This is a project closeout transmittal and documentation package for the Building 1372 Roof Replacement project at Naval Station Newport, Rhode Island, submitted by Enfield Enterprises LLC under Contract No. N4008523D0050 to N4008524F5985.

The project involved complete roof replacement and associated work on Ripley Hall (Building 1372), with substantial completion on November 17, 2025, and mechanical inspection punchlist completion on February 17, 2026. All contract work has been completed and accepted. Key deliverables include as-built drawings prepared by Triumph Roofing Inc., which document the installation of an 80-mil VersiFlex PVC roofing system covering 26,240 square feet across four roof areas. The roofing system includes tapered polyisocyanurate insulation, Versico edge metal and flashing components, and associated penetration treatments. Material specifications include Versico VersiCore polyiso insulation, Versiflex PVC membrane adhered with low-VOC bonding adhesive, and anchor bars with fasteners spaced per wind uplift design requirements (150 mph ultimate wind speed). Supporting work includes removal and replacement of duct insulation, lightning protection system installation by Northeast Lightning Protection LLC, and landscape seeding to be completed when weather permits. Warranty coverage includes a 20-year Versico Total Roofing System warranty (effective November 18, 2025 through November 17, 2045) and a one-year workmanship and leak-free warranty from Triumph Roofing. A Verisco inspection identified six minor defects related to missing sealant and cold welds, all of which were corrected prior to final approval. Lightning protection testing confirmed system compliance with UL96A standards, and the Lightning Protection Institute issued inspection approval for the rooftop system on January 5, 2026.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TRANSMITTAL OF SUBMITTALS, SHOP DRAWINGS, EQUIPMENT DATA, MATERIAL

SAMPLES, OR MANUFACTURER'S CERTIFICATES OF COMPLIANCE

Date: 2/25/2026 Transmittal # 11

SECTION 1 - REQUEST FOR APPROVAL OF THE FOLLOWING ITEMS (This section will be initiated by the contractor)

TO:

PWD Newport

NAVFAC MIDLANT

1 Simonpietri Drive Naval Station Newport, RI

From:

Enfield Enterprises LLC 30 Magaziner Place Springfield, MA 01104

Contract Number:

N4008523D0050 TO N4008524F5985

Check One:

( ) This is a new transmittal

(X ) This is a resubmittal of Transmittal

SPECIFICATION SECTION NUMBER: PROJECT TITLE: Building 1372 Roof Repair

Control Number a.

Description of Item Submitted (type, size, model number/etc.)

b.

Mfg. or Ktr

Number c.

# Of Copies d.

Contract Reference Document

Contractor Use Code g.

Variation Request (Y/N) h.

Use Code

i. Spec.Para.

e.

Dwg Sht f.

1 Close Out

REMARKS: I hereby certify that the above item(s) shown and marked in this submittal and proposed to be incorporated with this contract, is in strict compliance with the contract drawings and specifications (except as otherwise stated), can be installed in the allocated spaces, and:

( ) is approved for use.

(x) is submitted for Government Approval

Contractor QC Representative’s:

Name and Signature: Jacque Perkins, EE LLC

Action Codes: (Note: Approval of items does not relieve the contractor from complying with all the requirements of the plans and specifications) A-Approved as Submitted C-Approved, except as noted on drawings. E-Disapproved. See attached sheet.

B-Approved, except as noted on drawings. Refer to attached sheet. Resubmission required.

Resubmission not required D-Will be returned by separate correspondence SECTION II - APPROVAL ACTION (refer to ROICC Use Code)

Enclosures Returned Name, Title and Signature of Approving Authority Date

ENG FORM 4025, CS rev Jan 2002 Sheet 1 o f 1

Enclosure (40)

A

Corporate Office: 30 Magaziner Place Springfield, MA 01104-3328

FL Regional Offices:

NAS Pensacola 27 West Romana St Pensacola FL 32502

FL Regional Offices:

Eglin AFB 28 Kelly Avenue Fort Walton Beach, FL 32548

FL Regional Offices:

Tyndall AFB 5618 Lilly Street Panama City, FL 32404

LA Regional Office:

278 General Patton Ave Suite 600 Mandeville, LA 70471

NY Regional Office:

227 Kingsley Road, Suite 26 Burnt Hills, NY 12027

Phone: 866-788-2688 Fax: 413-788-2479

Newport Build 1372 Ripley Hall Contract No: N4008523D0050 / N4008524F985

PROJECT CLOSE OUT

NAS Pensacola 27 West Romana St Pensacola FL 32502

FL Regional Offices:

Eglin AFB 28 Kelly Avenue Fort Walton Beach, FL 32548

FL Regional Offices:

Tyndall AFB 5618 Lilly Street Panama City, FL 32404

LA Regional Office:

278 General Patton Ave Suite 600 Mandeville, LA 70471

NY Regional Office:

227 Kingsley Road, Suite 26 Burnt Hills, NY 12027

Phone: 866-788-2688 Fax: 413-788-2479

Table of Contents

Warranty Letters

As-Built Drawings

Verisco Inspection Report

Lighting Protection Testing Reports

Lighting Protection Inspection Report

Punch List Completion Photos

Landscape Notes

NAS Pensacola 27 West Romana St Pensacola FL 32502

Eglin AFB 28 Kelly Avenue Fort Walton Beach, FL 32548

Tyndall AFB 5618 Lilly Street Panama City, FL 32404

LA Regional Office:

278 General Patton Ave Suite 600 Mandeville, LA 70471

NY Regional Office:

227 Kingsley Road, Suite 26 Burnt Hills, NY 12027

Phone: 866-788-2688 Fax: 413-788-2479

Wednesday, February 25, 2026

Mr. Robert Krivinskas NAVFAC Mid-Atlantic Bldg. 1, Simonpietri Drive Newport, RI 02841

RE: Contract No. N4008523D0050 / N4008524F5985 DB B1372 Roof Replacement Naval Station Newport, Newport RI Letter of Final Completion

This Letter shall serve as Notice of Final Completion for the referenced project. All contract work has been completed and accepted as follows:

Substantial Completion of Work: 17 November 2025 Mechanical Inspection Punchlist Completion: 17 February 2026

All deficiencies identified during the Pre-Final Inspection have been corrected in full. Please feel free to reach out with questions or concerns.

Sincerely, Peter Baruffaldi Vice President of Operations Enfield Enterprises LLC.

WORKMANSHIP & LEAK-FREE WARRANTY

Issued By:

Triumph Roofing, Inc. 46 Elm St. Unit 3, Baldwinville, MA 01436

Project Name: Newport B1372 Ripley Hall Roof Project Address: Building 1372 Naval Station, Newport, RI 02841 Owner: Naval Station Newport NAVFAC MID ATLANTIC Completion Date: 11/17/2025 Warranty Term: 1 Year (Expires: 11/17/2026)

1. COVERAGE

Triumph Roofing, Inc. warrants that the installed roofing system is free from workmanship defects and leaks due to improper installation for 1 year. Repairs for such defects will be made at no cost to the Owner.

2. EXCLUSIONS

This warranty does not cover:

• Natural disasters (hail, storms, earthquakes, etc.).

• Unauthorized repairs or modifications.

• Damage from improper maintenance, excessive foot traffic, or misuse.

• Damage from mechanical equipment or non-roofing activities.

3. CLAIM PROCEDURE

Owner must:

1. Notify Triumph Roofing, Inc. in writing within 2 days of discovering a defect.

2. Provide proof of warranty and project details.

3. Allow inspection and evaluation of the roof.

4. REMEDY

Valid claims will be repaired by Triumph Roofing, Inc. at no cost. This warranty is non-transferable and does not cover incidental or consequential damages.

Respectfully, Richard Scobi, Project Executive

Triumph Roofing Inc.

