1572053_P1394B_dwg 11of14.pdf
PDF 2 MB Posted
- Attached to
- P1394 PHASE B VEHICLE MAINTENANCE AND STORAGE, MARINE CORPS BASE, CAMP LEJEUNE, NORTH CAROLINA
- Solicitation number
- N4008522R2639
About this file
This federal solicitation requests proposals for a construction project at Marine Corps Base Camp Lejeune in North Carolina. The project includes constructing a new 18,000 square foot Boat Maintenance and Storage Facility and a 20,000 square foot Large Vehicle Maintenance Storage Building. Both buildings will consist of pre-engineered metal structures with concrete masonry unit infill walls. The Boat Maintenance Facility will include spaces for rubber repair, engine repair, parts storage, life safety storage, boat storage, and restroom facilities. The Vehicle Storage Building will contain five single bay and one multi-bay caged storage areas, each served by a dedicated office, as well as restrooms and mechanical spaces. Additional site work includes utility systems, parking, domestic and fire water, sanitary sewer, propane gas, fencing, lighting, and stormwater management. Electrical systems will provide power distribution, lighting, energy monitoring, security, and fire alarms. Mechanical systems include plumbing, fire protection, compressed air, HVAC, and controls. The solicitation is for proposals to complete this construction project at Marine Corps Base Camp Lejeune.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S
VENT THROUGH ROOF - DIAGRAMMATIC
WATER HAMMER ARRESTOR
'A'
DOMESTIC COLD WATER
DOMESTIC HOT WATER (120°F)
DOMESTIC HOT WATER RECIRCULATING
SOIL, WASTE OR SANITARY SEWER
AIR GAP FITTING
UNION
WALL HYDRANT (WH)
HOSE BIBB (HB)
OVERFLOW RAINLEADER PIPINGORL
RAINLEADER PIPINGRL
VENT PIPING
PIPE TURNING DOWN
PIPE TURNING UP
PITCH DOWN IN DIRECTION OF ARROW
PROPANE GAS PIPINGLPG
# CONSTRUCTION NOTE IDENTIFICATION
WALL CLEANOUTWCO
CLEANOUT PLUGCOP
WASTE RISER DESIGNATION
WATER RISER DESIGNATION
AUTOMATIC AIR VENT
VALVES AND ACCESSORIES
AUTOMATIC FLOW CONTROL VALVE
BACKFLOW PREVENTER (BFD)
BALL VALVE
BUTTERFLY VALVE
CAPPED PIPE
CHECK VALVE
CONCENTRIC REDUCER
DIRECTION OF FLOW
ECCENTRIC REDUCER
FLANGED CONNECTION
FLEXIBLE CONNECTION
FLOW METER
BALL VALVE FOR 2" & UNDER
BUTTERFLY FOR 2.5" AND LARGER
GLOBE VALVE
MANUAL AIR VENT
METERED BALANCING VALVE
W/PRESSURE TAPS
PRESSURE/TEMPERATURE TEST PLUG
PT
NEEDLE VALVE
PLUG VALVE
PIPE ANCHOR (W=WALL, C=CEILING, F=FLOOR)W,C,F
PIPE GUIDE
PIPE SLEEVE
PRESSURE REDUCING VALVE
PRESSURE RELIEF VALVE
PRESSURE GAUGE WITH GAUGE COCK
SQUARE HEAD COCK
STEAM TRAP
STRAINER
STRAINER W/BLOW DOWN VALVE
THREE WAY CONTROL VALVE
TWO WAY CONTROL VALVE
THERMOMETER
THERMOSTATIC RADIATOR VALVE
VACUUM BREAKER
VALVE IDENTIFICATION
GENERAL
LEGEND
INDICATES ITEM TO BE PROVIDED
FLOOR DRAIN WITH DEEP SEAL P-TRAP
PARKING DECK DRAIN
FD
PD
CLEANOUT, GRADE TYPE
GCO
CLEANOUT, FLOOR
TYPE
FCO
CLEANOUT
CO
BRANCH SIDE CONNECTION
BRANCH TOP CONNECTION
BRANCH BOTTOM CONNECTION
SUMP PUMP DISCHARGE PIPINGSPD
SAN
V-1
X
STORM RISER DESIGNATION
CONNECT NEW TO EXISTING
COMPRESSED AIRCA
VTR
SOLENOID SWITCH / VALVE
VIRGINIA BEACH, VA 23462
SUITE 1400
757·455·5800 FAX 757·455·5638
WWW.CLARKNEXSEN.COM
4525 MAIN STREET
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
DRAWFORM REVISION: 7 FEBRUARY 2019
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
N
A V
A L
S T
A T
IO
N
N
O R
F O
L K
V
A
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
XXXXX-XX-X-XXXX
1572053
P-001
P S
O F
M O
T O
R T
R A
N S
P O
R T
M A
IN
T
E N
A N
C E
E X
P A
N S
IO
N
S
IT
E
P
LU
M B
IN
G
L E
G E
N D
DAC
12827108
DLL DLL
12/2/2020
APPROVED BY SOFIA SCHWARTZ, DEPUTY DIRECTOR
OF INSTALLATION DEVELOPMENT, WITH MCB CAMP
LEJEUNE, VIA EMAIL
SGL/JPC
JA
C
K S
O N
V
IL
LE
, N
C M
C B
C A
M P
L E
JE
U
N E
EJA
ALG
AD ACCESS DOOR
ADA AMERICANS WITH DISABILITY ACT
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHR AIR HOSE REEL
ALUM ALUMINUM
AP ACCESS PANEL
ARCH ARCHITECTURAL
DIA DIAMETER
DN DOWN
DWG DRAWING
EX EXISTING
EXR EXISTING TO REMAIN
FF FINISHED FLOOR
FS FLOOR SINK
GA GAUGE
GALV GALVANIZED
GFCI GOVERNMENT FURNISHED CONTRACTOR
INSTALLED
GPM GALLONS PER MINUTE
HB HOSE BIBB
MISC MISCELLANEOUS
MV MIXING VALVE
NIC NOT IN CONTRACT
o OD OVERFLOW DRAIN o RD ROOF DRAIN
RBJ RUN THRU JOISTS
REX REMOVE EXISTING
RL RAINLEADER
RP RECIRCULATION PUMP
SPD SUMP PUMP DISCHARGE
TD TRENCH DRAIN
TYP TYPICAL
UON UNLESS OTHERWISE NOTED
WH-1 WATER HEATER
WHA-'A' WATER HAMMER ARRESTOR AND SIZE
WSV WATER STACK VENT
WVB WATER VALVE BOX
1. PROVIDE ALL LABOR, MATERIAL, AND EQUIPMENT REQUIRED FOR THE COMPLETION AND OPERATION OF ALL SYSTEMS IN THIS SECTION OF WORK IN ACCORDANCE WITH CONTRACT PLANS, SPECIFICATIONS AND ALL APPLICABLE STATE AND LOCAL CODES.
2. PROVIDE A COMPLETE SYSTEM OF HOT AND COLD WATER, AND WASTE AND VENT PIPING TO ALL FIXTURES WITHIN THE BUILDING.
3. ALL WATER, SOIL, WASTE, AND VENT PIPING LINES SHALL BE CONCEALED IN THE BUILDING CONSTRUCTION, EXCEPT WHERE
INDICATED OTHERWISE.
