N4008521B2504 Amendment06.pdf

PDF 114 KB Posted

Attached to
Infrastructure Reset Demo Buildings - Package B Federal contract opportunity
Solicitation number
N4008521B2504
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This is an amendment to a solicitation for the demolition of various buildings at Camp Lejeune, North Carolina. The amendment provides clarification on safety officer requirements, adds Building 40 to the demolition list, removes Building 115 from the scope of work, and responds to contractor questions. Bids are now due by 1400 on May 20, 2021 for the demolition of 43 buildings according to the plans and specifications. Safety officers must be onsite during all work activities, and a hygienist is required during asbestos abatement. The bid sheet has been updated to reflect the changes to the demolition list and associated pricing.

View the file

Other files for this federal contract opportunity

Other files attached to Infrastructure Reset Demo Buildings - Package B, newest first.
File Type Posted
N4008521B2504 Amendment08.pdf PDF
N4008521B2505 Amendment08.pdf PDF
N4008521B2504 Amendment07.pdf PDF
EMD Decision Memorandum.pdf PDF
Building 40 Demo Plans.pdf PDF
Building 40 Asbestos Survey.pdf PDF
Building 40 Lead Survey.pdf PDF
Amended Section 02 82 16 Removal of Asbestos Materials.pdf PDF
N4008521B2504 Amendment05.pdf PDF
N4008521B2504 Amendment04.pdf PDF
N4008521B2504 Amendment03.pdf PDF
Contractor_Environmental_Guide.pdf PDF
N4008521B2504 Amendment02.pdf PDF
N4008521B2504 Amendment01.pdf PDF
N4008521B2504Solicitation.pdf PDF
N4008521B2504Specs.pdf PDF
N4008521B2504Dwgs.pdf PDF
N4008521B2504AsbestosSurveyReport.pdf PDF
N4008521B2504LeadSurveyReport.pdf PDF
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

210002

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

N4008521B2504 Infrastructure Reset Demo Buildings – Package B

Amendment 0006

This amendment should be acknow ledged w hen your bid is submitted. Failure to acknow ledge may constitute grounds for rejection of a bid.

See Continuation Page(s)

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 30-Apr-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008521B2504

X 9B. DATED (SEE ITEM 11)

18-Mar-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

30-Apr-2021

CODE

NAVFACSYSCOM MID-ATLANTIC

ROICC CAMP LEJEUNE

1005 MICHAEL ROAD

CAMP LEJEUNE NC 28547-2521

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008521B2504

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMEND 0006

The purpose of this amendment is to provide the following information:

1. Clarification for SSHO requirements have been provided as follows:

a. One Full Time SSHO for the project and 1 Alternate SSHO will be required. If multiple sites are working at the same time, the contractor shall employ a minimum of one competent person at each project site to function as the SSHO. Proof of competency/qualification shall be provided as required in the EM 385-1-1 “01.A.17”. The SSHO and/or Competent Person will be a full time responsbility. SSHO or Competent Person will be present at the site during all work activities.

b. A Hygienist will be required onsite during asbestos abatement.

2. Requirements have been amended to add Building 40 to the demo list for Package B. Drawings, lead survey, and asbestos survey have been provided. The bid sheet has been updated to reflect this change.

3. Building 115 which was originally shown on the bid sheet is not included in Package B. The bid sheet has been updated to reflect this change.

4. The below RFI response has been provided.

5. The date and time for receipt of bids is hereby extended to 1400 on 20 May 2021. RFIs must be received by close of business 12 May 2021.

6. All other terms and conditions remain unchanged.

RFIs – Amendment 0006

1. Drawing C101 which shows building 3 and building 3B, also shows building 3C. Can you confirm that 3C is to be demolished?

Answer: Yes.

Bid Pricing Sheet Solicitation N4008521B2504 Infrastructure Reset Demo Package B Camp Lejeune, NC

Bid Item Building Price

001 3

002 3B/3C

003 39

004 113

005 116

006 117

007 117A

008 126

009 214

010 229

011 300

012 300A

013 307

014 339

015 425

016 435

017 436

018 438

019 524

020 731

021 738

022 762

023 812

024 812A

025 911

026 1010

027 1203

028 1307

029 1315

030 1409

031 1410

032 1728

033 1742

034 1804

035 1808

036 2043

037 H48

038 PT6

039 SH13

040 SH22

041 SH39

042 SHE22

043 40

Total Price Bid Items 001 ‐ 043:

(End of Summary of Changes)

File details come from the government source that posted it. Updated .