 20 percent of the offer price or $3,000,000 (whichever is less) is required with the proposal. Performance and Payment Bonds are due ten calendar days after award. The applicable Davis-Bacon wage determination is RI20260001 dated 05/18/2026. Department of Labor prevailing wage rates apply to all workers on the project.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Design-Build (DB), Special Project RM25-4593 – Building 47 Upgrades/Modernization Solicitation No.: N4008526R0234 of Storage Space; NUWC, Naval Station Newport, Newport, RI Work Order No.: 1814702
NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND, MID-ATLANTIC
9324 VIRGINIA AVE, BLDG Z-140
NAVAL STATION NORFOLK, NORFOLK, VA 23511
POC: Chamel Adams, chamel.r.adams.civ@us.navy.mil (757) 341-1667
INDEFINITE DELIVERY/INDEFINITE QUANTITY (IDIQ) MULTIPLE AWARD CONSTRUCTION
CONTRACT (MACC) FOR FACILITIES IN THE NORTH AREA OF RESPONSIBILITY (AOR) TO
INCLUDE CONNECTICUT, DELAWARE, MAINE, MASSACHUSETTS, NEW HAMPSHIRE, NEW
JERSEY, NEW YORK, PENNSYLVANIA, RHODE ISLAND, AND VERMONT
MACC GROUP: MACC ML-C00068
SOLICITATION NUMBER: N4008526R0234
Design-Build (DB), Special Project RM25-4593 – Building 47 Upgrades/Modernization of Storage
Space, Naval Undersea Warfare Center, Naval Station Newport, Newport, RI
DATE OF SOLICITATION: 29 July 2026
NORTH AOR MACC CONTRACT HOLDERS:
N4008521D0052
Benaka Inc.
7 Lawrence Street
New Brunswick, New Jersey 08901
POC: C.N. Manjunath
Phone: (732) 246-7060
Email: benaka@benakainc.com
N4008521D0053
CCI Utility and Construction Services, LLC
111 W. 16th Avenue, Suite 402
Anchorage, AK 99501
POC: Jim Henebury
Jeffrey Eaton
Tim Nichols
Phone: (207) 485-6701
Email: jhenebury@bbch-llc.com jeaton@bbch-llc.com
Const-estimating@bbch-llc.com
Const-proposals@bbch-llc.com
N4008521D0054
Kunj Construction Corporation
163 B Paris Avenue
Northvale, NJ 07647
POC: Neekunj Bhanderi
Yatin Gajera
Raghav Krish
Phone: (201) 694-7617
Email: neekunjb@gmail.com
Yatin@kunjcc.com
Krish@kunjcc.com
N4008521D0055
Ocean Construction Services
104 Aragona Boulevard, Suite 101
Virginia Beach, VA 23462
POC: Kara Laskowski
Phone: (757) 200-9590
Email: bids@ocsinc.us mailto:benaka@benakainc.com mailto:jhenebury@bbch-llc.com mailto:jeaton@bbch-llc.com mailto:Const-estimating@bbch-llc.com mailto:Const-proposals@bbch-llc.com mailto:neekunjb@gmail.com mailto:Yatin@kunjcc.com mailto:Krish@kunjcc.com mailto:bids@ocsinc.us
Design-Build (DB), Special Project RM25-4593 – Building 47 Upgrades/Modernization Solicitation No.: N4008526R0234
N40085-21-D-0056
PEM-Harkins Joint Venture
6161 Busch Boulevard, Suite 255
Columbus, OH 43229
POC: Radagodage Sumanaweera
Phone: (614) 573-7299
Email: tsumanaweera@peminc.biz
N40085-21-D-0057
Tantara Corporation
54 Mason Street
Worcester, MA 01610
POC: Dawn Dearborn
Phone: (508) 752-5599
Email: DDearborn@tantaracorp.com
N40085-21-D-0066
J&J Contractors, Inc.
101 Billerica Avenue, Building 5, Suite 205
North Billerica, MA 01862
POC: Kamlesh Patel
Phone: (978) 259-2454
Email: kamp@jjcontractor.com
GENERAL REQUIREMENTS
All terms and conditions of N40085-21-D-0052/0053/0054/0055/0056/0057/0066 IDIQ Contract apply to this solicitation. Please review your MACC award document for guidance on contract clauses and requirements that may pertain to this order. You are responsible for adhering to all applicable clauses, even if they are not restated in this RFP package or the Task Order award document. For clarification on any clause or other contractual issue please contact Chamel Adams at chamel.r.adams.civ@us.navy.mil
Amendments will be posted directly to PIEE, Sam.gov and sent directly via email to MACC Holders. It is ultimately the responsibility of the MACC Holders to monitor SAM.gov for any updates.
NAVFAC Solicitation No.: N4008526R0234
NAVFAC Specification/Drawing: Work Order No. 1814702
Title: Design-Build, Special Project RM25-4593 – Building 47 Upgrades/Modernization of Storage Space
Location of the work: Naval Undersea Warfare Center, Naval Station Newport, Newport, RI
Description of the work: The purpose of this project is to improve the life safety of the warehouse while strategically providing access to additional spaces and consolidating spaces to get more footprint. The project will replace the existing fire alarm and mass notification systems with a new combined addressable fire alarm and mass notification system. The existing systems will remain in place and active until the new system has finished final acceptance testing. The existing dry pipe sprinkler system will be replaced with a wet-pipe sprinkler systems utilizing ESFR (Early Suppression Fast Response) sprinklers. A fire pump room will be installed to serve the building sprinkler systems. The fire doors separating bays B and bay C will be replaced. New central emergency inverters will be installed in each bay to provide one or several branch circuits with emergency power. This will address the emergency lighting in the warehouse. Ventilation units will be installed in each bay of the warehouse to bring in more outside air. Air currents will be installed on the overhead doors that are primarily used to better maintain the interior warehouse temperature. An opening will be installed in the CMU wall in Bay A to give access to the currently unoccupied space. The mailto:tsumanaweera@peminc.biz mailto:DDearborn@tantaracorp.com mailto:kamp@jjcontractor.com mailto:chamel.r.adams.civ@us.navy.mil
Design-Build (DB), Special Project RM25-4593 – Building 47 Upgrades/Modernization Solicitation No.: N4008526R0234 unoccupied space will be renovated to meet the needs of the warehouse operations and will provide additional office and laydown space. The existing two-story office space and the restroom in Bay A will be removed to allow for more laydown space for the warehouse operations. The break room and office space in Bay C will be combined into a two-story facility. Site/civil work includes new utility pole with utility risers for proposed electrical service and underground PVC piping, fire water service and sanitary sewer to service new fire pumproom. Base Bid includes all Hazardous Materials abatement and disposal.
