N4008522R2506 Regional HVAC.pdf
PDF 2 MB Posted
- Attached to
- Regional HVAC&R Hampton Roads, Virginia
- Solicitation number
- N4008522R2506
About this file
This is a synopsis for a solicitation seeking proposals for a facilities support contract providing heating, ventilation, air conditioning and refrigeration repair and maintenance services for facilities in the Hampton Roads, Virginia area. The contract will have recurring and non-recurring services priced using indefinite delivery/indefinite quantity terms over a base period of one year with four one-year option periods not to exceed five years total. Recurring services will include preventative maintenance and service calls while non-recurring services will include minor construction and alterations. The work involves facilities and equipment at Naval Station Norfolk, Naval Support Activity Norfolk, Norfolk Naval Shipyard, Joint Expeditionary Base Little Creek-Fort Story and Naval Weapon Station Yorktown. Proposals are due on February 10, 2022 and will be evaluated using tradeoff analysis considering price and non-price factors relating to technical approach, experience, safety and past performance. The solicitation is designated as a total small business set-aside with a NAICS code of 811310 and size standard of $8 million.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 22R2506 Amendment 0005.pdf | ||
| 22R2506 Amendment 0004.pdf | ||
| J-0200000-21 (Amendment 0003- SIte Visit Log).pdf | ||
| 22R2506 Amendment 0003.pdf | ||
| 22R2506 Amendment 0002.pdf | ||
| 22R2506 Amendment 0001.pdf | ||
| 22R2506 Amendment 0001.pdf | ||
| J-0200000-20 (Amendment 0001) NCTAMS Site Visit Incoming Visitor Log.xlsx | XLSX spreadsheet | |
| J-15020000-07 HVAC IMP Inventory.xlsx | XLSX spreadsheet | |
| 0200000 J Management and Administration.pdf | ||
| J-0200000-07 ASSET INFORMATION.xlsx | XLSX spreadsheet | |
| J-0200000-15 ELINS.xlsx | XLSX spreadsheet | |
| 1502000 J Facility Investment.pdf | ||
| J-15020000-08 HVAC Seasonal Startup-Shutdown.xlsx | XLSX spreadsheet | |
| 1501000 J Facility Management.pdf | ||
| J-0200000-06 SERVICE PROVIDER INFORMATION.xlsx | XLSX spreadsheet | |
| J-15020000-05 HVAC PM Inventory.xlsx | XLSX spreadsheet |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 02:00 PM local time 10 Feb 2022
X
A X B X C
D
EX
X G F 131 - 147
148 - 156 X H 157 - 165 matthew.a.collins1@navy.mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
1 165
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N40085 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
Building Z-140, Room 216 conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
MATTHEW A. COLLINS 757-341-0090
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
1 - 2 3 - 13
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
14 - 83 J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
84 - 87 88 - 99
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 100 - 103 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 104 - 107 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
108 - 128
PART II - CONTRACT CLAUSES
NAVFACSYSCOM MID-ATLANTIC
CONTRACTING CORE
9324 VIRGINIA AVENUE
NORFOLK VA 23511-3095
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
129 - 130
6. REQUISITION/PURCHASE NO.
ACQR5896780
5. DATE ISSUED
10 Jan 2022
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N4008522R2506
Section A - Solicitation/Contract Form
COVER SHEET
COMMANDER
NAVAL FACILITIES ENGINEERING COMMAND
MID-ATLANTIC DIVISION
ACQUISITION CORE
NORFOLK, VIRGINIA 23511-3095
NOTICE:
Proposals to be submitted by 2:00 P.M.
By Commercial Carrier to:
Matthew Collins Matthew.a.collins51.civ@us.navy.mil
NAVFAC SPECIFICATION
No. 05-22-2506
RFP NUMBER N4008522R2506
FACILITY INVESTMENT SERVICES FOR HEATING, VENTILATION, AIR CONDITIONING &
REFRIGERATION REPAIR & MAINTENANCE SERVICES FOR THE NAVFACSYSCOM MID-
ATLANTIC HAMPTON ROADS AREA OF RESPONSBILITY (AOR)
NOTICE
All inquiries concerning any phase of the specification, prior to the proposal due date shall be submitted electronically, Attn: Matthew Collins, matthew.a.collins51.civ@us.navy.mil
Contracts or purchase order to be awarded as a result of this contract shall be assigned (as Appropriate for specific procurement), DO-S1 rating in accordance with the provisions of DPA Regulation 1 and/or DMS Regulation 1.
Section B - Supplies or Services and Prices
GENERAL INFORMATION
B.1 Contract Title: Facility Investment Services for Heating, Ventilation, Air Conditioning & Refrigeration
Repair & Maintenance Services for the NAVFACSYSCOM MID-ATLANTIC Hampton Roads Area of Responsibility
B.2 Type of Contract: This is a Facilities Support, Indefinite Delivery/Indefinite Quantity Contract with Recurring and
Non-Recurring Services as noted in Section L, Instructions, Conditions, and Notices to Offeror.
B.3 Minimum Guarantee: The Recurring Price portion of the base year only is the minimum guarantee for this contract. It can be paid in either the base year or over the entire term of the contract.
B.4 Set-Aside: 100% Small Business Set-Aside Competitive Procurement. Refer to Section I, FAR Clause
52.219-6, Notice of Total Small Business Set-Aside.
B.5 NAICS Code: The NAICS Code assigned to this procurement is 811310 with a small business size standard of $8,000,000.00. Refer to On-Line Representations and Certifications Application (ORCA) via System for Award Management (SAM) at https://www.sam.gov/portal/public/SAM .
B.6 Wage Determination (Service)/Wage Decision (Construction): Service Contract Act (SCA) and Davis-
Bacon Act (DBA) wages are included in this solicitation. Refer to Section J, Attachments.
