This document contains specifications for the removal and disposal of asbestos materials at Camp Lejeune. The work includes demolishing and removing various asbestos containing materials as identified in drawings and reports. All personnel involved must be accredited by the North Carolina Department of Health and Human Services. Requirements include obtaining necessary permits, developing an asbestos abatement plan, conducting air sampling and monitoring, using specified personal protective equipment, performing cleanup and site restoration, and disposing of asbestos waste at the Camp Lejeune Sanitary Landfill. The specifications provide detailed requirements for encapsulants, equipment, work procedures, personal and area air sampling, inspection and certification processes, and disposal procedures to ensure the safe removal and handling of asbestos materials.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 02 82 16
REMOVAL AND DISPOSAL OF ASBESTOS MATERIALS
(CAMP LEJEUNE COMPLEX)
03/10
PART 1 GENERAL
1.1 APPLICABLE NORTH CAROLINA LAW
North Carolina State General Statues 130A, Article 19-444-452 and 10A North Carolina Administrative Chapter (NCAC) 41C .0600 through .0611 .
1.1.1 N.C. (DHHS-HHCU) Asbestos Accredidation
All personnel involved in asbestos removal shall be currently accredited for asbestos removal by N.C (DHHS-HHCU). An application for accreditation may be requested from the State of North Carolina, Department of Health & Human Services, Division of Public Health,;1912 Mail Service Center, Raleigh, NC 27699-1912; (919) 707-5950. Out of State accreditation will not be accepted.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
ANSI Z88.2 (1992) Respiratory Protection
AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)
ASTM C 732 (1995) Aging Effects of Artificial Weathering on Latex Sealants
ASTM D 1331 (1989; R 1995) Surface and Interfacial Tension of Solutions of Surface-Active Agents
ASTM E 84 (2000a) Surface Burning Characteristics of Building Materials
ASTM E 96 (1997; Rev A) Water Vapor Transmission of Materials
ASTM E 119 (1998) Fire Tests of Building Construction and Materials
ASTM E 736 (1992) Cohesion/Adhesion of Sprayed Fire-Resistive Materials Applied to Structural Members
ASTM E 1368 (1997) Visual Inspection of Asbestos Abatement Projects
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910.103 Respiratory Protection
29 CFR 1926.59 Hazard Communication
29 CFR 1926.1101 Asbestos
40 CFR 61, SUBPART A General Provisions
40 CFR 61, SUBPART M National Emission Standard for Asbestos
U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)
EPA 560/5-85-024 (1985) Guidance for Controlling Asbestos Containing Materials in Buildings
EPA SW-846 (Rev O; Updates I, II, IIA, IIB, and III) Test Methods for Evaluating Solid Waste (Vol IA, IB, IC, and II)
UNDERWRITERS LABORATORIES (UL)
UL 586 (1996; Rev thru Aug 1999) High-Efficiency, Particulate, Air Filter Units
1.3 DEFINITIONS
1.3.1 Asbestos Containing Material (ACM)
All building materials that have more than 1% of chrysotile, amosite, crocidolite, tremolite, anthopyhlite, or any other form of asbestos in the serpentine or anthobole class.
1.3.2 Action Level/Permissive Exposure Limit (PEL)
An airborne concentration of asbestos fibers, in the breathing zone of a worker equaling 0.1 fibers per cubic centimeter of air calculated as an 8-hour time weighted average.
1.3.3 Amended Water
Water containing a wetting agent or surfactant with a surface tension of 29 dynes per square centimeter when tested in accordance with ASTM D 1331 shall be utilized. In the event where wetting operations are suspended due to freezing temperatures, the operator or abatement contractor shall record the temperature on Form DHHS 3787.
1.3.4 Area Sampling
Sampling of asbestos fiber concentrations within the asbestos control area and outside the asbestos control area which approximates the concentrations of asbestos in the theoretical breathing zone but is not actually collected in the breathing zone of an employee.
