This document is an amendment to Solicitation N40085-23-R-2780 for the replacement of Air Handling Unit #3 above Room 39 in Building 3030 at Naval Air Station Oceana in Virginia Beach, Virginia. The amendment extends the proposal due date to July 12, 2024 at 2:00 PM EDT and replaces the previous wage determination with a new one, VA20240167 dated 02/23/2024. The solicitation is limited to contractors holding the Utility Mechanical Construction for HR MACC Contract N4008523KD0043-0048. The scope of work includes securing electrical power, disconnecting and removing the existing AHU, and providing and installing a new AHU that meets or exceeds the existing specifications and is compatible with the existing Direct Digital Controls. Proposals must be valid for 150 calendar days and submitted per the detailed instructions in the amendment.

View the file

Other files

File Type Posted
23R2780 AMENDMENT 0015.pdf PDF
23R2780 AMENDMENT 0014.pdf PDF
SOW AMENDED (1) (W)21304022 REPLACE AHU 3 ABOVE ROOM 39 - OC-3030.pdf PDF
PPI Set 5 Etolin Strait OC-3030.xlsx.pdf PDF
CSAA - AHU-3 - Consolidated Customer Package.pdf PDF
PPI Set 6 Etolin Strait OC-3030.xlsx.pdf PDF
AMENDMENT 0012.pdf PDF
AMENDMENT 0011.pdf PDF
AMENDMENT 0010.pdf PDF
AMENDMENT 0009.docx DOCX document
PPI Set 1 Etolin Strait OC3030.xlsx.pdf PDF
PPI Set 2 Etolin Strait OC3030.xlsx.pdf PDF
AMENDMENT 0008.pdf PDF
PPI MIG GOV OC3030 Replace AHU 3 Above room 39.xlsx.pdf PDF
PPI Goshawk OC3030 AHU 3.xlsx.pdf PDF
PPI Set 4 Etolin Strait OC3030.xlsx.pdf PDF
PPI Set 3 Etolin Strait OC3030.xlsx.pdf PDF
CSAA - Oceana-3030 AHU-3 Equipment Specifications - TRANE.pdf PDF
Amendment 0007.pdf PDF
AMENDMENT 0006.pdf PDF
AMENDMENT 0005.pdf PDF
AMENDMENT 0004.pdf PDF
Oceana IDIQ Front End SPECS.pdf PDF
Site Visit AHU.pdf PDF
AMENDMENT 0003.pdf PDF
AMENDMENT 0002.pdf PDF
IMG-5778.jpg JPG image
IMG-5777.jpg JPG image
IMG-5779.jpg JPG image
AMENDMENT 0001.pdf PDF
PROVISION 52.204-24.pdf PDF
va167 (1).txt TXT text file
SECNAV 5512.pdf PDF
GENERAL REQUIREMENTS BLDG 3030.pdf PDF
PPI Spreadsheet.xlsx XLSX spreadsheet
BASE ACCESS INSTRUCTION.pdf PDF
SOW (W)21304022 AHU 3 ABOVE ROOM 39 IS DOWN THIS IS NEEDED FOR COMMS EQUIP OC3030.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

J

PAGE OF PAGES

1 2

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

12-JUN-2024

4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY CODE N40085 7. ADMINISTERED BY (If other than item 6) CODE

NAVFAC MID ATLANTIC

PWD OCEANA

FACILITIES ENGINEERING & ACQ DIV

953 HORNET DR SUITE 213

VIRGINIA BEACH VA 23460-2190

See Item 6

8. NAME AND ADDRESS OF CONT RACTOR (No., Street, County, State and Zip Code) X 9A. AMENDMENT OF SOLICITATION NO.

N40085-23-R-2780

X 9B. DATED (SEE ITEM 11)

12-JUN-2024

10A. MOD. OF CONT RACT /ORDER NO.

10B. DAT ED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENT S OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT

TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNT ING AND APPROPRIAT ION DAT A (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICAT IONS OF CONT RACTS/ORDERS.

IT MODIFIES THE CONT RACT /ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONT RACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONT RACT /ORDER IS MODIFIED TO REFLECT THE ADMINIST RAT IVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORT ANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

SOLICITATION N40085-23-R-2780, REPLACE AHU #3 ABOVE ROOM 39, BUILDING 3030, NAS OCEANA, VIRGINIA BEACH, VIRGINIA.