SCA (Wage Determination No._2015-4341 Rev 19) shall be used for wage rates and fringe benefits for FSC services.
Wage Rate Requirements Construction (General Decision Number: VA20220160) shall be used for construction services not included under the SCA Wage Determination.
WAGE RATE REQUIREMENTS CONSTRUCTION IN FACILITY SUPPORT CONTRACTS
INCLUDING CONSTRUCTION
This contract contains only one Wage Rate Requirement Construction General Decision which shall be in effect for the life of the contract. The contractor may include in the offered price for the option years any increase needed for wages or benefits for construction work under the contract. The contractor warrants that the prices in the option years of this contract do not include any allowance for any contingency to cover increased cost for which adjustment is provided under FAR clause 52.217- 43, Fair Labor Standards Act and Service Contract Act - Price Adjustment. Offerors are required to segregate Davis-Bacon hours and wages and SCA hours and wages in the payroll records.
B.7 Bid Guarantee/Bonding Requirements: NOT REQUIRED for this procurement.
B.8 Contract Term: This contract contains provisions for a Base Period with four (4) Option Periods, not to exceed a total of sixty (60) months. The Government has the option to extend the term of the contract in accordance with Section I, Contract Clauses, 52.217-9, Option to Extend the Term of the Contract-Services (Mar 2000). In the option periods, the Government will adjust the prices, if applicable, based on the new Department of Labor Wage Determination.
B.9 Period of Performance: The period of performance will be determined at the time of award.
B.10 Evaluation of Proposal: Proposers shall submit a lump sum price for Section B, CLINs 0001 through 0012 and unit prices for Exhibit A through Exhibit F, referenced in Section J. For purposes of evaluating offers for award, the Government will utilize the pricing submitted for the base year and all option periods. Refer to Section M, FAR 52.217-5, Evaluation of Options (JUL 1990).
B.11 Contract Line Items And Contract Exhibit Line Items
a. Proposers shall enter unit prices and amounts for Contract Line Items (CLINs) and Contract Exhibit line items (ELINs) as indicated in the schedules and accompanying exhibits.
b. In the event there is a difference between a unit price and the extended total amount, the unit price will be held to be the intended bid and the total of the CLIN, the ELIN will be recomputed accordingly. The CLIN will also be recomputed to take into account the change in the contract ELINs. If the offeror provides a total amount for an ELIN, but fails to enter the unit price, the total amount divided by the ELIN quantity will be held to be the intended unit price.
c. The Schedule of Recurring Work (CLIN 0001, 0003, 0005, 0007, 0009, and 0011) and the Schedule of
Non-Recurring Work (CLIN 0002, 0004, 0006, 0008, 0010, and 0012) will be used as the basis for deductions in accordance with FAR Clause 52.246-4, Inspection of Services – Fixed Price, Section E.
B.12 Unit Price Adjustments In Option Periods
This contract incorporates the Service Contract Act (SCA) and the Wage Rates-Construction. The SCA Wage Determination incorporated in Section J is for the Base Year performance period only. The latest Wage Determination available at the time for each option exercise will be incorporated into the contract. Unit prices will ONLY be adjusted for the Service Contract Act (SCA) wage increases in accordance with FAR Clauses 52.222-43, Fair Labor Standards Act and Service Contract Act – Price Adjustment. The contractor warrants, by submission of this proposal, that the price does not include any contingency for future wage increases with the exception of Wage Rates-Construction.
B.13 Indefinite Quantity Individual Contract Line Item Quantities
Once the estimated quantities for individual line items shown in the Schedule have been ordered, additional quantities may be ordered as long as the overall not-to-exceed (NTE) amount of the contract per year is not exceeded and the Contractor agrees by signing the task order.
B.14 Unit Prices For Labor
a. A portion of the work included in the scope of this contract cannot be identified in advance in sufficient detail to be as a Unit Price Task in this contract. Labor for this work will be ordered and paid for based on unit prices for labor proposed by the Contractor listed in the Schedule of Non-Recurring Quantity Work.
b. Estimated hours in the Schedule are a forecast of future requirements. These estimated hours are for performing "Non-Recurring Quantity Work” accomplished in the time period shown.
c. The Contractor shall enter, in the unit price proposal space, the unit price for performing composite labor. The composite labor price shall include all direct and indirect costs associated with performing an hour of work. The composite labor price should be the Contractor's hourly craft wage adjusted to allow for the offerors work force productivity (i.e., the Contractor's estimate of how its’ work force will perform in relation to the Means Facilities Cost Data and/or the Engineered Performance Standards).
The Composite Labor Rate shall include all costs for preparation of the cost proposal, job preparation, travel, pre- expended bin materials and supplies, ordering and stockpiling job material, additional material handling, items of equipment necessary to perform work (I.e. bucket truck, lifting equipment, staging, etc.), profit, tools, equipment, field and home office overhead, clerical support, supervision, inspection, fees, taxes, licenses, bonds, permits, insurance, etc.
B.15 Period Of Performance – Less than One Year
Offer shall be submitted for the performance of work for a period of one year. The contractor is cautioned to recognize that the initial term of the contract may be for a period of less than one year in accordance with the “Term of Contract” clause in Section F. In the event that the period of performance is less than one year, the Government will reduce the individual line item quantities to reflect work remaining in the contract term and no other adjustments to the pro-rated contract price will be made.
B.16 Government Purchase Card
Non-Recurring quantity work may be ordered at the prices offered by two ways: 1) by the issuing activity using a DD Form 1155 “Order for Supplies and Services”; 2) by an authorized Government user via a Government Purchase Card (GPC). When receiving GPC orders against Section B, the contractor shall provide the supplies and services at the offered price without additional markup or handling fee.
