O - 8.5 UFGS SECTION 26 08 00 APPARATUS INSPECT & TEST.pdf
PDF 11 KB Posted
- Solicitation number
- N4008525R0126
About this file
This document is a technical specification section (Section 26 08 00) for Apparatus Inspection and Testing related to extending a 35kV Circuit NS-5 to SA Sub. The specification outlines detailed requirements for electrical equipment testing and inspection, emphasizing the need for a qualified, independent testing organization with at least 5 years of experience. Key requirements include submitting test reports, inspection procedures, and qualifications of the testing organization and lead engineering technician.
The specification mandates that the testing organization must be a first-tier subcontractor and perform acceptance tests and inspections in accordance with NETA ATS (2021) standards and manufacturer recommendations. The testing will focus on underground electrical distribution, specifically medium voltage cables and grounding systems. Final system acceptance is contingent upon satisfactory completion of these tests, and a representative from the approved testing organization must be present when equipment is initially energized and placed in service.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Extend 35kV Circuit NS-5 to SA Sub 1747833
SECTION 26 08 00
APPARATUS INSPECTION AND TESTING
11/22
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
INTERNATIONAL ELECTRICAL TESTING ASSOCIATION (NETA)
NETA ATS (2021) Standard for Acceptance Testing Specifications for Electrical Power Equipment and Systems
1.2 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following :
SD-06 Test Reports
Acceptance Tests and Inspections; G
SD-07 Certificates
Qualifications of Organization, and Lead Engineering Technician; G
Acceptance Test and Inspections Procedure; G
1.3 QUALITY ASSURANCE
1.3.1 Qualifications
Engage the services of a qualified testing organization to provide inspection, testing, calibration, and adjustment of the electrical distribution system and generation equipment listed in paragraph ACCEPTANCE TESTS AND INSPECTIONS herein. Organization must be independent of the supplier, manufacturer, and installer of the equipment. The organization must be a first tier subcontractor. No work required by this section of the specification may be performed by a second tier subcontractor.
a. Submit name and qualifications of organization. Organization must have been regularly engaged in the testing of electrical materials, devices, installations, and systems for a minimum of 5 years. The organization must have a calibration program, and test instruments used must be calibrated in accordance with NETA ATS.
b. Submit name and qualifications of the lead engineering technician performing the required testing services. Include a list of three comparable jobs performed by the technician with specific names and telephone numbers for reference. Testing, inspection, calibration, SECTION 26 08 00 Page 1 and adjustments must be performed by an engineering technician, certified by NETA (Level III) or the National Institute for Certification in Engineering Technologies (NICET) with a minimum of 5 years' experience inspecting, testing, and calibrating electrical distribution and generation equipment, systems, and devices.
1.3.2 Acceptance Tests and Inspections Reports
Submit certified copies of inspection reports and test reports. Include certification of compliance with specified requirements, identify deficiencies, and recommend corrective action when appropriate. Type and neatly bind test reports to form a part of the final record. Submit test reports documenting the results of each test not more than 10 days after test is completed.
1.3.3 Acceptance Test and Inspections Procedure
Submit test procedure reports for each item of equipment to be field tested at least 45 days prior to planned testing date. Do not perform testing until after test procedure has been approved.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
3.1 ACCEPTANCE TESTS AND INSPECTIONS
Testing organization will perform acceptance tests and inspections. Test methods, procedures, and test values must be performed and evaluated in accordance with NETA ATS, the manufacturer's recommendations, and paragraph FIELD QUALITY CONTROL of each applicable specification section.
Tests identified as optional in NETA ATS are not required unless otherwise specified. Place equipment in service only after completion of required tests and evaluation of the test results have been completed. Supply to the testing organization complete sets of shop drawings, settings of adjustable devices, and other information necessary for an accurate test and inspection of the system prior to the performance of any final testing. Notify Contracting Officer at least 14 days in advance of when tests will be conducted by the testing organization. Perform acceptance tests and inspections on applicable equipment and systems specified in the following sections:
a. Section 33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION. Medium voltage cables and grounding systems only.
3.2 SYSTEM ACCEPTANCE
Final acceptance of the system is contingent upon satisfactory completion of acceptance tests and inspections.
3.3 PLACING EQUIPMENT IN SERVICE
A representative of the approved testing organization must be present when equipment tested by the organization is initially energized and placed in service.
-- End of Section --