Estimated Price Range: The estimated price range for this project is between $10,000,000 and
$25,000,000.
Time for completion: The duration of this task order for the base bid work is 365 calendar days. The duration will be extended an additional 365 calendar days if option work is to be included in the original award, or modified to be included in the contract. If options are awarded, the overall contract completion date will be 730 calendar days from date of contract award. (includes 15 calendar days for submission and approval of bonds and insurance).
Wage Rate Requirements: Department of Labor (DoL) General Decision Number: RI20260001 dated
05/18/2026 (Attachment B) applies to this work. Should this wage determination be modified by DoL prior to award, the most current wage determination will be incorporated in the award.
Liquidated damages: In accordance with FAR 52.211-12 Liquidated Damages (DEVIATION 2026-
O0038), if the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $2,018 for each calendar day of delay for base work and $2,781 for each day of delay for option work, until the work is completed or accepted in accordance with the time for completion for base and option work stated above.
Utilities: .In accordance with FAR 52.236-14 (DEVIATION 2026-O0038) Availability and Use of Utility
Services - The Government shall make all reasonably required amounts of utilities available to the
Contractor from existing outlets and supplies, as specified in the contract. Unless otherwise provided in the contract, the amount of each utility service consumed shall be charged to or paid for by the Contractor at prevailing rates charged to the Government or, where the utility is produced by the Government, at reasonable rates determined by the Contracting Officer. The Contractor shall carefully conserve any utilities furnished without charge.
Record Shop Drawings: In accordance with FAR 52.236-21(DEVIATION 2026-O0038) Specifications and Drawings for Construction Alternate I (Apr 1984) record shop drawings are required. Reproducible copies of these record drawings are required to be provided to the Government as deliverables under the task order.
Government Furnished Property: There is no Government Furnished Property.
Bond Requirements: In accordance with FAR 52.228-1 (DEVIATION 2026-O0038), Bid Guarantees, each offeror shall submit with its offer a guarantee bond (Standard Form 24) in a penal sum equal to at least
20 percent of the offer price or $3,000,000, whichever is less.
Performance and Payment Bonds are required from the contract task order awardee ten (10) calendar days after date of award.
Proposal Acceptance Period: Proposal acceptance period shall be 120 days from receipt of offers.
Design-Build (DB), Special Project RM25-4593 – Building 47 Upgrades/Modernization Solicitation No.: N4008526R0234
Definitization Of Equitable Adjustments For Change Orders Under Construction Contracts
No data is available regarding the timely definitization of equitable adjustments for change orders under construction contracts. The REA definitization information referenced in Navy Marine Corps Acquisition
Regulation Supplement (NMCARS) 5236.211(b)(2), should not be utilized. There are no agency-specific policies and procedures that apply to the definitization of equitable adjustments for change orders under construction contracts. This Contract contains rated order quantities certified for national defense use, and you are required to follow all the provisions of the DPAS regulation (DPAS Regulation - 15 CFR Part
700.12) only as it pertains to the rated quantities.
Pre-Proposal Inquiries (PPIs): Offerors who determine that the technical and or contractual requirements of this RFP require clarification(s) in order to permit submittal of a responsive proposal shall submit all questions in writing. All inquiries shall be submitted via email to Chamel Adams at chamel.r.adams.civ@us.navy.mil. no later than, fourteen (14) calendar days prior to proposal due date.
Additionally, all inquiries shall be submitted using the Pre-Proposal Inquiry (PPI) form (Attachment C).
Do not submit the same inquiry more than once. Please verify that inquiries submitted by you on behalf of your subcontractors are not duplicates. A response will be published via an amendment by email to MACC holders.
Site Visit: All MACC holders are invited to attend the Site Visit for this project. Firms participating in the site visit will not be directly compensated for their participation.
The Contractor site visit is scheduled for August 13, 2026 at 1000.
All Contractors and their subcontractors shall follow NSN Base Access procedures noted below and once persons are fully vetted prior, on day of site walk through obtain contractor one-day pass at Naval Station
Newport (NSN) Pass and ID Office B1377. The Pass and ID Office is located on Cloyne Court off
Training Station Road just before the bridge outside of Gate 1, Naval Station Newport.
Visitors and contractors will need to present MINIMUM TWO (2) FORMS OF ID to obtain one-day pass at the Pass and ID Office prior to driving to Gate 1.
Visitors and contractors will proceed to NAVAL STATION NEWPORT (NOT NUWC) B47
WAREHOUSE located at WEST INDUSTRIAL ROAD, LOADING DOCK SIDE, BAY B.
Visitors and contractors will meet with project Point of Contacts NSN NAVFAC Contracting Officer
Representative, NSN NAVFAC Design Manager Bethany Collard, and other NUWC Tenant
Representatives.
Refer to attached map.
ALL persons requesting NSN base access MUST follow ALL procedures:
1) For those persons currently not vetted at Naval Station Newport Security Office, must request base access by submitting form 5512 MINIMUM 7 BUSINESS DAYS PRIOR TO
REQUESTED BASE ACCESS. Send to base sponsor Bethany Collard, Bethany.a.collard.civ@us.navy.mil 401-841-7611. See documents “SECNAV Form 5512-
NSNPT- JUL-2024-HIGHLIGHTED”. Please note all blocks MUST be properly completed, INCLUDING SOCIAL SECURITY NUMBER, and hand initialed/signed where requested.
FORM SF 5512 MUST BE EMAILED AS PASSWORD PROTECTED EMAIL, WITH
PASSWORD IN A SEPARATE EMAIL.
mailto:Bethany.a.collard.civ@us.navy.mil
Design-Build (DB), Special Project RM25-4593 – Building 47 Upgrades/Modernization Solicitation No.: N4008526R0234
ALL REQUESTED BASE ACCESS FORMS SF5512 MUST BE COMPLETED AND SUBMITTED
TO BETHANY COLLARD BY NOON August 4, 2026.