B.17 Contractor Support Of Electronic Facilities Support Contracting (e-FSC)
This procurement allows for the use of FEDMALL for issuing orders. Refer to Section H, Special Contract Requirement.
B.18 Incorporation of Technical Proposal
a. The Contractor’s technical proposal, including revisions and amendments made prior to contract award and a copy of which is in the possession of both parties, will be incorporated into this contract upon award by reference with the same force and effect as if set forth in full text. All contractor personnel shall meet or exceed the qualification standards, experience levels, and trade backgrounds set forth in the technical proposal.
b. In the event of an inconsistency between the provisions of this contract and the technical proposal, the inconsistency shall be resolved by giving precedence in the following order: (i) the contract (excluding the technical proposal), and then (ii) the technical proposal.
B.19 Request For Proposals (RFP) Information/Clarification Questions
Contractors are required to review the entire solicitation package before submitting questions. All questions must be submitted at least 10 days before proposals are due, either by email to matthew.a.collins51.civ@us.navy.mil or fax to: 757-341-0079. This is the most efficient way to ensure all questions are addressed in a timely manner.
B.20 Request for Proposal (RFP) Files:
Solicitations are posted to the Contract Opportunities website (https://www.sam.gov) as mandated by our Agency. By necessity, these files are protected to prevent unauthorized editing.
It is the sole responsibility of the offeror to obtain the RFP files, along with any amendments, from this website.
Unprotected editable file copies of the RFP documents including: Word, Excel and/or .pdf files (Adobe Acrobat Files) will not be provided. Please plan accordingly.
B.21 Solicitation
This solicitation incorporates by reference a Performance Work Statement (PWS) developed by using NAVFAC performance-based specifications. The PWS consists of Annexes 1, 2, and 15. The contractor will be required to meet the specifications in those Annexes per Section C of this solicitation.
B.22 Notice to Offerors:
Offerors are required to submit Section B, Contract Line Items (CLINs) Schedule, and Section J, Exhibit Line Items (ELINs) with their proposal. The total of the CLIN is equal to the sum of the ELINs as shown below:
CLINS ELINs CLINs ELINs 0001 A001 through A008 0007 D001 through D008 0002 A700 through A706 0008 D700 through D706 0003 B001 through B008 0009 E001 through E008 0004 B700 through B706 0010 E700 through E706 0005 C001 through C008 0011 F001 through F008
0006 C700 through C706 0012 F700 through F706
NOTE: CLINs 0011 and 0012 are pursuant to FAR Clause 52.217-8, if exercised by the Contracting Officer.
B.23 Proposal Delivery
Submitting Your Proposal
Proposals should be sent via a commercial carrier, such as Federal Express, and shall be addressed to:
NAVFAC MIDLANT
Attn: Matthew Collins 9324 Virginia Avenue Building Z-140, Room 216 Norfolk, Virginia 23511
Proposals that are hand carried will NOT be accepted.
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0001 UNDEFINED Each
BASE YEAR- RECURRING WORK
FFP
Provide all labor, management, supervision, tools, material and equipment and other items necessary to perform Facility Investment Services for Heating, Ventilation, Air Conditioning & Refrigeration Repair & Maintenance Services for the NAVFACSYSCOM MID-ATLANTIC Hampton Roads Area of Responsibility FOB: Destination
PURCHASE REQUEST NUMBER: ACQR5896780
PSC CD: J041
MAX
NET AMT
UNIT UNIT PRICE MAX AMOUNT
0002 UNDEFINED Each
BASE YEAR- NON-RECURRING WORK
FFP
Provide all labor, management, supervision, tools, material and equipment and other items necessary to perform Facility Investment Services for Heating, Ventilation, Air Conditioning & Refrigeration Repair & Maintenance Services for the NAVFACSYSCOM MID-ATLANTIC Hampton Roads Area of Responsibility FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
0003 UNDEFINED Each
OPTION OPTION YEAR 1 - RECURRING WORK
FFP
Provide all labor, management, supervision, tools, material and equipment and other items necessary to perform Facility Investment Services for Heating, Ventilation, Air Conditioning & Refrigeration Repair & Maintenance Services for the NAVFACSYSCOM MID-ATLANTIC Hampton Roads Area of Responsibility FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
0004 UNDEFINED Each
OPTION OPTION YEAR 1 - NON-RECURRING WORK
FFP
Provide all labor, management, supervision, tools, material and equipment and other items necessary to perform Facility Investment Services for Heating, Ventilation, Air Conditioning & Refrigeration Repair & Maintenance Services for the NAVFACSYSCOM MID-ATLANTIC Hampton Roads Area of Responsibility
UNIT UNIT PRICE MAX AMOUNT
0005 UNDEFINED Each
OPTION OPTION YEAR 2 - RECURRING WORK
FFP
Provide all labor, management, supervision, tools, material and equipment and other items necessary to perform Facility Investment Services for Heating, Ventilation, Air Conditioning & Refrigeration Repair & Maintenance Services for the NAVFACSYSCOM MID-ATLANTIC Hampton Roads Area of Responsibility
UNIT UNIT PRICE MAX AMOUNT
0006 UNDEFINED Each
OPTION OPTION YEAR 2 - NON-RECURRING WORK
FFP
Provide all labor, management, supervision, tools, material and equipment and other items necessary to perform Facility Investment Services for Heating, Ventilation, Air Conditioning & Refrigeration Repair & Maintenance Services for the NAVFACSYSCOM MID-ATLANTIC Hampton Roads Area of Responsibility
UNIT UNIT PRICE MAX AMOUNT
0007 UNDEFINED Each
OPTION OPTION YEAR 3 - RECURRING WORK
FFP
Provide all labor, management, supervision, tools, material and equipment and other items necessary to perform Facility Investment Services for Heating, Ventilation, Air Conditioning & Refrigeration Repair & Maintenance Services for the NAVFACSYSCOM MID-ATLANTIC Hampton Roads Area of Responsibility
UNIT UNIT PRICE MAX AMOUNT
