0003_ATT. G_Price Proposal Form_REV3.pdf

PDF 131 KB Posted

Attached to
PIERS 15 AND 14 - REPAIR CLEATS AND BOLLARDS
Solicitation number
N4008524R2609
Issued by

About this file

This document is a Price Proposal Form for the Piers 15 and 14 Repair Cleats and Bollards project. It provides line item pricing for various tasks related to the removal and replacement of mooring cleats and bollards, including concrete foundations, on Piers 15 and 14. The contract opportunity is a Solicitation issued by the Department of the Navy Naval Facilities Engineering Command, which is only open to Small Business Multiple Award Construction Contract (MACC) Contractors primarily in the Hampton Roads Area of Virginia. The Base Price covers the work on Pier 15, while Option 1 covers the work on Pier 14. The Government reserves the right to exercise Option 1 within 365 calendar days after the contract award. The contract completion date for the Base Price work is 270 calendar days after award, and a separate completion date will be established if Option 1 is exercised. The evaluation of offers will include the price for Option 1.

View the file

Other files

File Type Posted
0005_Site visit log 04.25.24.pdf PDF
Amendment 0005.pdf PDF
0005_Pre-Proposal Inquiry Responses Rev_2.pdf PDF
Amendment 0004.pdf PDF
0004_24R2609_General Requirements_Rev3.pdf PDF
0003_ATT. J1_FAA Approach Path.pdf PDF
Amendment 0003.pdf PDF
0003_ATT. F_Pre-Proposal Inquiry Form_REV1.xlsx XLSX spreadsheet
0003_24R2609_General Requirements_Rev2.pdf PDF
0003_ATT. J3_Piers 12-15 Mooring Platforms.pdf PDF
0003_ATT. A_1802688_Specifications.pdf PDF
0003_ATT. B_1802688_Drawings.pdf PDF
0003_ATT. J4_Piers 15-17 Mooring Platform Extension.pdf PDF
0003_ATT. J2_Piers 15-19 Original Drawings.pdf PDF
DoN REAs_Export_04_05_2024.xlsx XLSX spreadsheet
0003_ATT. J5_Piers 11-14 Original Drawings.pdf PDF
0002_24R2609 Pier 14 General Requirements Rev_1.pdf PDF
Amendment 0002.pdf PDF
0002_Attachment F - Pre-Proposal Responses Rev_1.pdf PDF
0002_Attachment G - Price Proposal Form Rev_2.pdf PDF
0001_Attachment I- JEBLCFS Site Visit List.pdf PDF
0001_Attachment G - Price Proposal Form Rev_1.pdf PDF
Amendment 0001.pdf PDF
0001_Attachment F - Pre-Proposal Responses.pdf PDF
0001_Attachment H - Solicitation Provisions Rev_1.pdf PDF
Attachment G - Price Proposal Form.pdf PDF
Attachment C - WD VA20240203 05JAN24.pdf PDF
Attachment B - Drawings.pdf PDF
24R2609 Pier 14 General Requirements.pdf PDF
Attachment F - Pre-Proposal Inquiry Form.xlsx XLSX spreadsheet
Attachment A - Specifications.pdf PDF
Attachment D - SECNAV 5512.pdf PDF
Attachment E - ONE DAY PASS FORM.xls XLS spreadsheet
Attachment H - SOLICITATION PROVISIONS.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRICE PROPOSAL FORM: PIERS 15 AND 14, REPAIR CLEATS AND BOLLARDS

Provide line item prices, where indicated by blank underlines, for the following items:

LINE ITEM 1 – BASE PRICE, PIER 15 CLEATS AND BOLLARDS

Line Item

Description QTY Unit Unit Price Sub-Total

1A

Price for the entire work for Pier 15, Remove and replace mooring cleat fixtures and connection hardware, complete in accordance with the drawings and specifications, but excluding work described in another line Item.

17 EA $_________ $________________

1B

Price for the entire work for Pier 15, Remove and replace mooring cleat concrete foundations, complete in accordance with the drawings and specifications, but excluding work provided in another line item.

13 EA $_________ $________________

1C

Price for the entire work for Pier 15, Remove and replace 35-ton mooring bollard fixtures and connection hardware, complete in accordance with the drawings and specifications, but excluding work provided in another line item

6 EA $_________ $________________

1D

Price for the entire work for Pier 15, Remove and replace 35-ton mooring bollard concrete foundations, complete in accordance with the drawings and specifications, but excluding work provided in another line item.