2) All contractors must submit a separate email with a complete list of names/companies of those persons, including their subcontractors, planning to attend the site visit, to base sponsor Bethany
Collard Bethany.a.collard.civ@us.navy.mil by Noon August 4, 2026
3) Contractor to wear appropriate business casual dress
Site Visit POCs:
a. Ms. Bethany Collard:(401)-841-7611 / bethany.a.collard.civ@us.navy.mil
Proposal Due Date: 01 September 2026 at 02:00PM EST. LATE RESPONSES WILL BE HANDLED
IN ACCORDANCE WITH FAR 15.107(b) (DEVIATION 2026-O0048)
Proposal Submission Instructions: The Offeror shall submit an electronic copy of the proposal in accordance with the instructions below by the proposal due date.
Electronic Copies: OFFERORS SHALL SUBMIT ELECTRONIC PROPOSAL (.PDF FORMAT)
IN RESPONSE TO THIS SOLICITATION. Only the PIEE Solicitation Module is authorized for the submission of electronic proposals in response to this solicitation. Electronic proposal submissions should be no larger than 1.9 GB per file. Offerors shall ensure that the Government has received the electronic proposal prior to the date and time specified. PIEE Solicitation Vendor Access Instructions are provided via Attachment E. Emailed, mailed, and hand-delivered submissions will not be accepted.
Offerors shall allow adequate time to upload files which may be slower for non-DoD users and to avoid other technical difficulties that may be encountered. Offerors are also responsible for submitting files in the format specified and consistent with requirements stated elsewhere in this solicitation. Files that cannot be opened or are otherwise missing the required content are the responsibility of the Offeror.
The PIEE system will record the date and time of package submittal. Upon successful receipt of the proposal through PIEE, the Offeror should receive an email confirmation. Please keep this for your records. The date and time of package receipt recorded in PIEE shall govern the timeliness of any proposal submission.
Evaluation Factors for Award:
1. The proposed task order will be awarded to the responsible Offeror offering the best value to the
Government. The lowest price source selection process is selected as appropriate for this acquisition because the best value is expected to result from selection of the proposal with the lowest evaluated price. To make a determination of best value, the Government shall evaluate each Offeror on price only.
2. Basis of Evaluation and Submittal Requirements.
Price:
Solicitation Submittal Requirements:
Price shall be submitted on the Price Proposal Form included in the solicitation. The offeror shall submit one (1) electronic copy via The Procurement Integrated Enterprise Environment (PIEE), with the solicitation submittal requirements identified below:
mailto:Bethany.a.collard.civ@us.navy.mil mailto:bethany.a.collard.civ@us.navy.mil
Design-Build (DB), Special Project RM25-4593 – Building 47 Upgrades/Modernization Solicitation No.: N4008526R0234
a. Cover page with solicitation number, solicitation title, offeror name, address, phone number, Employer Identification Number (EIN), Unique Entity Identifier (UEI) in SAM, CAGE code, Federal Tax ID number, Point of Contact (POC), POC phone number, and POC email address;
b. All amendments acknowledged;
c. Attachment D: B47- Price Proposal Form;
d. Copy of Representation and Certifications and proof of registration in System for Award
Management (SAM); Please also submit the representation and certification for 52.209-13 -
Violation of Arms Control Treaties or Agreements- Certification separately. It is not included in the annual representations and certifications in the System for Award Management.
e. Confirmation of filing of Veterans’ Employment and Training (VETS) VETS-4212 for the
2024/2025 filing cycle; and
f. Bid Guarantee in accordance with FAR 52.228-1(DEVIATION 2026-O0038), Bid Guarantee.
Amount shall be at least twenty percent (20%) of the proposed price, but shall not exceed $3 million.
g. This solicitation includes CMMC Level 1 (Self- Assessment) Requirements in accordance with
DFARS 252.204-7025 AND 252.204-7021.
The Offeror is required to submit a complete Price Proposal Form that includes completion of all line-item numbers. All required proposal documents shall be submitted in accordance with FAR 15.107
(DEVIATION 2026-O0048).
i. Basis of Evaluation:
The Government will evaluate price based on the total lump sum price. Analysis will be performed by one or more of the following tecniques to ensure a fair and reasonable price:
a. Comparison of proposed prices received in response to the RFP.
b. Comparison of the proposed prices with the Independent Government Cost Estimate (IGCE).
c. Comparison of proposed prices with available historical information.
d. Comparison of market survey results.
Evaluation:
The Government reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contract; to negotiate with offerors in the competitive range; and to award the contract to the Offeror submitting the lowest price proposal.
The Government intends to evaluate proposals and award a contract without discussions with offerors
(except clarifications as described in FAR 15.202(a)(2)) (DEVIATION 2026-O0048). The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary.