0008 UNDEFINED Each
OPTION OPTION YEAR 3 - NON-RECURRING WORK
FFP
Provide all labor, management, supervision, tools, material and equipment and other items necessary to perform Facility Investment Services for Heating, Ventilation, Air Conditioning & Refrigeration Repair & Maintenance Services for the NAVFACSYSCOM MID-ATLANTIC Hampton Roads Area of Responsibility FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
0009 UNDEFINED Each
OPTION OPTION YEAR 4 - RECURRING WORK
FFP
Provide all labor, management, supervision, tools, material and equipment and other items necessary to perform Facility Investment Services for Heating, Ventilation, Air Conditioning & Refrigeration Repair & Maintenance Services for the NAVFACSYSCOM MID-ATLANTIC Hampton Roads Area of Responsibility
UNIT UNIT PRICE MAX AMOUNT
0010 UNDEFINED Each
OPTION OPTION YEAR 4 - NON-RECURRING WORK
FFP
Provide all labor, management, supervision, tools, material and equipment and other items necessary to perform Facility Investment Services for Heating, Ventilation, Air Conditioning & Refrigeration Repair & Maintenance Services for the NAVFACSYSCOM MID-ATLANTIC Hampton Roads Area of Responsibility
UNIT UNIT PRICE MAX AMOUNT
0011 UNDEFINED Each
OPTION OPTION YEAR 5 - RECURRING WORK
FFP
Provide all labor, management, supervision, tools, material and equipment and other items necessary to perform Facility Investment Services for Heating, Ventilation, Air Conditioning & Refrigeration Repair & Maintenance Services for the NAVFACSYSCOM MID-ATLANTIC Hampton Roads Area of
UNIT UNIT PRICE MAX AMOUNT
0012 UNDEFINED Each
OPTION OPTION YEAR 5 - NON-RECURRING WORK
FFP
Provide all labor, management, supervision, tools, material and equipment and other items necessary to perform Facility Investment Services for Heating, Ventilation, Air Conditioning & Refrigeration Repair & Maintenance Services for the NAVFACSYSCOM MID-ATLANTIC Hampton Roads Area of
Section C - Descriptions and Specifications
ANNEX 0100000
0100000 – General Information Spec Item Title 1 General Information
1.1 Outline of Services
1.2 Acquisition of Additional Work
1.3 Background Information
1.4 Navy PBSA Approach
1.5 Standard Template
1.6 Related Information
1.7 Verification of Workload and Conditions
1.8 Contractor's Knowledge
1.9 Technical Proposal Certification
0100000 – General Information Spec Item Title Description 1 General Information
1.1 Outline of Services Except where otherwise stated, the Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide the services outlined below and described in this Performance Work Statement (PWS) at Naval Support Activity Norfolk (NSA) Norfolk, Norfolk Naval Ship Yard (NNSY), Joint Expeditionary Base Little Creek- Fort Story, Naval Weapon Station Yorktown, and outlying bases supported by these installation’s performance-based contract that is comprised of both Recurring Work and Non-Recurring Work Items.
The PWS is organized into annexes. Annex 1 is "General Information".
Annex 2 contains the on-site project management and administration requirements. Annexes 3 through 18 contain the technical requirements.
The annex numbers are identified as 1 through 18 in the description column, but the fully expanded annex numbers include seven digits (e.g., Annex 1 expanded number is 0100000 as shown in the header row at the top of this page
Annex 1 General Information Annex 2 Management and Administration Annex 3 Command and Staff Annex 4 Public Safety Annex 5 Air Operations Annex 6 Port Operations Annex 7 Ordnance Annex 8 Range Operations Annex 9 Health Care Support Annex 10 Supply Annex 11 Personnel Support Annex 12 Morale, Welfare and Recreation Support Annex 13 Galley Annex 14 Housing Annex 15 Facilities Support Annex 1500000 Facilities Management
Annex 1502000 Facility Investment
Annex 16 Utilities Annex 17 Base Support Vehicles and Equipment Annex 18 Environmental
1.2 Acquisition of
Additional Work
The Government reserves the right to acquire additional services at additional locations, within the scope of the annexes and areas included in Spec Item 1.1 Outline of Services, in addition to the services and locations identified in the requirements of this contract. Additional services will be incorporated into the contract in accordance with the CHANGES clause, SECTION I or ordered under the non-recurring work provisions of the contract. Items of work not covered by this contract but within the general intent are considered in the scope of this contract.
1.3 Background Information Tidewater is a region of low-lying plains of southeast Virginia and northeastern North Carolina, part of the Atlantic coastal plain in the United States of America. The term tidewater may be correctly applied to all portions of any area, including Virginia, where the water level is affected by the tides (more specifically, where the water level rises when the tide comes in). In the case of Virginia, the Tidewater region includes the land east of the Fall Line, the natural border with the Piedmont Region. It includes Hampton Roads, the rest of the Virginia Peninsula, the Middle Peninsula, the Northern Neck, and the Eastern Shore. Hampton Roads is home to the world's largest naval installation. In 1983 Hampton Roads became the official name for the region, unifying the Southside (Norfolk, Virginia Beach, Suffolk, Chesapeake and Portsmouth) and the Peninsula (Hampton and Newport News). Also included are the counties of Isle of Wight, James City, Surrey, and York. Each of these entities shares one principal bond: their close association to the water and the harbor called Hampton Roads. You cannot live in Hampton Roads without being minutes from a naval installation. The Hampton Roads Area is defined as all Navy/Marine Corps Activities in Virginia south of 38 N latitude and east of Interstate-95 (including bisected cities). Since 1983, Hampton Roads has been recognized by the U.S. Office of Management and Budget as a group of communities having economic and social integration.
