Amend 0002.pdf

PDF 1 MB Posted

Attached to
Repair BEQ M445 Federal contract opportunity
Solicitation number
N4008525R2687
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This document is an Amendment of Solicitation (Standard Form 30) for a Navy construction project at Camp Lejeune. The amendment (Amendment No. 0002) is for Solicitation Number N4008525-R-2687, concerning the Repair of Bachelor Enlisted Quarters (BEQ) M445, with an effective date of 05/21/25. The amendment addresses four specific technical questions related to hospital tips and knobs, water closet flush valve tube lengths, chilled water piping sizes, and heating hot water piping sizes. The time and date for receipt of proposals remains 1300 on 7 July 2025, and failure to acknowledge the amendment may constitute grounds for proposal rejection. The solicitation is being issued by NAVFAC Mid-Atlantic Resident Officer in Charge of Construction, located in Camp Lejeune, NC.

View the file

Other files for this federal contract opportunity

Other files attached to Repair BEQ M445, newest first.
File Type Posted
Amend 0009.pdf PDF
Amend 0008.pdf PDF
Amend 0007.pdf PDF
240017 Pricing Sheet Awarding All Options.pdf PDF
Amend 0006.pdf PDF
Amend 0005.pdf PDF
Amend 0004.pdf PDF
Amend 0003.pdf PDF
Amend 0001.pdf PDF
240017 RFP.pdf PDF
N4008524B0017 Specs.pdf PDF
24-0017 Appendix-D.pdf PDF
24-0017 Asbestos and Lead Paint Survey.pdf PDF
N4008524B0017 Dwgs.pdf PDF
24-0017 REIR-DM.pdf PDF
24-0017 NEPA.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N40085-25-R-2687 Amendment 0002

CONTINUATION SHEET

1. QUESTION:

Please clarify if hospital tips and knobs are required.

ANSWER: Provide knobs in all locations except RFID locks.

2. QUESTION: During the site visit today it was observed that the water closets have

- new water closets require extended vacuum breaker tubes for the flush valves as to use the existing holes in the walls, or do we need to core drill a new hole and install the standard height (11-hole?

ANSWER: The intent is to utilize the existing holes. Therefore, flush valve lengths as described will need to be provided.

3. QUESTION: The chilled water piping sizes shown on drawing M-802 do not reflect what is shown on drawing, M-401, and M-112. Drawing M-from CH-1 Chiller. Drawing M- CH-1 Chiller. Which pipe diameter is correct?

ANSWER: 4" CHW piping is correct.

4. QUESTION: The heating hot water piping sizes shown on drawing M-803 do not reflect what is shown on drawing M-401 & M-112. Drawings M-401 & M-water coming from the mechanical building, Drawing M-803 heating hot water diagram shows

ANSWER: 2" HW piping is correct.

5. All other terms and conditions remain unchanged.