In addition, if the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the
Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
Design-Build (DB), Special Project RM25-4593 – Building 47 Upgrades/Modernization Solicitation No.: N4008526R0234
ATTACHMENTS:
ATTACHMENT A: Building 47 Specifications
ATTACHMENT B:Building 47 Drawings
ATTACHMENT C: Wage Determination
ATTACHMENT D: Pre-Proposal Inquiry (PPI) form
ATTACHMENT E: B47- Price Proposal Form
ATTACHMENT F: PIEE Vendor Access Instructions
ATTACHMENT G: SECNAV Form 5512
ATTACHMENT H – Site Visit Map
ATTACHMENT I - J&A No. ML-26-04 – Redacted
Design-Build (DB), Special Project RM25-4593 – Building 47 Upgrades/Modernization Solicitation No.: N4008526R0234
Attachment A
Specifications
See separately attached PDF File labeled as follows:
ATTACHMENT A: Building 47 Specifications
Design-Build (DB), Special Project RM25-4593 – Building 47 Upgrades/Modernization Solicitation No.: N4008526R0234
Attachment B
Drawings
See separately attached PDF File labeled as follows:
ATTACHMENT B: Building 47 Drawings
Design-Build (DB), Special Project RM25-4593 – Building 47 Upgrades/Modernization Solicitation No.: N4008526R0234
Attachment C
Wage Determination
"General Decision Number: RI20260001 05/18/2026
State: Rhode Island
Construction Types: Building, Heavy and Highway
Counties: Rhode Island Counties of
Bristol, Kent, Newport, Providence and
Washington
Includes Marine Construction Projects
Modification Number Publication Date
2 01/30/2026
3 05/18/2026
ASBE0006-006 09/01/2024
Rates Fringes
HAZARDOUS MATERIAL HANDLER (INCLUDES PREPARATION,
WETTING, STRIPPING, REMOVAL SCRAPPING, VACUUMING,
BAGGING & DISPOSING OF ALL INSULATION MATERIALS,
WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM
MECHANICAL SYSTEMS).................................$ 49.91 36.63
ASBE0006-008 09/01/2024
ASBESTOS WORKER/INSULATOR (INCLUDES APPLICATION OF
ALL INSULATING MATERIALS, PROTECTIVE COVERINGS,
COATINGS & FINISHES TO ALL TYPES OF MECHANICAL
SYSTEMS)............................................$ 49.91 36.63
BOIL0029-001 01/01/2025
BOILERMAKER.........................................$ 50.62 28.82
BRRI0003-001 06/01/2022
BRICKLAYER, STONEMASON, POINTER, CAULKER & CLEANER..$ 46.86 29.14
BRRI0003-002 09/01/2022
MARBLE SETTER, TERRAZZO WORKER & TILE SETTER........$ 46.54 30.34
BRRI0003-003 09/01/2022
MARBLE, TILE & TERRAZZO FINISHER....................$ 38.78 29.61
CARP0330-001 01/01/2023
PILEDRIVER FOOTNOTES: WHEN NOT DIVING OR
Design-Build (DB), Special Project RM25-4593 – Building 47 Upgrades/Modernization Solicitation No.: N4008526R0234
TENDING THE DIVER, THE DIVER AND DIVER TENDER SHALL
RECEIVE THE PILEDRIVER RATE. DIVER TENDERS SHALL
RECEIVE $1.00 PER HOUR ABOVE THE PILE DRIVER RATE
WHEN TENDING THE DIVER. WORK ON FREE-STANDING
STACKS, CONCRETE SILOS & PUBLIC UTILITY ELECTRICAL
POWER HOUSES, WHICH ARE OVER 35 FT. IN HEIGHT WHEN
CONSTRUCTED: $.50 PER HOUR ADDITIONAL. WORK ON
EXTERIOR CONCRETE SHEAR WALL GANG FORMS, 45 FT. OR
MORE ABOVE GROUND ELEVATION OR ON SETBACK: $.50 PER
HOUR ADDITIONAL. THE DESIGNATED PILEDRIVER,
KNOWN AS THE ""MONKEY"": $1.00 PER HOUR ADDITIONAL....$ 41.53 29.35
WELDER FOOTNOTES: WHEN NOT DIVING OR TENDING
THE DIVER, THE DIVER AND DIVER TENDER SHALL RECEIVE
THE PILEDRIVER RATE. DIVER TENDERS SHALL RECEIVE
$1.00 PER HOUR ABOVE THE PILE DRIVER RATE WHEN
TENDING THE DIVER. WORK ON FREE-STANDING STACKS,
CONCRETE SILOS & PUBLIC UTILITY ELECTRICAL POWER
HOUSES, WHICH ARE OVER 35 FT. IN HEIGHT WHEN
CONSTRUCTED: $.50 PER HOUR ADDITIONAL. WORK ON
EXTERIOR CONCRETE SHEAR WALL GANG FORMS, 45 FT. OR
MORE ABOVE GROUND ELEVATION OR ON SETBACK: $.50 PER
HOUR ADDITIONAL. THE DESIGNATED PILEDRIVER,
KNOWN AS THE ""MONKEY"": $1.00 PER HOUR ADDITIONAL....$ 48.68 30.50
DIVER TENDER FOOTNOTES: WHEN NOT DIVING OR
TENDING THE DIVER, THE DIVER AND DIVER TENDER SHALL
RECEIVE THE PILEDRIVER RATE. DIVER TENDERS SHALL
RECEIVE $1.00 PER HOUR ABOVE THE PILE DRIVER RATE
WHEN TENDING THE DIVER. WORK ON FREE-STANDING
STACKS, CONCRETE SILOS & PUBLIC UTILITY ELECTRICAL
POWER HOUSES, WHICH ARE OVER 35 FT. IN HEIGHT WHEN
CONSTRUCTED: $.50 PER HOUR ADDITIONAL. WORK ON
EXTERIOR CONCRETE SHEAR WALL GANG FORMS, 45 FT. OR
MORE ABOVE GROUND ELEVATION OR ON SETBACK: $.50 PER
HOUR ADDITIONAL. THE DESIGNATED PILEDRIVER,
KNOWN AS THE ""MONKEY"": $1.00 PER HOUR ADDITIONAL....$ 48.68 30.50
DIVER FOOTNOTES: WHEN NOT DIVING OR TENDING
THE DIVER, THE DIVER AND DIVER TENDER SHALL RECEIVE
THE PILEDRIVER RATE. DIVER TENDERS SHALL RECEIVE
$1.00 PER HOUR ABOVE THE PILE DRIVER RATE WHEN
TENDING THE DIVER. WORK ON FREE-STANDING STACKS,
CONCRETE SILOS & PUBLIC UTILITY ELECTRICAL POWER
HOUSES, WHICH ARE OVER 35 FT. IN HEIGHT WHEN
CONSTRUCTED: $.50 PER HOUR ADDITIONAL. WORK ON
EXTERIOR CONCRETE SHEAR WALL GANG FORMS, 45 FT. OR
MORE ABOVE GROUND ELEVATION OR ON SETBACK: $.50 PER
HOUR ADDITIONAL. THE DESIGNATED PILEDRIVER,
KNOWN AS THE ""MONKEY"": $1.00 PER HOUR ADDITIONAL....$ 60.83 30.50
