This document is a Bid Schedule for the B1372 NAPS Upgrades contract, establishing pricing requirements for a design-build project involving facility upgrades and renovations. The contract utilizes a firm fixed price structure with one base bid and ten optional contract line items (CLINs).
The base bid (CLIN 0001) comprises eight component tasks totaling approximately $__________ and includes replacement of eight rooftop make-up air units, relocation of fire alarm control panel, replacement of 174 smoke detectors in berthing spaces, removal and replacement of southside entrance door with structural framing rebuilding, replacement of south stairwell treads with navy blue color and repainting of wainscoting, removal and replacement of approximately 10,800 square feet of vinyl floor tiles with luxury vinyl tiles, replacement of approximately 1,200 square feet of ceramic tiles on the quarterdeck with heavy-use wood grain tile, and replacement of carpeting and tiles in six offices with matching wood grain tile. The ten optional CLINs (0002-0011) address additional mechanical equipment replacement (exhaust fans), thermostat and controls upgrades, electronic and mechanical access control systems, hallway wainscoting enhancements, ceiling tile replacement (14,500 square feet), fire alarm system replacements and upgrades, public address panel integration, and carbon monoxide detection installation. Award will be made on the total sum of all CLINs including base and all options. The contract completion date is 420 calendar days from the award date, with approximately five months allocated for the design period. All pricing must be submitted as lump sum amounts for each CLIN with grand total calculations required.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B1372 NAPS UPGRADES BID SCHEDULE REV 6/12/26
DOCUMENT 00 22 13.00 20
SUPPLEMENTARY INSTRUCTIONS TO OFFERORS
PART 1 GENERAL
1.1 CONTRACT LINE ITEMS
The terms Offeror and Bidder and versions thereof (offer/bid) have the same definition as used within this contract.
Provide the Contract Line Item (CLIN) lump sum price for the following items (all base and options CLINs are FIRM FIXED PRICE and shall be in accordance with the design-build statement of work (and amendment) requirements:
CLIN DESCRIPTON TOTAL PRICE FOR
CLIN
0001 BASE BID
0001AA Replacement of Roof top mechanical equipment
- eight (8) make-up air units.
0001AB Relocate existing fire alarm control panel (FACP) from south stairwell to Quarterdeck.
0001AC Replace smoke detectors in berthing spaces (174).
0001AD Remove the existing southside entrance door, complete, and replace with new door, hardware, and completely rebuilt structural framing.
0001AE Replace all treads in the south stairwell in navy blue. Repair and repaint existing wainscoting system and paint remaining surface in the stairwell.
0001AF Removal of existing vinyl Floor tiles, approximately 10,800 square feet (mostly in the hallways) to be replaced with Luxury Vinyl Tiles (LVT).
0001AG Remove existing ceramic tiles on the quarterdeck (about 1,200 FT2) and replace with a heavy use quality wood grain tile system.
0001AH Remove existing carpeting and tiles in 6 offices (approximately 350 FT2 each) and replace with the same heavy-use quality wood grain tile system being installed in the Quarterdeck.
0001 TOTAL PRICE FOR CLIN 0001
(0001AA+0001AB+0001AC+0001AD+0001AE+0001AF+
0001AG+0001AH)
OPTIONS
CLIN DESCRIPTION TOTAL PRICE FOR
CLIN
0002 Replacement of Roof top mechanical equipment - seventeen (17) exhaust fans.
0003 Replacement of the thermostats in the berthing spaces (174) and (10) others in common spaces for a total of 184. Provide direct digital controls (DDC) work (supervisory controllers) associated with the thermostat replacement as indicated in the statement of work
0004 Install electronic CAC card readers for accessing the two main doors at the south stairwell and quarterdeck.
0005 Install mechanical cipher locks, with key back-ups, on doors in all berthing spaces
(174) plus (10) others throughout the building.
0006 Hallways will receive a wainscoting system including a top and mid rail and base cove to enhance the resiliency of the walls.
0007 Replace 2’ x 2’ ceiling tiles, approximately 14,500 FT2, in the hallways and several common spaces
0008 Replacement of the existing Fire Alarm Control Panel (FACP) with new FACP to be installed in the Quarterdeck area next to the existing public address (PA) Panel.
0009 Replace all remaining Fire Alarm devices (pull stations, horn-strobes, annunciators, smoke detectors, etc.
[except the smoke detectors replaced as part of the base bid]) to be compatible with new FACP.
0010 Replace public address (PA) panel and integrate into new FACP.
0011 Provide new addressable CO detectors in the mechanical room and tie into the nearest fire alarm loop.
TOTAL PRICE FOR ALL OPTIONS (CLINs 0002+ 0003+0004+0005+0006+0007+0008+0009+0010+ 0011)
GRAND TOTAL FOR ALL CLINs (BASE + ALL
OPTIONS)
1.2 GENERAL BID NOTES Award will be made on the total sum of all CLIN (base and all options).
Contract Completion Date will be 420 calendar days from the date of the contract award including the design period which is expected to last approximately five months.
1.3 Previous version of the bid schedule issued with the original solicitation shall be deleted.
-- End of Document --
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
| PART 1 GENERAL |
| 1.1 CONTRACT LINE ITEMS |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
File details come from the government source that posted it. Updated .