0005_Pre-Proposal Inquiry Responses Rev_2.pdf

PDF 427 KB Posted

Attached to
PIERS 15 AND 14 - REPAIR CLEATS AND BOLLARDS
Solicitation number
N4008524R2609
Issued by

About this file

This document is a collection of pre-proposal inquiry responses related to the federal contract opportunity for the "PIERS 15 AND 14 - REPAIR CLEATS AND BOLLARDS" solicitation (N4008524R2609).

The key details are:

  • The contract is set aside for Small Business Multiple Award Construction Contract (MACC) contractors primarily in the Hampton Roads area of Virginia.
  • The work involves repairing cleats and bollards on Piers 15 and 14 at the Joint Expeditionary Base Little Creek - Fort Story.
  • The contractor is required to replace 4 cleats and 7 pipe bollards on Pier 15. The cleats have a 6-inch embedment and the pipe bollards are 4.5-inch OD by 4.03-inch ID with a height matching adjacent bollards.
  • There are questions and responses related to access, restrictions on country of origin for cleats/bollards, potential delays from long lead times, and the possibility of concurrent work on both piers if the option is awarded.
  • The current completion time is 270 calendar days, but the contractor has requested a 6-month extension due to the scope and potential need for concurrent work.

View the file

Other files

File Type Posted
0005_Site visit log 04.25.24.pdf PDF
Amendment 0005.pdf PDF
Amendment 0004.pdf PDF
0004_24R2609_General Requirements_Rev3.pdf PDF
0003_ATT. J1_FAA Approach Path.pdf PDF
Amendment 0003.pdf PDF
0003_ATT. F_Pre-Proposal Inquiry Form_REV1.xlsx XLSX spreadsheet
0003_24R2609_General Requirements_Rev2.pdf PDF
0003_ATT. J3_Piers 12-15 Mooring Platforms.pdf PDF
0003_ATT. A_1802688_Specifications.pdf PDF
0003_ATT. B_1802688_Drawings.pdf PDF
0003_ATT. J4_Piers 15-17 Mooring Platform Extension.pdf PDF
0003_ATT. J2_Piers 15-19 Original Drawings.pdf PDF
0003_ATT. G_Price Proposal Form_REV3.pdf PDF
DoN REAs_Export_04_05_2024.xlsx XLSX spreadsheet
0003_ATT. J5_Piers 11-14 Original Drawings.pdf PDF
0002_24R2609 Pier 14 General Requirements Rev_1.pdf PDF
Amendment 0002.pdf PDF
0002_Attachment F - Pre-Proposal Responses Rev_1.pdf PDF
0002_Attachment G - Price Proposal Form Rev_2.pdf PDF
0001_Attachment I- JEBLCFS Site Visit List.pdf PDF
0001_Attachment G - Price Proposal Form Rev_1.pdf PDF
Amendment 0001.pdf PDF
0001_Attachment F - Pre-Proposal Responses.pdf PDF
0001_Attachment H - Solicitation Provisions Rev_1.pdf PDF
Attachment G - Price Proposal Form.pdf PDF
Attachment C - WD VA20240203 05JAN24.pdf PDF
Attachment B - Drawings.pdf PDF
24R2609 Pier 14 General Requirements.pdf PDF
Attachment F - Pre-Proposal Inquiry Form.xlsx XLSX spreadsheet
Attachment A - Specifications.pdf PDF
Attachment D - SECNAV 5512.pdf PDF
Attachment E - ONE DAY PASS FORM.xls XLS spreadsheet
Attachment H - SOLICITATION PROVISIONS.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Page Section Para.

1 03/0724 S-301 B1 Detail states to "SEE NOTE 3 (BOTH SIDES)". Sheet notes do not show a Note 3. Please provide.

PRIOR TO CONCRETE CHIPPING, SAWCUT 1" DEEP ON 3 FACES OF EXISTING CURB TO ESTABLISH DEMO

LIMITS. EXISTING LONGITUDINAL REINFORCING TO REMAIN. 1

2 03/0724 S-301 C3,A3 C3 states for 8" embedment of reinforcing steel. A3 calls for a 6" embedment. Please clarify. C3/S301 is incorrect and should read as 6" embedment. 1

3 03/0724 Attachment G

In previous Price Proposal Forms, a CLIN has been designated to include the entire cost of the work including the Base Price. This allows the contractor to place activities that affect all bid, such as mobilization, into said CLIN.

