Extend 35kV Circuit from Navy South Substation to SA Substation at NSA HR, Norfolk, VA
Solicitation number
N4008525R0126
Issued by

About this file

The file is a Pre-Proposal Inquiry (PPI) Submission Form for Task Order #N4008525R0126, which involves extending a 35kV electrical circuit at Naval Support Activity Hampton Roads (NSA HR) in Norfolk, VA. The project is specifically limited to Contractors of the Small Business Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC) for Utility Mechanical Construction in the Hampton Roads area.

The detailed scope includes extending an underground 34.5 kV circuit from Navy South Switching Station circuit #5 (NS-5) to existing Switch #232, replacing the current NS-15 overhead circuit as the primary line for the SA Substation. The work involves demolition of the existing circuit and installation of new 35kV electrical cables, including 3-1/C #750kcmil 35kV EPR and a ground wire, routed through existing underground ductbank systems. The project is being managed by the Department of the Navy Naval Facilities Engineering Command (NAVFAC), with additional technical details provided in the NAVFAC Executable Scope Work Order No. 1747833.

View the file

Other files

Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 Pre-Proposal Inquiry Submission Form Task Order #: N4008525R0126 Project Title: Extend 35kV Circuit from Navy South Substation to SA Substation at Naval Support Activity Hampton Roads (NSA HR), Norfolk, VA

Submitted By:Date SubmittedLEAVE BLANKReferenceQuestionResponse
PageSectionParagraph

File details come from the government source that posted it. Updated .