Hampton Roads has grown from just over one million residents and the nation’s 34th largest market in 1983 to the country's 28th largest metro area with over 1.4 million people. The Center of Hampton Roads lies about ninety miles southeast of Richmond. To the north are Washington, DC (185 miles), Baltimore (210 miles) and New York City (330 miles).
Norfolk is about eighteen miles from the Atlantic Ocean and is bordered by the Chesapeake Bay and Hampton Roads Harbor. Norfolk serves as the nucleus for the metropolitan area of more than a million people.
1.4 Navy PBSA Approach The Navy’s approach to performance-based service acquisition (PBSA) includes four component parts, which are 1) performance outcomes, 2) measurable standards, 3) consideration of incentives, and 4) performance assessment plan.
1.5 Standard Template Key to implementing the PBSA approach is using a standard template that ensures Navy-wide consistency yet affords appropriate tailoring to meet local needs.
The standard template contains 18 standard annexes. Annex 1 will always contain General Information that is relevant to the entire scope of the contract. Annex 2 contains Management and Administration requirements that are relevant to the entire scope of the contract. Annexes 3 through 18 and their associated sub-annexes contain the General Information, Management and Administration requirements, Performance Objectives, Related Information, and Performance Standards that are relevant to that technical annex. Except where otherwise stated, Annexes 3 through 18 and their associated sub-annex requirements are not relevant to one another. Within each technical annex and sub-annex, the organization of information and requirements are also standardized. Specification Item 1 will always contain General Information. Specification Item 2 will always contain the Management and Administrative requirements. Specification Item 3 will always contain the Recurring Work requirements.
Specification Item 4 will always contain the Non-Recurring Work requirements. Requirements and standards for higher level specification items apply to all subordinate specification items, e.g., Specification Item 3 standards apply to all recurring work specification items. Specification Item 3.1 is applicable to all 3.1 subordinate specification items.
Specification Items 3.2 and 3.3 are not considered subordinate to 3.1 nor are they considered subordinate to one another. All costs associated with Annexes 1 and 2 and Specification Items 1 and 2 shall be priced, and their price shall be allocated to the Exhibit Line Items.
1.6 Related Information There are four types of Related Information that can be found in the Description and Related Information columns of the specification as follows:
Informational Notes as used throughout this PWS provides additional information to offerors’ to be used in developing a thorough understanding of the work to be performed in this contract. Any block of text marked “Informational Notes” throughout Annexes 1 through 18 and their associated sub-annexes are subject to this disclaimer. Offerors’ may not rely upon the "Informational Notes" as material representations of the Government. Information provided in "Informational Notes" does not create a contractually binding requirement on either party.
Clarifying Information describes client expectations in a more detailed manner than the Performance Objective and Performance standard alone.
Constraining Information describes limitations to the work performed to meet the Performance Objective and Performance Standard.
Requirement Information further describes client requirements associated with each Performance Objective.
1.7 Verification of
Workload and Conditions
Throughout the PWS, the workload data is generally referred to as being located in Sections C and J. Section C provides data such as descriptions, specifications, and the statement of work. Section J provides data such as system descriptions, maps, floor plans, and tables to represent the type and location of services to be provided.
All facilities, systems, and assets identified in this contract shall be accepted by the Contractor in "AS-IS" condition. The Contractor is fully responsible for all work up to and including the limits of liabilities specified.
As prescribed in FAR 52.237-1, offerors’ or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.
1.8 Contractor's Knowledge The Navy expects to receive insightful management from its contractors.
This management will include the knowledge, skills, authority and willingness to use contractor resources to find better ways of serving Navy clients’ strategic and operational goals and objectives. The Navy's use of performance-based objectives evidences this principle. Although performance work statements will typically contain several levels of performance assessment, the Navy wants its contractors to exercise maximum discretion within bounds of prudent risk management to adjust processes and resources needed to reach specified objectives at the highest performance level.
1.9 Technical Proposal
Certification
The Contractor warrants that its proposal incorporated herein by reference will meet or exceed the performance objectives set forth in this contract.