1.3.5 Asbestos
The term asbestos includes chrysotile, amosite, crocidolite, tremolite, anthophyllite, and actinolite and any of these minerals that has been chemically treated or altered. Materials are considered to contain asbestos if the asbestos content more than 1% of the material by area.
1.3.6 Asbestos Control Area
That area where asbestos removal operations are performed which is isolated by physical boundaries which assist in the prevention of the uncontrolled release of asbestos dust, fibers, or debris. Two examples of an asbestos control area are: a full containment and a "glovebag."
1.3.7 Asbestos Fibers
Those fibers having an aspect ratio of at least 3:1 and longer than 5 micrometers as determined by National Institute for Occupational Safety and Health (NIOSH) Method 7400.
1.3.8 Asbestos Permissible Exposure Limit
0.1 fibers per cubic centimeter of air as an 8-hour time weighted average as defined by 29 CFR 1926.1101 or other federal legislation having legal jurisdiction for the protection of workers health.
1.3.9 Background
Normal airborne asbestos concentration in an area similar to the asbestos abatement area but in an uncontaminated (with asbestos) state.
1.3.10 Contractor
The Contractor is that individual, or entity under contract to the Navy to perform the herein listed work.
1.3.11 Encapsulants
Specific materials in various forms used to chemically entrap asbestos fibers in various configurations to prevent these fibers from becoming airborne. There are four types of encapsulants as follows which must comply with performance requirements as specified herein.
a. Removal Encapsulant (can be used as a wetting agent)
b. Bridging Encapsulant (used to provide a tough, durable surface coating to asbestos containing material)
c. Penetrating Encapsulant (used to penetrate the asbestos containing material down to substrate, encapsulating all asbestos fibers)
d. Lock-Down Encapsulant (used to seal off or "lock-down" minute asbestos fibers left on surfaces from which asbestos containing material has been removed)
1.3.12 Friable Asbestos Material
Material that contains more than one percent asbestos by area and that can be crumbled, pulverized, or reduced to powder by hand pressure when dry.
1.3.13 Full Containment
Those engineering control techniques described in 29 CFR 1926.1101 for major asbestos removal, renovation and demolition operations.
1.3.14 Glovebag Technique
Those asbestos removal and control techniques put forth in 29 CFR 1926.1101.
1.3.15 HEPA Filter Equipment
High efficiency particulate air (HEPA) filtered vacuum and/or exhaust ventilation equipment with a filter system capable of collecting and retaining asbestos fibers. Filters shall retain 99.97 percent of particles
0.3 microns or larger as indicated in UL 586.
1.3.16 Navy Industrial Hygienist (NIH)
That industrial hygienist employed by the Navy to monitor, sample, and/or inspect the work separate from the original construction contract. The NIH can be either a Federal civil servant or a private consultant as determined by the Navy. In some instances the NIH shall perform assigned duties vicariously through a trained subordinate but only with the specific consent of the Contracting Officer.
1.3.17 Nonfriable Asbestos Material
Material that contains asbestos in which the fibers have been temporarily locked in by a bonding agent, coating, binder, or other material so that the asbestos is well bound and will not normally release asbestos fibers during any appropriate use, handling, storage or transportation. It is understood that asbestos fibers will be released under other conditions such as demolition or removal.
1.3.18 PCM - Phased Contrast Microscopy
A method of analyzing air samples for fibers using a light microscope
1.3.19 PLM - Polarized Light Microscopy
A method of analyzing bulk samples for asbestos in which the sample is illuminated with polarized light (light which vibrates in only one plane) and viewed under a light microscope.
1.3.20 Personal Sampling
Air sampling to determine asbestos fiber concentrations within the breathing zone of a specific employee, performed in accordance with
29 CFR 1926.1101.
1.3.21 Supervising Air Monitor (SAM)
That supervising air monitor hired by the Contractor to perform the herein listed industrial hygiene tasks. In some instances, the SAM can perform this role vicariously through a trained subordinate, but only with the specific consent of the Contracting Officer. Under N.C. Statue, the SAM must make a site visit on any project exceeding 10 days and once every 30 days therafter.