4. PIPING RUN IN RETURN AIR CEILING PLENUM SPACE SHALL BE CAST IRON OR OTHER CODE APPROVED METAL. PLASTIC WILL NOT BE
PERMITTED.
5. MAKE PROPER PIPING CONNECTIONS TO ALL FIXTURES AND EQUIPMENT EVEN THOUGH ALL BRANCH MAINS, ELBOWS AND
CONNECTIONS ARE NOT SHOWN.
6. COORDINATE WITH ARCHITECTURAL DRAWINGS BEFORE ROUGHING-IN PLUMBING FIXTURES.
7. ROUTING OF ALL PIPING SHALL BE COORDINATED WITH OTHER TRADES.
8. BASIS OF DESIGN FIXTURES AND EQUIPMENT ARE INDICATED IN THE PLUMBING FIXTURE SCHEDULE, PUMP SCHEDULE, WATER HEATER SCHEDULE, SPECIALTIES SCHEDULE AND OTHER SCHEDULES, AS A GUIDE FOR GENERAL QUALITY AND PERFORMANCE DESIRED. FIXTURES AND EQUIPMENT BY OTHERS ARE ACCEPTABLE PROVIDED THEY ARE OF THE SAME TYPE, QUALITY, PERFORMANCE AND OPERATION.
9. ALL PLUMBING VENTS WITHIN A 15'-0" RADIUS OF ANY ROOF TOP UNIT OR FRESH AIR INTAKE SHALL BE OFFSET TO CLEAR OUTSIDE
THE RADIUS.
10. PROTECT COPPER PIPING AGAINST CONTACT WITH MASONRY OR DISSIMILAR METALS. HANGERS, SUPPORTS, ANCHORS AND CLIPS
SHALL BE COPPER OR COPPER PLATED.
11. PROVIDE SHUT-OFF VALVES AND BACKFLOW PREVENTION DEVICES AT ALL CONNECTIONS TO NON-POTABLE WATER SYSTEMS AND
EQUIPMENT.
12. INSTALL CLEANOUTS AT THE BASE OF ALL DRAINAGE STACKS.
13. PROVIDE UL LISTED THROUGH FIRE STOPPING ASSEMBLIES FOR EACH PENETRATION OF FIRE-RATED WALLS AND ASSEMBLIES.
14. PROVIDE DISCONNECT SWITCHES, VFD'S, STARTERS AND OTHER COMPONENTS REQUIRED FOR OPERATION OF THE MECHANICAL EQUIPMENT AS DESCRIBED ON THE DRAWINGS AND IN THE SPECIFICATIONS. THE ELECTRICAL CONTRACTOR SHALL PROVIDE CONDUIT AND WIRING FROM THE POWER SOURCE TO THE DISCONNECT SWITCH, FROM THE DISCONNECT SWITCH TO THE STARTER OR VFD, AND FROM THE STARTER OR VFD TO THE FINAL MECHANICAL EQUIPMENT CONNECTION.
15. COORDINATE PIPING WITH ELECTRICAL PANELS AND EQUIPMENT. RUN PLUMBING PIPING SUCH THAT IT DOES NOT RUN ABOVE
ELECTRICAL PANELS, SWITCH GEAR, AND SIMILAR ELECTRICAL EQUIPMENT.
16. VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINING WORK OR ORDERING EQUIPMENT, PIPING, FIXTURES, ETC.
17. WHERE EXISTING PIPING IS TO BE RETAINED FOR RE-USE, PATCH INSULATION WHERE FRAYED, DAMAGED OR MISSING. REPAIR OR REPLACE PIPE SUPPORTS ON EXISTING PIPING TO BE RETAINED FOR USE WHERE INSTALLED INCORRECTLY.
18. COORDINATE WITH THE OWNER'S REPRESENTATIVE FOR PIPING SERVICE CONNECTIONS TO EXISTING SYSTEMS: WHERE POSSIBLE, LIMIT DOWN-TIME TO A SINGLE 4 HOUR PERIOD, BETWEEN 12:00 MIDNIGHT AND 6:00 AM.
19. VISIT THE SITE PRIOR TO BIDDING TO BECOME FAMILIAR WITH EXISTING CONDITIONS AND PROJECT REQUIREMENTS. UNFORSEEN CONDITIONS RESULTING FROM A FAILURE TO ACCOMPLISH A PRE-BID SITE VISIT WILL NOT BE CONSIDERED GROUNDS FOR A
CHANGE.
20. INSTALL ALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS AND ALL APPLICABLE LISTING
REQUIREMENTS.
21. WATER PIPING SIZES ARE BASED ON A MINIMUM WORKING PRESSURE OF 35 PSIG AT A FLOW RATE AS DOCUMENTED IN THE
SUBMITTED CALCULATIONS.
GENERAL NOTES
ABBREVIATIONS
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
N O
R T H C A R O L
I N A
P
ROF E S S I ONA
L
D W
A Y N E A L L A N
CA
R R
034339
SEAL
E NG I N E E R
clacross Typewritten Text
DSN
C8C7C6C5C4C3 C2C1
CA
CF
BOAT
MAINTENANCE
C101
RUBBER
REPAIR
C116
ENGINE
MAINTENANCE
C102
ENGINE
STORAGE
C103
ELEC
C114
SPRINK
C113
LIFE
SAFETY
STORAGE
C109
OFFICE
C111SIPR CAFE
C112
COMM
C115
FD2
P81
P80
FCO
FCO FCO
P80
FD2
FD2
SAN
SAN SAN
S A
N
4" 4"
3"
3"VTR
3"
4"
S A
N
S A
N
4"
4"
4"
4"
4"
S A
N
4"
M A
T C
H
LI
N E
P L1
C
M A
T C
H
LI
N E
P L1
C
FD1
2"VTR
2" VTR
FCO
SAN
SAN
S A
N
CO
CO
CO
VIRGINIA BEACH, VA 23462
SUITE 1400
757·455·5800 FAX 757·455·5638
WWW.CLARKNEXSEN.COM
4525 MAIN STREET
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
DRAWFORM REVISION: 7 FEBRUARY 2019
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
N
A V
A L
S T
A T
IO
N
N
O R
F O
L K
V
A
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
XXXXX-XX-X-XXXX
1572053
PL101C
P S
O F
M O
T O
R T
R A
N S
P O
R T
M A
IN
T
E N
A N
C E
E X
P A
N S
IO
N
S
IT
E
R R
D R
A
IN
A G
E P
LA
N
A
R E
A A
DAC
12827109
DLL DLL
12/2/2020
APPROVED BY SOFIA SCHWARTZ, DEPUTY DIRECTOR
OF INSTALLATION DEVELOPMENT, WITH MCB CAMP
LEJEUNE, VIA EMAIL
SGL/JPC
JA
C
K S
O N
V
IL
LE
, N
C M
C B
C A
M P
L E
JE
U
N E
EJA
ALG
SCALE: 1/8" = 1'-0"
RR456 DRAINAGE PLAN AREA A
1/8" = 1' - 0" 0 5' 10' 15' 30'
GRAPHIC SCALE(S)
KEY PLAN
# KEY NOTES
GENERAL NOTES
1. REFER TO P-001 FOR LEGEND, NOTES AND SCHEDULES.
1 4" DRAIN FROM MOTOR TANK TO OIL SEPARATOR. SEE CIVIL SHEET CU101C
FOR CONTINUATION. INVERT 3'-0" BELOW FINISH FLOOR.