Rich@triumphroofinginc.com

(603) 313-9703

EMVSW_1 (REV 2024) Rev 12/24 of 1 4

1676107 WARRANTY NO.:

DEPARTMENT OF THE NAVYBUILDING OWNER:

NAVAL STATION NEWPORT RIPLEY HALL BUILDING 1372 ROOF REPLACEMENT NAME OF BUILDING:

440 MEYERKORD AVE. NEWPORT, RI BUILDING ADDRESS:

11/17/2025DATE OF COMPLETION OF THE VERSICO TOTAL ROOFING SYSTEM:

11/18/2025WARRANTY START DATE:

11/17/2045WARRANTY EXPIRATION DATE:

Versico Roofing Systems, a division of Carlisle Construction Materials, LLC (Versico) warrants to the Building Owner (Owner) of the above described building, that; subject to the terms, conditions, and limitations stated in this warranty, Versico will repair any leak in the Versico Roofing System (Versico Total Roofing System) installed by a Versico Authorized Roofing Applicator for a period of 20 years, commencing with the date of Versico's acceptance of the Versico Total Roofing System installation. However, in no event shall Versico's obligations extend beyond 5 years, subsequent to the date of20.

completion of the Versico Total Roofing System. See above for the exact date of warranty expiration.

The Versico Total Roofing System is defined as the following newly installed Versico brand materials: Membrane, Flashings, Adhesives and Sealants, Insulation, Cover Boards, Fasteners, Fastener Plates, Fastening Bars, Edge Metal, and Insulation Adhesives utilized in this installation.

TERMS, CONDITIONS, LIMITATIONS

1. Owner shall provide Versico with written notice via the online leak report form, phone, letter, fax, or email within thirty (30) days of any leak in the Versico Total Roofing System. See Versico's Care and Maintenance Guide, which accompanies this warranty, for contact information. By so notifying Versico, the Owner authorizes Versico or its designee to investigate the cause of the leak. Should the investigation reveal the cause of the leak to be outside the scope of this Warranty, investigation and repair costs for this service shall be paid by the Owner.

2. If, upon inspection, Versico determines that the leak is caused by a defect in the Versico Total Roofing System's materials, or workmanship of the Versico Authorized Roofing Contractor in installing the same, Owner's remedies and Versico's liability shall be limited to Versico's repair of the leak. Versico shall have sole responsibility in determining the method of repair of the area.

3. This warranty shall not be applicable if, upon Versico's inspection, Versico determines that any of the following has occurred:

(a) The Versico Total Roofing System is damaged by: natural disasters, lightning, fire, insects, animals, windblown debris or objects, earthquakes, tornados, hail, hurricanes, and winds of (3 second) peak gust speeds in excess of 150 mph measured at 10 meters above ground; or

(b) Loss of integrity of the building envelope and/or structure, including, but not limited to, partial or complete loss of roof decking, wall siding, windows, roof top units, doors or other envelope components; or

(c) All associated building components, including but not limited to the deck substrate, joists, columns and foundation, must also meet wind speed design requirements.

(d) The Versico Total Roofing System is damaged by any acts, accidents, misuse, abuse, vandalism, civil disobedience or the like; or

EMVSW_1 (REV 2024) Rev 12/24 of 2 4

(e) Deterioration or failure of building components, including, but not limited to, the roof substrate, walls, mortar, HVAC units, non Versico brand metal work, wood nailer, etc., occurs and causes a leak, or otherwise damages the Versico Total Roofing System; or

(f) Deterioration of metal materials and accessories caused by marine salt water, atmosphere, or by regular spray of either salt or fresh water; or

(g) Acids, oils, harmful chemicals and the like come in contact with the Versico Total Roofing System and cause a leak, or otherwise damage the Versico Total Roofing System; or

(h) The Versico Total Roofing System encounters leaks or is otherwise damaged by condensation resulting from any condition within the building that may generate moisture; or

(i) The Versico Authorized Contractor or any additional contractor or subcontractor failed to follow Versico’s published specifications and details for the approved system assembly or failure to correct all installation deficiencies listed in any Versico inspection report.

4. This Warranty shall be null and void if any of the following shall occur:

(a) If, after installation of the Versico Total Roofing System by a Versico Authorized Roofing Contractor, there are any alterations or repairs made on or through the roof or objects such as, but not limited to, structures, fixtures, solar arrays, wind turbines, roof gardens or utilities are placed upon or attached to the roof without first obtaining written authorization from Versico; or

(b) Failure by the Owner to use reasonable care in maintaining the roof, said maintenance to include, but not be limited to, those items listed on Versico’s Care & Maintenance Guide which accompanies this Warranty.

5. In addition, it shall be Owner’s sole responsibility to remove and re-install at Owner’s expense, all obstructions, including, but not limited to, structures, fixtures, solar arrays, wind turbines, roof gardens, utilities or other overburden from the affected area as determined by Versico that would hinder or impede repairs being made in the most expedient and least expensive manner possible. Owner shall be responsible for all costs associated with any loss of power generation in the event that removal of a solar array is required to repair the roofing system.

6. During the term of this Warranty, Versico shall have free access to the roof during regular business hours.

7. Versico shall have no obligation under this Warranty while any bills for installation, supplies, service, and/or warranty charges have not been paid in full to the Versico Authorized Roofing Contractor, Versico, or material suppliers.

8. Versico’s failure at any time to enforce any of the terms or conditions stated herein shall not be construed to be a waiver of such provision.

9. Versico shall not be responsible for the cleanliness or discoloration of the Versico Total Roofing System caused by environmental conditions including, but not limited to, dirt, pollutants or biological agents.

10. Versico shall have no liability under any theory of law for any claims, repairs, restoration, or other damages including, but not limited to, consequential or incidental damages relating, directly or indirectly, to the presence of any irritants, contaminants, vapors, fumes, molds, fungi, bacteria, spores, mycotoxins, or the like in the building or in the air, land, or water serving the building.

11. This warranty shall be transferable upon a change in ownership of the building when the Owner has completed certain procedures, including a transfer fee and an inspection of the Roofing System by a Versico representative.

EMVSW_1 (REV 2024) Rev 12/24 of 3 4

12. Any dispute, controversy or claim between the Owner and Versico concerning this Limited Warranty shall be settled by mediation. In the event that the Owner and Versico do not resolve the dispute, controversy or claim in mediation, the Owner and Versico agree that any and all suits, proceedings, or claims shall be filed in either the state courts of Cumberland County, Pennsylvania or in the United States District Court for the Middle District of Pennsylvania. Each party irrevocably consents to the jurisdiction and venue of the above-identified courts.

13. Roof System Design Assembly: Versico, as manufacturer of commercial roofing products with the sole purpose of offering products for an Owner, design professional, architect, consultant, or engineer when designing/choosing a roof system assembly, assumes no liability nor implies to the suitability of the products for any particular assembly or specific building operation or structure. The Owner, design professional, architect, consultant, or engineer is solely responsible for the assembly chosen for a particular building structure to include the responsibility to properly calculate wind uplift values, design dead loads and live loads, and suitability and condition of building envelope substrate, decking, parapets, drainage, slope, and other attributes pertaining to the performance of the roof system assembly.

14. The Versico Authorized Contractor or any additional contractor or subcontractor are not agents of Versico.

VERSICO DOES NOT WARRANT ANY PRODUCTS UTILIZED IN THIS INSTALLATION WHICH ARE NOT DEFINED ABOVE AS THE VERSICO TOTAL ROOFING SYSTEM AND SPECIFICALLY DISCLAIMS LIABILITY, UNDER ANY THEORY OF LAW, ARISING OUT OF THE INSTALLATION AND PERFORMANCE OF, OR DAMAGES SUSTAINED BY OR CAUSED BY, PRODUCTS NOT FURNISHED BY VERSICO OR THE PRIOR EXISTING ROOFING

MATERIAL OVER WHICH THE VERSICO ROOFING SYSTEM HAS BEEN INSTALLED.

THE REMEDIES STATED HEREIN ARE THE SOLE AND EXCLUSIVE REMEDIES FOR FAILURE OF THE VERSICO TOTAL ROOFING SYSTEM OR ITS COMPONENTS. THERE ARE NO WARRANTIES EITHER EXPRESSED OR IMPLIED, INCLUDING THE IMPLIED WARRANTIES OF FITNESS FOR A PARTICULAR PURPOSE AND MERCHANTABILITY, WHICH EXTEND BEYOND THE FACE HEREOF. VERSICO SHALL NOT BE LIABLE FOR ANY INCIDENTAL, CONSEQUENTIAL OR OTHER DAMAGES INCLUDING, BUT NOT LIMITED TO, LOSS OF

PROFITS OR DAMAGE TO THE BUILDING OR ITS CONTENTS UNDER ANY THEORY OF LAW.

