Price Proposal Form - Rev 1.pdf
PDF 77 KB Posted
- Solicitation number
- N4008525R2611
About this file
This document is a Price Schedule for the Ammunition Rail Trestle and Culvert Repair Project, dated 01 May 2025, for Naval Weapons Station Earle in Colts Neck, New Jersey. The pricing template includes multiple line items with detailed unit prices for various construction and repair activities, such as mobilization, traffic control, compaction grouting, concrete repairs, culvert work, and site restoration. The document lists quantitative requirements for each line item, with blank spaces for contractors to fill in unit prices, including specific repairs for different types of concrete work, culvert patching, geopolymer lining, and other project-specific tasks. The total pricing will be calculated based on the unit prices and specified quantities, with the government reserving the right to reject offers that are deemed materially unbalanced in pricing.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICE SCHEDULE – REVISION 1 – 01 MAY 2025
Provide line item prices, where indicated by blank underlines, for the following items:
Line
Item
Description Quantity Unit Unit
Price
Sub-
Total
Total
Price
0001 BASE PRICE: Total Price for the entire work for the
Ammunition Rail Trestle and
Culvert Repair Project
1 EA $_____
0001A Subtotal of Base Price for
Mobilization and
Demobilization, entire site preparation work, to include the clearing and grubbing, erosion and sediment control measures, access road construction, construction access construction, storm drainage by-pass, and material and equipment staging.
1 EA $_____
0001B Subtotal of Base Price for the required maintenance of traffic
/ traffic control measures throughout construction
1 EA $_____
0001C Unit Price for the compaction grouting work on the railroad embankment in accordance with the requirements of Sheet
BB102 (including exploratory borings, haul off, and pressure grouting)
1,300 CY $_____ $_____
0001D Unit Price for the sinkhole remediation in accordance with the requirements of Sheet
BB102
150 CY $_____ $_____
0001E Unit Price for providing Type 1
Concrete Repairs, in accordance with the plans and specifications, as depicted on sheets S-102, S-103, and S-104
132 LF $_____ $_____
0001F Unit Price for providing Type 2
Concrete Repairs, in accordance with the plans and specifications, as depicted on sheets S-102, S-103, and S-104
1,471 SF $_____ $_____
0001G Unit Price for providing Type 3
Concrete Repairs, in accordance with the plans and
24 CF $_____ $_____
TOTAL PRICE FOR CLINs 0001 $___________________
GENERAL BID NOTES
a. Award will be made on the total sum of Contract Line Item 0001. For CLINs 0001C, 0001D, 0001E, 0001F, 0001G, 0001H, 0001I, and 0001K, enter unit price and extended total in space provided. If there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid and the total recomputed accordingly. If an Offeror provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.
specifications, as depicted on sheets S-102, and S-104
0001H Unit Price for providing Type 4
Concrete Repairs, in accordance with the plans and specifications, as depicted on sheets S-102, S-103, and S-104
2,000 Gal $_____ $_____
0001I Unit Price for providing Type 5
Concrete Repairs, in accordance with the plans and specifications, as depicted on sheets S-102, S-103, and S-104
2,702 SF $_____ $_____
0001J Subtotal of Base Price for entire work to install cofferdams at Culvert 1A and
Culvert 1B downstream and upstream, entire work to dewater the work area and culverts to perform repairs cofferdams at Culvert 1A and at Culvert 1B and entire work to remove the sediment from the culverts to perform repairs cofferdams at Culvert 1A and
Culvert 1B.
1 EA $_____ $_____
0001K Unit Price for providing culvert patching and repairs prior to geopolymer placement, in accordance with the plans and specs on sheet C-502, detail A1
8,000 SF $_____ $_____
0001L Subtotal of Base Price for entire work to place the geopolymer lining in the culverts, both banks of culverts, in accordance with the plans and specifications
1 EA $_____ $_____
0001M Subtotal of Base Price for the site restoration work depicted in the plans and specifications
1 EA $_____ $_____
b. The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.
c. The Performance Bond must reflect 100 percent of the aggregate amount of all items.
File details come from the government source that posted it. Updated .