2 MOTOR TEST TANK DRAIN THROUGH OIL INTERCEPTOR.
3 TRAFFIC RATED DRAINS PIPED TO OIL INTERCEPTOR.
4 ROLL DOWN OFF FOOTING, COORDINATE WITH MAIN SEWER ELEVATION.
5 OFF-SET VENT AS REQUIRED TO CENTER IN ROOF PAN BETWEEN STANDING
SEAMS. TYPICAL ALL BUILDING LOCATIONS.
AREA A AREA B
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
N O
R T H C A R O L
I N A
P
ROF E S S I ONA
L
D W
A Y N E A L L A N
CA
R R
034339
SEAL
E NG I N E E R
clacross
C12C11C10C9C8
CA
CF
C13
P11P32 P32P60
P60
P60
P11(*)
P11(*)
FD1P80 FD1
FD1
FD2
LIFE
SAFETY
STORAGE
C109
OFFICE
C110
BOAT
MAINTENANCE
C101
PARTS
C105
MENS
C108
WOMENS
C106
OFFICE
C111
FD1
BOILER RM
C107
BB
C104
3"VTR
3"VTR
3"VTR
SANSANSANSAN
S A
N
S A
N
S A
N
3"
2"
4" 3"
4"
3"
4"
4" 4" 4" 4" 1
3"
2" 2"2"
3"
3"
SAN
2"
4"
3"
4"
2"
2"
M A
T C
H
LI
N E
P L1
C
4"FD1
FCO
CO
2"
GCO
FCO
FD1
FD1
FD1
3" 3"
3"
2"
2"2"
4"
3"
4"
4"
SAN
SAN
SAN
SAN
SAN
4"
P11(*)
P32
3" VTR
3" VTR
P60
CO
P32 P32
4"
SAN
SAN
SAN
SAN
SAN
SAN
FD1
3" VTR
FD1
P11
P11(*)
2"
2" 2"
2"2" 2"
2" 3"
3"
4"
4"
4"
3" 3"
4" 4"
4" 4"
2" 3"
2"
2" 2"
2"
P60
P60
VIRGINIA BEACH, VA 23462
SUITE 1400
757·455·5800 FAX 757·455·5638
WWW.CLARKNEXSEN.COM
4525 MAIN STREET
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
DRAWFORM REVISION: 7 FEBRUARY 2019
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
N
A V
A L
S T
A T
IO
N
N
O R
F O
L K
V
A
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
XXXXX-XX-X-XXXX
1572053
PL102C
P S
O F
M O
T O
R T
R A
N S
P O
R T
M A
IN
T
E N
A N
C E
E X
P A
N S
IO
N
S
IT
E
R R
D R
A
IN
A G
E P
LA
N
A
R E
A B
DAC
12827110
DLL DLL
12/2/2020
APPROVED BY SOFIA SCHWARTZ, DEPUTY DIRECTOR
OF INSTALLATION DEVELOPMENT, WITH MCB CAMP
LEJEUNE, VIA EMAIL
SGL/JPC
JA
C
K S
O N
V
IL
LE
, N
C M
C B
C A
M P
L E
JE
U
N E
EJA
ALG
SCALE: 1/8" = 1'-0"
RR456 DRAINAGE PLAN AREA B
1/8" = 1' - 0" 0 5' 10' 15' 30'
GRAPHIC SCALE(S)
KEY PLAN
# KEY NOTES
GENERAL NOTES
1 INVERT -3'-0" BELOW FINISH FLOOR. SEE CIVIL SHEET CU101C FOR
CONTINUATION.
1. REFER TO P-001 FOR LEGEND, NOTES AND SCHEDULES.
SCALE: NOT TO SCALE
A1
BOILER ROOM C107 AND WOMANS ROOM C106 - WASTE
RISER
SCALE: NOT TO SCALE
A3
MENS ROOM C108 - WASTE RISER
AREA A AREA B
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
N O
R T H C A R O L
I N A
P
ROF E S S I ONA
L
D W
A Y N E A L L A N
CA
R R
034339
SEAL
E NG I N E E R
clacross
C7C6C5C4C3C2C1
CA
CF
HB2
P81
P80
ENGINE
STORAGE
C103
BOAT
MAINTENANCE
C101
SIPR CAFE
C112
COMM
C115
SPRINK
C113
ELEC
C114
RUBBER
REPAIR
C116
ENGINE
MAINTENANCE
C102
HB2
HB2
P80
AHR
AHR
AHR
AHR
AHR AHR
AHR
AHR
AHRAHR
AHR
HB2
M A
T C
H
LI
N E
P P
2C
M A
T C
H
LI
N E
P P
2C
AHR
1 1/2" 3/4"
1"1"
C A
C A
CA CA CA
CA
C A
C A
CA
C
AC
A
C A
C A
CA CA
C A
C
ACA
3/4" 3/4" 3/4"
1"1"
1"1"
3/4" 1 1/2"
1 1/2" 1"
1 1/2"
1"
3/4"
1 1/2"
3/4"
1"1"
3/4"
BFP-3
AHR
1"
1/2"1/2"
1/2"1/2"
3/4"
1/2"1/2"
3/4"
3/4"
1 1/2"
CA
AHR
1" 1 1/4"
1 1/2"
1"1"
2"
METER
PRV SET FOR 11"WC LPG
WH1
6" FLUE
GAS PIPE SIZE CALCULATED ON
LONGEST RUN.
45 FEET X 1.5 = 67.5 FEET
USE TABLE 402.4 (26) NCFGC (80 FEET)
PIPING SYSTEM DESIGNED AT 11"WC
TOTAL LOAD 848 CFH
VIRGINIA BEACH, VA 23462
SUITE 1400
757·455·5800 FAX 757·455·5638
WWW.CLARKNEXSEN.COM
4525 MAIN STREET
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
DRAWFORM REVISION: 7 FEBRUARY 2019
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
N
A V
A L
S T
A T
IO
N
N
O R
F O
L K
V
A
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
XXXXX-XX-X-XXXX
1572053
PP101C
P S
O F
M O
T O
R T
R A
N S
P O
R T
M A
IN
T
E N
A N
C E
E X
P A
N S
IO
N
S
IT
E
R R
P R
E S
S U
R E
P
LA
N
A R
E A
A
DAC
12827111
DLL DLL
12/2/2020
APPROVED BY SOFIA SCHWARTZ, DEPUTY DIRECTOR
OF INSTALLATION DEVELOPMENT, WITH MCB CAMP
LEJEUNE, VIA EMAIL
SGL/JPC
JA
C
K S
O N
V
IL
LE
, N
C M
C B
C A
M P
L E
JE
U
N E
EJA
ALG
SCALE: 1/8" = 1'-0"
RR456 PRESSURE PLAN - AREA A
1/8" = 1' - 0" 0 5' 10' 15' 30'
GRAPHIC SCALE(S)
KEY PLAN
# KEY NOTES
GENERAL NOTES
1. REFER TO P-001 FOR LEGEND, NOTES AND SCHEDULES.
1 AIR DRYER.
2 AIR OUTLET. SEE AIR OUTLET DETAIL ON SHEET P-501.
3 1" CW DOMESTIC WATER PIPING BELOW GRADE.
