Amend 0002.pdf
PDF 1 MB Posted
- Attached to
- Repair BEQ M445 Federal contract opportunity
- Solicitation number
- N4008525R2687
About this file
This document is an Amendment of Solicitation (Standard Form 30) for a Navy construction project at Camp Lejeune. The amendment (Amendment No. 0002) is for Solicitation Number N4008525-R-2687, concerning the Repair of Bachelor Enlisted Quarters (BEQ) M445, with an effective date of 05/21/25. The amendment addresses four specific technical questions related to hospital tips and knobs, water closet flush valve tube lengths, chilled water piping sizes, and heating hot water piping sizes. The time and date for receipt of proposals remains 1300 on 7 July 2025, and failure to acknowledge the amendment may constitute grounds for proposal rejection. The solicitation is being issued by NAVFAC Mid-Atlantic Resident Officer in Charge of Construction, located in Camp Lejeune, NC.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amend 0009.pdf | ||
| Amend 0008.pdf | ||
| Amend 0007.pdf | ||
| 240017 Pricing Sheet Awarding All Options.pdf | ||
| Amend 0006.pdf | ||
| Amend 0005.pdf | ||
| Amend 0004.pdf | ||
| Amend 0003.pdf | ||
| Amend 0001.pdf | ||
| 240017 RFP.pdf | ||
| N4008524B0017 Specs.pdf | ||
| 24-0017 Appendix-D.pdf | ||
| 24-0017 Asbestos and Lead Paint Survey.pdf | ||
| N4008524B0017 Dwgs.pdf | ||
| 24-0017 REIR-DM.pdf | ||
| 24-0017 NEPA.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N40085-25-R-2687 Amendment 0002
CONTINUATION SHEET
1. QUESTION:
Please clarify if hospital tips and knobs are required.
ANSWER: Provide knobs in all locations except RFID locks.
2. QUESTION: During the site visit today it was observed that the water closets have
- new water closets require extended vacuum breaker tubes for the flush valves as to use the existing holes in the walls, or do we need to core drill a new hole and install the standard height (11-hole?
ANSWER: The intent is to utilize the existing holes. Therefore, flush valve lengths as described will need to be provided.
3. QUESTION: The chilled water piping sizes shown on drawing M-802 do not reflect what is shown on drawing, M-401, and M-112. Drawing M-from CH-1 Chiller. Drawing M- CH-1 Chiller. Which pipe diameter is correct?
ANSWER: 4" CHW piping is correct.
4. QUESTION: The heating hot water piping sizes shown on drawing M-803 do not reflect what is shown on drawing M-401 & M-112. Drawings M-401 & M-water coming from the mechanical building, Drawing M-803 heating hot water diagram shows
ANSWER: 2" HW piping is correct.
5. All other terms and conditions remain unchanged.