ATTACHMENT B BID SCHEDULE.pdf
PDF 218 KB Posted
- Attached to
- P1394 PHASE B VEHICLE MAINTENANCE AND STORAGE, MARINE CORPS BASE, CAMP LEJEUNE, NORTH CAROLINA
- Solicitation number
- N4008522R2639
About this file
This document contains a bid schedule for a federal construction contract solicitation. The solicitation seeks bids for the construction of two new buildings at Marine Corps Base Camp Lejeune in North Carolina. The first is an 18,000 square foot Boat Maintenance and Storage Facility, and the second is a 20,000 square foot Large Vehicle Maintenance Storage Building. The bid schedule outlines pricing requirements for the base bids for each building, as well as optional items like repairs and upgrades to existing stormwater management facilities. It also includes planned modifications for procuring and installing furniture, fixtures, equipment, and audiovisual systems in the buildings, with the estimated costs provided. Bids are due within 120 calendar days of award, and the contract completion date is 730 days from award. The Navy Facilities Engineering Command is the contracting agency.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P1394 Phase B Bid Schedule
CLINS Description:
0001 BASE BID
FFP
0001 Price includes the following:
0001A Price for the entire work for RR469, complete to the 5 foot line outside the building, in accordance with the drawings and specifications.
Total Price for Item 0001A: $__________________________
0001B Price for the entire project Work Site for RR469, outside the 5 foot line, complete in accordance with the drawings and specifications.
Total Price for Item 0001B: $__________________________
OPTION ITEMS:
CLIN 0002 Option Item No. 1 Price includes the following:
0002A Price for the entire work for RR456, complete to the 5 foot line outside the building, in accordance with the drawings and specifications.
Total Price for Item 0002A: $__________________________
0002B Price for the entire project Work Site for RR456, outside the 5 foot line, complete in accordance with the drawings and specifications.
Total Price for Item 0002B: $__________________________
CLIN 0003 Option Item No. 2 Price includes the following:
Price for the entire work to repair of BMP 3# in accordance with the Amendment 1 drawings and specifications.
Total Price for Item 0003: $__________________________
CLIN 0004 Option Item No. 3 Price includes the following:
Price for the entire work to restore the wetlands adjacent to BMP #3 complete in accordance with the Amendment 1 drawing CS501 and specifications.
Total Price for Item 0004: $__________________________
CLIN 0005 Option Item No. 4 Price includes the following:
Price for the entire work to replace the BMP #3 underdrains complete in accordance with the Amendment 1 drawing CS101 Note 11 and specifications.
Total Price for Item 0005: $__________________________
CLIN 0006 Option Item No. 5 Price includes the following:
Price for the entire work to replace the BMP #3 collector pipe complete in accordance with the Amendment 1 drawing CS101 Note 12 and specifications.
Total Price for Item 0006: $__________________________
CLIN 0007 Option Item No. 6 Price includes the following:
Price for the entire work to construct an outlet structure to BMP #3 complete in accordance with the Amendment 1 drawing CS101 Note 13 and specifications.
Total Price for Item 0007: $__________________________
CLIN 0008 Option Item No. 7 Price includes the following:
Price for the entire work to construct outlet protection to BMP #3 complete in accordance with the Amendment 1 drawing CS101 Note 14 and specifications.
Total Price for Item 0008: $__________________________
0009 Planned Modification Item 1 - Price includes the following:
Price to procure and supervise installation, required for the RR469 Furniture, Fixtures, and Equipment (FF&E) complete in accordance with the plans and specification section 01 30
01.00 22 (Design, Procurement and Installation of Furniture, Fixtures and Equipment) and in accordance with the following schedule:
0009 GOVERNMENT FF&E HAR TOTAL
PRICE FOR
DESCRIPTION FF&E ESTIMATE (NTE 5%)
0009 $ 464,941 ________% $_____________
0010 Planned Modification Item 2 - Price includes the following:
Price to procure and supervise installation, required for the RR456 Furniture, Fixtures, and Equipment (FF&E) complete in accordance with the plans and specification section 01 30
01.00 22 (Design, Procurement and Installation of Furniture, Fixtures and Equipment) and in accordance with the following schedule:
0010 GOVERNMENT FF&E HAR TOTAL
DESCRIPTION FF&E ESTIMATE (NTE 5%)
0010 $ 1,141,500 ________% $_____________
0011 Planned Modification Item 3 - Price includes the following:
Price to procure and supervise installation, required for the RR456 Audio Visual (AV) complete in accordance with the plans and specification section 01 30 01.00 22 (Design, Procurement and Installation of Furniture, Fixtures and Equipment) and in accordance with the following schedule:
0011 GOVERNMENT FF&E HAR TOTAL
DESCRIPTION AV ESTIMATE (NTE 5%)