4 3/4" DOMESTIC WATER PIPING ABOVE GROUND WITH SHUT OFF VALVE.
5 MOTOR TEST TANK.
6 RUN ALONG BOTTOM CORD OF BEAM, PROVIDE SWING JOINT AT PEAK
7 DROP PIPES UNDER BEAM.
8 GAS CONNECTIONS UP TO HVAC GAS HEATERS (B1C, B2C, & B3C). 150 CFH
EACH. PROVIDE GAS COCK IN EACH BRANCH LINE.
9 GAS CONNECTION TO WATER HEATERS WH1. TWO (2) AT 199 CFH EACH.
PROVIDE GAS COCK ON EACH BRANCH LINE.
10 TURN UP AND RUN ALONG BOTTOM OF STRUCTURAL BEAM. (CW& CA)
11 COMPRESSED AIR FROM COMPRESSOR TO DRYER. TURN UP AND RUN TIGHT
TO WALL
12 TURN CA & CW UP AND RUN PARALLE TO ROOF. SEE NOTE 10.
13 RUN HIGH AND TIGHT TO WALL. (CA & CW)
SCALE: NOT TO SCALE
D1
BUILDING RR456 GAS RISER
AREA A AREA B
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
N O
R T H C A R O L
I N A
P
ROF E S S I ONA
L
D W
A Y N E A L L A N
CA
R R
034339
SEAL
E NG I N E E R
clacross
M
C12C11C10C9C8
CA
CF
C13
WH-1
P11(*)
P11
HB1
P32
P60
P60P11(*)
HB1 P32P60
LIFE
SAFETY
STORAGE
C109
OFFICE
C110
BOAT
MAINTENANCE
C101
BB
C104
PARTS
C105
WOMENS
C106
MENS
C108
BOILER RM
C107
OFFICE
C111
HB2
HB2
P80
HB1
HB2 HB2 HB2
HB2
M A
T C
H
LI
N E
P P
1C
CA
1"
3/4"
3/4"
AHR AHR
AHR AHR
3/4"
3/4"
C A
C A
CACA
CA CA
LPG
LPG
RP1
HB2
6 7
1 1/2"
1"
1 1/2"
1"
3/4"
3/4"3/4"
3/4"
3/4"
1 1/2"
1" 1 1/4"
1 1/2" 3/4"
1"1"
1/2"1/2"
3/4"3/4"
1"1" 3/4"
1 1/2"
3/4"
1"1" 1 1/2" 1 1/2" 1 1/2"
3/4"
6" FLUE
2"
2"2"2"1" 2"
BFP3
CA CA
C A C
A
9 9
RP1
HB2
WH1
WH1
1"1"
2"
1"
2"
1"1"
3/4"
1"
P11(*)
P32
P60
2"
3/4"
2"
BFP1
WATER METER
HB1
HB1
P11(*)
P11
P32
P32
P60
P60
1"
1"
3/4"
1/2"
1/2"
2"
1"
3/4"
1 1/4"
1"
3/4"
3/4"
3/4"
1"
3/4" 3/4"
WHA-"B"
HB1
VIRGINIA BEACH, VA 23462
SUITE 1400
757·455·5800 FAX 757·455·5638
WWW.CLARKNEXSEN.COM
4525 MAIN STREET
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
DRAWFORM REVISION: 7 FEBRUARY 2019
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
N
A V
A L
S T
A T
IO
N
N
O R
F O
L K
V
A
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
XXXXX-XX-X-XXXX
1572053
PP102C
P S
O F
M O
T O
R T
R A
N S
P O
R T
M A
IN
T
E N
A N
C E
E X
P A
N S
IO
N
S
IT
E
R R
P R
E S
S U
R E
P
LA
N
A R
E A
B
DAC
12827112
DLL DLL
12/2/2020
APPROVED BY SOFIA SCHWARTZ, DEPUTY DIRECTOR
OF INSTALLATION DEVELOPMENT, WITH MCB CAMP
LEJEUNE, VIA EMAIL
SGL/JPC
JA
C
K S
O N
V
IL
LE
, N
C M
C B
C A
M P
L E
JE
U
N E
EJA
ALG
SCALE: 1/8" = 1'-0"
RR456 PRESSURE PLAN - AREA B
1/8" = 1' - 0" 0 5' 10' 15' 30'
GRAPHIC SCALE(S)
KEY PLAN
# KEY NOTES
GENERAL NOTES
1. REFER TO P-001 FOR LEGEND, NOTES AND SCHEDULES.
1 TANK MOUNTED AIR COMPRESSOR LOCATED IN A WEATHER PROOF
ENCLOSURE ON A 6" CONCRETE SLAB. SEE P-502 FOR DETAIL.
2 AIR OUTLET. SEE COMPRESSED AIR CONNECTION DETAIL ON P-501.
3 SEE CIVIL SHEET CU101C FOR CONTINUATION.
4 PRESSURE REDUCING VALVE.
5 GAS METER.
6 WATER METER.
7 GAS CONNECTIONS DOWN TO TO GAS HEATERS
8 RUN ALONG BOTTOM CORD OF BEAM, PROVIDE SWING JOINT AT PEAK
9 RUN HIGH ALONG BOTTOM CORD OF BEAM AND DROP TO HOSE.
SCALE: NOT TO SCALE
A1
BOILER ROOM C107 AND WOMENS ROOM C106 - WATER
RISER
SCALE: NOT TO SCALE
A3
MENS ROOM C108 - WATER RISER
AREA A AREA B
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
N O
R T H C A R O L
I N A
P
ROF E S S I ONA
L
D W
A Y N E A L L A N
CA
R R
034339
SEAL
E NG I N E E R
clacross
D2 D3 D4 D5D1
DA
DC
DB
STORAGE
BAY
D105
OFFICE
D102
OFFICE
D106
OFFICE
D108
OFFICE
D104
STORAGE
BAY
D103
STORAGE
BAY
D101
STORAGE
BAY
D107
M A
T C
H
LI
N E
P L1
D
FCO3"
3"
SAN SANSAN
3"
2" 2"VTR
P81
EHW2
SAN
SAN
4"
4"
WCO
FD1
FD1
2"
2"2"
2"
2"
2"
2"
2"
4"
P10(*)
3"
P10(*)
P31
P31
3" VTR
FCO
VIRGINIA BEACH, VA 23462
SUITE 1400
757·455·5800 FAX 757·455·5638
WWW.CLARKNEXSEN.COM
4525 MAIN STREET
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
DRAWFORM REVISION: 7 FEBRUARY 2019
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
N
A V
A L
S T
A T
IO
N
N
O R
F O
L K
V
A
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
XXXXX-XX-X-XXXX
1572053
PL101D
P S
O F
M O
T O
R T
R A
N S
P O
R T
M A
IN
T
E N
A N
C E
E X
P A
N S
IO
N
S
IT
E
R R
D R
A
IN
A G
E P
LA
N
A
R E
A A
DAC
12827113
DLL DLL
12/2/2020
APPROVED BY SOFIA SCHWARTZ, DEPUTY DIRECTOR
OF INSTALLATION DEVELOPMENT, WITH MCB CAMP
LEJEUNE, VIA EMAIL
SGL/JPC
JA
C
K S
O N
V
IL
LE
, N
C M
C B
C A
M P
L E
JE
U
N E
EJA
ALG
SCALE: 1/8" = 1'-0"
RR469 DRAINAGE PLAN AREA A
1/8" = 1' - 0" 0 5' 10' 15' 30'
GRAPHIC SCALE(S)