1.3.22 TEM
Refers to Transmission Electron Microscopy (TEM). Technique whereby a beam of electrons is transmitted through and ultra thin specimen, interacting with the specimen as is passes through. An image is formed from the interaction of the electrons transmitted through the specimen; the image is magnified and focused onto an imaging device, such as a fluorescent screen, on a layer of photographic film, or to be detected by a sensor such as a CCB camera.
1.3.23 Time Weighted Average (TWA)
The TWA is an 8-hour time weighted average airborne concentration of asbestos fibers. At least three full shift samples per person are required to establish that person's TWA exposure.
1.3.24 Wetting Agent
That specific agent used to reduce airborne asbestos levels by physically bonding asbestos fibers to material to be removed. An equivalent wetting agent must have a surface tension of at least 29 dynes per square centimeter as tested in accordance with ASTM D 1331. In the event where wetting operations are suspended due to freezing temperatures, the operator or abatement contractor shall record the temperature on Form DHHS 3787.
1.4 REQUIREMENTS
1.4.1 Description of Work
The work covered by this section includes the handling of asbestos containing materials which are encountered during repair, construction and demolition projects and describes some of the resultant procedures and equipment required to protect workers and occupants of the building or area, or both, from contact with airborne asbestos fibers. The work also includes the disposal of the generated asbestos containing materials.
The asbestos work includes the demolition and removal of various asbestos containing materials (See drawings and asbetos reports). Under normal conditions non-friable or chemically bound materials containing asbestos would not be considered hazardous; however, this material will release airborne asbestos fibers during demolition and removal and therefore must be handled in accordance with North Carolina Regulations.
1.4.2 N.C. (DHHS-HHCU) North Carolina Department of Health and Human Services - Health Hazards Control Unit
Obtain necessary permits in conjunction with asbestos removal, hauling, and disposition, and furnish timely notification of such actions required by federal, state, regional, and local authorities. A permit is only required when you will be abating more than 260 linear feet, 160 square feet, or 35 cubic feet of an asbestos-containing building material. Also if mechanical means of removing non-friable asbestos is utilized the contractor will need to provide permit. Notify the N.C. (DHHS-HHCU) and the Contracting Officer in writing 10 days prior to the commencement of work. Submit a copy of the permit to the Contracting Officer.
1.4.2.1 N.C. (DHHS-HHCU) mailing address is:
Health Hazards Control Unit N. C. Department of Health and Human Services
Division of Public Health 1912 Mail Service Center Raleigh, NC 27699-1912 Phone: (919) 733-0820
1.4.2.2 Changes in Work
Changes in Work which affect items on the attached form shall be covered by an amended form submitted to the same address.
1.4.3 Safety and Health Compliance
In addition to detailed requirements of this specification, comply with those applicable laws, ordinances, criteria, rules, and regulations of federal, state, regional, and local authorities regarding handling, storing, transporting, and disposing of asbestos waste materials. Comply with the applicable requirements of the current issue of 29 CFR 1926.1101, 40 CFR 61, SUBPART A, 40 CFR 61, SUBPART M. Submit matters of interpretation of standards to the appropriate administrative agency for resolution before starting the work. Where the requirements of this specification, applicable laws, rules, criteria, ordinances, regulations, and referenced documents vary, the most stringent requirement as defined by the Contracting Officer shall apply.
1.4.4 Respiratory Protection Program
Establish and implement a respirator program as required by ANSI Z88.2 and
29 CFR 1910.103.
1.4.5 Supervising Air Monitor (SAM)
Conduct personal area/environmental air sampling and training under the direction of a North Carolina accredited supervising air monitor if required by the abatement plan. For the purpose of this contract, the Contractor shall retain the services of a SAM to perform the Contractor's industrial hygiene tasks.
1.5 SUBMITTALS
Submit 4 copies of the following in accordance with Section 01 33 00, "Submittal Procedures."
