This document is an amendment to Solicitation N4008524R2609 for the PIER 14 - REPAIR CLEATS AND BOLLARDS project at Joint Expeditionary Base Little Creek - Fort Story in Virginia Beach, VA.

The amendment revises the Price Proposal Form, provides responses to a pre-proposal inquiry, and updates the General Requirements document. The proposal due date of March 21, 2024 at 2:00 PM ET remains unchanged. This solicitation is limited to Small Business Multiple Award Construction Contract (MACC) Contractors primarily in the Hampton Roads Area of Virginia who hold Contract Nos. N40085-18-D-1156/1157/1158/1159/1160 with the Naval Facilities Engineering Command (NAVFAC) Mid-Atlantic. The purpose of the project is to repair cleats and bollards on Pier 14.

View the file

Other files

File Type Posted
0005_Site visit log 04.25.24.pdf PDF
Amendment 0005.pdf PDF
0005_Pre-Proposal Inquiry Responses Rev_2.pdf PDF
Amendment 0004.pdf PDF
0004_24R2609_General Requirements_Rev3.pdf PDF
0003_ATT. J1_FAA Approach Path.pdf PDF
Amendment 0003.pdf PDF
0003_ATT. F_Pre-Proposal Inquiry Form_REV1.xlsx XLSX spreadsheet
0003_24R2609_General Requirements_Rev2.pdf PDF
0003_ATT. J3_Piers 12-15 Mooring Platforms.pdf PDF
0003_ATT. A_1802688_Specifications.pdf PDF
0003_ATT. B_1802688_Drawings.pdf PDF
0003_ATT. J4_Piers 15-17 Mooring Platform Extension.pdf PDF
0003_ATT. J2_Piers 15-19 Original Drawings.pdf PDF
0003_ATT. G_Price Proposal Form_REV3.pdf PDF
DoN REAs_Export_04_05_2024.xlsx XLSX spreadsheet
0003_ATT. J5_Piers 11-14 Original Drawings.pdf PDF
0002_24R2609 Pier 14 General Requirements Rev_1.pdf PDF
0002_Attachment F - Pre-Proposal Responses Rev_1.pdf PDF
0002_Attachment G - Price Proposal Form Rev_2.pdf PDF
0001_Attachment I- JEBLCFS Site Visit List.pdf PDF
0001_Attachment G - Price Proposal Form Rev_1.pdf PDF
Amendment 0001.pdf PDF
0001_Attachment F - Pre-Proposal Responses.pdf PDF
0001_Attachment H - Solicitation Provisions Rev_1.pdf PDF
Attachment G - Price Proposal Form.pdf PDF
Attachment C - WD VA20240203 05JAN24.pdf PDF
Attachment B - Drawings.pdf PDF
24R2609 Pier 14 General Requirements.pdf PDF
Attachment F - Pre-Proposal Inquiry Form.xlsx XLSX spreadsheet
Attachment A - Specifications.pdf PDF
Attachment D - SECNAV 5512.pdf PDF
Attachment E - ONE DAY PASS FORM.xls XLS spreadsheet
Attachment H - SOLICITATION PROVISIONS.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT ID CODE PAGE OF PAGES

1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. PROJECT NO. (If applicable) 0002 03/21/2024

6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code

NAVFACSYSCOM MID-ATLANTIC

PWD LITTLE CREEK

FACILITIES ENGINEERING & ACQ DIV 1450 GATOR

BLVD SUITE 150

VIRGINIA BEACH VA 23459-8616

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.

N40085-24-R-2609

9B. DATED (SEE ITEM 11)

2/21/2024

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning _1_ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER: (specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

N40085-24-R-2609, PIER 14 - REPAIR CLEATS AND BOLLARDS, JOINT EXPEDITIONARY BASE LITTLE CREEK – FORT STORY

(JEBLCFS), LITTLE CREEK SITE, VIRGINIA BEACH, VA

Proposal due date of Thursday, 21 March 2024 @ 1400 ET remains unchanged.

The purpose of this amendment is as follows:

(1) Provide a revision to Attachment G Price Proposal Form Rev_2 , updated amount of days required to complete.

(2) Provide a revision to the General Requirements Rev_1, updated Time for Completion and Liquidated Damages amount.

(3) Provide responses to PPI, Attachment F Pre-Proposal Responses Rev_1.

SEE SF 30 BLOCK 14 CONTINUATION PAGE

Contract POC: Kristina DeGroat, Email: kristina.l.degroat.civ@us.navy.mil; 757-462-4901

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR (Same as Item 8)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)

PREVIOUS EDITION UNUSABLE Prescribed by GSA

N40085-24-R-2609

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SF 30 BLOCK 14 CONTINUATION PAGE

This amendment is issued for the following:

1. Provide Revised Price Proposal Form:

a. Provided as an attachment, Attachment G - Price Proposal Form Rev_2

2. Provide Response to Pre-Proposal Inquiry - #08

a. Provided as an attachment, Attachment F - Pre-Proposal Responses Rev_1

3. Provide a updated attachment with changes in red to General Requirements

a. Provided as an attachment, 24R2609 Pier 14 General Requirements Rev_1