BY: Ariel M. Andrejev

AUTHORIZED SIGNATURE

TITLE: Director, Technical and Warranty Services

EMVSW_1 (REV 2024) Rev 12/24 of 4 4

Versico Care and Maintenance Guide

In order to ensure the long-term performance of your Roofing System and continued warranty service and coverage, regular rooftop maintenance inspections are necessary. While normal aging will occur on all roofs, if not detected early, problems stemming from abuse, contamination, accidents and severe weather can result in extensive and costly repairs or premature failure of the roofing system. Single-ply Roofing Systems are typically low-slope and easy to inspect, but caution must be taken to ensure safety. Versico disclaims and assumes no liability for any rooftop activity.

- Owner must retain records related to the Roofing System. Such records include, but are not limited to: the warranty document and serial number, maintenance inspection logs, rooftop traffic logs, service logs, and invoices for work performed on the roofing system.

- Inspect the roof at least every six months (preferably spring and fall) and immediately following any weather event that includes excessive rainfall, high winds and/or hail warnings. Increased number of rooftop maintenance inspections may be required on some roofs as the location may dictate, such as higher trees near the building which will accumulate leaves and debris on the roof and have adverse effects on drainage. In addition, rooftop maintenance inspections should occur after regular maintenance of any rooftop unit.

When inspecting the Roofing System, pay special attention to the following:

- Walls/Parapets/Roof Edge – Wind damage often begins at the perimeter of the roof. Ensure all membrane terminations and edge metal and copings are secure.

- Roof Deck Membrane – Inspect the field of the roof, scanning for damage caused by wind-blown debris or traffic.

- Penetrations/Rooftop Units – Inspect the membrane, flashings and terminations around penetrations and roof top units for possible damage from service work. Ensure the units and terminations are secure.

- Remove debris (leaves, dirt, trash, etc.) – Good roofing practice dictates that water should drain from the roof and that ponded water should evaporate within 48 to 72 hours after a rainfall. Debris can inhibit drainage.

Additional Maintenance Items:

- Foot Traffic – Walkways must be provided if regular traffic is required or if rooftop equipment has a regular thirty (30) day or less maintenance schedule.

- Petroleum Products & Chemicals - Keep all liquids containing petroleum products or chemicals off the membrane to avoid product degradation.

- Animal Fats/Vegetable Oils: EPDM Membranes - Do not exhaust animal fats/vegetable oils directly onto EPDM roof surfaces. TPO & PVC Membranes – Animal fats/vegetable oils must be regularly removed and the rooftop surface cleaned with a mixture of soap and water.

What to do if a leak occurs:

- After verifying the leak is through the roofing system, contact Versico at 1-800-233-0551 or at www.versico.com.

- If minor, emergency temporary repairs are made to a suspected leak area, use Versico’s Lap Sealant or a good-grade rubber caulk to address the repair area (do not use asphaltic roof cement). Please note, Versico is not responsible for the cost associated with any emergency temporary repairs.

Alterations to the Roofing System:

- Alterations to the Roofing System must be completed by a Versico Authorized Contractor. The Versico Authorized Contractor must notify Versico when the revision work is complete. The necessary form can be found on the Versico website via the Authorized Contractors login.

Warranty Transfer:

- Warranties shall be transferable upon a change in ownership of the building when the Owner has completed certain procedures. This form can be found on the Versico website for additional guidelines.

ROOFING SYSTEM

WARRANTY

System Warranty Revisions & Alterations Procedure

Care & Maintenance Instructions

WARRANTY REVISIONS

AND ALTERATIONS PROCEDURES

Versico recommends periodic roof system evaluations to ensure the roofi ng system is performing as intended. We suggest regular maintenance inspections be conducted by a Versico Authorized Roofi ng Contractor or by someone specially trained in single-ply roofi ng installations. However, even with the most rigorous reviews, roofi ng systems can be damaged by fl ying debris, other trades servicing rooftop equipment, etc. Regardless of how the damage occurs, it is important to understand how to both protect your warranty investment and prolong the life of your roofi ng system. Following these procedures and recommendations can ensure that repairs are performed accurately so that the warranty duration and coverage remain intact.

Warranty Revisions & Alterations Procedures

1. Paragraph 4(a) of the Versico Roofi ng System Warranty states: “This warranty shall be null and void if, after installation of the Versico Roofi ng System by a Versico Authorized Roofi ng Contractor, there are any alterations or repairs made on or through the roof, or objects such as, but not limited to, structures fi xtures, solar panels, wind turbines, roof gardens or utilities placed upon or attached to the roof without fi rst obtaining written authorization from Versico.”

2. Solar panel installations entail additional documentation and require building owner authorization. Please refer to Versico’s website to review the proper documentation for Photovoltaic installations.

Below is address information for Versico’s Warranty Services Department.

Versico Attn. Warranty Services

P.O. Box 1289, Carlisle, PA 17013 Phone: 800.992.7663 | Fax: 717.960.4035

3. A Versico Authorized Roofi ng Contractor must perform all revision work. It is recommended that the original contractor who installed the roofi ng system perform the revision work, if possible.

4. The Versico Authorized Roofi ng Contractor must notify Versico when the revision work is complete. The form can be found on Versico’s website under the password protected section titled Warranty Revisions/ Alteration Procedures.

5. At Versico’s discretion, a Versico Field Service Representative may conduct an inspection to ensure compliance with the current published Versico Specifi cations and Details. The contractor will be notifi ed of the results. Current inspection charges and expenses will apply.

6. When the revision or alteration is completed in compliance with the above procedures, Versico will notify the building owner that the warranty is being continued.

MAINTENANCE ITEM ACTION

Drainage

Keep the roof surface clean at drain areas to avoid clogging. While the presence of ponded water will not void the Versico warranty, good roofi ng practice dictates that water should drain from the roof and that ponded water should evaporate within 48 to 72 hours after a rainfall.

Petroleum Products Keep all petroleum products (solvents, greases, oils, or any liquids containing petroleum products) off the membrane to avoid degradation.

Animal Fats – EPDM Membranes

Do not exhaust kitchen wastes (vegetable oils) or other animal fats directly onto the roof surface. If incidental contact is likely, contact Versico for recommendations on membrane type and usage.

Animal Fats – TPO & PVC Membranes

TPO and PVC membranes for restaurant rooftop use will not void the warranty. A rooftop maintenance program must be in place to ensure that accumulations of animal fats/grease are regularly removed and the rooftop surface is cleaned with a mixture of warm soap and water and/ or by other approved cleaning methods. See Versico’s Installation Guide for specifi c cleaning instructions.

Chemicals Contact Versico if any chemicals come in contact with the roofi ng membrane. Some chemicals could degrade the membrane or cause swelling.

Foot Traffic

Walkways must be provided if regular traffi c is required or if rooftop equipment has a regular thirty (30) day or less maintenance schedule.

Exercise caution when not walking on walkways, especially on white membranes (VersiGard white EPDM, VersiWeld TPO, or VersiFlex PVC) as ice or frost build-up may not be visible. All membranes are slippery when wet.

Roof Cement DO NOT USE ASPHALTIC ROOF CEMENT to repair or install rubber membrane. Roof cement contains petroleum products that may degrade the membrane.

Temporary Repairs

Use Versico’s Lap Sealant or any good-grade rubber caulk to make temporary repairs. Notify Versico of this action in writing. Versico is not responsible for emergency/temporary repairs in inclement weather conditions that will not allow a permanent repair.

The following maintenance items are the responsibility of the building owner and are not included within the scope of the Roofi ng System Warranty.

Care and Maintenance Instructions

The preceding care and maintenance requirements are for VersiGard EPDM (black and white), VersiWeld, VersiFlex and VersiFleece Membrane Roofi ng Systems. The list is not meant to be exhaustive and is for illustrative purposes only. Versico recommends that your maintenance staff and/or maintenance contractor inspect the roof periodically or at least twice a year. The inspection should concentrate on high-risk areas such as roof hatches, drains and around all rooftop equipment as well as general inspection of the entire roof. The inspector should be looking for membrane damage (cuts and tears), oil or Freon leaks, chemical spills, and water infi ltration into the roofi ng system.

