This is a Bid Price Schedule for a construction project at Naval Station Newport, Rhode Island. The project, designated Special Project RM25-4593, involves upgrades and modernization of storage space in NUWC Building 47 under Work Order Number 1814702.

The base bid (Line Item 0001) requires pricing for all construction services including hazardous material abatement and disposal, with sub-line items for sitework outside the facility (0001A), sitework inside the facility (0001B), and removal/disposal of asbestos-containing materials in floor tile (0001C, 560 SF estimated), pipe fitting insulation (0001D, 33 EA estimated), and lead-based/lead-containing paint from CMU walls (0001E, 3,000 SF estimated), steel columns (0001F, 625 SF estimated), and piping systems (0001G). Additional base bid items cover new mechanical systems (0001H), electrical work (0001I), plumbing (0001J), telecommunications (0001K), security systems (0001L), and fire suppression systems (0001M), plus additional hazardous material removal (0001N-0001P). The contract includes four option items: material handling equipment and storage racking for Bays A and B (0002); removal and renovation of office space with two-story office construction (0003); material handling and double-deep racking for Bay C (0004); and server room relocation with mobile racking in Bay D (0005A-0005B). All prices are firm fixed with no economic price adjustment provisions. The Government reserves the right to award any or all option items within 365 calendar days of contract award, with a potential contract completion date of 730 calendar days if all options are exercised. Contractors must submit unit prices and extended totals where indicated, and failure to price any line item will result in proposal rejection. Items marked with asterisks are estimated quantities subject to equitable adjustment if actual quantities vary more than 15 percent from estimates.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIAL PROJECT RM25-4593 – NUWC BUILDING 47

UPGRADES/MODERNIZATION OF STORAGE SPACE WON 1814702

NAVAL STATION NEWPORT, NEWPORT, RI

BID PRICE SCHEDULE

Provide line item prices, where indicated by blank underlines, for the following items:

Line Item Description Quantity Unit Unit Price Sub-Total Total Price

0001 BASE PRICE:

Total Price for

(subtotals of Line

Items 0001A-

0001P) the entire work for construction services in accordance with the

RFP, complete, but excluding work provided in another

Priced line Item.

Basis of Bid for

Line Item 0001 shall be all

Construction services as noted in the scope of work, including

Hazardous Material abatement and disposal, and all

Construction

Phasing, Base Bid

WON 1814702–

Items.

EA

0001A Price for the entire project sitework, OUTSIDE the facility 5-foot line, complete in accordance with the

RFP, but excluding work described in another priced line

Item.

0001B Price for the entire project sitework, INSIDE the facility

5-foot line, complete in accordance with the

RFP, but excluding work described in

Item.

0001C Price for removal and disposal of

Asbestos

Containing

Material floor tile and all associated asbestos containing mastic (ACM) complete in accordance with the

RFP, but excluding work provided in item.

560*

SF

0001D Price for removal and disposal of

Asbestos

Containing

Material pipe fitting insulation (ACM) complete in accordance with the

RFP, but excluding work provided in

33*

0001E Price for removal items containing

Lead Based Paint

(LBP) or Lead

Containing Paint

(LCP) for all CMU walls, stairs, doors, frames, complete in accordance with the

RFP, but excluding work provided in

3000*

0001F Price for removal items containing

Lead Based Paint

(LBP) or Lead

Containing Paint

(LCP) for all steel columns complete in accordance with

625* the RFP, but excluding work provided in another priced line item.

0001G Price for removal and disposal of items containing

Lead Based Paint

(LBP) or Lead

Containing Paint

(LCP) for all piping, sprinkler piping, risers in accordance with the

RFP, but excluding work provided in

0001H Price for all new work general mechanical scope, including all

TABS, Controls work, Commissioning and

Acceptance, as noted in contract documents excluding work priced line item.

0001I Price for all new electrical scope – switches, power and lighting, including all controls work, Commissioning and

Acceptance, as noted in contract documents excluding work

0001J Price for all new plumbing, including all controls work, Commissioning and

Acceptance, as noted in contract documents excluding work provided in another priced line item.

0001K Price for all new work general telecommunications including all fiber, controls work, Commissioning and

Acceptance, as noted in contract documents excluding work

0001L Price for all new electronic safety and security/physical security including all controls work, Commissioning and

Acceptance, as noted in contract documents excluding work

0001M Price for all new work general new work for Fire

Suppression system, Fire

Detection & Alarm

Systems, including testing/Government acceptance, as noted in contract documents excluding work

0001N Price for removal

Asbestos

Containing

Material floor tile and all associated asbestos containing mastic (ACM) complete in

100* accordance with the

RFP, but excluding work provided in another priced line item.