SD-06 Test Reports
Air sampling results (if required by abatement plan)
Pressure differential recordings for local exhaust system (if required by abatement plan)
Clearance sampling (if required by abatement plan)
SD-07 Certificates
Asbestos hazard abatement plan (Abatement Design)
SD-11 Closeout Submittals
Asbestos Waste Shipment Record N.C. (DHHS-HHCU) Form 3787
Daily log
North Carolina permit
Modifications to the North Carolina permit
Asbestos Inspection Reporting Form
1.5.1 Asbestos Hazard Abatement Plan (NC Abatement Design)
An asbestos abatement design shall be prepared by an accredited abatement designer for each individually permitted removal of more than 260 linear feet, 160 square feet, or 35 cubic feet of regulated asbestos containing materials. The plan shall be prepared, signed, and sealed, including accreditation number and date, by an accredited abatement designer. The respirator program and air monitoring strategies portion of this plan shall be prepared by the supervising air monitor. Such plan shall include but not be limited to the precise personal protective equipment to be used, the location of asbestos control areas including clean and dirty areas, buffer zones, showers, storage areas, change rooms, removal method, interface of trades involved in the construction, sequencing of asbestos related work, disposal plan, type of wetting agent and asbestos sealer to be used, locations of local exhaust equipment, planned air monitoring strategies, and a detailed description of the method to be employed in order to control pollution. The plan shall also include (both fire and medical emergency) response plans. The Contractor and designer shall meet with the Contracting Officer prior to beginning work, to discuss in detail the asbestos plan, including work procedures and safety precautions. The plan will be enforced as if an addition to the specification. Any changes required in the specification as a result of the plan shall be identified specifically in the plan. The plan shall comply with all federal and state requirements and this specification, and shall serve as the North Carolina Abatement Design. Submit a copy of plan to the Contracting Officer.
1.5.2 Air Sampling Results
If required by abatement plan complete fiber counting and provide results to the SAM for review within 16 hours. Notify the Contracting Officer immediately of any airborne levels of asbestos fibers in excess of the acceptable limits. Submit sampling results to the Contracting Officer and the affected Contractor employees within 3 working days, signed by the employee performing air sampling, the employee that analyzed the sample, and the SAM.
1.5.3 Pressure Differential Recordings for Local Exhaust System
If required by the abatment plan provide a local exhaust system that creates a negative pressure of at least 0.02 inches of water relative to the pressure external of the enclosure and operate it continuously, 24 hours a day, until the enclosure of the asbestos control area is removed.
Provide continuous 24-hour per day monitoring of the pressure differential with a pressure differential automatic recording instrument. Submit pressure differential recordings for each work day to the SAM for review and to the Contracting Officer within 24 hours from the end of each work day. Notify the Contractor and the Contracting Officer immediately of any variance in the pressure differential which could cause adjacent unsealed areas to have asbestos fiber concentrations in excess of 0.01 fibers per cubic centimeter or background whichever is higher. In no circumstance shall levels exceed 0.1 fibers per cubic centimeter.
1.5.4 Asbestos Waste Shipment Record N.C. (DHHS-HHCU) Form 3787
Record and report, to the Contracting Officer, the amount of asbestos containing material removed and released for disposal. Deliver the report for the previous day at the beginning of each day shift with amounts of material removed during the previous day reported in linear feet or square feet as described initially in this specification and in cubic feet for the amount of asbestos containing material released for disposal. Use "Asbestos Waste Shipment Record (DHHS-HHCU) Form 3787 for this report. A copy of the (DHHS-HHCU) Form 3787 must accompany any asbestos waste shipment to the Base sanitary landfill.
1.5.5 Daily Log
A daily log documenting work practices, sample locations, and all other asbestos related job conditions shall be maintained, by the testing lab and be available for Government examination throughout the course of work. At the completion of testing, a copy of this log shall be immediately delivered to the Government.
1.5.6 North Carolina Permit
Submit one copy of the North Carolina Permit before beginning abatement activities.