6 EA $_________ $________________

1E

Price for the entire work for Pier 15, Remove and replace 200-ton mooring bollard fixtures and connection hardware, complete in accordance with the drawings and specifications, but excluding work provided in another line item

2 EA $_________ $________________

1F

Price for the entire work for Pier 15, Remove and replace 200-ton mooring bollard concrete foundations, complete in accordance with the drawings and specifications, but excluding work provided in another line item.

2 EA $_________ $________________

1G

Price for providing all work in connection with Pier 15 Concrete curb repair, complete in accordance with the drawings and specifications, but excluding work provided in another line item.

BASE PRICE: Total Price for the entire work for Pier 15 Cleat and Bollard Repair in accordance with the drawings and specifications, complete, but excluding work provided in another Priced line Item.

(Total of Line Items 1A – 1G)

LINE ITEM 2 – OPTION 1, PIER 14 CLEATS AND BOLLARDS

Line Item

Description QTY Unit Unit Price Sub-Total

2A

Option 1, Price for the entire work for Pier 14, Remove and replace mooring cleat fixtures and connection hardware, complete in accordance with the drawings and specifications, but excluding work described in another line Item.

13 EA $_________ $________________

2B

Option 1, Price for the entire work for Pier 14, Remove and replace mooring cleat concrete foundations, complete in accordance with the drawings and specifications, but excluding work provided in another line item.

9 EA $_________ $________________

2C

Option 1, Price for the entire work for Pier 14, Remove and replace 35-ton mooring bollard fixtures and connection hardware, complete in accordance with the drawings and specifications, but excluding work provided in another line item

3 EA $_________ $________________

2D

Option 1, Price for the entire work for Pier 14, Remove and replace 35-ton mooring bollard concrete foundations, complete in accordance with the drawings and specifications, but excluding work provided in another line item.

3 EA $_________ $________________

2E

Option 1, Price for the entire work for Pier 14, Remove and replace 200-ton mooring bollard fixtures and connection hardware, complete in accordance with the drawings and specifications, but excluding work provided in another line item

2 EA $_________ $________________

2F

Option 1, Price for the entire work for Pier 14, Remove and replace 200-ton mooring bollard concrete foundations, complete in accordance with the drawings and specifications, but excluding work provided in another line item.

2 EA $_________ $________________

2G

Option 1, Price for providing all work in connection with Pier 14 Concrete curb repair, complete in accordance with the drawings and specifications, but excluding work provided in another Priced line item.

OPTION 1 PRICE: Total Price for the entire work for Pier 14 Cleat and Bollard Repair in accordance with the drawings and specifications, complete, but excluding work provided in another Priced line Item.

(Total of Line Items 2A – 2G)

GENERAL BID NOTES:

a. Award will be made on the total sum of Line Items 1A, 1B, 1C, 1D, 1E, 1F, and 1G. For Line Items 1A – 1F, and 2A – 2F, enter unit prices and extended totals in spaces provided. If there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid and the total recomputed accordingly. If an Offeror provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.

b. The Government reserves the unilateral right to award Line Item 2 to the Contractor at the proposed price within 365 calendar days after the contract award. A firm fixed proposed price is required for Line Items 1 and

2. No provision is made for economic price adjustment. The contract completion date for Line Item 1 is 270 calendar days after award of the contract. If Line Item 2 (Option 1) is exercised, a separate contract completion date will be established for this work only. All Option 1 work shall be completed within 270 calendar days after award.

c. Evaluation of Options (JUL 1990). Except when it is determined in accordance with FAR 17.206(b) Evaluation not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the price for the Option(s) to the total price for Line Item 1. In accordance with FAR 52.217-5 Evaluation of Options, evaluation of options will not obligate the Government to exercise the Option(s).

d. The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices, which are significantly overstated for other work.

e. If Line Item 2 (Option 1) is exercised, additional bonding and consent of surety is required. Consequently, the

Performance Bond must reflect 100 percent of the aggregate amount of all Items.

Submitted by:

Offeror Name: _________________________________

Authorized Individual to Sign: __________________________________

Signature: _________________________________

Date: _____________________________________

File details come from the government source that posted it. Updated .