Compliance with the above-listed care and maintenance requirements will aid in ensuring a durable, watertight membrane roofi ng system.

Leaks

Locate the leak and determine if it is a roof membrane leak or a wall, curb, skylight, metal ductwork or plumbing leak. Deterioration or failure of building components that causes a leak is not covered by the warranty. A water leak may be indicated by soft or warped insulation.

Physical damage to the membrane or fl ashing is not covered by the warranty.

If the leak is determined to be membrane-related, please notify Versico’s Warranty Services department at (800)-233-0551 or online at www.versico.com; Warranty Services link. The building owner is responsible to provide access to the roof system by removing overburden including snow/ice/water removal in excess of 1 hour.

Hypalon and Non-Versico Acrylic Coatings

These are maintenance items and are excluded from the Versico warranty. Recoat when necessary.

Rooftop Maintenance

When it is necessary for workers to be on the roof to service rooftop equipment (HVAC units, antennas, etc.) workers should be cautioned to use walkways and exercise care with their tools and equipment to avoid puncturing the roofi ng membrane.

Roof Alterations Please refer to the Versico Roofi ng System Revisions and Alteration procedures on the preceding page.

Cleaning

Handprints, footprints, general traffi c grime, industrial pollutants and environmental dirt may be cleaned from the surface of the membrane by scrubbing with detergent and water, then rinsing with clean water. To maximize refl ectivity, white membrane(s) should be cleaned once every two years.

Metal Work Keep roof maintenance items such as counterfl ashing, metal curbs and metal ducts sealed watertight at all times.

Care and Maintenance Instructions (continued)

We are pleased that you purchased a Versico roof and would like to provide some recommendations about how to properly care for your roof to ensure long-term performance.

Inspect and maintain your roof on schedule.

Weather, structural movement and stress are constantly attacking your roof. While normal aging will occur on all roofs, problems stemming from neglect, abuse, contamination or accident can result in extensive, costly repairs or premature failure of the roofi ng system if not detected early.

You can add years to the life of your roof by properly maintaining the roof with a regular inspection program to detect minor problems before they become serious. Plan and start an inspection program during the fi rst year your new roof has been installed.

Track your roof maintenance.

An essential element of a good inspection and maintenance program is proper record keeping and documentation. Versico recommends restricted access to your roof. Versico has provided a maintenance log for your convenience to keep track of who has access to your roof.

The log also includes columns to track two maintenance/inspection events per year. Versico recommends that you have your roof inspected twice annually and after a severe storm. Please have your Versico authorized maintenance company document the condition of your roof with photographs.

If repair, alteration or retrofi t is needed, please see the revisions and alterations procedures included in your owner’s manual packet.

CAUTION:

Roof surfaces may be slippery.

Use extreme caution when walking on your roof.

Building Maintenance

DATE ACCESS

GRANTED

ROOF ACCESS

GRANTED BY

COMPANY GRANTED

ACCESS

NAME

PURPOSE OF

ACCESS

IS THE HVAC

LEAKING

IS THE ROOF

LEAKING?

IS THE LEAK

REPAIRED?

SPRING MAINTENANCE

INSPECTION

FALL MAINTENANCE

INSPECTION

CONDUCTED

BY

DATE

CONDUCTED

BY

DATE

INSTALLATION DATE WARRANTY TERM

Building Name: Date: Contact Person: Warranty Number:

Building Address: City: State: Zip:

Telephone: Building Owner’s Name: Customer Number:

Description of Surrounding Terrain (city, country, hill, valley): Building Usage (note humidity, chemical processing, vibrations, etc.):

Building Height: Slope: Deck: Insulation:

Warranty Maintenance Log

ROOF ACCESS

GRANTED BY

COMPANY GRANTED

ACCESS

NAME

PURPOSE OF

ACCESS

IS THE HVAC

LEAKING

IS THE ROOF

LEAKING?

IS THE LEAK

REPAIRED?

SPRING MAINTENANCE

INSPECTION

FALL MAINTENANCE

INSPECTION

CONDUCTED

BY

DATE

CONDUCTED

BY

DATE

ROOF ACCESS

GRANTED BY

COMPANY GRANTED

ACCESS

NAME

PURPOSE OF

ACCESS

IS THE HVAC

LEAKING

IS THE ROOF

LEAKING?

IS THE LEAK

REPAIRED?

SPRING MAINTENANCE

INSPECTION

FALL MAINTENANCE

INSPECTION

CONDUCTED

BY

DATE

CONDUCTED

BY

DATE

ADDITIONAL COMMENTS:

V ersico . P rin ted in U

.S .A

R

E P

R

IN

T R E Q

U E S T C

O D

E : 6

- “C a re a n d M a in ten a n ce B ro ch u re W a rra n ty In sert” - 0 .1

.2

V ersico

, V ersiG a rd

, V ersiW eld , V ersiFlex a n d V ersiFleece a re a tra d em a rk o f V ersico

BL Mechanical, Inc.

726 Quaker Highway, Uxbridge, MA 01569

*Tel. No.: (508) 779-7401 *Fax No.: (508) 848-0812

2/25/2026

Enfield Enterprises LLC 30 Magaziner Place Springfield, MA 01104

RE:

Building 1372 Roof Replacement

Newport Naval Shipyard Newport, RI 02841 Project # N4008524F5985

Warranty Letter

BL Mechanical, Inc. warranties all materials and workmanship involved in the Building 1372 Roof Replacement project at the Newport Naval Base for the new duct insulation for a period of one year from the date of substantial completion – 2/17/2026. This guarantees against any and all defects in the material and workmanship. All warranty work will be done at the convenience of the customer and performed at the earliest possible time.

Regards, Ben Sherblom BL Mechanical, Inc.

ALL ITEMS ARE EXISTING UNLESS OTHERWISE NOTED PROPOSED

1. THESE GENERAL NOTES SHALL APPLY TO ALL DRAWING SHEETS.

2. THE INFORMATION SHOWN ON THIS DRAWING HAS BEEN COMPLIED FROM VARIOUS SOURCES, AND MAY NOT REFLECT THE ACTUAL

CONDITIONS AT THE TIME OF CONSTRUCTION.

3. HATCH PATTERNS ARE FOR REPRESENTATION ONLY AND SHOULD NOT BE USED A MEANS FOR QUANTIFYING.

4. DISCREPANCIES NOTED BY THE CONTRACTOR IN THE DRAWINGS OR SPECIFICATIONS MUST BE BROUGHT TO THE OWNER'S ATTENTION

PRIOR TO PERFORMING WORK.

5. ALL ITEMS OF CONSTRUCTION SHALL BE IN ACCORDANCE WITH LOCAL, STATE AND FEDERAL REGULATIONS APPLICABLE TO THE PROJECT.

6. THE CONTRACTOR SHALL REPORT DETERIORATED OR UNSUITABLE STRUCTURAL DECK OR SUBSTRATES TO THE OWNER PRIOR TO

PERFORMING ROOFING INSTALLATION WORK.

7. THE CONTRACTOR IS CAUTIONED THAT DUE TO BUILDING OCCUPANCY, THE OWNER REQUIRES COMPLIANCE ON WORK HOURS, SCHEDULING, SET-UP CLEANUP. PARKING, SECURITY, ETC. REFER TO SPECIFICATIONS FOR OWNER REQUIREMENTS.

8. NOTIFY THE OWNER OF WORK LOCATIONS A MINIMUM OF 72 HOURS IN ADVANCE IN ORDER THAT OCCUPANCY BELOW THE WORK AREAS

MAY BE CONTROLLED.

9. ROOFING AND FLASHING SHALL BE 100% WEATHER TIGHT ON A DAILY BASIS. REMOVE ONLY AS MUCH ROOFING AS CAN BE REPLACED ON

THE SAME DAY. PHASED CONSTRUCTION IS NOT PERMITTED.

10. REMOVE EXISTING LOW SLOPED ROOF SYSTEM, SHEET METAL EDGE COMPONENTS AND ASSOCIATED FLASHINGS AND UNDERLAYMENTS

DOWN TO THE EXISTING ROOF DECK TO INSTALL THE NEW ROOF SYSTEM.

11. DETAILS NOT DEPICTED SHALL BE CONSTRUCTED IN A MANNER CONSISTENT TO THE DETAIL DRAWINGS.

12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING AND LEGALLY DISPOSING OF ALL MATERIALS LISTED AND/OR INDICATED ON

THE DRAWINGS OR NOTED IN THE WRITTEN SPECIFICATIONS - TYPICAL.

13. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING AND VERIFYING ALL DIMENSIONS, CONDITIONS, HEIGHTS, MATERIAL THICKNESS, ETC., IN THE FIELD PRIOR TO ORDERING MATERIAL AND COMMENCING CONSTRUCTION.

14. THE BUILDING SHALL BE MAINTAINED IN A DUST FREE CONDITION. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY TEMPORARY PROTECTION TO ENSURE THE INTERIOR OF THE BUILDING REMAINS DUST FREE. NO DEMOLITION CAN PROCEED UNTIL AN APPROVED

TEMPORARY PROTECTION SYSTEM IS IN PLACE.

15. DUE TO THE CONGESTION AROUND THE PROJECT SITE THE CONTRACTOR MUST PROVIDE DETAILED TRAFFIC AND SCAFFOLDING PLANS TO THE OWNER FOR REVIEW. THE CONTRACTOR WILL ONLY BE ALLOWED THE AREAS SHOWN FOR SETUP AND STORAGE OF MATERIALS.

16. JOB SITE SAFETY IS THE CONTRACTOR' RESPONSIBILITY. GALE REPRESENTATIVES, INCLUDING SUBCONSULTANTS RETAINED BY GALE, MAY VISIT THE JOB SITE FROM TIME TO TIME. THESE VISITS ARE FOR CLARIFICATIONS OF SPECIFIC DESIGN RELATED ISSUES ONLY AND ARE NOT FOR THE PURPOSES OF JOB SITE SAFETY. IT IS THE CONTRACTOR/S SOLE RESPONSIBILITY TO COMPLY WITH ALL SITE SAFETY

APPLICABLE REQUIREMENTS.

17. FOR SAKE OF CLARITY, NOT ALL DETAIL INDICATORS HAVE BEEN SHOWN ON THE PLANS OR ELEVATIONS. DETAIL FLAGS HAVE BEEN SHOWN AT RANDOM LOCATIONS. PROVIDE SIMILAR DETAILS AT LEGEND DESIGNATED LOCATIONS.

18. SCAFFOLDING IS NOT ANTICIPATED TO BE REQUIRED FOR THIS PROJECT.

1. IN GENERAL, ALL FASTENERS, ANCHORS, NAILS, STRAPS AND OTHER ACCESSORIES SHALL BE OF STAINLESS STEEL, GALVANIZED STEEL OR FLUOROCARBON COATED STEEL. GALVANIZING SHALL BE HOT DIP IN ACCORDANCE WITH ASTM A153 SPECIFICATIONS.

ELECTRO-GALVANIZED ITEMS SHALL NOT BE USED.

2. FASTENERS FOR SECURING WOOD BLOCKING TO WOOD BLOCKING SHALL BE GALVANIZED ANNULAR THREADED RING SHANK NAILS.

FASTENERS SHALL BE OF SUFFICIENT LENGTH TO PENETRATE THE RECEIVING MEMBER 1-1/2" MINIMUM, EXCEPT FULL DEPTH INTO

PLYWOOD

3. FASTENERS FOR SECURING WOOD BLOCKING OR INSULATION TO METAL DECK SHALL BE NO.14 SELF-DRILLING, SELF-TAPPING SCREWS.

FASTENERS SHALL BE LONG ENOUGH TO PENETRATE THE RECEIVING SUBSTRATE 5/8-INCH MINIMUM TO 1-1/4-INCH MAXIMUM. WHERE PRACTICAL, SCREWS SHALL PENETRATE ONLY THE UPPER FLUTE OF THE STEEL DECK. FASTENERS SHALL BE STAINLESS STEEL, OR SHALL BE FLUOROCARBON COATED STEEL, IN ORDER TO PREVENT RUSTING IN ACCORDANCE WITH FM 4470 REQUIREMENTS.

4. FASTENERS FOR SECURING INTO METAL STUD FRAMING SHALL BE SELF-DRILLING, SELF-TAPPING SCREWS. FASTENERS SHALL BE LONG ENOUGH TO PENETRATE THE RECEIVING SUBSTRATE 5/8 INCH MINIMUM TO 1-1/4 INCH MAXIMUM WITH A SCREW DIAMETER OF 4.8MM MINIMUM. FASTENERS SHALL BE STAINLESS STEEL OR SHALL BE FLUOROCARBON COATED STEEL STEEL IN ORDER TO PREVENT RUSTING.

5. FASTENERS FOR SECURING TO PRESSURE TREATED WOOD BLOCKING SHALL BE STAINLESS STEEL OF EITHER AISI 304 OR 316 ALLOY.

6. TERMINATION BARS SHALL BE 1/8" X 1" ALUMINUM OR STAINLESS STEEL BAR (AS REQUIRED TO PREVENT GALVANIC ACTION WITH THE FLASHINGS BEING SECURED) WITH PRE-PUNCHED HOLES AT SIX INCHES (6") ON CENTER, OR AS REQUIRED BY THE MEMBRANE

MANUFACTURER.

7. STRESS PLATES SHALL BE 3" ALUMINUM PLATE, OR AS REQUIRED BY THE MEMBRANE MANUFACTURER.

8. EXPANSION ANCHORS: FABRICATED FORM CORROSION-RESISTANT MATERIALS, WITH CAPABILITY TO SUSTAIN. WITHOUT FAILURE, A LOAD EQUAL TO 5 TIMES DESIGN LOAD, AS DETERMINED BY TESTING PER ASTM E 488 CONDUCTED BY A QUALIFIED INDEPENDENT TESTING

AGENCY.

9. SECURING WOOD BLOCKING TO STEEL FRAMING SHALL HAVE A MAXIMUM SPACING OF FORTY EIGHT INCHES (48") AT THE PERIMETERS

AND TWENTY FOUR INCHES (24") AT THE CORNERS.

10. SECURING WOOD BLOCKING TO WOOD BLOCKING OR METAL STUDS SHALL HAVE A MAXIMUM SPACING OF TWENTY FOUR INCHES (24")

AND TWELVE INCHES (12") AT THE CORNERS.

11. FASTENERS SHALL BE INSTALLED IN TWO (2) ROWS. STAGGERED SIX INCHES (6") ON CENTER. FASTENERS SHALL BE SPACED THREE (3) TO

FOUR (4) INCHES FROM THE END OF EACH BOARD.

1. UNIFORM FACILITY CRITERIA (UFC) - 1-200-01 GENERAL

BUILDING REQUIREMENTS.

2. UNIFORM FACILITY CRITERIA (UFC) - 3-110-05 ROOFING.

3. INTERNATIONAL BUILDING CODE (IBC) - 2021

4. INTERNATIONAL EXISTING BUILDING CODE (IEBC) - 2021

5. INTERNATIONAL ENERGY CONSERVATION CODE (IECC) - 2021

6. INTERNATIONAL ENERGY OF CIVIL ENGINEERS (ASCE) - 7-16

CODE REFERENCES

FASTENER TYPES

GENERAL NOTES

SYMBOL LEGEND

SITE LEGEND

SITE PLAN

VAUGHAN

VAUGHAN

EL

LIO

T

AV

E

ME

YE

RK

OR

D

AV

E

BUILDING

BUILDING

BALD

ROOF LINE

BUILDING IN CONTRACT

BUILDING NOT IN CONTRACT

GRASS/LANDSCAPED AREAS

SIDEWALK/WALKWAY

BUILDING ENTRANCE DO NOT OBSTRUCT

TREE; SIZE VARIES

FENCE LINE

DETAIL SYMBOL

LETTER/NUMBER DESIGNATION

SHEET NUMBER WHERE DETAIL IS DRAWN

NOT TO SCALE

D E

P A

R

TM

E N

T O

F

TH

E N

A V

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M S

C O

M M

A N

D

DES DRW

M A

R K

D E

S C

R

IP

TI

O

N D

A

TE

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

Gale Associates, Inc.