1.5.7 Modifications to the North Carolina Permit
Submit a copy of all permit modifications to the Contracting Officer.
These must be received before they become effective. The Contractor is responsible for proper permit modification notification to the State.
Modifications may be delivered to the Contracts Office or transmitted by facsimile to (910) 411-5899.
1.5.8 Asbestos Inspection Reporting Form
If required by abatement plan provide Asbestos Inspection Reporting Form showing the homogeneous areas involved with this project. The Contractor shall mark the line "confirmed ACM from this HA:" as either "Abated" or "Managed in Place." Abated shall be defined as removed. If an HA is partially abated, approximate the percentaged of asbestos removed and mark in the comments area. Provide any other descriptive data, such as rooms/areas removed or rooms/areas where asbestos not removed. The intent of this requirement is to report "as built" conditions. The Contractor is not required to perform any additional asbestos surveys or inspections as a result of this paragraph. Include this report with drawing of abated areas with other closeout documentation.
1.6 PRE-ABATEMENT MEETING
The Contractor and designer shall meet with the Contracting Officer prior to beginning work, to discuss in detail the asbestos plan, including work procedures and safety precautions.
PART 2 PRODUCTS
2.1 ENCAPSULANTS
Shall conform to current USEPA requirements, shall contain no toxic or hazardous substances as defined in 29 CFR 1926.59, and shall conform to the following performance requirements. Use of encapsulants is generally restricted to the surface of the temporary enclosure and to areas that are not to be refinished such as attics and crawlspaces.The proposed use of encapsulants shall be included in the abatement design.
2.1.1 Removal Encapsulants
Requirement Test Standard
Flame Spread - 25, Smoke ASTM E 84 Emission - 50
Life Expectancy - 20 years ASTM C 732, Accelerated Aging Test
Permeability - Minimum 0.4 perms ASTM E 96
2.1.2 Lock-down Encapsulant
Requirement Test Standard
Flame Spread - 25, Smoke ASTM E 84 Emission - 50
Life Expectancy - 20 years ASTM C 732 Accelerated Aging Test
Permeability - Minimum 0.4 perms ASTM E 96 Fire Resistance - Negligible affect ASTM E 119 on fire resistance rating over 3 hour test (Tested with fireproofing over encapsulant applied directly to steel member)
Bond Strength - 100 pounds of force/ ASTM E 736 foot (Tests compatibility with cementitious and fibrous fire-proofing)
2.1.3 Plastic Sheet
Plastic sheet, polyethylene, 6 mil minimum thickness, unless otherwise specified, in sizes to minimize the frequency of joints. All asbestos material or debris will be at least double bagged or wrapped in two layers of 6 mil poly sheeting.
2.1.4 Tape
Capable of sealing joints of adjacent sheets or plastic sheets and for attachment of plastic sheet to finished or unfinished surfaces of dissimilar materials and capable of adhering under dry and wet conditions, including use of amended water.
2.1.5 Disposal Bages
Bags shall be a minimum of 6 mil thick polyethylene. Affix a warning and Department of Transportation (DOT) label to each bag or use bags with the approved warnings and DOT labeling preprinted on the bag.
2.1.6 Warning Labels
Provide labels conforming to 29 CFR 1926.1101 of sufficient size to be clearly legible, displaying the following legend:
DANGER
CONTAINS ASBESTOS FIBERS
AVOID CREATING DUST
CANCER AND LUNG DISEASE HAZARD
BREATHING ASBESTOS DUST MAY CAUSE
SERIOUS BODILY HARM
PART 3 EXECUTION
3.1 DISPOSAL SITE
CAMP LEJEUNE SANITARY LANDFILL
982 PINEY GREEN ROAD
CAMP LEJEUNE, NC 28542
(910) 451-5011
Base Sanitary Landfill shall be used for disposal of all asbestos waste.