KEY PLAN
# KEY NOTES
GENERAL NOTES
1. REFER TO P-001 FOR LEGEND, NOTES AND SCHEDULES.
SCALE: NOT TO SCALE
C1
BLDG RR469 - UNISEX D116 AND D117
AREA A AREA B
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
N O
R T H C A R O L
I N A
P
ROF E S S I ONA
L
D W
A Y N E A L L A N
CA
R R
034339
SEAL
E NG I N E E R
clacross
D5 D6 D7 D8 D9 D10
DC
DB
OFFICE
D110A
STORAGE
BAY
D111
STORAGE
BAY
D113
UNISEX
D116
UNISEX
D117
OFFICE
D110B
STORAGE
BAY
D109
OFFICE
D114
OFFICE
D112
M A
T C
H
LI
N E
P L1
D
TELECOM
D118
ELECTRICAL
D119
UTILITY
ROOM
D115
AHU
3"
4"
4"
FCO
FCO
FD1 FD1
WCO
4"4"
3" 3"
P10(*)
P31
P10(*) P312"
2"
UP TO 3"VTR
2"
FD-2
FD-2
4"
4"
4"
SAN
S A
N
SAN
S A
N
SAN
V
GCO
SAN SAN
2" V UP TO 3"VTR
4"
VIRGINIA BEACH, VA 23462
SUITE 1400
757·455·5800 FAX 757·455·5638
WWW.CLARKNEXSEN.COM
4525 MAIN STREET
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
DRAWFORM REVISION: 7 FEBRUARY 2019
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
N
A V
A L
S T
A T
IO
N
N
O R
F O
L K
V
A
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
XXXXX-XX-X-XXXX
1572053
PL102D
P S
O F
M O
T O
R T
R A
N S
P O
R T
M A
IN
T
E N
A N
C E
E X
P A
N S
IO
N
S
IT
E
R R
D R
A
IN
A G
E P
LA
N
A
R E
A B
DAC
12827114
DLL DLL
12/2/2020
APPROVED BY SOFIA SCHWARTZ, DEPUTY DIRECTOR
OF INSTALLATION DEVELOPMENT, WITH MCB CAMP
LEJEUNE, VIA EMAIL
SGL/JPC
JA
C
K S
O N
V
IL
LE
, N
C M
C B
C A
M P
L E
JE
U
N E
EJA
ALG
SCALE: 1/8" = 1'-0"
RR469 DRAINAGE PLAN AREA B
1/8" = 1' - 0" 0 5' 10' 15' 30'
GRAPHIC SCALE(S)
KEY PLAN
# KEY NOTES
GENERAL NOTES
1. REFER TO P-001 FOR LEGEND, NOTES AND SCHEDULES.
AREA A AREA B
INVERT ELEVATION
-4'-6" BELOW
FINISH FLOOR
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
N O
R T H C A R O L
I N A
P
ROF E S S I ONA
L
D W
A Y N E A L L A N
CA
R R
034339
SEAL
E NG I N E E R
clacross
D2 D3 D4 D5D1
DC
DB
HB2
STORAGE
BAY
D105
OFFICE
D102
OFFICE
D106
OFFICE
D108
STORAGE
BAY
D103
STORAGE
BAY
D101
STORAGE
BAY
D107
OFFICE
D104 3/4"
1/2"
1/2"
LPGLPG
3/4"
M A
T C
H
LI
N E
P P
2D
M A
T C
H
LI
N E
P P
2D
3/4"
UH-1D
UH-1D
LPG LPG
1/2"
P81 UH-1D UH-1D
2"
WHA-"B"
WHA-"B"
P10(*)
P10(*)
P31
P31
EWH1
EWH1
1 1/4"
1"
1/2"1/2"
3/4"
3/4"
1/2"1/2" 1"
3/4"
3/4"
3/4"
1 1/4"
2"
HB1
HB1
VIRGINIA BEACH, VA 23462
SUITE 1400
757·455·5800 FAX 757·455·5638
WWW.CLARKNEXSEN.COM
4525 MAIN STREET
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
DRAWFORM REVISION: 7 FEBRUARY 2019
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
N
A V
A L
S T
A T
IO
N
N
O R
F O
L K
V
A
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
XXXXX-XX-X-XXXX
1572053
PP101D
P S
O F
M O
T O
R T
R A
N S
P O
R T
M A
IN
T
E N
A N
C E
E X
P A
N S
IO
N
S
IT
E
R R
P R
E S
S U
R E
P
LA
N
A R
E A
A
DAC
12827115
DLL DLL
12/2/2020
APPROVED BY SOFIA SCHWARTZ, DEPUTY DIRECTOR
OF INSTALLATION DEVELOPMENT, WITH MCB CAMP
LEJEUNE, VIA EMAIL
SGL/JPC
JA
C
K S
O N
V
IL
LE
, N
C M
C B
C A
M P
L E
JE
U
N E
EJA
ALG
SCALE: 1/8" = 1'-0"
RR469 PRESSURE PLAN - AREA A
1/8" = 1' - 0" 0 5' 10' 15' 30'
GRAPHIC SCALE(S)
KEY PLAN
# KEY NOTES
GENERAL NOTES
1. REFER TO P-001 FOR LEGEND, NOTES AND SCHEDULES.
SCALE: NOT TO SCALE
C1
BLDG RR469 - UNISEX D116 AND D117 - WATER RISER
AREA A AREA B
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
N O
R T H C A R O L
I N A
P
ROF E S S I ONA
L
D W
A Y N E A L L A N
CA
R R
034339
SEAL
E NG I N E E R
clacross
D5 D6 D7 D8 D9 D10
DA
DC
DB
HB2
STORAGE
BAY
D111
STORAGE
BAY
D113
OFFICE
D110BOFFICE
D110A
UNISEX
D117
UNISEX
D116
STORAGE
BAY
D109
OFFICE
D112
OFFICE
D114
3/4"
ELECTRICAL
D119
TELECOM
D118
STORAGE
BAY
D109
STORAGE
BAY
D109
UTILITY
ROOM
D115 1/2"
3/4"
3/4"
1"
HB1
21"
3/4"
LPG
LP
G
LP
G
3/4"
M A
T C
H
LI
N E
P P
1D
M A
T C
H
LI
N E
P P
1D
3/4"
UH-1D
UH-1D
UH-1D
3/4" 1/2"3/4"1/2" 1/2"
3/4"
1/2"1/2"
LPG
LPG
LPG
1/2"1/2"
UH-1D
HB2
3/4"
2"
2"
3/4"
2"
1/2"
3/4"
LP
G
LPG
LP
G
LPG
LPG
3/4"
P10(*) P31
HB2
P10(*)
HB1 P31
3/4"
WHA-"B" WHA-"B"
1 1/4"
2"
1 1/4"
1" 2" 3/4"
EWH1
EWH1
BFP3
UH-1D
HB1
LPG
3/4"LPG
LPG
1/2"
1/2" 1/2"1/2"
1/2"
1/2"
1/2"
1"
3/4"
GAS PIPE SIZE CALCULATED ON LONGEST RUN
298 FEET X 1.5 = 447 FEET
USE TABLE 402.4 (25) NCFGC (450 FEET)
PIPING SYSTEM DESIGNED AT 2 PISG
TOTAL LOAD 765 CFH
1/2"
1/2"
1/2"
3/4"
1/2"
1/2"
SWING JOINT
AT PEAK
LPG
LPG
LPG
LPG
VIRGINIA BEACH, VA 23462
SUITE 1400
757·455·5800 FAX 757·455·5638
WWW.CLARKNEXSEN.COM
4525 MAIN STREET
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
DRAWFORM REVISION: 7 FEBRUARY 2019
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
N
A V
A L
S T
A T
IO
N
N
O R
F O
L K
V
A
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
XXXXX-XX-X-XXXX
1572053
PP102D
P S
O F
M O
T O
R T
R A
N S
P O
R T
M A
IN
T
E N
A N
C E
E X
P A
N S
IO
N
S
IT
E
R R
P R
E S
S U
R E
P
LA
N
A R
E A
B
DAC
12827116
DLL DLL
12/2/2020
APPROVED BY SOFIA SCHWARTZ, DEPUTY DIRECTOR
OF INSTALLATION DEVELOPMENT, WITH MCB CAMP
LEJEUNE, VIA EMAIL
SGL/JPC
JA
C
K S
O N
V
IL
LE
, N
C M
C B
C A
M P
L E
JE
U
N E
EJA
ALG
SCALE: 1/8" = 1'-0"
RR469 PRESSURE PLAN - AREA B
1/8" = 1' - 0"
0 5' 10' 15' 30'
GRAPHIC SCALE(S)
