This document contains a federal contract opportunity for replacing an air handling unit. The solicitation is seeking to replace Air Handling Unit #3 located on the roof of Building 3030 at NAS Oceana. The scope of work includes securing electrical power, disconnecting and removing wiring and piping from the existing unit, demolishing and disposing of the current unit, and providing and installing a new air handling unit that meets or exceeds specifications. The contractor must also provide new outside air dampers, actuators, and controls that are compatible with the existing direct digital controls system. Only contractors on the Utility Mechanical Construction Multiple Award Contract N4008523KD0043-0048 can bid on this project. The solicitation number is N4008523R2780 and the cut-off date for questions is July 21, 2023. The work must be completed within 500 calendar days to account for lead times and approvals. The Navy Facilities Engineering Command is the contracting agency.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page Section Para. Dwg #
1 Etolin Strait Associates 11/17/23
Previous Government response provided for ESA Set #2, PPI #3, stated that the intent for this SOW is to install a new roof curb and new flashing. Is the current roof system in the area of this work under warranty? If so which roof
Manufacturer holds the warranty on this roof?
The current roof is not under warranty.
2 Etolin Strait Associates 11/17/23
Previous Government response provided for ESA Set #4, PPI #1, stated to refer to new equipment specifications to be provided regarding the inquiry about the amount of time that would be required for the contract performance period which is currently stated in the RFP as 120 calendar days. Base on the information received from Trane after the govt response noted above, the lead time on the new AHU #3 is 52 weeks. To allow for submittals from the mfg, submittal approval, lead time, shipping, installation and start up and close out a total of 500 calendar days will be required to complete is project. We request that the time for completion be changed from 120 calendar days to 500 calendar days.
Changed by CS
Project Title: REPLACE AHU#3 ABOVE ROOM 39, BLDG 3030, NAS
OCEANA
Solicitation / RFP#: N4008523R2780 - PPI Cut Off Date: July 21, 2023
Amend No.
GOVERNMENT RESPONSE