The Base Sanitary Landfill is approved and is available for use by the Contractor providing the following requirements are satisfied:
a. The Contracting Officer must be informed at least five working days in advance of the anticipated delivery date of the asbestos material to the Landfill. On larger projects, the notification should be accompanied by a cubic yard estimate of the anticipated volume, updated weekly if the disposal period extends for more than one week. The Government will be responsible for digging the trenches and covering the debris at the end of the working day.
Debris will not be accepted before 8:00 AM or after 10:00 AM, except in an emergency situation.
b. Asbestos will be accepted only if adequately wet and double bagged in heavy-duty 6 mil plastic bags which are clearly marked "Asbestos." If a Contractor desires to handle the asbestos in a manner other than double-bagged, written application, along with a description of the proposed deviation, must be submitted to the OICC and Landfill Manager for approval.
c. Asbestos insulated piping with the asbestos insulation intact will be accepted if the following requirements are met:
1. The pipe is cut in eight foot or shorter lengths
2. Each section of pipe is double wrapped, sealed, and labeled as asbestos.
3. All pipe is palletized on a 7/8-inch, 4- by 8-foot sheet of plywood. The whole pallet is banded with a minimum of three 1-inch wide metal bands with the coupling on top and wrapped with 6-mil plastic. The pallet is not higher than 3-inches.
d. All asbestos, except palletized pipe will be off loaded and placed in the trench pipe hand.
e. Asbestos disposal is restricted to one designated location in the Landfill and the landfill operators must be informed of and direct each delivery. Asbestos shall be disposed of from 0800 to 1000 hours daily, except holidays and weekends. Trucks hauling asbestos must be properly covered with tarpaulins or equivalent.
Trucks not covered properly must be parked until the Contracting Officer approves corrective actions.
f. The Contractor will ensure asbestos contaminated material delivered to the Base Sanitary Landfill contain no free liquids.
Free liquids are defined as material which fails the EPA SW-846 free liquids test.
g. The Contractor will include all asbestos waste shipment records (DHHS-HHCU Form 3787) that are filled out completely with the correct information, to the project manager after abatement job is completed.
3.2 EQUIPMENT
Make available to the Contracting Officer or the Contracting Officer's Representative, two complete sets of personal protective equipment as required herein for entry to the asbestos control area at all times for inspection of the asbestos control area. Provide equivalent training to the Contracting Officer or a designated representative as provided to Contractor employees in the use of the required personal protective equipment. Provide manufacturer's certificate of compliance for all equipment required to contain airborne asbestos fibers.
3.2.1 Respirators
Comply with 29 CFR 1926.1101.
3.3 WORK PROCEDURE
Remove all friable and non-friable ACM in accordance with all Federal, State, and local Marine Corps regulations. Ensure that the asbestos abatement plan is followed throughout all aspects of the abatement process.
3.3.1 Furnishings
Furniture and equipment will be removed from the area of work by the Government before asbestos work begins.
3.3.2 Pipe Insulation
Pipe may be removed with the asbestos insulation in place by wrapping the entire length of pipe and associated insulation with double thickness 6 mil plastic secured with duct tape. Mechanically cutting of asbestos containing insulation is prohibited. When using the "candy-stripe" method the abatement contractor must use glovebag operations to establish an "asbestos free" area to cut the pipe into appropriate lengths. Cut piping simultaneously into lengths suitable for transportation to disposal area, but no greater than 8 feet in length. Continuously wet the cutting site during the process. As soon as a length of pipe is completely cut loose, cover exposed ends with double thickness 6 mil plastic secured with duct tape. If the pipe is to remain in service, the removed pipe must be replaced in accordance with this Specification, with a pipe of the same size that is removed.
3.3.2.1 Attic Insulation
In those buildings indicated on the drawings, attic insulation consisting of any combination of blown-in or batt fiberglass or rockwool material, has been contaminated with asbestos materials, and is to be removed as contaminated asbestos material. The insulation material shall be wet with a fine mist of amended water. The material shall be placed immediately in double thickness 6 mil plastic bags for disposal as asbestos waste.