CARPENTER: INCLUDES SOFT FLOOR LAYER................$ 47.88 30.50
CARP0330-001 06/02/2025
PILEDRIVER FOOTNOTES: WHEN NOT DIVING OR
TENDING THE DIVER, THE DIVER AND DIVER TENDER SHALL
RECEIVE THE PILEDRIVER RATE. DIVER TENDERS SHALL
RECEIVE $1.00 PER HOUR ABOVE THE PILE DRIVER RATE
WHEN TENDING THE DIVER. WORK ON FREE-STANDING
STACKS, CONCRETE SILOS & PUBLIC UTILITY ELECTRICAL
POWER HOUSES, WHICH ARE OVER 35 FT. IN HEIGHT WHEN
CONSTRUCTED: $.50 PER HOUR ADDITIONAL. WORK ON
EXTERIOR CONCRETE SHEAR WALL GANG FORMS, 45 FT. OR
MORE ABOVE GROUND ELEVATION OR ON SETBACK: $.50 PER
HOUR ADDITIONAL. THE DESIGNATED PILEDRIVER,
Design-Build (DB), Special Project RM25-4593 – Building 47 Upgrades/Modernization Solicitation No.: N4008526R0234
KNOWN AS THE ""MONKEY"": $1.00 PER HOUR ADDITIONAL....$ 41.53 29.35
WELDER FOOTNOTES: WHEN NOT DIVING OR TENDING
THE DIVER, THE DIVER AND DIVER TENDER SHALL RECEIVE
THE PILEDRIVER RATE. DIVER TENDERS SHALL RECEIVE
$1.00 PER HOUR ABOVE THE PILE DRIVER RATE WHEN
TENDING THE DIVER. WORK ON FREE-STANDING STACKS,
CONCRETE SILOS & PUBLIC UTILITY ELECTRICAL POWER
HOUSES, WHICH ARE OVER 35 FT. IN HEIGHT WHEN
CONSTRUCTED: $.50 PER HOUR ADDITIONAL. WORK ON
EXTERIOR CONCRETE SHEAR WALL GANG FORMS, 45 FT. OR
MORE ABOVE GROUND ELEVATION OR ON SETBACK: $.50 PER
HOUR ADDITIONAL. THE DESIGNATED PILEDRIVER,
KNOWN AS THE ""MONKEY"": $1.00 PER HOUR ADDITIONAL....$ 48.68 30.50
DIVER TENDER FOOTNOTES: WHEN NOT DIVING OR
TENDING THE DIVER, THE DIVER AND DIVER TENDER SHALL
RECEIVE THE PILEDRIVER RATE. DIVER TENDERS SHALL
RECEIVE $1.00 PER HOUR ABOVE THE PILE DRIVER RATE
WHEN TENDING THE DIVER. WORK ON FREE-STANDING
STACKS, CONCRETE SILOS & PUBLIC UTILITY ELECTRICAL
POWER HOUSES, WHICH ARE OVER 35 FT. IN HEIGHT WHEN
CONSTRUCTED: $.50 PER HOUR ADDITIONAL. WORK ON
EXTERIOR CONCRETE SHEAR WALL GANG FORMS, 45 FT. OR
MORE ABOVE GROUND ELEVATION OR ON SETBACK: $.50 PER
HOUR ADDITIONAL. THE DESIGNATED PILEDRIVER,
KNOWN AS THE ""MONKEY"": $1.00 PER HOUR ADDITIONAL....$ 48.68 30.50
DIVER FOOTNOTES: WHEN NOT DIVING OR TENDING
THE DIVER, THE DIVER AND DIVER TENDER SHALL RECEIVE
THE PILEDRIVER RATE. DIVER TENDERS SHALL RECEIVE
$1.00 PER HOUR ABOVE THE PILE DRIVER RATE WHEN
TENDING THE DIVER. WORK ON FREE-STANDING STACKS,
CONCRETE SILOS & PUBLIC UTILITY ELECTRICAL POWER
HOUSES, WHICH ARE OVER 35 FT. IN HEIGHT WHEN
CONSTRUCTED: $.50 PER HOUR ADDITIONAL. WORK ON
EXTERIOR CONCRETE SHEAR WALL GANG FORMS, 45 FT. OR
MORE ABOVE GROUND ELEVATION OR ON SETBACK: $.50 PER
HOUR ADDITIONAL. THE DESIGNATED PILEDRIVER,
KNOWN AS THE ""MONKEY"": $1.00 PER HOUR ADDITIONAL....$ 60.83 30.50
CARPENTER: INCLUDES SOFT FLOOR LAYER................$ 47.88 30.50
CARP1121-002 04/21/2025
MILLWRIGHT..........................................$ 45.72 31.50
ELEC0099-002 06/01/2025
TELEDATA SYSTEM INSTALLER FOOTNOTES: WORK OF
A HAZARDOUS NATURE, OR WHERE THE WORK HEIGHT IS 30
FT. OR MORE FROM THE FLOOR, EXCEPT WHEN WORKING
OSHA-APPROVED LIFTS: 20% PER HOUR ADDITIONAL.
WORK IN TUNNELS BELOW GROUND LEVEL IN COMBINED
SEWER OUTFALL: 20% PER HOUR ADDITIONAL..............$ 42.09 19.71
ELECTRICIAN FOOTNOTES: WORK OF A HAZARDOUS
NATURE, OR WHERE THE WORK HEIGHT IS 30 FT. OR MORE
FROM THE FLOOR, EXCEPT WHEN WORKING OSHA-APPROVED
LIFTS: 20% PER HOUR ADDITIONAL. WORK IN TUNNELS
BELOW GROUND LEVEL IN COMBINED SEWER OUTFALL: 20%
PER HOUR ADDITIONAL.................................$ 56.11 24.74
ELEV0039-001 01/01/2025
Design-Build (DB), Special Project RM25-4593 – Building 47 Upgrades/Modernization Solicitation No.: N4008526R0234
ELEVATOR MECHANIC FOOTNOTES: A. PAID HOLIDAYS:
NEW YEARS DAY; MEMORIAL DAY; INDEPENDENCE DAY;
LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE
FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY.
B. EMPLOYER CONTRIBUTES 8% BASIC HOURLY RATE FOR
5 YEARS OR MORE OF SERVICE OF 6% BASIC HOURLY RATE
FOR 6 MONTHS TO 5 YEARS OF SERVICE AS VACATION PAY
CREDIT..............................................$ 64.52 38.44
ENGI0057-001 12/01/2025
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,
SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION
WORK: GROUP 9 BOAT & TUG OPERATOR.
A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET
AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210
FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00
270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $
8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER
+ $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE
WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY
FALLS SHALL BE PAID FOR THE HOLIDAY. A. FOOTNOTES:
HAZMAT WORK: $2.00 PER HOUR ADDITIONAL.
TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL........$ 48.92 29.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,
SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION
WORK: GROUP 8 HEATER, CONCRETE MIXER, STONE
CRUSHER, WELDING MACHINE, GENERATOR AND LIGHT
PLANT, GAS AND ELECTRIC DRIVEN PUMP AND AIR
COMPRESSOR.
A. BOOM
LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $
2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER
+ $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND
OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET
AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A.
PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,
MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY,
COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY,
CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN
THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR
THE HOLIDAY. A. FOOTNOTES: HAZMAT WORK: $2.00 PER
HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR
ADDITIONAL..........................................$ 45.00 29.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,
WORK: GROUP 7 UTILITY ENGINEERS AND SIGNAL PERSONS
Design-Build (DB), Special Project RM25-4593 – Building 47 Upgrades/Modernization Solicitation No.: N4008526R0234
A.
BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER +
$ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND
OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET
AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350
FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00
A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,
MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY,
COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY,
CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN
THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR
THE HOLIDAY. A. FOOTNOTES: HAZMAT WORK: $2.00 PER
HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR
ADDITIONAL..........................................$ 33.15 29.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,
WORK: GROUP 6 WELL-POINT INSTALLATION CREW.
A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND
OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET
AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270
FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00
350 FEET AND OVER + $ 9.00 400 FEET AND OVER +
$10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE
WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY
FALLS SHALL BE PAID FOR THE HOLIDAY. A. FOOTNOTES:
HAZMAT WORK: $2.00 PER HOUR ADDITIONAL.
TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL........$ 39.15 29.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,
SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION
WORK: GROUP 5 BULLDOZER, BOBCATS, SKID STEER
LOADER, TRACTOR, SCRAPER, COMBINATION LOADER
BACKHOE, ROLLER, FRONT END LOADER (LESS THAN 3
YDS.), STREET AND MOBILE-POWERED SWEEPER (3-YD.
CAPACITY), 8-FT. SWEEPER MINIMUM 65 HP).
A. BOOM LENGTHS, INCLUDING JIBS: 150
FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00
210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $
5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER
+ $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND
OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE
WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY
FALLS SHALL BE PAID FOR THE HOLIDAY. A. FOOTNOTES:
HAZMAT WORK: $2.00 PER HOUR ADDITIONAL.
TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL........$ 48.35 29.95
Design-Build (DB), Special Project RM25-4593 – Building 47 Upgrades/Modernization Solicitation No.: N4008526R0234
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,
WORK: GROUP 4 OILER ON CRAWLER BACKHOE.
A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER
+ $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND
OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET
AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350
FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00
A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,
MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY,
COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY,
CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN
THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR
THE HOLIDAY. A. FOOTNOTES: HAZMAT WORK: $2.00 PER
HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR
ADDITIONAL..........................................$ 42.07 29.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,
WORK: GROUP 3 OILERS ON CRANES.
A. BOOM LENGTHS, INCLUDING JIBS: 150
FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00
210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $
5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER
+ $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND
OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE
WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY
FALLS SHALL BE PAID FOR THE HOLIDAY. A. FOOTNOTES:
HAZMAT WORK: $2.00 PER HOUR ADDITIONAL.
Design-Build (DB), Special Project RM25-4593 – Building 47 Upgrades/Modernization Solicitation No.: N4008526R0234
TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL........$ 44.92 29.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,
SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION
WORK: GROUP 2 DIGGING MACHINE, ROSS CARRIER,
LOCOMOTIVE, HOIST, ELEVATOR, BIDWELL-TYPE MACHINE,
SHOT & WATER BLASTING MACHINE, PAVER, SPREADER,
GRADERS, FRONT END LOADER (3 YDS. AND OVER),
VIBRATORY HAMMER & VACUUM TRUCK, ROADHEADERS,
FORKLIFTS, ECONOMOBILE TYPE EQUIPMENT, TUNNEL
BORING MACHINES, CONCRETE PUMP AND ON SITE CONCRETE
PLANTS.
A. BOOM LENGTHS, INCLUDING
JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND
OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET
AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300
FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00
400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW
YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY
FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY,
VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A:
ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH
A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A.
FOOTNOTES: HAZMAT WORK: $2.00 PER HOUR ADDITIONAL.
TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.......$ 49.30 29.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,
SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION
WORK: GROUP 1 CRANES, LIGHTERS, BOOM TRUCKS AND
DERRICKS
A. BOOM LENGTHS,
INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180
FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00
240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $
7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER
+ $ 9.00 400 FEET AND OVER + $10.00 A. PAID
HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,
MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY,
Design-Build (DB), Special Project RM25-4593 – Building 47 Upgrades/Modernization Solicitation No.: N4008526R0234
COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY,
CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN
THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR
THE HOLIDAY. A. FOOTNOTES: HAZMAT WORK: $2.00 PER
HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR
ADDITIONAL..........................................$ 51.30 29.95
ENGI0057-003 12/01/2025
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION:
GROUP 8 HEATER, CONCRETE MIXER, STONE CRUSHER,
WELDING MACHINE, GENERATOR FOR LIGHT PLANT, GAS AND
ELECTRIC DRIVEN PUMP & AIR COMPRESSOR
A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER:
+ $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT. AND
OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT.
AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350
FT. AND OVER: + $ 9.00 400 FT. AND OVER: +
$10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE
WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY
FALLS SHALL BE PAID FOR THE HOLIDAY.
A. FOOTNOTE: HAZMAT WORK: $2.00 PER HOUR
ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER
HOUR ADDITIONAL.....................................$ 44.54 29.95
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION:
GROUP 7 WELL POINT INSTALLATION CREW
A. BOOM LENTHS,
INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00 180
FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $ 4.00
240 FT. AND OVER: + $ 5.00 270 FT. AND OVER: + $
7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND OVER:
+ $ 9.00 400 FT. AND OVER: + $10.00 A.
PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,
MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY,
COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY &
CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN
THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR
THE HOLIDAY. A. FOOTNOTE: HAZMAT
WORK: $2.00 PER HOUR ADDITIONAL.
TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL........$ 47.22 29.95
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION:
GROUP 6 BULLDOZER,SKID STEER LOADERS,BOBCATS,
TRACTOR, GRADER, SCRAPER,COMBINATION LOADER
BACKHOE, ROLLER, FRONT END LOADER (LESS THAN 3
YDS.), STREET AND MOBILE POWERED SWEEPER (3 YDS.