0011 $ 2,400 ________% $_____________
SUM OF ALL ABOVE TOTAL PRICE FOR
0001, 0002, 0003, 0004, 0005, 0006, 0007, 0008, THIS SOLICITATION
0009, 0010, & 0011
CONTRACT LINE ITEM NOTES
General
1. Award will be made on the total sum of Item 0001, 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, and 0011.
2. FAR 52.217-5, Evaluation of Options (Jul 1990) - Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interest, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
3. The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.
4. The Government is not obligated to award the FF&E and A/V line items. Should the Government choose to award the FF&E and A/V, the line items will be awarded as a negotiated modification to the contract/task order. The contractor's proposed HAR will be applied to all vendor/supplier costs for the FF&E and A/V. The Government will make best efforts to award the FF&E and A/V modifications at least six months prior to the contract completion date. A minimum of six months is likely required for the contractor to purchase, deliver and install the FF&E and A/V without impacting the overall completion date of the project. The contractor’s schedule should assume the award of the FF&E and A/V as a modification. No schedule extensions shall be granted if the modification is awarded at least six months prior to the contract completion date. If the Government decides to negotiate and award the furniture modification with less than six months prior to the contract completion date, the contractor may be entitled to a contract extension and extended field overhead. A contract extension and extended field overhead will only be granted in those cases where the prime contractor demonstrates that accepted Final FF&E and A/V packages were submitted within the approved schedule deadlines and sufficient lead time for the FF&E and A/V is not available and the Government’s award of the modification is in the last six months of the contract.
5. If Item 0002, 0003, 0004, 0005, 0006, 0007, and 0008 are exercised, additional bonding and consent of surety will be required. Consequently, the Performance and Payment Bond shall reflect 100 percent of the aggregate amount of all items.
6. The Government reserves the unilateral right to award the Option(s) to the Contractor at the negotiated price within 120 Calendar Days after the Contract Award Date. A Firm Fixed proposed price is required for Items: 0001 thru 0008. No provision is made for economic price adjustment. If Options are exercised, the Contract Completion Date remains: 730 Calendar Days after award of the contract.
PLANNED MODIFICATION BID NOTES
These notes apply to Planned Modification
a. The estimated amount for FF&E and A/V have been supplied by the Government to provide offerors with the projected magnitude of effort. The estimated amount includes the actual cost of the FF&E and A/V including freight and installation charges. The Government FF&E and A/V Estimate is only an estimated amount.
b. If awarded, line items will be funded separately after completion of FF&E and A/V design package review and approval by the Government, and receipt of appropriate funding by the Government. Requirements and details are provided in specification section 01 30 01.00 22.
DESIGN, PROCUREMENT AND INSTALLATION OF FURNITURE, FIXTURES AND
EQUIPMENT in Administrative Requirements
c. Bonding is not required for the design, procurement and installation of 0009 FF&E, 0010 FF&E and 0011 AV.
d. Offerors may propose a Handling and Administration Rate (HAR) for the FF&E and A/V not to exceed 5 percent. This fee will account for all administrative costs, overhead, bonding fees, administration of subcontracts, profit, and any other costs associated with and related to the coordination and processing of the procurement and installation of FF&E and A/V. The proposed HAR percentage will be incorporated into the contract award and will not be adjusted regardless of fluctuations from the estimate amount for the FF&E and A/V. The proposed HAR is a fixed rate.
e. The Final FF&E and AV packages shall be submitted no later than 9 months prior to building completion. The Government is not obligated to award the Planned Modification line items. Should the Government choose to award the Planned Modification, the line item will be awarded as a negotiated modification to the contract/task order. The Contractor's proposed HAR will be applied to all vendor/supplier costs for the FF&E and A/V.
f. If awarded, the FF&E and A/V modifications may be awarded at least six months prior to the contract completion date. A minimum of six months is likely required for the Contractor to purchase, deliver and install the FF&E and A/V without impacting the overall completion date of the project. The Contractor's schedule must assume the award of the FF&E and A/V as a modification. No schedule extensions will be granted if the modification is awarded at least six months prior to the contract completion date. If the Government decides to negotiate and award the furniture modification with less than six months prior to the contact completion date, the Contractor may be entitled to a contract extension and extended field overhead. A contract extension and extended field overhead will only be granted in those cases where the Contractor demonstrates that an accepted Final FF&E and A/V packages were submitted within the approved schedule deadlines and sufficient lead time for the FF&E and A/V is not available and the Government's award of the modification is in the last six months of the contract.
g. Upon Government approval of the Best Value Determination (BVD) Analysis solicitation package, a BVD will be made and will be the rationale for selecting the FF&E and A/V vendors for the project. Accordingly, the price[s] provided by the selected vendors, using predominately negotiated price schedules from BPA, GSA or other Federal contracts, will be the basis for the actual cost of the Final FF&E and A/V Packages. The actual total cost of the awarded planned modifications will be the total of the accepted Final FF&E and A/V Package and the HAR rate applied to the accepted Final FF&E and A/V Packages. See specification section 01 30 01.00 22.
DESIGN, PROCUREMENT AND INSTALLATION OF FURNITURE, FIXTURES AND
EQUIPMENT in Administrative Requirements
COMPLETION DATE: 730 Calendar Days after contract award.
-- End of Document –
File details come from the government source that posted it. Updated .