This document is a draft transmittal letter from the New Jersey Department of Environmental Protection's Bureau of Water Allocation & Well Permitting regarding a New Temporary Dewatering Permit for Naval Weapon Station Earle's Culvert Repairs project. The letter, dated March 25, 2025, is addressed to Brandy Chenault at Jacobs and provides draft documents for review, including a Draft Staff Report, Draft Permit Requirements, and Draft Permit Inventory.
Key requirements include submitting a well drilling permit application for each proposed well, obtaining well permits before use, and meeting specific replacement well criteria for potential minor modifications. The recipient is requested to review the factual material and provide comments within 14 days. If no response is received, the Bureau will assume acceptance and continue processing the permit application. The project involves dewatering activities, and access agreements must be signed prior to any site activities such as well construction or dewatering.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
March 25, 2025
VIA EMAIL: Brandy.Chenault@jacobs.com
NAVAL WEAPON STATION EARLE - CULVERT REPAIRS
2 Crowne Pt Ct Cincinnati, OH 45241 Attn: Brandy Chenault
Re: Program Interest ID/ Permit No. 1393D – New Temporary Dewatering Permit
Activity No. DWP240001
Dear Ms. Chenault:
I have completed a Draft Staff Report, Draft Permit Requirements, and Draft Permit Inventory based upon my review of the information submitted with the application filed on behalf of NAVAL WEAPON STATION EARLE - CULVERT REPAIRS. Attached for your review and comments are copies of the above referenced draft documents.
Your review of the factual material is important as this was the basis for my analysis, and subsequent recommendations for permit conditions. Please advise me if you find any of this information to be incomplete or inaccurate.
The Permit Requirements section should be reviewed carefully to make sure that you will be able to comply with the proposed permit conditions. I would like to draw your attention to the Submittal/Action Requirements, Submit Well Drilling Permit Application, which requires that a well permit application be submitted for each proposed well in order to obtain a well permit for each well used in the dewatering activities. No well should be used until each well permit is approved. Also, Text Requirement no. 1 indicates that a modification of the temporary dewatering permit will be required once the wells are installed. In order for the wells to be added through a minor modification, every well must meet replacement well criteria in relation to the proposed location, depth, pumping capacity, and aquifer. If any well does not meet replacement criteria a major modification will be required. Also, the access agreements must be signed and in place prior to any activity taking place on the site (e.g., well construction, dewatering, etc.).
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Mail Code 401-04Q Division of Water Supply & Geoscience
New Jersey Geological and Water Survey Element Bureau of Water Allocation & Well Permitting
401 E. State Street - P.O. Box 420 Trenton, New Jersey 08625-0420
Tel #: (609) 984-6831 - Fax #: (609) 633-1231 https://www.nj.gov/dep/watersupply/
SHAWN M. LATOURETTE
COMMISSIONER
PHILIP D. MURPHY
GOVERNOR
TAHESHA L. WAY
LT. GOVERNOR
mailto:Brandy.Chenault@jacobs.com
Your review and comments at this time will allow us to resolve any problems before the permit is issued.
I would appreciate receiving your comments within 14 days from the date of this letter. If I do not hear from you within this time frame, I will assume that the Draft Staff Report, Draft Permit Requirements, and Draft Permit Inventory are acceptable to you, and the Bureau will continue with processing of the permit application. Should you have any questions please contact me at
(609) 984-6831 or by email at Ovidiu.Petriman@dep.nj.gov .
Very truly yours, Ovidiu M. Petriman, Geologist 3 Bureau of Water Allocation & Well Permitting
Enclosure c: (via email) Daniel Callery, NWS Earle, daniel.j.callery.civ@us.navy.mil Darren Muller, NWS Earle, darren.j.mueller.civ@us.navy.mil mailto:Ovidiu.Petriman@dep.nj.gov mailto:daniel.j.callery.civ@us.navy.mil mailto:darren.j.mueller.civ@us.navy.mil
| Mail Code 401-04Q |
| Division of Water Supply & Geoscience |
| New Jersey Geological and Water Survey Element |
| Bureau of Water Allocation & Well Permitting |
| 401 E. State Street - P.O. Box 420 |
| Trenton, New Jersey 08625-0420 |
| Tel #: (609) 984-6831 - Fax #: (609) 633-1231 |
| https://www.nj.gov/dep/watersupply/ |
File details come from the government source that posted it. Updated .