ANNEX 0200000
0200000 – Management and Administration Spec Item Title 2 Management and Administration
2.1 Definitions and Acronyms
2.2 General Information
2.2.1 Government Regular Working Hours
2.2.1.1 Observed Federal Holidays
2.2.1.2 Restriction to Contractor Working Hours
2.2.2 Wage Determinations
2.2.3 Requirements Hierarchy
Spec Item Title
2.3 General Administrative Requirements
2.3.1 Required Conferences and Meetings
2.3.2 Training for Maintenance and Operation of New and Replacement Systems and Equipment
2.3.3 Partnering
2.3.3.1 Informal Partnering
2.3.3.2 Contract Partnering Administration
2.3.3.3 Contract Partnering Session Attendees
2.3.4 Permits and Licenses
2.3.5 Insurance
2.3.5.1 Certificate of Insurance
2.3.5.2 Minimum Insurance Amounts
2.3.6 Protection of Government Property
2.3.7 Directives, Instructions, and References
2.3.8 Invoicing Procedures
2.3.9 Forms
2.4 Government-Furnished Items
2.4.1 Government-Furnished Utilities
2.5 Contractor-Furnished Items
2.5.1 Portable Electronic Devices NNSY
2.6 Management
2.6.1 Safeguarding Information
2.6.2 Dissemination of Information
2.6.3 Work Reception
2.6.4 Work Control
2.6.5 Work Schedule
2.6.6 Deliverables
2.6.7 Service Interruptions
2.6.8 NAVFAC Maximo
2.6.8.1 NAVFAC Maximo Data
2.6.8.2 NAVFAC Maximo Method of Data Entry
2.6.8.3 NAVFAC Maximo Access
2.6.8.4 NAVFAC Maximo Training
2.6.9 Quality Management System (QMS)
2.6.9.1 Quality Management (QM) Plan
2.6.9.2 Quality Inspection and Surveillance
2.6.9.3 Quality Inspection and Surveillance Report
2.6.10 Property Management Plan
2.6.11 System and Equipment Replacement
2.7 Personnel Requirements
2.7.1 Key Personnel
2.7.1.1 Project Manager (PM)
2.7.1.2 Quality Manager
2.7.1.2.1 Quality Control Personnel
2.7.1.3 Site Safety and Health Officer (SSHO)
2.7.1.4 Environmental/Energy Manager
2.7.2 Employee Requirements
2.7.2.1 Employee Certification and Training
2.7.2.2 Employee Appearance
2.7.2.3 Employee Conduct
2.7.2.4 Identification as Contractor Employee
2.7.2.5 Removal of Employees
2.7.2.6 Proof of Legal Residency
2.7.3 Service Contract Reporting (SCR)
2.8 Security Requirements
2.8.1 Employee Listing
2.8.2 Vehicles
2.8.3 Photography NNSY
2.8.4 Marine Corps Security Force (MCSF) NNSY
2.8.5 Passes and Badges
2.8.6 Access to Installation
2.8.6.1 DBIDS Program
2.8.6.2 DBIDS Credentials
2.8.7 Access to Buildings
2.8.8 Access Arrangements
2.8.9 Escort Arrangement for Secured Areas
2.8.10 Security Clearances
2.8.11 Access to Controlled Unclassified Information
2.8.12 Access to Government Information Technology (IT), Operating Technology (OT), and Facility
Related Control Systems (FRCS)
2.8.13 Access to Navy Marine Corps Intranet (NMCI)
2.8.14 Employee Status
2.9 Contractor Safety Program
2.9.1 Contractor Safety Requirements
2.9.1.1 Experience Modification Rate (EMR)
2.9.1.2 OSHA Days Away From Work, Restricted Duty, or Job Transfer (DART) Rate
2.9.2 Accident Prevention Plan (APP)
2.9.3 Activity Hazard Analysis (AHA)
2.9.4 Safety and Occupational Health (SOH) Risks and Compliance Plans
2.9.4.1 Alcohol and Drug Abuse Prevention Plan
2.9.4.2 Chemical Hazard Communication Program
2.9.4.3 Confined Space Program
2.9.4.4 Critical Lift Plan
2.9.4.5 Fall Prevention and Protection Plan
2.9.4.6 Control of Hazardous Energy (lockout/tagout)
2.9.5 Crane Operations
2.9.5.1 Crane Inspections
2.9.5.2 Rigging Gear
2.9.5.3 Crane Operators
2.9.6 Accident and Damage Reporting
2.9.6.1 Accident Reporting and Notification Criteria
2.9.7 Fire Protection
2.9.8 Monthly On-Site Labor Report
2.9.9 OSHA Citations and Violations
2.9.10 Safety Inspections and Monitoring
2.9.11 Safety Certification
2.9.12 Safety Apparel on Jobsites
2.9.13 Restrictions On Use of Yellow Materials (NNSY)
2.9.14 Emergency Medical Treatment
2.9.15 Additional Safety Requirements for Norfolk Naval Shipyard
2.9.15.1 Emergency Response Requirement NNSY
2.9.15.2 Notification NNSY
2.9.15.3 Sheltering NNSY
2.9.15.4 Evacuation NNSY
2.9.15.5 Incident Report NNSY
2.9.15.6 Fire Protection NNSY
2.9.15.7 Hot Work Permit SY
2.9.15.8 Traffic Cones and Signs NNSY
2.9.15.9 Access to Radiological Controlled Areas NNSY
2.9.15.10 Danger Tags and Locks NNSY
2.10 Environmental Management and Sustainability
2.10.1 Energy Management Program
2.10.1.1 Water Conservation Plan
2.10.1.2 Energy Efficient Products
2.10.2 Environmental Protection
2.10.2.1 ODS Requirements for Refrigerant Recycling
2.10.2.2 Non-Regulated Waste Disposal
2.10.2.4 Spill Prevention, Containment, and Clean-up
2.10.2.3 Hazardous Material Management
2.10.2.4 Asbestos Containing Material (ACM)
2.10.2.5.1 Asbestos Certification / Asbestos Containing Materials NNSY
2.10.2.5.2 Safety and Health Requirements for Control of Asbestos Material NNSY
2.10.3 Sustainable Procurement and Practices
2.10.3.1 Environmentally Preferable Products
2.10.3.2 Use of Recovered Materials
2.10.3.3 Use of Biobased Products
2.10.3.4 Water Pollution Control NNSY
2.10.3.5 Housekeeping Requirements NNSY
2.10.3.6 Paint Removal NNSY
2.10.3.7 Paint Mixing, Spray Painting and Paint Applications NNSY
2.10.3.8 Paint and Thinner Transfer, Handling and Storage Procedures NNSY
2.11 Disaster Preparedness
2.12 Technical Library
2.13 Warranty Management
2.14 Recurring Work Procedures
2.14.1 Recurring Work Preparation of Proposals
2.14.2 Notification to the Government for Work Above the Recurring Work Limitations
2.14.3 Recurring Work Exhibit Line Item Numbers (ELINs)
2.15 Non-Recurring Work
2.15.1 Unit Priced Task (UPT) Work (Non-Negotiated)
2.15.1.1 Acceptance and Performance
2.15.1.2 Invoicing and Receiving Payment
2.15.2 Unit Priced Labor (UPL)Work (Negotiated)
2.15.2.1 Non-recurring Work Preparation of Proposals
2.15.2.1.1 Labor Requirements
2.15.2.1.2 Direct Material and Construction Equipment Requirements
2.15.2.2 Issuance of Final Task Order
2.15.3 Non-Recurring Work ELINS
0200000 - Management and Administration
2 Management and
Administration
2.1 Definitions and
Acronyms Definitions and Acronyms are listed in J-0200000-01.