Can the Navy provide this for the contractor?

Please see updated Price Proposal Form per Amendment 0001

4 03/0724 S-001 Note 3 Bid Notes Note states for contractor to be responsible for estimation of tides. The datum plane is provided but no elevations are provided on the DWG to show datum in relation to elevation. Please provide.

Top of Pier Deck is +10.12' above MLLW 1

5 03/0724 Ships are currently docked alongside Pier 14. Will the contractor have unimpeded water access to the Pier during construction? Please advise.

Level of access unknown due to unknown PortT OPS schedule. Contractor to coordinate construction schedule with NAVFAC Construction Manager and JEBLCFS Port OPS. 1

6 03/0724 S-101

4 of the 13 Cleats will not have their concrete foundations replaced and will have new holes coredrilled for the anchor bolts. As such, there will be no recess pocket on which to grout the cleats. Please advise on how to approach the cleat base.

C15, C16, C17 and C18 will bear directly on the existing concrete deck of the mooring platforms and will not have a recessed grout pocket. Cleat will be through bolted to bottom side of deck as shown on A4/S304. 1

7 3/4/2024 6 01 33 00 1.5.3.3.2 Are there any restrictions on the country of origin of the bollards and cleats? Procurement of the cast steel cleats and bollards are subject to Buy America Act requirements 1

8 3/21/2024

Having requested multiple prices from domestic suppliers of cleats and bollards, the quotes we have received have very long lead times which will not give the contractor enough time to complete the job by 182 days after award.

Please provide a vendor that will satisfy this time frame. If one is not available, we are requesting an extension of Completion of Work by a minimum of 3 months to account for submittals, approval, shop drawings, fabrication, painting and delivery of the mooring fixtures. Please see updated Price Proposal Form and General Requirements per Amendment 0002 2

4/23/2024 Attch. G

In previous Price Proposal Forms, a CLIN has been designated to include the entire cost of the work including the Base Price. This allows the contractor to place activities that affect all bid items, such as mobilization, into said CLIN. Can the Navy provide this for the contractor?

Please use the Price Proposal form provided, no additional clins will be added.

4/23/2024

Will Option 1 be awarded the same time as the Base Bid? If not, how many days does the Navy have to Award Option 1 after the Base Bid has been awarded?

The Government does not know when or if Option 1 will be awarded. Please see Price Proposal Form_REV3, general bid notes, b, "The Government reserves the unilateral right to award Line Item 2 to the Contractor at the proposed price within 365 calendar days after the contract award." 5

4/23/2024

S-305 A1 Is the contractor to replace the 7 EA pipe bollards on Pier 15? Please provide specifications on pipe bolllards.

Yes, 7 pipe bollards are to be replaced on Pier 15. The pipe bollards are to be 4.5" Outside Diameter (O.D.) and 4.03" Inside Diameter (I.D.) as specified in AISC Steel Construction Manual, 15th Ed. for 4" Std. Pipe. The height shall match the adjacent bollards (approx. 37") 5

12 4/23/2024 S-305 A1 What is the length of the 4" dia. Pipe Bollards? What is the thickness of the Pipe?

The pipe bollards are to be 4.5" Outside Diameter (O.D.) and 4.03" Inside Diameter (I.D.) as specified in AISC Steel Construction Manual, 15th Ed. for 4" Std. Pipe. The height shall match the adjacent bollards (approx. 37") 5

4/23/2024

Gen. Req Will the contractor be able to work on both Piers simulataneously if Option 1 were to be awarded? Assume work will be performed and completed on Pier 15 before progressing to Pier 14. Contractor and Contracting Officer to coordinate pier outages with Port Operations. Port Operations may allow for simultaneous Pier outages depending on schedule. 5

4/23/2024

Attch. G

Due to the larger scope of work on the Base Bid of Pier 15, and the possibility of having to do Pier 14 Option work concurrently with the Base Bid due to limited resources, we are requesting an extension of the work completion by 6 months.

The current time for completion for the base period is 270 calendar days, if Line Item 2 (Option 1) is exercised, a separate contract completion date will be established for this work only 5

Pre-Proposal Inquiry Submission Form: N4008524R2609, Pier 15 and 14-Repair Cleats and Bollards

Amend No.

PPI

No.

Date Submitted

REFERENCE

QUESTION GOVERNMENT RESPONSE