KEY PLAN
# KEY NOTES
GENERAL NOTES
1. REFER TO P-001 FOR LEGEND, NOTES AND SCHEDULES.
1 SEE CIVIL DRAWINGS SHEET CU101D FOR CONTINUATION.
2 GAS METER.
3 PRESSURE REDUCING VALVE. LINE PRESSURE TO 2PSIG BUILDING PRESSURE.
4 RUN ALONG BOTTOM CORD OF BEAM, PROVIDE SWING JOINT AT PEAK
5 CONNECT TO UH-1D. COORDINATE WITH MC. 85 MBH EACH
6 LP GAS FROM TANK SEE CIVIL CU 101D PLANS
7 GAS TRAIN. SHUT OFF VALVE, PRESSURE REDUCING VALVE AND METER. SEE
DETAIL ON P501
8 WATER METER.
SCALE: NOT TO SCALE
C3
BUILDING RR469 GAS RISER
AREA A AREA B
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
N O
R T H C A R O L
I N A
P
ROF E S S I ONA
L
D W
A Y N E A L L A N
CA
R R
034339
SEAL
E NG I N E E R
clacross
FLOOR
1/8 BEND
SCORIATED COVER
TAPER THREAD
CLEANOUT PLUG
CLEANOUT BOX
V A
R
IE
S
UNDERGROUND PIPING
CAULK OUTLET 1/2" TRAP
PRIMER TAP
GRATE
DEEP SEAL "P" TRAP
FLOOR DRAIN
FIN. FLOOR
FROM GAS SUPPLYNOTES:
1. GAS REGULATOR IS NOT REQUIRED IF CONNECTED APPLIANCES ARE
FURNISHED WITH INTEGRAL REGULATORS.
2. VENT PRV TO ATMOSPHERE WHEN REQUIRED.
PLUG VALVE
PRV
GROUND
UNIONUNIONTO BUILDING
GAS METER
FLOW
PRESSURE
GAUGE
MOTOR
CONCENTRIC
REDUCER METERED
BALANCING VALVE
CHECK VALVE
BALL VALVE TYP
FLOW
UNION
NORMALLY OPEN
(CLOSE FOR PUMP
SUCTION PRESSURE)
NORMALLY CLOSED
(OPEN FOR SUCTION
PRESSURE)
RP-1
FINISHED FLOOR
ANGLE STOP VALVE
P-TRAP
FAUCET
LAVATORY
INSTANTANEOUS ELECTRIC HOT
WATER HEATER (EWH1) (MOUNT
UNDER LAVATORY AS HIGH AS
POSSIBLE)
JUNCTION BOX
1/2"
1/2"
1/2"
A
A
SECTION A-A
SLOPE SLOPE
TRENCH DRAIN
POURED IN CONCRETE
PROVIDE EXTRA SOLID COVER TO
TRENCH DRAIN WHERE IT RUNS
THROUGH THE WELDING AREA
NOTE:
1. REFER TO STRUCTURAL DETAILS FOR CONCRETE
SLOPE.
SEE SCHEDULE FOR GRATE TYPE
CATCH BASIN WITH SEDIMENT
BUCKET STRAINER
TRENCH DRAIN
BOTTOM OUTLET
CATCH BASIN WITH
SEDIMENT BUCKET
STRAINER
FLOW
SLOPE SLOPE
3'-0"
UNLESS
SHOWN
OTHERWISE
1/4" NPT QUICK CONNECT
AIR COUPLER (TYP OF 2)
1/2" COMBINATION
REGULATOR AND FILTER
3/4" NPT SHUT-OFF
VALVE
3/4"
COMPRESSED
AIR MAIN
TOP TAKE-OFF
1/2" AIR LUBRICATOR
1/4" NPT SHUT-OFF
VALVE (TYP OF 2)
1/2" NPT SHUT-OFF
VALVE
FINISHED FLOOR
1' -6
1'
-0 "3/4"
VIRGINIA BEACH, VA 23462
SUITE 1400
757·455·5800 FAX 757·455·5638
WWW.CLARKNEXSEN.COM
4525 MAIN STREET
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
DRAWFORM REVISION: 7 FEBRUARY 2019
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
N
A V
A L
S T
A T
IO
N
N
O R
F O
L K
V
A
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
XXXXX-XX-X-XXXX
1572053
P-501
P S
O F
M O
T O
R T
R A
N S
P O
R T
M A
IN
T
E N
A N
C E
E X
P A
N S
IO
N
S
IT
E
D E
TA
IL
S
DAC
12827117
DLL DLL
12/2/2020
APPROVED BY SOFIA SCHWARTZ, DEPUTY DIRECTOR
OF INSTALLATION DEVELOPMENT, WITH MCB CAMP
LEJEUNE, VIA EMAIL
SGL/JPC
JA
C
K S
O N
V
IL
LE
, N
C M
C B
C A
M P
L E
JE
U
N E
EJA
ALG
SCALE: NOT TO SCALE
A2
CLEANOUT - FLOOR
SCALE: NOT TO SCALE
A1
FLOOR DRAIN DETAIL
SCALE: NOT TO SCALE
B4
GAS CONNECTION DETAIL W/ PLUG VALVE
SCALE: NOT TO SCALE
A4
INLINE RECIRCULATING PUMP DETAIL
SCALE: NOT TO SCALE
B1
INSTANTANEOUS WATER HEATER DETAIL
SCALE: NOT TO SCALE
C3
TRENCH DRAIN DETAIL
SCALE: NOT TO SCALE
C1
TYPICAL COMPRESSED AIR DROP DETAIL
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
N O
R T H C A R O L
I N A
P R
OF E S S I ONA
L
D W
A Y N E A L L A N
CA
R R
034339
SEAL
E N G I N E E R clacross
3 9
REFRIGERATED AIR DRYER WITH
PRE-FILTER AND AFTER FILTER,
110V CONTROLS
MIN. 4" HIGH, LEVEL
CONCRETE EQUIPMENT
PAD
TO AIR
SYSTEM
NORMALLY
CLOSED
BYPASS
PROVIDE VIBRATION ISOLATION
PER COMPRESSOR
MANUFACTURERS
RECOMMENDATION
AIR COMPRESSOR
WITH START UP KIT
AC-1 34.1 CFM @ 175
PSI WITH 120 GALLON
STORAGE TANK.
