PPI LOG 01 FOR P1394.pdf

PDF 435 KB Posted

Attached to
P1394 PHASE B VEHICLE MAINTENANCE AND STORAGE, MARINE CORPS BASE, CAMP LEJEUNE, NORTH CAROLINA
Solicitation number
N4008522R2639
Issued by

About this file

This document contains a pre-proposal inquiry and response related to solicitation number N40085-22-R-2639 from the Naval Facilities Engineering Command. The solicitation seeks proposals for project P1394 to construct a Boat Maintenance and Storage Facility and a Large Vehicle Maintenance Storage Building at Marine Corps Base Camp Lejeune in North Carolina. The Boat Maintenance and Storage Facility will be an 18,000 square foot pre-engineered metal building with reinforced CMU walls, including spaces for rubber repair, engine repair, parts storage, boat storage, an SIPR Net Cafe, restrooms and locker rooms. The Large Vehicle Maintenance Storage Building will be a 20,000 square foot pre-engineered metal building with reinforced CMU walls, organized as five single bay storage areas and one multi-bay storage area, each with a shipping/receiving office. Special construction features include soil surcharge loads, wetlands mitigation and stormwater management practices. Electrical, mechanical, plumbing and information systems are also specified. Site work will include utilities, security fencing, parking, stormwater and communications infrastructure.

View the file

Other files

File Type Posted
P1394 AMENDMENT 0005.pdf PDF
P1394 AMENDMENT 0004.pdf PDF
P1394 PPI LOG 03.pdf PDF
P1394 BID SCHEDULE AMEND 0004.pdf PDF
P1394 PPI LOG 02.pdf PDF
P1394 PHASE B BID SCHEDULE UPDATED.pdf PDF
AMENDMENT 0003 FOR P1394.pdf PDF
Site Visit Log.pdf PDF
P1394 AMENDMENT 0002.pdf PDF
BMP 3 2011 AS BUILT.pdf PDF
Attachment E- SMALL BUSINESS SUBCONTRACTING PLAN.docx DOCX document
BMP 3 2020 REPAIR DESIGN.pdf PDF
1572053_P1394B_dwg 4of14.pdf PDF
1572053_P1394B_dwg 13of14.pdf PDF
1572053_P1394B_dwg 8of14.pdf PDF
Attachment A - PPI Inquiry Log.doc DOC document
Attachment F- PIEE Vendor Access Instructions.pdf PDF
1572053_P1394B_dwg 14of14.pdf PDF
1572053_P1394B_spc_1of2.pdf PDF
1572053_P1394B_dwg 3of14.pdf PDF
01 30 01.00 22.pdf PDF
1572053_P1394B_dwg 2of14.pdf PDF
1572053_P1394B_dwg 1of14.pdf PDF
MARSOC BMP 3 2021 REPAIRS.pdf PDF
BMP 3 2016 MODIFICATIONS.pdf PDF
AMENDMENT LANGUAGE.pdf PDF
AMENDMENT 0001 FOR P1394 PHASE B.pdf PDF
1572053_P1394B_dwg 10of14.pdf PDF
Site Visit Contractor Access.xls XLS spreadsheet
1572053_P1394B_dwg 12of14.pdf PDF
Attachment C- Construction Experience Data Sheet.pdf PDF
1572053_P1394B_dwg 9of14.pdf PDF
1572053_P1394B_spc_2of2.pdf PDF
BMP 3 2008 ORIGINAL DESIGN.pdf PDF
ATTACHMENT B BID SCHEDULE.pdf PDF
1572053_P1394B_dwg 6of14.pdf PDF
211105 AMENDMENT 0001.pdf PDF
1572053_P1394B_dwg 7of14.pdf PDF
1572053_P1394B_dwg 5of14.pdf PDF
1572053_P1394B_dwg 11of14.pdf PDF
RFP FOR P1394 PHASE B.pdf PDF
Attachment D- Past Performance Questionnaire.docx DOCX document
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRE-PROPOSAL INQUIRY ATTACHMENT

Solicitation Number: N40085-22-R-2639 P1394 Contractor Name:

Contractor POC Instructions: DO NOT submit in PDF format. DO submit as a word document

Contractor

PPI#

Section of RFP or Page Number

Paragraph Reference

Drawing Number

Question RESPONSE AMEND

001 Key Note #1

PP102C What type of air compressor enclosure is required, will this be built in place or a prefabricated unit?