Engineers and Planners

300 LEDGEWOOD PLACE, SUITE 300

ROCKLAND, MA 02370

P 781.335.6465 F 781.335.6467 www.gainc.com

Boston Baltimore Orlando Hartford Manchester

GALE JN: 843810

GALE JEN CM

AS BUILT

AS BUILT CONDITONS HAVE BEEN

PRESENTED AND REVIEWED BY EEI

OF SPRINGFIELD, MA

413-788-2688

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

P U

B

LI

C W

O R

K S

D E

P A

R

TM

E N

T

- M

A

IN

E N

A V

A L

S

TA

TI

O

N N

E W

P O

R T

- N E

W P

O R

T, R

I

N A

V A

L S

TA

TI

O N

N E

W P

O R

T N

E W

P O

R T, R I

R

IP

LE

Y

H A

LL

B U

IL

D

IN

G

R

O O

F R

E P

LA

C

E M

E N

T

MM/DD/YYYY

1802331

Approved by <<ACTIVITY_REP>>, <<ACTIVITY_REP_TITLE>>, with

<<ACTIVITY>>, via Email.

S

IT

E P

LA

N

A N

D G

E N

E R

A L

N O

TE

S

NOT TO SCALE

GI002

PHOTOGRAPHIC INDICATOR

THE PHOTOGRAPHS SHOWN ON THIS SHEET ARE UNIQUE AND TYPICAL. THEY ARE NOT TO BE CONSIDERED AS ALL ENCOMPASSING.

PHOTOGRAPHIC INDICATORS

1. THE INFORMATION SHOWN ON THIS DRAWING HAS BEEN COMPILED FROM VARIOUS SOURCES AND MAY NOT REFLECT THE ACTUAL CONDITIONS AT THE

TIME OF CONSTRUCTION.

2. PHOTOGRAPHIC INDICATORS ARE IN APPROXIMATE LOCATIONS.

3. REFER TO SHEET GI002 FOR ADDITIONAL GENERAL NOTES.

GENERAL NOTES

PHOTO 1 - PARTIAL VIEW OF ROOF AREA A.

PHOTO 6 - VIEW OF THE EAST ELEVATION.

PHOTO 2 - PARTIAL VIEW OF ROOF AREA A.

PHOTO 7 - VIEW OF THE PENTHOUSE ABOVE ROOF AREA A.

PHOTO 3 - PARTIAL VIEW OF ROOF AREA A'S PARAPET.

PHOTO 8 - PARTIAL VIEW OF ROOF AREA C.

PHOTO 4 - VIEW OF A TYPICAL THROUGHWALL SCUPPER.

PHOTO 9 - PARTIAL VIEW OF ROOF AREA D.

PHOTO 5 - VIEW OF A TYPICAL THROUGHWALL SCUPPER CONDUCTOR BOX.

PHOTO 10 - PARTIAL VIEW OF ROOF AREA B.

REMOVE AND REPLACE ROOF ASSEMBLY; TYPICAL

INSTALL NEW SHEET METAL AND FLASHINGS AROUND ALL PIPES, STACKS, VENTS, EQUIPMENT SUPPORTS, AND OTHER ROOF PENETRATIONS

COORDINATE WITH LIGHTNING PROTECTION SUBCONTRACTOR FOR THE INSTALLATION OF LIGHTNING PROTECTION SYSTEM

RAISE ROOF HATCH CURB, INSTALL SHEET METAL AND FLASHINGS PRIOR TO REINSTALLING ROOF HATCH

INSTALL FAN CURB FLASHINGS AND SHEET METAL SKIRT FLASHINGS

INSTALL SHEET METAL FLASHING AT EIFS WALLS

INSTALL THERMOPLASTIC CLAD METAL SCUPPER SLEEVE AND MEMBRANE FLASHINGS

REMOVE, STORE AND REINSTALL CONDUCTOR BOX AND DOWNSPOUT AS REQUIRED TO INSTALL NEW SCUPPER SLEEVE

INSTALL SHEET METAL AND PERIMETER EDGE METAL FLASHING

RTU; REMOVE AND REPLACE FACE FASTENERS WITH FASTENERS THROUGH EPDM BACKED METAL WASHERS; TYPICAL

REMOVE AND REPLACE DUCT INSULATION; TYPICAL

PROVIDE ROOF MANUFACTURER'S WALKWAY PAD AND SPLASHBLOCK UNDER CONDENSATE PIPE, TYPICAL

REPLACE MISSING CONDUCTOR AND DOWNSPOUT TO MATCH THE EXISTING CONFIGURATIONS

REPLACE ALL RTU DOOR HANDLES; ESTIMATED QUANTITY EQUALS FIFTY (50)

REPLACE SIX (6) DAMAGED RTU SIDE PANELS (CONFIRM LOCATION IN THE FIELD).

KEY PLAN

NOT TO SCALEPLAN

NORTH

ROOF AREA B

ROOF AREA A

ROOF AREA CROOF AREA D

LEGEND

14 152 2 1 32 79 9 7

13 9 6 1 3 1 1

8 9

PHOTO 11 - RTU 1 PHOTO 12 - RTU 2 PHOTO 13 - RTU 3 PHOTO 14 - RTU 4 PHOTO 15 - RTU 5

PHOTO 16 - RTU 6 PHOTO 17 - RTU 7

PHOTO 18 - RTU 8

14 15

15 3 10 11 11 15 15 3 11 14 12 10 14 3 3 1014 15 11 11 3 10 14 15

15 14 10 12 3 11 3 10 14 15 11

10 14 12 15 11

8 8 8 2 899

IT IS THE INTENT OF THIS PROJECT TO KEEP THE EXISTING ROOF TOP UNITS IN PLACE, AND

PERFORM THE FOLLOWING REPAIRS:

1. REPLACE ALL DUCT INSULATION AND WATERPROOF MEMBRANE. PROVIDE NEW WATER WRAP

MEMBRANE. APPROXIMATE SQUARE FOOTAGE 920SF.

2. REPLACE AHU DOOR HANDLES - 50 HANDLES

3. REPLACE AHU - FIXED PANELS (APPROX. 8’X5” EA, 6 UNITS)

4. PROVIDE ALL NEW SCREWS FOR ALL PANELS

5. REMOVE PAINT (ON THE INSIDE OF DOORS) AND ANY RUST FROM THE BOTTOM OF INSIDE OF

30% OF THE AHU DOORS. PRIME AND RUST PROOF THE BOTTOM OF THE AHU DOORS WHICH

REQUIRE REPAIRS – ESTIMATED 30%OF ALL AHU DOORS.

6. PROVIDE ALL NEW RUBBER GASKETS FOR ALL AHU DOORS AND BUTYL TAPE FOR THE FIXED

PANELS

ROOF TOP UNIT SCOPE OF WORK

D E

P A

R

TM

E N

T O

F

TH

E N

A V

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M S

C O

M M

A N

D

DES DRW

M A

R K

D E

S C

R

IP

TI

O

N D

A

TE

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

Gale Associates, Inc.

Engineers and Planners

300 LEDGEWOOD PLACE, SUITE 300

ROCKLAND, MA 02370

P 781.335.6465 F 781.335.6467 www.gainc.com

Boston Baltimore Orlando Hartford Manchester

GALE JN: 843810

GALE JEN CM

AS BUILT

AS BUILT CONDITONS HAVE BEEN

PRESENTED AND REVIEWED BY EEI

OF SPRINGFIELD, MA

413-788-2688

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

P U

B

LI

C W

O R

K S

D E

P A

R

TM

E N

T

- M

A

IN

E N

A V

A L

S

TA

TI

O

N N

E W

P O

R T

- N E

W P

O R

T, R

I

N A

V A

L S

TA

TI

O N

N E

W P

O R

T N

E W

P O

R T, R I

R

IP

LE

Y

H A

LL

B U

IL

D

IN

G

R

O O

F R

E P

LA

C

E M

E N

T

MM/DD/YYYY

1802331

Approved by <<ACTIVITY_REP>>, <<ACTIVITY_REP_TITLE>>, with

<<ACTIVITY>>, via Email.

P H

O

TO

G R

A P

H

IC

D O

C U

M E

N

TA

TI

O

N

AS NOTED

GI003

LEGEND

ALL ITEMS ARE EXISTING UNLESS

OTHERWISE NOTED

ROOF EDGE

PARAPET

CRICKET

THROUGH WALL SCUPPER

BALLASTED GUARDRAIL

LIGHTNING PROTECTION CABLE

DUCTWORK ABOVE ROOF SURFACE

ROOF TOP MECHANICAL UNIT

ACCESS HATCH

FAN

DUCT

VENT

SLEEPER

ROOF ACCESS DOOR

VENT PIPE; # INDICATES DIAMETER

ROOF DRAIN

STACK

LIGHTNING PROTECTION

PENETRATION

ELECTRICAL PENETRATION

GUARDRAIL BASE; REMOVE AND

STORE

TAPERED INSULATION SLOPE

HEIGHT RELATIVE TO MAIN

ENTRANCE WHICH IS ASSUMED TO

BE 100'-0"

RTU

F

H

VP

157'-3"±

30'-0"± 14'-10"± 16'-7"±

61'-4"±

29'-11"±14'-8"±16'-6"±

61'-1"±

53'-3"± 72'-11"± 6'-3"± 72'-11"± 52'-3"±

52'-8"± 52'-6"±16'-9"±6'-9"±

135'-0"±

5'-0"±

4'-0"±

20'-6"±

SCALE: 3/32"=1'-0"

NOTE: ALL ITEMS ARE EXISTING UNLESS OTHERWISE DESIGNATED

ROOF AREA PLAN - DEMOLITION

0 8' 16' 24'

GENERAL NOTES

1. THE INFORMATION SHOWN ON THIS DRAWING HAS

BEEN COMPILED FROM VARIOUS SOURCES, AND

MAY NOT REFLECT THE ACTUAL CONDITIONS AT

THE TIME OF CONSTRUCTION.

2. FOR THE SAKE OF CLARITY, EACH INDIVIDUAL

DETAIL ON THE ROOF PLAN HAS NOT BEEN

INDICATED, DEMOLITION DETAILS HAVE BEEN

INDICATED FOR TYPICAL COMPONENTS AT

RANDOM LOCATIONS.

3. HATCH PATTERNS ARE FOR REPRESENTATION

ONLY AND SHOULD NOT BE USED AS A MEANS FOR

QUANTIFYING.

4. REFER TO GENERAL NOTES ON GI002.

23'-0"±

ROOF AREA B

ELEV.=123'-0"±

ROOF AREA A

ELEV.=136'-6"±

ROOF AREA C

ELEV.=143'-3"±

ROOF AREA D

ELEV.=136'-0"±

REMOVE EXISTING ROOF SYSTEMS; TYPICAL.

REMOVE EXISTING FLASHINGS; TYPICAL ALL CURB AND PENETRATION

LOCATIONS.

SUPPORT EXISTING DUCT WORK TO REMOVE ROOF; TYPICAL.

REMOVE AND STORE EXISTING LIGHTNING PROTECTION SYSTEM TO

REMOVE THE ROOF; TYPICAL.

REMOVE EXISTING ROOF HATCH.

REMOVE AND SUPPORT FAN UNIT TO REMOVE THE ROOF; TYPICAL ALL

LOCATIONS.

PREPARE EXISTING RISING WALL AND EIFS WALL COMPONENTS FOR

NEW FLASHING CONFIGURATION; TYPICAL.

REMOVE EXISTING THROUGH WALL SCUPPER SLEEVE; TYPICAL.

REPAIR MISSING AND/OR DAMAGED DOWNSPOUT AND COLLECTOR

BOX

REMOVE PERIMETER METAL; TYPICAL ALL LOCATIONS.

REMOVE AND STORE EXISTING BALLASTED RAILS FOR

REINSTALLATION.

REMOVE AND STORE EXISTING THRESHOLD TO INSTALL NEW

ROOFING.

REMOVE EXISTING FACE FASTENERS AND GASKETS AT RTU'S

DEMOLITION NOTES

ELEV.=#'-#"

4"

VP

D E (2)

D E (2)

E (2)

4"

VP

4"

VP

4"

VP

RTUE (2)

D

D 4"

VP

4"

VP

D D

E (2)

E (2) E (2)

D D

E (2)

D

4"

VP

6'-5"±

66'-7"±

47'-10"±

13'-6"±

RTU 6

RTU 7

RTU 8

RTU 5

RTU 4

RTU 2

RTU 3

RTU 1

HH

F

F

F

F F

F F

F

F

F

F

F F

F

F

F

2 6

2 6

1 2 6

2 6

2 6

2 6

4"

VP

E

LP

F

V

V

4"

VP

F

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

5 2 8

8 8 8 8

2 5

AD501

AD501

AD501

AD501

AD501

AD501

AD501

AD501

AD501

AD501

AD501

AD501

AD501

AD501

AD501

AD501

AD501

AD501

AD501

PLAN

NORTH

D E

P A

R

TM

E N

T O

F

TH

E N

A V

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M S

C O

M M

A N

D

DES DRW

M A

R K

D E

S C

R

IP

TI

O

N D

A

TE

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

Gale Associates, Inc.

Engineers and Planners

300 LEDGEWOOD PLACE, SUITE 300

ROCKLAND, MA 02370

P 781.335.6465 F 781.335.6467 www.gainc.com

Boston Baltimore Orlando Hartford Manchester

GALE JN: 843810

GALE JEN CM

AS BUILT

AS BUILT CONDITONS HAVE BEEN

PRESENTED AND REVIEWED BY EEI

OF SPRINGFIELD, MA

413-788-2688

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

P U

B

LI

C W

O R

K S

D E

P A

R

TM

E N

T

- M

A

IN

E N

A V

A L

S

TA

TI

O

N N

E W

P O

R T

- N E

W P

O R

T, R

I

N A

V A

L S

TA

TI

O N

N E

W P

O R

T N

E W

P O

R T, R I

R

IP

LE

Y

H A

LL

B U

IL

D

IN

G

R

O O

F R

E P

LA

C

E M

E N

T

MM/DD/YYYY

1802331

Approved by <<ACTIVITY_REP>>, <<ACTIVITY_REP_TITLE>>, with

<<ACTIVITY>>, via Email.

R O

O F

A R

E A

P

LA

N

D E

M O

LI

TI

O N

AS NOTED

AD101

100'-0"

FIRST FLOOR

112'-0"

SECOND FLOOR

123'-0"

THIRD FLOOR

136'-6"

TOP OF PARAPET

143'-6"

TOP OF ROOF PENTHOUSE

100'-0"

FIRST FLOOR

112'-0"

SECOND FLOOR

123'-0"

THIRD FLOOR

136'-6"

TOP OF PARAPET

143'-6"

TOP OF ROOF PENTHOUSE

100'-0"

FIRST FLOOR

112'-0"

SECOND FLOOR

123'-0"

THIRD FLOOR

136'-6"

TOP OF PARAPET

143'-6"

TOP OF ROOF PENTHOUSE

LEGEND

ALL ITEMS ARE EXISTING UNLESS

OTHERWISE NOTED

EXISTING EIFS

EXISTING BRICK

TYPICAL EXISTING WINDOW

TYPICAL EXISTING DOOR

EXISTING SCUPPER

NOT TO SCALEPLAN

NORTH

ROOF AREA B

ROOF AREA A

ROOF AREA CROOF AREA D

ELEVATION INDICATOR

LEGEND:

NOT USED ON THIS SHEET.

NOT USED ON THIS SHEET.

NOT USED ON THIS SHEET.

NOT USED ON THIS SHEET.

NOT USED ON THIS SHEET.

NOT USED ON THIS SHEET.

NOT USED ON THIS SHEET.

REMOVE EXISTING THROUGH WALL

SCUPPER SLEEVE; TYPICAL.

REPAIR MISSING AND/OR DAMAGED

DOWNSPOUT AND COLLECTOR BOX.

REMOVE PERIMETER METAL; TYPICAL ALL

LOCATIONS.

NOT USED ON THIS SHEET.

NOT USED ON THIS SHEET.

NOT USED ON THIS SHEET.

CLEAR/RELOCATE SOIL TO ATTACHED

NEW COLLAR; TWO LOCATIONS.

PREPARE SURFACES FOR REPLACEMENT

CONDUCTOR BOX AND DOWNSPOUT;

REFER TO THE THROUGHWALL SCUPPER

DETAIL ON D4.

DEMOLITION NOTES

10 10 8 8

8 8

10 10 10 8 15 8 8 8

10 10

8 8 8 8

KEY PLAN

SCALE: 3/32"=1'-0"

NOTE: ALL ITEMS ARE EXISTING UNLESS OTHERWISE DESIGNATED

NORTH ELEVATION - DEMOLITION

0 8' 16' 24'

SCALE: 3/32"=1'-0"

NOTE: ALL ITEMS ARE EXISTING UNLESS OTHERWISE DESIGNATED

EAST ELEVATION - DEMOLITION

0 8' 16' 24'

SCALE: 3/32"=1'-0"

NOTE: ALL ITEMS ARE EXISTING UNLESS OTHERWISE DESIGNATED

WEST ELEVATION - DEMOLITION

0 8' 16' 24'

D E

P A

R

TM

E N

T O

F

TH

E N

A V

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M S

C O

M M

A N

D

DES DRW

M A

R K

D E

S C

R

IP

TI

O

N D

A

TE

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

Gale Associates, Inc.

Engineers and Planners

300 LEDGEWOOD PLACE, SUITE 300

ROCKLAND, MA 02370

P 781.335.6465 F 781.335.6467 www.gainc.com

Boston Baltimore Orlando Hartford Manchester

GALE JN: 843810

GALE JEN CM

AS BUILT

AS BUILT CONDITONS HAVE BEEN

PRESENTED AND REVIEWED BY EEI

OF SPRINGFIELD, MA

413-788-2688

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

P U

B

LI

C W

O R

K S

D E

P A

R

TM

E N

T

- M

A

IN

E N

A V

A L

S

TA

TI

O

N N

E W

P O

R T

- N E

W P

O R

T, R

I

N A

V A

L S

TA

TI

O N

N E

W P

O R

T N

E W

P O

R T, R I

R

IP

LE

Y

H A

LL

B U

IL

D

IN

G

R

O O

F R

E P

LA

C

E M

E N

T

MM/DD/YYYY

1802331

Approved by <<ACTIVITY_REP>>, <<ACTIVITY_REP_TITLE>>, with

<<ACTIVITY>>, via Email.

N O

R

TH

, E A

S T, A N

D W

E S

T E

LE

V

A

TI

O N

S

D E

M O

LI

TI

O N

AS NOTED

AD201

112'-0"

SECOND FLOOR

123'-0"

THIRD FLOOR

136'-6"

TOP OF PARAPET

143'-6"

TOP OF ROOF PENTHOUSE

88'-0"

GROUND FLOOR

100'-0"

FIRST FLOOR

112'-0"

SECOND FLOOR

123'-0"

THIRD FLOOR

136'-6"

TOP OF PARAPET

100'-0"

FIRST FLOOR

112'-0"

SECOND FLOOR

123'-0"

THIRD FLOOR

136'-6"

TOP OF PARAPET

10 8 8

8 8

10 10

LEGEND

ALL ITEMS ARE EXISTING UNLESS

OTHERWISE NOTED

EXISTING EIFS

EXISTING BRICK

TYPICAL EXISTING WINDOW

TYPICAL EXISTING DOOR

TYPICAL EXISTING SCUPPER

NOT TO SCALEPLAN

NORTH

ROOF AREA B

ROOF AREA A

ROOF AREA CROOF AREA D

ELEVATION INDICATOR

LEGEND:

NOT USED ON THIS SHEET.

NOT USED ON THIS SHEET.

NOT USED ON THIS SHEET.

NOT USED ON THIS SHEET.

NOT USED ON THIS SHEET.

NOT USED ON THIS SHEET.

NOT USED ON THIS SHEET.

REMOVE EXISTING THROUGH WALL

SCUPPER SLEEVE; TYPICAL.

NOT USED ON THIS SHEET.

REMOVE PERIMETER METAL; TYPICAL

ALL LOCATIONS.

NOT USED ON THIS SHEET.

NOT USED ON THIS SHEET.

NOT USED ON THIS SHEET.

CLEAR/RELOCATE SOIL TO ATTACHED

NEW COLLAR; TWO LOCATIONS.

NOT USED ON THIS SHEET.

DEMOLITION NOTES

KEY PLAN

SCALE: 3/32"=1'-0"

NOTE: ALL ITEMS ARE EXISTING UNLESS OTHERWISE DESIGNATED

SOUTH ELEVATION - DEMOLITION

0 8' 16' 24'

SCALE: 3/32"=1'-0"

NOTE: ALL ITEMS ARE EXISTING UNLESS OTHERWISE DESIGNATED

EAST ELEVATION - DEMOLITION

0 8' 16' 24'

SCALE: 3/32"=1'-0"

NOTE: ALL ITEMS ARE EXISTING UNLESS OTHERWISE DESIGNATED

WEST ELEVATION - DEMOLITION

0 8' 16' 24'

D E

P A

R

TM

E N

T O

F

TH

E N

A V

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M S

C O

M M

A N

D

DES DRW

M A

R K

D E

S C

R

IP

TI

O

N D

A

TE

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

Gale Associates, Inc.

Engineers and Planners

300 LEDGEWOOD PLACE, SUITE 300

ROCKLAND, MA 02370

P 781.335.6465 F 781.335.6467 www.gainc.com

Boston Baltimore Orlando Hartford Manchester

GALE JN: 843810

GALE JEN CM

AS BUILT

AS BUILT CONDITONS HAVE BEEN

PRESENTED AND REVIEWED BY EEI

OF SPRINGFIELD, MA

413-788-2688

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

P U

B

LI

C W

O R

K S

D E

P A

R

TM

E N

T

- M

A

IN

E N

A V

A L

S

TA

TI

O

N N

E W

P O

R T

- N E

W P

O R

T, R

I

N A

V A

L S

TA

TI

O N

N E

W P

O R

T N

E W

P O

R T, R I

R

IP

LE

Y

H A

LL

B U

IL

D

IN

G

R

O O

F R

E P

LA

C

E M

E N

T

MM/DD/YYYY

1802331

Approved by <<ACTIVITY_REP>>, <<ACTIVITY_REP_TITLE>>, with

<<ACTIVITY>>, via Email.

S O

U

TH

, E A

S T, A N

D W

E S

T E

LE

V

A

TI

O N

S

D E

M O

LI

TI

O N

AS NOTED

AD202

WOOD BLOCKING TO REMAIN

METAL STUD WITH GYPSUM

SHEATHING; ASSUMED

INSULATED; TO REMAIN

ROOF MEMBRANE TO

BE REMOVED

INSULATION TO

BE REMOVED

METAL DECK

TO REMAIN

ROOF MEMBRANE TO

BE REMOVED

INSULATION TO BE

REMOVED

FLASHING MEMBRANE TO BE

REMOVED

STUD WALL; ASSUME INSULATED; TO

REMAIN

PLYWOOD SHEATHING TO REMAIN

ROOF MEMBRANE TO BE REMOVED

INSULATION TO BE REMOVED

METAL STUD FRAMING TO REMAIN

GAPS SHOWN

FOR CLARITY

ROOF MEMBRANE TO BE REMOVED

INSULATION TO BE REMOVED

METAL DECK TO REMAIN

FLASHING MEMBRANE TO BE

REMOVED

EDGE METAL TO BE REMOVED

WOOD BLOCKING TO REMAIN AND

RESECURED

EIFS TO REMAIN

0 3" 6" 9"

EDGE METAL TO BE

REMOVED

PLYWOOD TO REMAIN

STUD WALL FRAMING TO

REMAIN

EIFS TO REMAIN

METAL DECK TO REMAIN

METAL DECK TO

REMAIN

METAL STUD; ASSUMED INSULATED; TO REMAIN

EIFS TO REMAIN

GYPSUM SHEATHING TO REMAIN

ROOF MEMBRANE TO BE REMOVED

INSULATION TO BE REMOVED

METAL DECK TO REMAIN

18"± - 22"±

0 3" 6" 9" 0 3" 6" 9"

0 3" 6" 9" 0 3" 6" 9"

0 3" 6" 9"

FLASHING MEMBRANE TO BE REMOVED

STUD WALL; ASSUME INSULATED; TO

REM…