CAPACITY), 8-FT. SWEEPER (MINIMUM 65 HP)
Design-Build (DB), Special Project RM25-4593 – Building 47 Upgrades/Modernization Solicitation No.: N4008526R0234
OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT.
AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350
FT. AND OVER: + $ 9.00 400 FT. AND OVER: +
$10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE
WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY
FALLS SHALL BE PAID FOR THE HOLIDAY.
A. FOOTNOTE: HAZMAT WORK: $2.00 PER HOUR
ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER
HOUR ADDITIONAL.....................................$ 47.65 29.95
GROUP 5 OILER ON CRAWLER BACKHOE
A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND
OVER: + $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT.
AND OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270
FT. AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00
350 FT. AND OVER: + $ 9.00 400 FT. AND OVER: +
$10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE
WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY
FALLS SHALL BE PAID FOR THE HOLIDAY.
A. FOOTNOTE: HAZMAT WORK: $2.00 PER HOUR
ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER
HOUR ADDITIONAL.....................................$ 41.50 29.95
GROUP 4 FIREMAN & OILER ON CRANES
LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00
180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $
4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER:
+ $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND
OVER: + $ 9.00 400 FT. AND OVER: + $10.00
A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,
MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY,
COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY &
CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN
THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR
THE HOLIDAY. A. FOOTNOTE: HAZMAT
WORK: $2.00 PER HOUR ADDITIONAL.
TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL........$ 44.35 29.95
Design-Build (DB), Special Project RM25-4593 – Building 47 Upgrades/Modernization Solicitation No.: N4008526R0234
GROUP 3 TELEHANDLER EQUIPMENT, FORKLIFT, CONCRETE
PUMP & ON-SITE CONCRETE PLANT
OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT.
AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350
FT. AND OVER: + $ 9.00 400 FT. AND OVER: +
$10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE
WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY
FALLS SHALL BE PAID FOR THE HOLIDAY.
A. FOOTNOTE: HAZMAT WORK: $2.00 PER HOUR
ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER
HOUR ADDITIONAL.....................................$ 48.35 29.95
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION:
GROUP 2 DIGGING MACHINE, ROSS CARRIER, LOCOMOTIVE,
HOIST, ELEVATOR, BIDWELL-TYPE MACHINE, SHOT & WATER
BLASTING MACHINE, PAVER, SPREADER, FRONT END LOADER
(3 YDS. AND OVER), VIBRATORY HAMMER AND VACUUM
TRUCK
180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $
4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER:
+ $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND
OVER: + $ 9.00 400 FT. AND OVER: + $10.00
A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,
MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY,
COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY &
CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN
THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR
THE HOLIDAY. A. FOOTNOTE: HAZMAT
WORK: $2.00 PER HOUR ADDITIONAL.
TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL........$ 48.57 29.95
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION:
GROUP 1 CRANES, LIGHTERS, BOOM TRUCKS AND
DERRICKS.
180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $
4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER:
+ $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND
OVER: + $ 9.00 400 FT. AND OVER: + $10.00
A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,
MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY,
COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY &
CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN
THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR
THE HOLIDAY. A. FOOTNOTE: HAZMAT
WORK: $2.00 PER HOUR ADDITIONAL.
TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL........$ 50.57 29.95
Design-Build (DB), Special Project RM25-4593 – Building 47 Upgrades/Modernization Solicitation No.: N4008526R0234
ENGI0057-005 12/01/2025
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION
PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE
INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND
BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 8 GAS
AND ELECTRIC DRIVE HEATERS, CONCRETE MIXERS, LIGHT
PLANTS, WELDING MACHINES, PUMPS AND COMPRESSORS
A. FOOTNOTE: A. ANY
EMPLOYEE WHO WORKS THREE DAYS IN THE WEEK IN WHICH
A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. B.
PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,
MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY,
COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY &
CHRISTMAS DAY.......................................$ 38.70 29.95
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION
PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE
INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND
BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 7
COMBINATION LOADER / BACKHOES, FRONT-END LOADERS
(LESS THAN 3 YDS.), FORKLIFT, BULLDOZERS, SCRAPERS,
BOATS, ROLLERS, SKID STEER LOADERS (REGARDLESS OF
ATTACHMENTS), STREET SWEEPERS, MECHANICS, WELDERS,
OPERATORS IN MATERIALS YARDS, SHOPS AND GARAGES
A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. B.
PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,
MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY,
COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY &
CHRISTMAS DAY.......................................$ 43.43 29.95
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION
PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE
INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND
BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 6
OILERS ON CRANES AND DECKHANDS
Design-Build (DB), Special Project RM25-4593 – Building 47 Upgrades/Modernization Solicitation No.: N4008526R0234
A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. B.
PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,
MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY,
COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY &
CHRISTMAS DAY.......................................$ 39.73 29.95
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION
PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE
INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND
BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 5
SIGNAL PERSONS
A.
FOOTNOTE: A. ANY EMPLOYEE WHO WORKS THREE DAYS IN
THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR
THE HOLIDAY. B. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY & CHRISTMAS DAY....................$ 33.15 29.95
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION
PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE
INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND
BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 4
UTILITY ENGINEERS
A. FOOTNOTE:
A. ANY EMPLOYEE WHO WORKS THREE DAYS IN THE WEEK IN
WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE
HOLIDAY. B. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY & CHRISTMAS DAY....................$ 25.75 29.95
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION
PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE
INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND
BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 3
WELLPOINT INSTALLATION AND DRILL/BORING MACHINE
ASSISTANTS
Design-Build (DB), Special Project RM25-4593 – Building 47 Upgrades/Modernization Solicitation No.: N4008526R0234
A. FOOTNOTE: A. ANY EMPLOYEE WHO WORKS THREE
DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE
PAID FOR THE HOLIDAY. B. PAID HOLIDAYS: NEW YEAR'S
DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH,
VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY & CHRISTMAS DAY....................$ 39.15 29.95
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION
PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE
INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND
BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 2
DIGGING MACHINES, EXCAVATORS, LOCOMOTIVES, JOHN
HENRY'S, DIRECTIONAL DRILLING MACHINES, COLD
PLANERS, RECLAIMERS, PAVERS, SPREADERS, GRADERS,
FRONT-END LOADERS (3YDS & OVER), VACUUM TRUCK,
DRILL/BORING MACHINE OPERATORS, VERMEER SAW, WATER
BLASTER, HYDRAULIC-DEMOLITION ROBOT, ROSS CARRIERS,
CONCRETE PUMP OPERATORS, ASPHALT/MATERIAL TRANSFER
MACHINES, ROTATING TELEHANDLERS, SPMT TYPE
EQUIPMENT
A. FOOTNOTE: A.
ANY EMPLOYEE WHO WORKS THREE DAYS IN THE WEEK IN
WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE
HOLIDAY. B. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY & CHRISTMAS DAY....................$ 44.45 29.95
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION
PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE
INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND
BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 1
CRANES, PILE DRIVERS, LIGHTERS, BOOM TRUCKS,
HOISTS, DERRICKS
A. FOOTNOTE: A. ANY EMPLOYEE WHO WORKS THREE
DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE
PAID FOR THE HOLIDAY. B. PAID HOLIDAYS: NEW YEAR'S
DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH,
VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY & CHRISTMAS DAY....................$ 46.45 29.95
Design-Build (DB), Special Project RM25-4593 – Building 47 Upgrades/Modernization Solicitation No.: N4008526R0234
IRON0037-001 09/16/2025
IRONWORKER..........................................$ 43.03 33.53
LABO0271-001 12/03/2023
LABORER GROUP 5 (BUILDING CONSTRUCTION).............$ 39.00 26.90
LABORER GROUP 4 (BUILDING CONSTRUCTION).............$ 37.00 26.90
LABORER GROUP 3 (BUILDING CONSTRUCTION).............$ 37.00 26.90
LABORER GROUP 2 (BUILDING CONSTRUCTION).............$ 37.00 26.90
LABORER GROUP 1 (BUILDING CONSTRUCTION).............$ 37.00 26.90
LABO0271-002 11/27/2022
LABORER TEST BORING LABORER.........................$ 41.95 24.15
LABORER TEST BORING DRILLER.........................$ 41.95 24.15
LABORER OPEN AIR CAISSON, UNDERPINNING WORK AND
BORING CREW TOP MAN & LABORER...................$ 35.60 24.15
LABORER OPEN AIR CAISSON, UNDERPINNING WORK AND
BORING CREW BOTTOM MAN..............................$ 41.50 24.15
LABORER FREE AIR GROUP 3............................$ 42.45 24.15
LABORER FREE AIR GROUP 2............................$ 45.00 24.15
LABORER FREE AIR GROUP 1............................$ 46.00 24.15
LABORER COMPRESSED AIR GROUP 3......................$ 42.45 24.15
LABORER COMPRESSED AIR GROUP 2......................$ 52.93 24.15
LABORER COMPRESSED AIR GROUP 1......................$ 55.40 24.15
PAIN0011-005 06/01/2025
PAINTER (SPRAY, SAND & WATER BLASTING)..............$ 42.57 26.60
PAINTER (EPOXY, TANKS, TOWERS, SWING STAGE &
STRUCTURAL STEEL)...................................$ 41.57 26.60
PAINTER (BRUSH AND ROLLER)..........................$ 39.57 26.60
PAIN0011-006 06/01/2024
GLAZIER FOOTNOTES: SWING STAGE: $1.00 PER
HOUR ADDITIONAL. PAID HOLIDAYS: LABOR DAY &
CHRISTMAS DAY.......................................$ 41.63 26.15
PAIN0011-011 06/01/2024
PAINTER (BRIDGE WORK)...............................$ 57.85 26.40
PAIN0035-008 06/01/2011
SIGN PAINTER........................................$ 24.79 13.72
PLAS0040-001 01/01/2025
CEMENT MASON/CONCRETE FINISHER (BUILDING
CONSTRUCTION) FOOTNOTE: CEMENT MASON: WORK ON
FREE SWINGING SCAFFOLDS UNDER 3 PLANKS WIDTH AND
WHICH IS 20 OR MORE FEET ABOVE GROUND AND ANY
OFFSET STRUCTURE: $.30 PER HOUR ADDITIONAL..........$ 44.75 29.10
Design-Build (DB), Special Project RM25-4593 – Building 47 Upgrades/Modernization Solicitation No.: N4008526R0234
PLAS0040-002 01/01/2025
CEMENT MASON/CONCRETE FINISHER (HEAVY AND HIGHWAY
CONSTRUCTION).......................................$ 44.75 29.10
PLAS0040-003 01/01/2025
PLASTERER...........................................$ 45.52 29.43
PLUM0051-002 08/25/2025
PLUMBERS AND PIPEFITTERS............................$ 54.34 34.50
ROOF0033-004 12/01/2025
ROOFER..............................................$ 47.49 31.44
SFRI0669-001 04/01/2025
SPRINKLER FITTER....................................$ 53.76 33.44
SHEE0017-002 06/01/2025
SHEET METAL WORKER..................................$ 44.42 41.94
TEAM0251-001 05/01/2025
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP
5 FOUR- AND FIVE-AXLE EQUIPMENT
FOOTNOTES:
A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND
CHRISTMAS DAY, PLUS PRESIDENTS' DAY, COLUMBUS DAY,
VETERAN'S DAY & V-J DAY, PROVIDING THE EMPLOYEE HAS
WORKED AT LEAST ONE DAY IN THE CALENDAR WEEK IN
WHICH THE HOLIDAY FALLS. B. EMPLOYEE WHO HAS
BEEN ON THE PAYROLL FOR 1 YEAR OR MORE BUT LESS
THAN 5 YEARS AND HAS WORKED 150 DAYS DURING THE
LAST YEAR OF EMPLOYMENT SHALL RECEIVE 1 WEEK'S PAID
VACATION; 5 TO 10 YEARS - 2 WEEKS' PAID VACATION;
10 OR MORE YEARS - 3 WEEK'S PAID VACATION. C.
EMPLOYEES ON THE SENIORITY LIST SHALL BE PAID A ONE
HUNDRED DOLLAR ($100.00) BONUS FOR EVERY FOUR
HUNDRED (400) HOURS WORKED, UP TO A MAXIMUM OF FIVE
HUNDRED DOLLARS ($500.00) ALL DRIVERS WORKING ON A
DE…