What type of materials is the weatherproof air compressor enclosure to be constructed of?

There is no detail or specifications for the weatherproof air compressor enclosure in the documents provided, can we get a detail of this enclosure added to the drawings and possibly a specification added as well?

The air compressor used as the basis-of-design is furnished with a sound-attenuating enclosure. This enclosure was mislabeled as a water-proof enclosure on sheet PP102C. Metal shading device is provided over the compressor to limit exposure to the elements.

Provide a tank-mounted air compressor with a sound-attenuating enclosure to lower the sound level generated by the compressor and further reduce exposure of the compressor’s components to outdoor conditions.

002 Page 13 of

Mailed Hard Copies

“Shall be delivered by mail within 5 business days of the electronic

As stated I the RFP: One (1) original hard copy, one (1) copy of the hard copy, and one (1) CD- ROM of the proposal shall be delivered by mail within 5 business days of the electronic proposal proposal submission”.

To clarify, is it acceptable to say within 5 business days after the electronic proposal submission?

submission. Hard copy and CD- ROM versions of the proposals shall be labeled “PRICE PROPOSAL

OR NONCOST/PRICE FACTORS

PROPOSAL FOR RFP N40085-22-R-

2639, ATTN: CS GEORGIA SCOTT;

DO NOT OPEN IN MAIL ROOM”.

003 Will there be a DoD Safe Link provide to submit electronic proposal? Files will be to big to submit via email in one part.

As stated in the RFP: “Only the PIEE Solicitation Module is authorized for the submission of electronic proposals in response to this solicitation. Electronic proposal submissions should be no larger than 1.9 GB per file.” Please review Attachment F: PIEE Vendor Access Instructions on how to submit your proposals. Emailed submissions will not be accepted.

004 00 10 00 Bid Form Section 00 10 00 Bid Form lists Clin 0003 as option item #2. What is option #1?

Please advise.

CLIN 0002 is Option item 01. So that it is clear please use attachment B that was submitted as a separate document to input your price total.

005 00 10 00 Bid Form Is Clin 002 option #1?

YES 0002

006 Attachment C

Would the Government consider allowing offerors to adjust row heights and top/bottom margins within the form as long as we stay within the 2-page limit?

Please follow what the RFP states 0002

007 SF1442 Page 1 block 10 & 4.3

N/A The SF1442 states to submit PPIs in

Direction on how to submit Pre- Proposal Inquiries: PRE-PROPOSAL INQUIRIES (PPIs): All inquiries accordance with section

4.3. However, section 4.3 does not appear to be included in the RFP. Please provide section 4.3 or direction for PPIs to include the cutoff date.

must be submitted in writing and received by the Contract Specialist by 10 calendars days prior to proposal due date in order to permit adequate time to reply to the inquiry. There is no guarantee that PPI’s submitted after the cut-off date will be answered before the solicitation closes. Submit all questions to Georgia.a.scott.civ@us.navy.mil.

All PPIs shall be submitted using the PPI document.

008 RFP Page 13 of

N/A Mailed Hard Copies – Would the Government consider removing the requirement for hard copies and CD Rom and accepting electronic submissions only?

As stated in the RFP: “Only the PIEE Solicitation Module is authorized for the submission of electronic proposals in response to this solicitation. Electronic proposal submissions should be no larger than 1.9 GB per file.” Please review Attachment F: PIEE Vendor Access Instructions on how to submit your proposals. Emailed submissions will not be accepted.