0001O Price for removal and disposal of

Asbestos

Containing

Material pipe fitting insulation (ACM) complete in accordance with the

RFP, but excluding work provided in

20*

0001P Price for removal items containing

Lead Based Paint

(LBP) or Lead

Containing Paint

(LCP) complete in accordance with the

RFP, but excluding work provided in

100*

0002 Option Item No. 1:

Price for providing all work for construction for material handling equipment and storage racking for the Bay A and Bay

B disposal, small parts, and receiving operations complete in accordance with the

RFP, but excluding work provided in

0003 Option Item No.

2: Price for providing all work for construction to remove the existing office space on the exterior wall of Bay

B and construct a new two story office space. The existing office space on the bay b and bay c wall will get renovated to provide additional cooling for the server room and some walls will be removed to improve the office space usage. Bid

Option 2 will renovate the existing restroom connected to Bay

C.

0004 Option Item No.

3: Price for providing all work for construction for material handling equipment and double deep storage racking for Bay C.

0005A Option Item No.

4A: Price for providing all work for construction relocate the server room in Bay D to allow for the drive lane to be opened.

Bay D will be installed with mobile racking system.

0005B Option Item No.

4B: Price for providing all work for construction

Provide existing concrete floor survey, provide and install existing concrete floor repairs as required to receive new floor leveler per mobile racking system requirements.

TOTAL PRICE FOR LINE ITEMS 0001- 0005

GENERAL BID NOTES

a. Award will be evaluated on the total proposed price for Line Items 0001 – 0005, Base Price and the sum of all Option Item prices. The subtotal of Line Item 0001A-0001P is included in Line Item 0001.

b. The Government reserves the unilateral right to award any or all of Line Items 0002 through 0005 to the

Contractor at the proposed price within 365 calendar days after the contract award and in accordance with all bid notes. A firm fixed proposed price is required for Line Items 0001-0005. No provision is made for economic price adjustment. The Contract Completion Date (CDD) will be extended an additional 365 calendar days if all option work is to be included in the original award, or modified to be included in the contract. If all options are awarded, contract completion date will be 730 calendar days from date of contract award. The Contractor shall submit a preliminary construction schedule with price schedule that logically sequences the project and phasing.

c. Quantities on the bid schedule that are followed by an asterisk (*) are estimated quantities. Contractor shall only be paid for quantities/units of work actually performed. If the estimated quantity used in the bid schedule is not reached, a deductive modification shall be taken at the end of contract for quantities/units not performed. If the estimated quantity is exceeded, an equitable adjustment shall be made to the contract price for work performed over the estimated quantity. If the quantity of a unit-priced item in this contract is an estimated quantity and the actual quantity of the unit-priced item varies more than 15 percent above or below the estimated quantity, an equitable adjustment in the contract price shall be made upon demand of either party. The equitable adjustment shall be based upon any increase or decrease in costs due solely to the variation above 115 percent or below 85 percent of the estimated quantity. If the quantity variation is such as to cause an increase in the time necessary for completion, the Contractor may request, in writing, an extension of time, to be received by the Contracting Officer within 10 days from the beginning of the delay, or within such further period as may be granted by the Contracting Officer before the date of final settlement of the contract. Upon the receipt of a written request for an extension, the Contracting Officer shall ascertain the facts and make an adjustment for extending the completion date as, in the judgement of the Contracting Officer, is justified.

d. Evaluations of Options (JUL 1990). Except when it is determined in accordance with FAR 17.202 (b)

(DEVIATION 2026-O0027) not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the price for Line Items 0002 through 0005 to the total price for the Base Bid, (Line Item 0001). Evaluation of options will not obligate the Government to exercise the Option(s). (FAR

52.217-5 DEVIATION 2026-O0038).

e. The Government may reject an offer as non-responsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly understated for some work and prices which are significantly overstated for other work.

f. Failure to enter a price for any Line Item will result in a proposal being rejected.

g. For bid items where unit prices are indicated as required, bidders shall enter unit prices and extended totals in spaces provided. If there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid and the extended total recomputed accordingly. If an Offeror provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.

h. If any or all of Line Item 0002 through 0005 are exercised, additional bonding and consent of surety is required. Consequently, the Performance Bond must reflect 100 percent of the aggregate amount of all items.

CLOSEOUT AND WARRANTY BID NOTES:

a. The Contractor shall provide full turnover documentation, including as-builts, warranties, and maintenance information, for each completed phase. The Contractor shall provide ongoing support through the warranty period to address any issues that may arise in the newly completed areas.