3.3.2.2 Contaminated Soil
In those buildings so indicated on the drawings, asbestos materials are located in the building crawl spaces and deterioration of the asbestos material has resulted in contamination of the soil under the building.
Under the indicated area of these buildings, asbestos material and 2 inches of soil shall be removed and one sheet of plastic, 6 mils thick, spread over the area with seams lapped a minimum of 4 inches. Sand shall be placed a minimum of 2 inches thick over the plastic. Removal shall occur just prior to clean-up operations. All debris in the crawl space shall be disposed of with the soil as asbestos materials. Workers shall be equipped with respirators and protective clothing during the removal of soil and debris.
3.3.2.2 Non-Organic Bound (NOB) Asbestos Materials
These kind of materials include floor tile, mastic, caulking, roofing material, and other non-friable material. Materials are to be adequately wet before removal and double bagged with a 6 mil poly bag.
Ensure that bags have been labeled properly before they are taken to the Base Landfill.
3.3.3 Air Sampling
If required by abatement plan provide air sampling in accordance with 29 CFR 1926.1101 and as specified herein. Sampling performed in accordance with 29 CFR 1926.1101 shall be performed by the SAM. Sampling performed for environmental and quality control reasons shall be performed by the SAM. Unless otherwise specified, use NIOSH Method 7400 for sampling and analysis. Monitoring may be duplicated by the Government at the discretion of the Contracting Officer. If the air sampling results obtained by the Government differ from those results obtained by the Contractor, the Government results shall prevail.
3.3.3.1 Sampling Prior to Asbestos Work
If required by abatment plan provide area air sampling and establish the baseline one day prior to the masking and sealing operations for each removal site. Establish the background by performing area sampling in similar but uncontaminated sites in the building.
3.3.3.2 Sampling During Asbestos Work
If required by the abatement plan the SAM shall provide personal and area sampling as indicated in 29 CFR 1926.1101 and governing environmental regulations. Thereafter, provided the same type of work is being performed, provide area sampling at least once every work shift close to the work inside the containment, outside the clean room entrance to the containment, and at the exhaust opening of the local exhaust system. Also, where an enclosure is not provided, conduct area monitoring of airborne asbestos fibers during the work shift at the designated limits of the asbestos work area at such frequency as recommended by the SAM and conduct personal samples of each worker engaged in asbestos handling (removal, disposal, transport and other associated work). If the quantity of airborne asbestos fibers monitored at the breathing zone of the workers or designated limits at any time exceeds background or 0.01 fibers per cubic centimeter whichever is lesser, stop work, evacuate personnel in adjacent areas or provide personnel with approved protective equipment at the discretion of the Contracting Officer. This sampling may be duplicated by the government at the discretion of the Contracting Officer. If the air sampling results obtained by the government differ from those obtained by the Contractor, the government results shall prevail. If adjacent areas are contaminated as determined by the Contracting Officer, clean the contaminated areas, monitor, and visually inspect the area as specified herein.If sampling outside the containment shows airborne levels have exceeded background or 0.01 fibers per cubic centimeter, whichever is greater, stop all work, correct the condition(s) causing the increase, and notify the Contracting Officer immediately. In areas where the construction of a containment is not required, after initial TWAs are established and provided the same type of work is being performed, provide sampling at the designated limits of the asbestos work area at such frequency as recommended by the SAM. Where glovebag methods are used, perform personal and area air sampling at locations and frequencies that will accurately characterize the evolving airborne asbestos levels.
3.3.3.3 Sampling After Final Clean-Up (Clearance Sampling)For the Areas Identified in the Asbestos Hazard Abatement Plan
If required by the abatement plan provide area sampling of asbestos fibers using aggressive air sampling techniques as defined in the EPA 560/5-85-024 and establish an air borne asbestos concentration of less than 0.01 fibers per cubic centimeter after final clean-up but before removal of the containment or the asbestos work control area. After final cleanup and the asbestos control area is dry but prior to clearance sampling, the SAM shall perform a visual inspection, in accordance with ASTM E 1368, to insure that the asbestos control and work area is free of any accumulations of dirt, dust, or debris. Should any of the final samples indicate a higher value, the Contractor shall take appropriate actions to re-clean the area and shall repeat the sampling and analysis at the Contractor's expense.
3.3.4 Lock Down
Prior to removal of plastic barriers and after pre-clearance clean up of gross contamination, a visual inspection by the SAM, of all areas affected by the removal of the asbestos contaminated materials for any visible fibers, shall be conducted and approved by the SAM. A post removal (lock down) encapsulant shall then be spray applied to ceiling, walls, floors and other areas exposed in the removal area. The exposed area shall include but not be limited to plastic barriers, furnishings and articles to be discarded as well as dirty change room, air locks for bag removal and decon chambers.
3.3.5 Site Inspection
While performing asbestos removal work, the Contractor shall be subject to on-site inspection by the Contracting Officer who may be assisted by or represented by safety or industrial hygiene personnel. If the work is found to be in violation of this specification, the Contracting Officer or his representative will issue a stop work order to be in effect immediately and until the violation is resolved. Standby time required to resolve the violation shall be at the Contractor's expense.
3.4 CLEAN-UP AND DISPOSAL
3.4.1 Housekeeping
Essential parts of asbestos dust control are housekeeping and clean-up procedures. Maintain surfaces of the asbestos control area free of accumulations of asbestos fibers. Give meticulous attention to restricting the spread of dust and debris; keep waste from being distributed over the general area. Use HEPA filtered vacuum cleaners. Do not blow down the space with compressed air. When asbestos removal is complete, all asbestos waste is removed from the work-site, final clean-up is completed, and final air sampling results are reported, the SAM will certify the area as safe and the Contracting Officer will approve the abatement completion, before the signs can be removed. After final clean-up and acceptable airborne concentrations are attained but before the HEPA unit is turned off and the containment removed, remove all pre-filters on the building HVAC system and provide new pre-filters. Dispose of filters as asbestos-contaminated materials. Reestablish HVAC mechanical, and electrical systems in proper work ing order. The Contracting Officer will visually inspect all surfaces within the containment for residual material or accumulated dust or debris. The Contractor shall re-clean all areas showing dust or residual materials. If re-cleaning is required, air sample and establish an acceptable asbestos airborne concentration after re-cleaning. The SAM will provide written certification that the work area is safe within all standards as referenced within this contract before unrestricted entry is permitted. The Government shall have the option to perform monitoring to certify the areas are safe before entry is permitted.
3.4.2 Title to Materials
All materials resulting from demolition work, except as specified otherwise, shall become the property of the Contractor and shall be disposed of as specified in applicable local, state, and Federal regulations and herein. All building materials that are cross contaminated must be disposed of as an ACM at Base Landfill.
3.4.3 Disposal of Asbestos
3.4.3.1 Procedure for Disposal
Collect asbestos waste, asbestos contaminated water, scrap, debris, bags, containers, equipment, and asbestos contaminated clothing which may produce airborne concentrations of asbestos fibers and place in sealed fiberproof, waterproof, non-returnable containers (e.g. double plastic bags 6 mils thick, cartons, drums or cans). Wastes within the containers must be wetted to insure the security of the material in case of container breeching. Affix a warning and Department of Transportation (DOT) label to each bag or use at least 6 mil thick bags with the approved warnings and DOT labeling preprinted on the bag. For temporary storage, store sealed impermeable bags in asbestos waste drums or skids. An area for interim storage of asbestos waste-containing drums or skids will be assigned by the Contracting Officer or his authorized representative. Procedure for haul ing and disposal shall comply with 40 CFR 61, SUBPART M, state, regional, and local standards.
3.4.3.2 Disposal Material Shall Contain No Free Liquid
The Contractor will ensure asbestos contaminated material delivered to the Base Sanitary Landfill contain no free liquids. Free liquids are defined as material which fails the EPA SW-846 Free Liquids Test.
-- End of Section --