This document appears to be a set of pre-proposal responses related to a solicitation for the repair of cleats and bollards on Pier 14 at Joint Expeditionary Base Little Creek - Fort Story. The key details are:

The solicitation number is N4008524R2609, and the project is titled "PIER 14 - REPAIR CLEATS AND BOLLARDS." The work is limited to Small Business Multiple Award Construction Contract (MACC) Contractors primarily in the Hampton Roads Area of Virginia. The document addresses various questions and requests for clarification, including issues with drawings, embedment depths, pricing, availability of domestic cleats/bollards, and scheduling impacts due to long lead times. The government has provided responses to several of these inquiries, such as clarifying the cleat installation details and noting the requirement for procurement of cleats and bollards that comply with the Buy America Act. The contractor is requesting an extension to the 182-day completion timeline to account for the long lead times on the mooring fixtures.

View the file

Other files

File Type Posted
0005_Site visit log 04.25.24.pdf PDF
Amendment 0005.pdf PDF
0005_Pre-Proposal Inquiry Responses Rev_2.pdf PDF
Amendment 0004.pdf PDF
0004_24R2609_General Requirements_Rev3.pdf PDF
0003_ATT. J1_FAA Approach Path.pdf PDF
Amendment 0003.pdf PDF
0003_ATT. F_Pre-Proposal Inquiry Form_REV1.xlsx XLSX spreadsheet
0003_24R2609_General Requirements_Rev2.pdf PDF
0003_ATT. J3_Piers 12-15 Mooring Platforms.pdf PDF
0003_ATT. A_1802688_Specifications.pdf PDF
0003_ATT. B_1802688_Drawings.pdf PDF
0003_ATT. J4_Piers 15-17 Mooring Platform Extension.pdf PDF
0003_ATT. J2_Piers 15-19 Original Drawings.pdf PDF
0003_ATT. G_Price Proposal Form_REV3.pdf PDF
DoN REAs_Export_04_05_2024.xlsx XLSX spreadsheet
0003_ATT. J5_Piers 11-14 Original Drawings.pdf PDF
0002_24R2609 Pier 14 General Requirements Rev_1.pdf PDF
Amendment 0002.pdf PDF
0002_Attachment G - Price Proposal Form Rev_2.pdf PDF
0001_Attachment I- JEBLCFS Site Visit List.pdf PDF
0001_Attachment G - Price Proposal Form Rev_1.pdf PDF
Amendment 0001.pdf PDF
0001_Attachment F - Pre-Proposal Responses.pdf PDF
0001_Attachment H - Solicitation Provisions Rev_1.pdf PDF
Attachment G - Price Proposal Form.pdf PDF
Attachment C - WD VA20240203 05JAN24.pdf PDF
Attachment B - Drawings.pdf PDF
24R2609 Pier 14 General Requirements.pdf PDF
Attachment F - Pre-Proposal Inquiry Form.xlsx XLSX spreadsheet
Attachment A - Specifications.pdf PDF
Attachment D - SECNAV 5512.pdf PDF
Attachment E - ONE DAY PASS FORM.xls XLS spreadsheet
Attachment H - SOLICITATION PROVISIONS.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Page Section Para.

1 03/0724 S-301 B1 Detail states to "SEE NOTE 3 (BOTH SIDES)". Sheet notes do not show a

Note 3. Please provide.

PRIOR TO CONCRETE CHIPPING, SAWCUT 1" DEEP ON 3 FACES OF EXISTING CURB

TO ESTABLISH DEMO LIMITS. EXISTING LONGITUDINAL REINFORCING TO

REMAIN.

2 03/0724 S-301 C3,A3 C3 states for 8" embedment of reinforcing steel. A3 calls for a 6" embedment.

Please clarify. C3/S301 is incorrect and should read as 6" embedment.

3 03/0724

Attachment G

In previous Price Proposal Forms, a CLIN has been designated to include the entire cost of the work including the Base Price. This allows the contractor to place activities that affect all bid, such as mobilization, into said CLIN. Can the Navy provide this for the contractor?

Please see updated Price Proposal Form per Amendment 0001

4 03/0724 S-001 Note 3 Bid Notes

Note states for contractor to be responsible for estimation of tides. The datum plane is provided but no elevations are provided on the DWG to show datum in relation to elevation. Please provide.

Top of Pier Deck is +10.12' above MLLW

5 03/0724 Ships are currently docked alongside Pier 14. Will the contractor have unimpeded water access to the Pier during construction? Please advise.

Level of access unknown due to unknown PortT OPS schedule. Contractor to coordinate construction schedule with NAVFAC Construction Manager and JEBLCFS Port OPS.

6 03/0724 S-101

4 of the 13 Cleats will not have their concrete foundations replaced and will have new holes coredrilled for the anchor bolts. As such, there will be no recess pocket on which to grout the cleats. Please advise on how to approach the cleat base.

C15, C16, C17 and C18 will bear directly on the existing concrete deck of the mooring platforms and will not have a recessed grout pocket. Cleat will be through bolted to bottom side of deck as shown on A4/S304.

7 3/4/2024 6 01 33 00 1.5.3.3.2 Are there any restrictions on the country of origin of the bollards and cleats? Procurement of the cast steel cleats and bollards are subject to Buy America Act requirements

8 3/21/2024

Having requested multiple prices from domestic suppliers of cleats and bollards, the quotes we have received have very long lead times which will not give the contractor enough time to complete the job by 182 days after award. Please provide a vendor that will satisfy this time frame. If one is not available, we are requesting an extension of Completion of Work by a minimum of 3 months to account for submittals, approval, shop drawings, fabrication, painting and delivery of the mooring fixtures. Please see updated Price Proposal Form and General Requirements per Amendment 0002

GOVERNMENT RESPONSE

Pre-Proposal Inquiry Submission Form: N4008524R2609, Pier 14-Repair Cleats and Bollards

RFI No.

Date Submitted REFERENCE QUESTION

Sheet1

File details come from the government source that posted it. Updated .