MOUNT IN WEATHER
PROOF ENCLOSURE.
1 CHECK VALVE
2 BALL VALVE
3 FLEXIBLE CONNECTOR
4 UNION
5 SAFETY RELIEF VALVE
SET @ 200 PSI
6 AUTOMATIC DRAIN VALVE
7 DRAIN VALVE
8 FLOOR DRAIN
9 PRESSURE GAUGE (0-250 PSI
RANGE)
10 AIR COMPRESSOR WITH REVEIVER (AC-1)
11 REFRIGERATED AIR DRYER (RD-1)
AIR COMPRESSOR PIPING DIAGRAM NOTES
A
FIN. GRADE
ELEV. VARIES
5/8" I.D. x 50' RED RUBBER HOSE
HOSE STOP
QUICK DISCONNECT
3/4" FILTER
3/4" REGULATOR
3/4" LUBRICATOR IF NEEDED.
BALL VALVE
3/4" A
3/4" A
A
VIRGINIA BEACH, VA 23462
SUITE 1400
757·455·5800 FAX 757·455·5638
WWW.CLARKNEXSEN.COM
4525 MAIN STREET
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
DRAWFORM REVISION: 7 FEBRUARY 2019
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
N
A V
A L
S T
A T
IO
N
N
O R
F O
L K
V
A
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
XXXXX-XX-X-XXXX
1572053
P-502
P S
O F
M O
T O
R T
R A
N S
P O
R T
M A
IN
T
E N
A N
C E
E X
P A
N S
IO
N
S
IT
E
D E
TA
IL
S
DAC
12827118
DLL DLL
12/2/2020
APPROVED BY SOFIA SCHWARTZ, DEPUTY DIRECTOR
OF INSTALLATION DEVELOPMENT, WITH MCB CAMP
LEJEUNE, VIA EMAIL
SGL/JPC
JA
C
K S
O N
V
IL
LE
, N
C M
C B
C A
M P
L E
JE
U
N E
EJA
ALG
SCALE: 12" = 1'-0"
A1
AIR COMPRESSOR PIPING DETAIL (AC-1)
SCALE: 1/8" = 1'-0"
A3
COMPRESSED AIR HOSE REEL DETAIL (AHR-1)
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
N O
R T H C A R O L
I N A
P
ROF E S S I ONA
L
D W
A Y N E A L L A N
CA
R R
034339
SEAL
E NG I N E E R
clacross
MARK NO. NOTES AND COMMENTS
WATER HAMMER ARRESTORS
TOTAL FIXTURE
UNITS
WHA A
WHA B
WHA C
WHA D
1-11 FIXTURE UNITS
12-32 FIXTURE UNITS
33-60 FIXTURE UNITS
61-113 FIXTURE UNITS
INSTALL PER PDI-WH 201
INSTALL PER PDI-WH 201
INSTALL PER PDI-WH 201
INSTALL PER PDI-WH 201
PLUMBING FIXTURE SCHEDULE
MARK FIXTURE TYPE
FIXTURE CONNECTIONS
WASTE VENT CW HW
REMARKS
P31 LAVATORY
P10 WATER
CLOSET
-4" 2" 1"FLUSH VALVE WALL HUNG, MOUNTING HEIGHT 15"-16.5" FINISHED FLOOR TO FLOOD LEVEL RIM OF FIXTURE. FURNISH WITH OPEN FRONT SEAT.
WHERE NOTED (*) MOUNT FOR HANDICAPPED (17"-19").
WALL MOUNTED 1 1/2" 1/2" 1/2" 1/2"
MOUNTING HEIGHT IS FROM FINISHED FLOOR TO FLOOD LEVEL RIM OF FIXTURE. GRID DRAIN, LOOSE KEY STOPS, RIGID RISERS, RECTANGULAR STEEL UPRIGHT CONCEALED ARM SUPPORT. PROVIDE INSULATION KIT FOR SUPPLIES AND TRAP.
SHOWER 2" 1 1/2" 1/2" 1/2"
PRESSURE-BALANCED SHOWER MIXING VALVE WITH CHECK STOPS, DIVERTER VALVE HAND SHOWER HEAD AND 24" SLIDE BAR, AND SHOWER DRAIN W/CHROME STRAINER. PROVIDE DRAIN PAN. SOLID SURFACE WALL BY DIVISION 09.
P80
EMERGENCY
EYEWASH
WALL
MOUNTED
1/2"
NOTES:
2" 1 1/2" 1/2" PROVIDE MIXING VALVE SET FOR 85 DEGREES F.
P60 SQUARE STALL
P81
EMERGENCY
EYEWASH
WALL
MOUNTED
FROST PROOF
1/2"2" 1 1/2" 1/2" FROST PROOF, WITH ELECTRIC HEATER OR MIXING VALVE AS NOTED ON PLAN TO PROVIDE TEPID WATER AT 85 DEGREES F
1. ALL PLUMBING FIXTURES SHALL BE PROVIDED WITH ALL VANDAL PROOF OPTIONS AVAILABLE.
2. PROVIDE TRAP OFFSET TAIL PIECE FOR ALL ADA LAVATORIES AND SINKS.
3. PROVIDE FLOOR MOUNTED CARRIERS FOR ALL WALL HUNG FIXTURES.
4. ALL FIXTURES SHALL BE WHITE.
5. PLUMBING CONTRACTOR SHALL MAKE ALL FINAL CONNECTIONS.
P11 -4" 2" 1"FLUSH VALVE STAINLESS STEEL, WALL HUNG, MOUNTING HEIGHT 15"-16.5" FROM FINISHED FLOOR TO FLOOD LEVEL RIM OF FIXTURE. FURNISH WITH
OPEN FRONT SEAT. WHERE NOTED (*) MOUNT FOR HANDICAPPED (17"-19").
WATER
CLOSET
1 1/2" 1 1/2" 1/2" STAINLESS STEEL LAVATORY BOWL, PROVIDE WITH INSULATIOIN KIT FOR SUPPLIES AND TRAP, GRID DRAIN, CAST BRASS TRAP, LOOSE KEY STOPS AND FLEX RISERS. 1/2"COUNTER MOUNTEDP32 LAVATORY
VIRGINIA BEACH, VA 23462
SUITE 1400
757·455·5800 FAX 757·455·5638
WWW.CLARKNEXSEN.COM
4525 MAIN STREET
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
DRAWFORM REVISION: 7 FEBRUARY 2019
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
N
A V
A L
S T
A T
IO
N
N
O R
F O
L K
V
A
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
XXXXX-XX-X-XXXX
1572053
P-601
P S
O F
M O
T O
R T
R A
N S
P O
R T
M A
IN
T
E N
A N
C E
E X
P A
N S
IO
N
S
IT
E
S C
H E
D U
LE
S
DAC
12827119
DLL DLL
12/2/2020
APPROVED BY SOFIA SCHWARTZ, DEPUTY DIRECTOR
OF INSTALLATION DEVELOPMENT, WITH MCB CAMP
LEJEUNE, VIA EMAIL
SGL/JPC
JA
C
K S
O N
V
IL
LE
, N
C M
C B
C A
M P
L E
JE
U
N E
EJA
ALG
WATER HEATER SCHEDULE (Gas)
MARK LOCATION TYPE MOUNTING
TEMP RISE
GPM
FLOW RATE
(GPM)
INPUT GAS
(BTU)
ENERGY
EFFICIENCY NOTES
PLUMBING SPECIALTIES SCHEDULE
MARK DESCRIPTION
AHR COMPRESSED AIR HOSE REEL
BFP-3 REDUCED PRESSURE BACKFLOW PREVENTER SEE PLAN FOR SIZE
FCO FLOOR CLEAN OUT
FD1 3" FLOOR DRAIN
FD-2 4" FLOOR DRAIN
GCO GRADE CLEAN OUT
HB1 3/4" HOSE BIBB
HB2 FROST PROOF WALL HYDRANT
WCO WALL CLEAN OUT
WHA-"B" WATER HAMMER ARRESTER SIZE 'B'
WH-1 RR456 RM C107 GAS WALL 4.83 199,000 96% LP GAS45°F TO 110°F
WATER HEATER SCHEDULE (Electric)
MARK LOCATION TYPE MOUNTING TEMP RISE
FLOW RATE
(GPM) INPUT KW NOTES
EWH-1 RR469
D116 & D117
ELECT. WALL 55°F .65GPM 6KW
208/1Ø
EWH-2 RR469
D113
ELECT. WALL 28°F 2.0GPM 9.6KW
208/1Ø
PUMP SCHEDULE
MARK LOCATION TYPE
CAPACITY
DESCRIPTIONGPM FT. HD.
RP1 RR456 C107 CIRCULATOR 3 7.5 STAINLESS STEEL VARIABLE SPEED CIRCULATOR 4-60 WATTS
120V/60/1PH
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
N O
R T H C A R O L
I N A
P
ROF E S S I ONA
L
D W
A Y N E A L L A N
CA
R R
034339
SEAL
E NG I N E E R
clacross
| PLUMBING |
| P-001 - PLUMBING LEGEND |
| PL101C - RR456 DRAINAGE PLAN -AREA A |
| PL102C - RR456 DRAINAGE PLAN -AREA B |
| PP101C - RR456 PRESSURE PLAN -AREA A |
| PP102C - RR456 PRESSURE PLAN -AREA B |
| PL101D - RR469 DRAINAGE PLAN -AREA A |
| PL102D - RR469 DRAINAGE PLAN -AREA B |
| PP101D - RR469 PRESSURE PLAN -AREA A |
| PP102D - RR469 PRESSURE PLAN -AREA B |
| P-501 - DETAILS |
| P-502 - DETAILS |
| P-601 - SCHEDULES |
| 2020-11-23T14:07:30-0500 | |
| Dwayne Carr | |
| I, Dwayne Carr, am signing to approve this document. |
| 2020-11-23T14:07:46-0500 | |
| Dwayne Carr | |
| I, Dwayne Carr, am signing to approve this document. |
| 2020-11-23T14:07:46-0500 | |
| Dwayne Carr | |
| I, Dwayne Carr, am signing to approve this document. |
| 2020-11-23T14:07:46-0500 | |
| Dwayne Carr | |
| I, Dwayne Carr, am signing to approve this document. |
| 2020-11-23T14:07:46-0500 | |
| Dwayne Carr | |
| I, Dwayne Carr, am signing to approve this document. |
| 2020-11-23T14:07:47-0500 | |
| Dwayne Carr | |
| I, Dwayne Carr, am signing to approve this document. |
| 2020-11-23T14:07:47-0500 | |
| Dwayne Carr | |
| I, Dwayne Carr, am signing to approve this document. |
| 2020-11-23T14:07:47-0500 | |
| Dwayne Carr | |
| I, Dwayne Carr, am signing to approve this document. |
| 2020-11-23T14:07:47-0500 | |
| Dwayne Carr | |
| I, Dwayne Carr, am signing to approve this document. |
| 2020-11-23T14:07:48-0500 | |
| Dwayne Carr | |
| I, Dwayne Carr, am signing to approve this document. |
| 2020-11-23T14:07:48-0500 | |
| Dwayne Carr | |
| I, Dwayne Carr, am signing to approve this document. |
| 2020-11-23T14:07:48-0500 | |
| Dwayne Carr | |
| I, Dwayne Carr, am signing to approve this document. |
| 2020-11-23T14:08:30-0500 | |
| Dwayne Carr | |
| I, Dwayne Carr, am signing to approve this document. |
| 2020-11-23T14:08:47-0500 | |
| Dwayne Carr | |
| I, Dwayne Carr, am signing to approve this document. |
| 2020-11-23T14:08:47-0500 | |
| Dwayne Carr | |
| I, Dwayne Carr, am signing to approve this document. |
| 2020-11-23T14:08:47-0500 | |
| Dwayne Carr | |
| I, Dwayne Carr, am signing to approve this document. |
| 2020-11-23T14:08:48-0500 | |
| Dwayne Carr | |
| I, Dwayne Carr, am signing to approve this document. |
| 2020-11-23T14:08:48-0500 | |
| Dwayne Carr | |
| I, Dwayne Carr, am signing to approve this document. |
| 2020-11-23T14:08:48-0500 | |
| Dwayne Carr | |
| I, Dwayne Carr, am signing to approve this document. |
| 2020-11-23T14:08:48-0500 | |
| Dwayne Carr | |
| I, Dwayne Carr, am signing to approve this document. |
| 2020-11-23T14:08:49-0500 | |
| Dwayne Carr | |
| I, Dwayne Carr, am signing to approve this document. |
| 2020-11-23T14:08:49-0500 | |
| Dwayne Carr | |
| I, Dwayne Carr, am signing to approve this document. |
| 2020-11-23T14:08:49-0500 | |
| Dwayne Carr | |
| I, Dwayne Carr, am signing to approve this document. |
| 2020-11-23T14:08:50-0500 | |
| Dwayne Carr | |
| I, Dwayne Carr, am signing to approve this document. |
| 2021-01-12T09:59:39-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2021-01-12T10:00:19-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2021-01-12T10:00:20-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2021-01-12T10:00:28-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2021-01-12T10:00:29-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2021-01-12T10:00:30-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2021-01-12T10:00:31-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2021-01-12T10:00:40-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2021-01-12T10:00:41-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2021-01-12T10:00:50-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2021-01-12T10:00:59-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2021-01-12T10:01:07-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2021-01-12T10:01:21-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2021-01-12T10:01:53-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2021-01-12T10:01:54-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2021-01-12T10:01:55-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2021-01-12T10:01:56-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2021-01-12T10:01:56-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2021-01-12T10:01:57-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2021-01-12T10:01:58-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2021-01-12T10:01:59-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2021-01-12T10:02:00-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2021-01-12T10:02:01-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2021-01-12T10:02:02-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
File details come from the government source that posted it. Updated .