THERE IS A CHANGE TO THE PROPOSAL DUE DATE AS A RESULT OF THIS AMENDMENT.

PROPOSALS ARE DUE 12 JULY 2024 AT 2:00 PM.

SEE CONTINUATION SHEETS

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONT RACTING OFFICER (Type or print)

TEL: EMAIL:

15B. CONT RACT OR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNIT ED STATES OF AMERICA

BY

(Signature of Contracting Officer)

16C. DATE SIGNED

12-JUN-2024

EXCEPTION TO SF 30

30-105-04

STANDARD FORM 30 (Rev. 10-83) APPROVED BY OIRM 11-84 Prescribed by GSA

FAR (48 CFR) 53.243

N40085-23-R-2780

The following have been added by full text:

AMENDMENT 0013

SOLICITATION N40085-23-R-2780, REPLACE AHU #3 ABOVE ROOM 39, BUILDING 3030, NAS OCEANA, VIRGINIA BEACH, VIRGINIA.

The purpose of this amendment is to extend the Receipt of Proposals due date and to replace the wage determination.

The Receipt of Proposals due date is 12 July 2024 at 1400 EDT. Price Submission must be completely submitted per the instructions in the Request for Proposal N4008523R2780, including all amendments. Offerors proposal must be valid for 150 calendar days after submission. Price Proposal Form is

Attachment G. Previously submitted proposals will not be evaluated.

Price Submission:

(1) Solicitation Submittal Requirements: Offeror shall submit the following:

(A) Cover page that includes:

- Solicitation Number

- Solicitation Title

- Prime Contractor Name

- Prime Contractor Address

- Phone Number

- Fax Number

- Cage Code

- Employer Identification Number (EIN)

- Point of Contact

- Point of Contact Phone Number

- Point of Contact Email

(B) Price Proposal Form (Attachment G)

(C) Acknowledged Amendments

(D) Copy of Reps & Certs from SAM (sam.gov)

(E) Completed copy of Provision 52.204-24 (Attachment H)

(F) Bid Bond

Proposals may be sent via Federal

Express (FedEx), United Parcel Service (UPS), emailed*, or hand-carried to the following address:

Mailing Address:

ATTN: Jessica Grosso

Naval Facilities Engineering Systems Command Mid-Atlantic

Public Works Department

Facilities Engineering and Acquisition Division

Building 820, 2nd Floor

953 Hornet Drive

Virginia Beach, VA 23460-2190

*Email Submissions:

Please note, if you email your proposal, ensure ALL required submission items are attached to the email or you will be deemed non-responsive. The date/time received noted on the Contract

Specialist’s computer is the date/time that will be recorded on your proposal. It will NOT be the date/time you sent your email. Ensure you send your proposal/email with all attachments early enough that your firm does not miss the deadline due to any server issue on either your side or the

Government’s. If you wish to send your proposal via email due to COVID, etc., send it to

Jessica.m.grosso.civ@us.navy.mil.

mailto:Jessica.m.grosso.civ@us.navy.mil

Wage Determination included in the Request for Proposal (RFP) as Attachment B is hereby replaced with VA20240167 dated 02/23/2024. Should this wage determination be modified by DoL prior to award, the most current wage determination will be incorporated in the award:

"General Decision Number: VA20240167 02/23/2024

Superseded General Decision Number: VA20230167

State: Virginia

Construction Type: Building

County: Virginia Beach* County in Virginia.

*INDEPENDENT CITY OF VIRGINIA BEACH

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).

|If the contract is entered |. Executive Order 14026 |

|into on or after January 30, | generally applies to the |

|2022, or the contract is | contract. |

|renewed or extended (e.g., an |. The contractor must pay |

|option is exercised) on or | all covered workers at |

|after January 30, 2022: | least $17.20 per hour (or |

| | the applicable wage rate |

| | listed on this wage |

| | determination, if it is |

| | higher) for all hours |

| | spent performing on the |

| | contract in 2024. |

|If the contract was awarded on|. Executive Order 13658 |

|or between January 1, 2015 and| generally applies to the |

|January 29, 2022, and the | contract. |

|contract is not renewed or |. The contractor must pay all|

|extended on or after January | covered workers at least |

|30, 2022: | $12.90 per hour (or the |

| | applicable wage rate listed|

| | on this wage determination,|

| | if it is higher) for all |

| | hours spent performing on |

| | that contract in 2024. |

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the

Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.

Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.

Modification Number Publication Date

0 01/05/2024

1 02/23/2024

ASBE0024-006 10/01/2023

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR - MECHANICAL (Duct, Pipe & Mechanical System

Insulation)......................$ 40.02 19.67+a

a. PAID HOLIDAYS: New Year's Day, Martin Luther King Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,the day after Thanksgiving and Christmas

Day provided the employee works the regular work day before and after the paid holiday.

BOIL0045-003 01/01/2021

BOILERMAKER......................$ 42.62 24.81

BRVA0008-001 05/01/2022

BRICKLAYER.......................$ 22.44 10.23

* ELEV0052-005 01/01/2024

ELEVATOR MECHANIC................$ 49.84 37.885+a+b

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence

Day, Labor Day, Veterans' Day, Thanksgiving Day, the Friday after Thanksgiving Day and Christmas Day.

b. VACATIONS: 6% men under 5 years based on regular hourly rate and 8% men over 5 years based on regular hourly rate for all hours worked.

ENGI0147-019 05/01/2022

POWER EQUIPMENT OPERATOR

Cranes 90 tons & over capacity; Tower & Climbing

Cranes with Controls 100

ft. above ground............$ 34.17 15.21

Cranes under 90 tons........$ 33.26 15.12

IRON0079-012 05/01/2022

IRONWORKER, STRUCTURAL AND

ORNAMENTAL.......................$ 28.87 11%+14.24

IRON0079-013 05/01/2022

IRONWORKER, RIGGER...............$ 28.87 11%+14.24

PLUM0110-008 11/01/2023

PIPEFITTER (Includes HVAC

Pipe, Unit and Temperature

Controls Installations)..........$ 33.67 17.50

PLUMBER..........................$ 33.67 17.50

* SUVA2013-052 01/11/2016

CARPENTER, Includes

Acoustical Ceiling

Installation, Drywall

Hanging, and Form Work...........$ 17.93 4.41

CAULKER..........................$ 18.49 1.33

CEMENT MASON/CONCRETE FINISHER...$ 17.13 ** 0.00

ELECTRICIAN, Includes Low

Voltage Wiring and Alarm

Installation.....................$ 22.94 1.94

GLAZIER..........................$ 19.36 4.68

IRONWORKER, REINFORCING..........$ 27.18 4.13

LABORER: Mason Tender - Brick...$ 13.48 ** 3.27

LABORER: Mason Tender -

Cement/Concrete..................$ 12.96 ** 3.12

LABORER: Pipelayer..............$ 12.40 ** 1.96

LABORER: Common or General, Including Demolition.............$ 12.90 ** 0.96

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 19.25 2.72

OPERATOR: Bobcat/Skid

Steer/Skid Loader................$ 18.95 4.03

OPERATOR: Bulldozer.............$ 18.07 3.50

OPERATOR: Forklift..............$ 19.40 7.00

OPERATOR: Loader................$ 21.28 3.17

OPERATOR: Roller................$ 16.25 ** 4.88

PAINTER (Brush and Roller).......$ 18.00 0.00

PAINTER: Spray..................$ 18.10 5.43

ROOFER...........................$ 17.50 2.20

SHEET METAL WORKER, Includes

HVAC Duct Installation...........$ 19.24 2.80

SPRINKLER FITTER (Fire

Sprinklers)......................$ 18.91 4.67

TILE FINISHER....................$ 23.40 0.00

TILE SETTER......................$ 27.80 10.25

TRUCK DRIVER: Dump Truck........$ 15.50 ** 0.75

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($17.20) or 13658

($12.90). Please see the Note at the top of the wage determination for more information. Please also note that the minimum wage requirements of Executive Order 14026 are not currently being enforced as to any contract or subcontract to which the states of Texas, Louisiana, or Mississippi, including their agencies, are a party.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the

Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (iii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate

(weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or

""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010

08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION"