N4008521B2504 Amendment02.pdf
PDF 90 KB Posted
- Attached to
- Infrastructure Reset Demo Buildings - Package B Federal contract opportunity
- Solicitation number
- N4008521B2504
About this file
This amendment modifies a solicitation for the demolition of various buildings at Marine Corps Base Camp Lejeune. The solicitation seeks bids to demolish multiple buildings according to provided plans and specifications, with work to begin within 60 days of award and be completed within 360 days. Bidders must visit the site and all demolition debris must be removed from the base and disposed of properly. The Navy Facilities Engineering Command Mid-Atlantic is the contracting agency. The amendment provides responses to contractor questions, confirming requirements for credentials and permitting, as well as clarifying the scope of work and disposal procedures. Pricing must be provided individually for each building.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N4008521B2504 Amendment08.pdf | ||
| N4008521B2505 Amendment08.pdf | ||
| EMD Decision Memorandum.pdf | ||
| N4008521B2504 Amendment07.pdf | ||
| N4008521B2504 Amendment06.pdf | ||
| Building 40 Asbestos Survey.pdf | ||
| Building 40 Lead Survey.pdf | ||
| Building 40 Demo Plans.pdf | ||
| Amended Section 02 82 16 Removal of Asbestos Materials.pdf | ||
| N4008521B2504 Amendment05.pdf | ||
| N4008521B2504 Amendment04.pdf | ||
| N4008521B2504 Amendment03.pdf | ||
| Contractor_Environmental_Guide.pdf | ||
| N4008521B2504 Amendment01.pdf | ||
| N4008521B2504LeadSurveyReport.pdf | ||
| N4008521B2504Dwgs.pdf | ||
| N4008521B2504AsbestosSurveyReport.pdf | ||
| N4008521B2504Solicitation.pdf | ||
| N4008521B2504Specs.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
210002
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
N4008521B2504 Infrastructure Reset Demo Buildings – Package B
Amendment 0002
This amendment should be acknow ledged w hen your bid is submitted. Failure to acknow ledge may constitute grounds for rejection of a bid.
See Continuation Page(s)
1. CONTRACT ID CODE PAGE OF PAGES
J 1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 02-Apr-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008521B2504
X 9B. DATED (SEE ITEM 11)
18-Mar-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
02-Apr-2021
CODE
NAVFACSYSCOM MID-ATLANTIC
ROICC CAMP LEJEUNE
1005 MICHAEL ROAD
CAMP LEJEUNE NC 28547-2521
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008521B2504
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMEND 0002
The purpose of this amendment is to provide the following information:
1. Marine Corps Base Camp Lejeune Contractor Environmental Guide has been added to the attachments list.
2. See RFI responses provided below.
3. All other terms and conditions remain unchanged.
RFIs – Amendment 0002
1. When is it expected for the work to start?
Within 60 days or as soon as approved submittals are received.
2. Is this project part of a larger project? If so, is that out for bid or a pre‐solicitation issued?
Each package is its own project.
3. Will we be allowed to use the Camp Lejeune landfill for the disposal of the debris associated with this project?
Refer to spec section 01 57 19 paragraph 3.4.2 for debris disposal
4. As the solicitation is written, the small business size standard is $16.5 M with a NAICS of 238910. We are requesting the small business size standard be changed to $39.5M in an effort to bid this project as our company exceeds the $16.5M criteria. We are registered under the NAICS code 238910 & have the capability & past‐performance to self‐perform the bigger portion of work identified within the bid documents.
The NAICS code remains 238910 with a small business size standard of $16.5 M.
5. What is the thickness of asphalt thickness of stone base to be removed?
No thickness specified. This varies by location.
6. Does the Contractor need a license to cap off storm drain piping?
No. Contractor would be responsible for any damage occurring during capping.
7. Will the Contractor need a building permit for each building, or will one permit cover all buildings?
No building permit to be issued.
8. Is there a place to dispose of concrete on site?
No, All demoed materials must be removed from the base.
9. Due to the complexity of this work, a site visit is needed. To allow offerors time to visit the site to inform the bid, will you consider extending the proposal deadline?
No proposal extension is planned at this time.
10. Will you make an exception to work weekends with a proper request?
Yes – to be coordinated with NAVFAC upon award.
11. What permits are already in place?
Erosion Control permits
12. Is there onsite disposal available for debris related to tree removal? If not, can the debris be chipped and spread on site to assist with erosion control?
No, All demoed materials must be removed from the base.
13. The specifications require contact information for the PE who will conduct inspections and certifications associated with the Quality Control Plan. Must the PE be licensed in North Carolina?
Provide per specification
14. Can you please provide the referenced (1) "Marine Corps Base (MCB), Camp Lejeune, Contractor Environmental Guide;" and (2) "Camp Lejeune Sanitary Landfill Information Sheet"
(1) Yes (2) No, All demoed materials must be removed from the base.
15. Will the Contractor be provided a construction entrance for expedited transport of materials on and off the base? If not, what gate will Contractors need to utilize for entry/exit?
No construction entrance provided. Contractors are to use MCAS New River main gate for access to MCAS New River and any of the MCB Camp Lejeune gates for access to MCB Camp Lejeune. All contractor base entry measures shall be followed.
16. Are there grading plans available with existing and proposed contours, rather than just spot elevations?
Provide per project drawings
17. Is there a spec for the permanent grass seeding, to include grass seed type and pounds per acre?
Provide per project drawings. All areas shall receive sod.
18. Will hydro‐seeding be permitted and if so what is the seed/mulch specification?
Provide per project drawings. All areas shall receive sod.
19. If sod is the only permitted form of grass restoration, what are the desired species of centipede grass and is there an authorized equivalent?
Centipede sod is specified. No authorized equivalent.
20. Can you please confirm that topsoil placement is not required for restoration? If it is required, please advise the desired depth.
Provide per project drawings.
21. Can you please provide any information/ planting specifications on any required plantings included in restoration?
Provide per project drawings.
22. Are there any lawn mowing requirements as part of the restoration?
Provide per project drawings. Required from mobilization until construction fence is removed for BOD of project.
23. Are the removed trees going to become Government property for market timber, or is the contractor obligated to remove them from the site?
Remove from site.
24. Will sand be a suitable fill material to backfill the building foundations to meet the grade that is desired?
Provide fill per specifications.
25. Can you please provide the soil borings?
No boring logs available.
26. Will truckers delivering materials be required to obtain badges or can someone with a badge provide escort?
Badging required. All contractors must adhere to base entry requirements.
27. Can one individual fulfill the role of SSHO, Superintendent, and QC Manager?
Each site must have an SSHO. Superintendent & QC may be 1 person.
28. Under Section 01 35 29 of the specifications, it states that the SSHO needs to meet levels 1, 2, 3, 4, 5, and
6. Can you confirm that the SSHO needs to meet the qualifications of each level or would a SSHO level 4 be acceptable?
SSHO must meet levels 1, 2, 3, 4, 5, and 6
29. Under Section 01 35 29 of the specifications, it states that a CSP/CIH and a ASP/STS/CHST needs to be onsite at all times. These requirements seem excessive. Would one SSHO be acceptable that meets level 4 requirements?
CSP/CIH and a ASP/STS/CHST need to be on site at all times.
30. Can multiple buildings be demolished at one time under one contract? Would this require an SSHO, Superintendent, and QC Manager at each building being demolished?
Each site will need its own SSHO. Superintendent and QC Manager may be over multiple sites.
31. Are we to assume that only items specifically mentioned in the specifications are required to be salvaged?
If not, can the government please provide specific designation on any additional items to be salvaged?
All items inside the building are considered to be property of the contractor upon award. Contractor can dispose or retain these items as desired during demolition.
32. Ref. Section 02 41 00, Paragraph 3.3.3, Sub‐paragraph a. Please clarify the statement "salvage items and material to the maximum extent possible".
All items inside the building are considered to be property of the contractor upon award. Contractor can
33. Who will be responsible for removing any remaining furniture?
All items inside the building are considered to be property of the contractor upon award. Contractor can
34. Solicitation states delivery date 360 days after award of contract and clause 52.211‐10 states 210 calendar days. Please advise.
Period of performance is 360 days after award of contract.
35. It is a suggestion to lump several bid items in one for bid pricing sheet. For example, all BA & SBA series structures are within same disturbance limit and has several common items and hard to allocate cost.
Same thing with all SAW series.
All buildings are to be priced individually.
(End of Summary of Changes)