This document is a Design Revision 01 for a naval electrical infrastructure project issued by PWD Norfolk, Facilities Engineering and Acquisition Division. The project involves extending a 35kV electrical circuit from Naval Station (NS) Sub to SA Sub at Naval Station Norfolk and NSA Hampton Roads, with the construction contract number N40085-25-R-0126. Key revisions include adding special scheduling requirements for airfield access, specifying contractor responsibilities such as performing Toxicity Characteristics Leaching Procedure (TLCP) on manhole water, and updating electrical site plan drawings and manhole layouts. The revision is dated 4 September 2025 and responds to previous project instructions from 27 August 2025, with specific modifications to electrical distribution specifications and site plan drawings covering station locations from STA 46+83.46 to STA 73+66.55.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PWD Norfolk, Facilities Engineering and Acquisition Division Form Version 2023.11.07 Page 1 of 2
Design Revision 01 eProjects Work Order Number: 1747833
Construction Contract Number: N40085-25-R-0126
Location: Naval Station Norfolk and NSA Hampton Roads
Project Title: Extend 35kV Circuit from NS Sub to SA Sub
Date: 4 September 2025
Design Revision Purpose
1. Response to PP!s of 27AUG25
Executable Scope of Work Revisions
4. Special Scheduling Requirements / Work Procedures: Add the following:
4.6 Contact the Airfield Manager, Shane Dudley at 757-322-3420 (office) or 757-613-5828 or shane.d.dudley.civ@us.navy.mil at least 14 days in advance to access airfield. The contractor is required to have the Airfield Vehicle Operations on Chambers Field (AVOC). Refer to Att 8.7 3710.6C Regulations Governing Airfield Vehicle Operations on Chambers Field.
4.7 The government will remove any vegetation overgrowth in the project area.
7. Project Overview and Work Requirements: Add the following:
7.5 The contractor shall perform Toxicity Characteristics Leaching Procedure (TLCP) on water in the manholes.
8. Attachments: Add the following:
8.7 3710.6C Regulations Governing Airfield Vehicle Operations on Chambers Field
Executable Scope of Work Attachment Revisions
Att 8.3 – Manhole Layouts: is revised as follows:
EMH#3743J layout is deleted. The electrical manhole layouts for EMH#3743I, EMH#3743K, EMH#3743L, ENH#3743M, EMH#3743N, EMH#2743O, EMH#3743P, and EMH#3743Q are revised.
EMH#3743R is provided.
PWD Norfolk, Facilities Engineering and Acquisition Division Form Version 2023.11.07 Page 2 of 2
Att 8. 4 Extend 35kV Circuit Electrical Site Plans Drawing Revisions
The following drawings are revised as of 9/4/2025, and accompany this Design Revision:
SHEET NO.
NAVFAC DRAWING NO. SHEET TITLE NO. SHEET
ELECTRICAL
8 ES108 12,927,774 ELECTRICAL SITE PLAN – STA 46+83.46 TO STA 53+52.64
9 ES109 12,927,775 ELECTRICAL SITE PLAN – STA 53+52.64 TO STA 60+22.52
10 ES110 12,927,776 ELECTRICAL SITE PLAN – STA 60+22.52 TO STA 66+94.82
11 ES111 12,927,777 ELECTRICAL SITE PLAN – STA 66+94.82 TO STA 73+66.55
Att 8.6 UFGS SECTION 33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
In paragraph 2.5.3 Separable Insulated Connector Type, a. delete the last sentence in this paragraph.