2.2 General
Information
2.2.1 Government
Regular Working Hours
The Government's regular working hours are from, 0700-1600, five days per week, Monday through Friday, except observed Federal holidays. Exceptions to the regular hours of operation are detailed in subsequent sections of this PWS. Work in certain annexes or sub-annexes require Contractor continuous operations, 24 hours a day, every day of the year including holidays. The performance of other work requirements shall be accomplished within the Government’s regular working hours unless the specific work requirement specified herein necessitates otherwise. Any other work outside Government regular working hours must be authorized by the KO prior to commencement of work.
2.2.1.1 Observed Federal
Holidays
The Government observes the following holidays: New Year’s Day, Martin Luther King Jr.’s Birthday, President’s Day, Memorial Day, Juneteenth National Independence Day, Independence Day, Labor Day, Columbus Day, Veterans’ Day, Thanksgiving Day, and Christmas Day.
2.2.1.2 Restriction to
Contractor Working Hours
If the Contractor wishes to work outside of the Government's regular working hours for the Contractor’s convenience, the Contractor shall submit a written Request to Work Outside Government’s Regular Working Hours per Section F. Excludes work to be performed during specified hours.
2.2.2 Wage
Determinations
Wage Determinations are included in J-0200000-02.
2.2.3 Requirements
Hierarchy
Requirements or definitions specified in each spec item of this contract apply to subordinate paragraphs. For example, requirements shown in spec item 3.1 would apply to spec items 3.1.1, 3.1.2, 3.1.2.1 and so on.
Likewise, Performance Standards specified at a lower digit level (i.e. spec item 3.1.1, 3.1.2, 3.1.2.1) apply when performance is assessed at a higher tier (i.e., spec item 3.1) based on the composite work requirements.
2.3 General
Administrative Requirements
2.3.1 Required
Conferences and Meetings
The Contractor shall attend administrative and coordination meetings. The Meetings will be as often as necessary at the discretion of the KO, but not less than monthly. A mutual effort will be made to resolve all problems identified. The Government reserves the right to bring other Government representatives to any meeting(s). At a minimum the Project Manager, Quality Manager, and Site Safety and Health Officer will attend meetings.
2.3.2 Training for
Maintenance and Operation of New and Replacement Systems and Equipment
When construction, renovation, or repair work is performed by means other than this contract, the Contractor shall attend Government provided training, as applicable, for maintenance and operation of new and replacement systems and equipment at no additional cost to the Government.
2.3.3 Partnering The Government requires cohesive partnerships with its Contractors and subcontractors. Key stakeholders, including the supported commands who may receive services, principal individuals from NAVFAC, the performance assessment team, and representative(s) of the installation(s) will be invited to participate in the partnering process. Key members of the prime and sub-contractor teams, including senior management personnel must participate.
The partnership will draw on the strength of each organization in an effort to achieve quality contract services done right the first time, within the contract price, as scheduled, and without any safety mishaps.
The goal of Partnering is to develop a cohesive team with common purpose, commitment and established communication processes.
2.3.3.1 Informal
Partnering
The Contracting Officer shall organize the initial Partnering Meeting with key personnel of the project team, including Contractor's personnel and Government personnel. The initial session will be scheduled concurrent with the Pre-Performance Conference and held no later than 30 days after award and will be held at a Government provided facility as designated by the KO.
The Initial Informal Partnering Session will be conducted and facilitated using electronic media (a video and accompanying forms) provided by Contracting Officer. The senior Government stakeholder present will lead the meeting, however, the Contractor’s PM or senior representative is encouraged to participate as co-lead.
The Partners will determine the frequency of the follow-on sessions.
2.3.3.2 Contract
Partnering Administration
Upon award, the ACO will contact the Contractor, supported command(s), Region, and Installation(s) stakeholders, and the performance assessment team to discuss implementation of partnering. Commence discussions with the Contractor to select a facilitator and location that are acceptable to both partners. A partnership agreement, The Charter, should be in place as early as possible so issues arising, even before work begins, can be resolved using the issues resolution process. Replacement of Core Management Team members (stakeholders who attended the initial session and manage the contract work day-to-day) is discouraged since it will disrupt the synergy that has been developed. If replacement of a team member proves to be unavoidable, a follow-on partnering session must be held to officially turn the responsibilities of the position over to the new member.
The Core Management Team consisting of the attendees below must be present during the initial and all follow-on partnering sessions. These are the core mandatory attendees. Other stakeholders may attend if they desire or as recommended by the partners.
2.3.3.3 Contract
Partnering Session Attendees
The Contractor shall bring the necessary personnel to successfully partner on this contract. Asterisk indicates mandatory personnel.
President/Vice President
* Project Manager
* Quality Manager Site Safety and Health Officer
2.3.4 Permits and
Licenses
The Contractor shall obtain all required permits, licenses, and authorizations to perform work under this contract and comply with all the applicable Federal, state and local laws and regulations. The Contractor shall submit copies of Permits and Licenses per Section F.
2.3.5 Insurance The Contractor shall submit a Certificate of Insurance per Section F as evidence of the existence of the following insurance coverage in amounts not less than the amounts specified below in accordance with the FAR Clause
52.228-5, INSURANCE – WORK ON A GOVERNMENT
INSTALLATION. This insurance must be maintained during the performance period.
2.3.5.1 Certificate of
Insurance The Certificate of Insurance shall provide for at least 30 calendar days written notice to the KO by the insurance company prior to cancellation or material change in policy coverage per Section F. Other requirements and information are contained in the aforementioned insurance clause.
2.3.5.2 Minimum
Insurance Amounts
The Contractor shall procure and maintain, during the entire period of performance under this contract, the following minimum insurance coverage:
Comprehensive General Liability: $500,000 per occurrence
Automobile Liability: $200,000 per person, $500,000 per occurrence, $20,000 per occurrence for property damage
Workmen's Compensation: As required by Federal and state worker's compensation and occupational disease statutes
Employer's Liability coverage: $100,000, except in states where worker's compensation may not be written by private carriers
Other as required by state law.
2.3.6 Protection of
Government Property
During execution of the work, the Contractor shall protect Government property. The Contractor shall return areas damaged as a result of Contractor negligence under this contract to their original condition at no cost to the Government.
2.3.7 Directives, Instructions, and References
Department of Defense (DoD), Secretary of the Navy (SECNAV), Chief of Naval Operations (OPNAV), and other applicable Directives, Instructions, and References are listed in J-0200000-03. The Contractor shall comply with the most current version of directives, instructions, and references including versions published during the term of the contract.
2.3.8 Invoicing
Procedures
Refer to Section G for invoicing instructions. Refer to Invoice Form in J- 0200000-04 for sample.
Invoices shall be submitted in a format compatible with the most recent Government installed Microsoft Office Version (currently 2010). Invoice data shall be capable of being sorted by CLIN, annex/sub-annex, spec item, spec item title, and ELIN/Sub-ELIN.
2.3.9 Forms Forms referenced in this Annex, e.g. accident reporting, and damage reporting are included among the Forms in J-0200000-05.
2.4 Government-
Furnished Items
Except for items identified below as Government-Furnished, the Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide the services described in this Performance Work Statement (PWS).
2.4.1 Government-
Furnished Utilities
The Government will make available water and electricity at existing outlets required for the work to be performed under the contract. The Contractor shall provide and maintain, at its expense, the necessary service lines from the existing Government outlets to the work site. Provide and maintain backflow prevention devices on connections to domestic water lines and electrical transformer provisions on connections to electric lines. Meet all Federal, State, local, and installation codes and regulations for backflow prevention devices and electrical transformer provisions. Services required by the Contractor, for which there are no available Government outlets, shall be provided by the Contractor at no cost to the Government.
2.5 Contractor-
Furnished Items
Except for items identified as Government Furnished, the Contractor shall provide all equipment, materials, parts, supplies, components, and facilities to perform the requirements of this contract. The KO may inspect Contractor-furnished items for adequacy and compliance with contract requirements.
Inadequate or unsafe items shall be removed and replaced by the Contractor at no cost to the Government. Materials containing asbestos, lead, and polychlorinated biphenyls (PCBs) shall not be brought onsite. Energy efficient tools and equipment shall be used when available. The KO may at any time require Samples, Safety Data Sheets (SDS) or Manufacturer’s Data Cut Sheets of Materials used in this contract.
2.5.1 Portable
Electronic Devices
NNSY
In the process of performing preventative maintenance, certifications, and /or repair on board Norfolk Naval Shipyard (NNSY), it may be necessary to employ the use of portable electronic devices (i.e. laptops, tablets etc.) This equipment shall be approved for use by security prior to being brought on to NNSY property. When operationally required, submit a written request containing specific justification and details to the NNSY Security Officer prior to release.
2.6 Management The Contractor shall manage the total work effort associated with the services required herein to meet the performance objectives and standards. Such management includes but is not limited to planning, scheduling, cost accounting, report preparation, establishing and maintaining records, and quality assurance. The Contractor shall provide a staff with the necessary management expertise to ensure performance objectives and standards are met.
2.6.1 Safeguarding
Information
The Contractor shall safeguard controlled unclassified information and information associated with Government property in accordance with the latest revision of CNSSI 1253, DoDI 8582.01, NIST SP 800-53, NIST SP 800-171, SECNAV Defense Industrial Base (DIB) Memo, and applicable contract clauses. At a minimum, this information shall be protected at the moderate confidentiality level as defined in NIST SP 800-171.
Contractor information and data systems that contain information associated with Government property shall comply with DoD Risk Management Framework (RMF).
The Contractor shall develop Plans of Action and Milestones (POA&Ms) per NIST SP 800-171, track accomplishment, and submit to the Government per Section F.
If a cybersecurity incident is encountered or suspected related to any (Contractor or Government) Information Technology (IT) or Operating Technology (OT) systems, including Monitoring and Control Systems, the Contractor shall notify the Government per Section F.
2.6.2 Dissemination of
Information
DoD policy limits the dissemination of certain information. Instructions, Directives, and References not releasable to the public, e.g., Floor Plans, Maps, Post Orders, and Standard Operating Procedures, will be made available after contract award to the successful offeror with appropriate credentials and a need to know.
2.6.3 Work Reception The Contractor shall provide the necessary personnel, equipment, space and other necessary items to be able to receive, prioritize, correspond, and respond to service orders and task orders during Government regular working hours and provide a point of contact at a local or toll free number who can perform the above function during other than Government regular working hours.
2.6.4 Work Control The Contractor shall implement all necessary work control procedures to ensure timely accomplishment of work requirements, as well as to permit tracking and reporting of work in progress. The Contractor shall plan and schedule work to assure material, labor, and equipment are available to complete work requirements within the specified time limits and in conformance with the quality standards established herein. Verbal scheduling and work status updates shall be provided when requested by the Government. A status update of any item of work must be provided within two hours of the inquiry during regular working hours, and by 0800 the following work day for inquiries after regular working hours per Section F.
The Contractor shall provide work schedules for both Recurring and Non- Recurring Work per Section F.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .