P1394 PHASE B BID SCHEDULE UPDATED.pdf

PDF 214 KB Posted

Attached to
P1394 PHASE B VEHICLE MAINTENANCE AND STORAGE, MARINE CORPS BASE, CAMP LEJEUNE, NORTH CAROLINA
Solicitation number
N4008522R2639
Issued by

About this file

This bid schedule outlines pricing requirements for a federal construction contract opportunity. The contract involves construction of two new facilities at Marine Corps Base Camp Lejeune in North Carolina, including a Boat Maintenance and Storage Facility and a Large Vehicle Maintenance Storage Building. The bid schedule requests pricing for the base bid and optional items for each facility, and includes planned modification line items for procuring and installing furniture, fixtures, equipment, and audiovisual components. Pricing is required as firm fixed prices, and the completion date is 730 calendar days from award. Evaluation will consider the total price of all line items, and award will be made to the lowest priced responsive bidder meeting all requirements.

View the file

Other files

File Type Posted
P1394 AMENDMENT 0005.pdf PDF
P1394 AMENDMENT 0004.pdf PDF
P1394 PPI LOG 03.pdf PDF
P1394 BID SCHEDULE AMEND 0004.pdf PDF
P1394 PPI LOG 02.pdf PDF
AMENDMENT 0003 FOR P1394.pdf PDF
PPI LOG 01 FOR P1394.pdf PDF
Site Visit Log.pdf PDF
P1394 AMENDMENT 0002.pdf PDF
BMP 3 2011 AS BUILT.pdf PDF
Attachment E- SMALL BUSINESS SUBCONTRACTING PLAN.docx DOCX document
BMP 3 2020 REPAIR DESIGN.pdf PDF
1572053_P1394B_dwg 4of14.pdf PDF
1572053_P1394B_dwg 13of14.pdf PDF
1572053_P1394B_dwg 8of14.pdf PDF
Attachment A - PPI Inquiry Log.doc DOC document
Attachment F- PIEE Vendor Access Instructions.pdf PDF
1572053_P1394B_dwg 14of14.pdf PDF
1572053_P1394B_spc_1of2.pdf PDF
1572053_P1394B_dwg 3of14.pdf PDF
01 30 01.00 22.pdf PDF
1572053_P1394B_dwg 2of14.pdf PDF
1572053_P1394B_dwg 1of14.pdf PDF
MARSOC BMP 3 2021 REPAIRS.pdf PDF
BMP 3 2016 MODIFICATIONS.pdf PDF
AMENDMENT LANGUAGE.pdf PDF
AMENDMENT 0001 FOR P1394 PHASE B.pdf PDF
1572053_P1394B_dwg 10of14.pdf PDF
Site Visit Contractor Access.xls XLS spreadsheet
1572053_P1394B_dwg 12of14.pdf PDF
Attachment C- Construction Experience Data Sheet.pdf PDF
1572053_P1394B_dwg 9of14.pdf PDF
1572053_P1394B_spc_2of2.pdf PDF
BMP 3 2008 ORIGINAL DESIGN.pdf PDF
ATTACHMENT B BID SCHEDULE.pdf PDF
1572053_P1394B_dwg 6of14.pdf PDF
211105 AMENDMENT 0001.pdf PDF
1572053_P1394B_dwg 7of14.pdf PDF
1572053_P1394B_dwg 5of14.pdf PDF
1572053_P1394B_dwg 11of14.pdf PDF
RFP FOR P1394 PHASE B.pdf PDF
Attachment D- Past Performance Questionnaire.docx DOCX document
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P1394 Phase B Bid Schedule

CLINS Description:

0001 BASE BID

FFP

0001 Price includes the following:

0001A Price for the entire work for RR469, complete to the 5 foot line outside the building, in accordance with the drawings and specifications.

Total Price for Item 0001A: $__________________________

0001B Price for the entire project Work Site for RR469, outside the 5 foot line, complete in accordance with the drawings and specifications.

Total Price for Item 0001B: $__________________________

OPTION ITEMS:

0002 Option Item No. 1 Price includes the following:

0002A Price for the entire work for RR456, complete to the 5 foot line outside the building, in accordance with the drawings and specifications.

Total Price for Item 0002A: $__________________________

0002B Price for the entire project Work Site for RR456, outside the 5 foot line, complete in accordance with the drawings and specifications.

Total Price for Item 0002B: $__________________________

0003 Planned Modification Item 1 - Price includes the following:

Price to procure and supervise installation, required for the RR469 Furniture, Fixtures, and Equipment (FF&E) complete in accordance with the plans and specification section 01 30

01.00 22 (Design, Procurement and Installation of Furniture, Fixtures and Equipment) and in accordance with the following schedule:

0003 GOVERNMENT FF&E HAR TOTAL

PRICE FOR

DESCRIPTION FF&E ESTIMATE (NTE 5%)

0003 $ 464,941 ________% $_____________

0004 Planned Modification Item 2 - Price includes the following:

Price to procure and supervise installation, required for the RR456 Furniture, Fixtures, and Equipment (FF&E) complete in accordance with the plans and specification section 01 30

01.00 22 (Design, Procurement and Installation of Furniture, Fixtures and Equipment) and in accordance with the following schedule:

0004 GOVERNMENT FF&E HAR TOTAL

DESCRIPTION FF&E ESTIMATE (NTE 5%)

0004 $ 1,141,500 ________% $_____________

0005 Planned Modification Item 3 - Price includes the following:

Price to procure and supervise installation, required for the RR456 Audio Visual (AV) complete in accordance with the plans and specification section 01 30 01.00 22 (Design, Procurement and Installation of Furniture, Fixtures and Equipment) and in accordance with the following schedule:

0005 GOVERNMENT FF&E HAR TOTAL

DESCRIPTION AV ESTIMATE (NTE 5%)

0005 $ 2,400 ________% $_____________

SUM OF ALL ABOVE TOTAL PRICE FOR

0001, 0002, 0003, 0004, & 0005 THIS SOLICITATION

CONTRACT LINE ITEM NOTES

General

1. Award will be made on the total sum of Item 0001, 0002, 0003, 0004, and 0005.

2. FAR 52.217-5, Evaluation of Options (Jul 1990) - Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interest, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).

3. The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.

4. The Government is not obligated to award the FF&E and A/V line items. Should the Government choose to award the FF&E and A/V, the line items will be awarded as a negotiated modification to the contract/task order. The contractor's proposed HAR will be applied to all vendor/supplier costs for the FF&E and A/V. The Government will make best efforts to award the FF&E and A/V modifications at least six months prior to the contract completion date. A minimum of six months is likely required for the contractor to purchase, deliver and install the FF&E and A/V without impacting the overall completion date of the project. The contractor’s schedule should assume the award of the FF&E and A/V as a modification. No schedule extensions shall be granted if the modification is awarded at least six months prior to the contract completion date. If the Government decides to negotiate and award the furniture modification with less than six months prior to the contract completion date, the contractor may be entitled to a contract extension and extended field overhead. A contract extension and extended field overhead will only be granted in those cases where the prime contractor demonstrates that accepted Final FF&E and A/V packages were submitted within the approved schedule deadlines and sufficient lead time for the FF&E and A/V is not available and the Government’s award of the modification is in the last six months of the contract.

5. If Item 0002 is exercised, additional bonding and consent of surety will be required.

Consequently, the Performance and Payment Bond shall reflect 100 percent of the aggregate amount of all items.

6. The Government reserves the unilateral right to award the Option(s) to the Contractor at the negotiated price within 120 Calendar Days after the Contract Award Date. A Firm Fixed proposed price is required for Items: 0001 thru 0002. No provision is made for economic price adjustment. If Options are exercised, the Contract Completion Date remains: 730 Calendar Days after award of the contract.

PLANNED MODIFICATION BID NOTES

These notes apply to Planned Modification

a. The estimated amount for FF&E and A/V have been supplied by the Government to provide offerors with the projected magnitude of effort. The estimated amount includes the actual cost of the FF&E and A/V including freight and installation charges. The Government FF&E and A/V Estimate is only an estimated amount.

b. If awarded, line items will be funded separately after completion of FF&E and A/V design package review and approval by the Government, and receipt of appropriate funding by the Government. Requirements and details are provided in specification section 01 30 01.00 22.

DESIGN, PROCUREMENT AND INSTALLATION OF FURNITURE, FIXTURES AND

EQUIPMENT in Administrative Requirements

c. Bonding is not required for the design, procurement and installation of 0003 FF&E, 0004 FF&E and 0005 AV.

d. Offerors may propose a Handling and Administration Rate (HAR) for the FF&E and A/V not to exceed 5 percent. This fee will account for all administrative costs, overhead, bonding fees, administration of subcontracts, profit, and any other costs associated with and related to the coordination and processing of the procurement and installation of FF&E and A/V. The proposed HAR percentage will be incorporated into the contract award and will not be adjusted regardless of fluctuations from the estimate amount for the FF&E and A/V. The proposed HAR is a fixed rate.

e. The Final FF&E and AV packages shall be submitted no later than 9 months prior to building completion. The Government is not obligated to award the Planned Modification line items. Should the Government choose to award the Planned Modification, the line item will be awarded as a negotiated modification to the contract/task order. The Contractor's proposed HAR will be applied to all vendor/supplier costs for the FF&E and A/V.

f. If awarded, the FF&E and A/V modifications may be awarded at least six months prior to the contract completion date. A minimum of six months is likely required for the Contractor to purchase, deliver and install the FF&E and A/V without impacting the overall completion date of the project. The Contractor's schedule must assume the award of the FF&E and A/V as a modification. No schedule extensions will be granted if the modification is awarded at least six months prior to the contract completion date. If the Government decides to negotiate and award the furniture modification with less than six months prior to the contact completion date, the Contractor may be entitled to a contract extension and extended field overhead. A contract extension and extended field overhead will only be granted in those cases where the Contractor demonstrates that an accepted Final FF&E and A/V packages were submitted within the approved schedule deadlines and sufficient lead time for the FF&E and A/V is not available and the Government's award of the modification is in the last six months of the contract.

g. Upon Government approval of the Best Value Determination (BVD) Analysis solicitation package, a BVD will be made and will be the rationale for selecting the FF&E and A/V vendors for the project. Accordingly, the price[s] provided by the selected vendors, using predominately negotiated price schedules from BPA, GSA or other Federal contracts, will be the basis for the actual cost of the Final FF&E and A/V Packages. The actual total cost of the awarded planned modifications will be the total of the accepted Final FF&E and A/V Package and the HAR rate applied to the accepted Final FF&E and A/V Packages. See specification section 01 30 01.00 22.

DESIGN, PROCUREMENT AND INSTALLATION OF FURNITURE, FIXTURES AND

EQUIPMENT in Administrative Requirements

COMPLETION DATE: 730 Calendar Days after contract award.

-- End of Document –