Revised 1502000 C UST-AST SOW (FFP).docx

DOCX document 44 KB Posted

Attached to
Above Ground / Underground Storage Tank Services, NAVAL STATION NEWPORT, NEWPORT RI
Solicitation number
N4008521B2500
Issued by

View the file

Other files

File Type Posted
Revised ELINs- AST-UST 12.14.20.xlsx XLSX spreadsheet
Revised AST UST Inventory 12 14 20.xlsx XLSX spreadsheet
Amendment 4 N4008521B2500 REVISED INVENTORY AND ELINS and RFI Questions and Answeres.pdf PDF
Amendment 3 N4008521B2500 Attachment Revision- Bid Due date extension- clarification.pdf PDF
RFI ELINs - AST-UST.xlsx XLSX spreadsheet
Revised UST-AST Tank Inventory 12-11-20.xlsx XLSX spreadsheet
Amendment 2 N4008521B2500 BID OPENING INFORMATION.pdf PDF
NSNTanksMapbook_20201104 FINAL.pdf PDF
Amendment 1 N4008521B2500 Add Attachment Tank Mapbook.pdf PDF
Current NSN Tank Inventory 21 April 2020.xlsx XLSX spreadsheet
0200000 F Management and Administration v2.8 (track changes).docx DOCX document
PAP AST UST.doc DOC document
1502000 FAP Facility Investment ver 2.5.doc DOC document
1502000 C UST-AST SOW (FFP) w EM comments.docx DOCX document
1502000 J Facility Investment ver 2.4 F.doc DOC document
Wage Determination.pdf PDF
Solicitation AST-UST Services Contract Naval Station Newport N4008521R2516.pdf PDF
ELINs - AST-UST Completed.xlsx XLSX spreadsheet
0200000 J Management and Administration v2.6 (track changes).docx DOCX document
0200000 C Management and Administration v2.9 (track changes).docx DOCX document
0100000 C General Information.docx DOCX document
1502000 J Facility Investment ver 2.4.doc DOC document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1502000 – Facility Investment Table of Content

Spec Item
Title
1
General Information
1.1
Concept of Operations
2
Management and Administration
2.1
Definitions and Acronyms
2.2
Personnel
2.2.1
Certification, Training, and Licensing
2.3
Special Requirements
2.3.1
Workmanship and Material Standards
2.3.2
Historical Preservation
2.4
References and Technical Documents
3
FFP Work
3.1
Service Orders
3.1.1
Routine Service work Orders
3.1.2
Emergency Service Work Orders
3.2
Preventative Maintenance Program
3.2.1
AST Monthly Inspections
3.2.1.1
AST Yearly Inspections
3.2.1.2
UST Monthly Inspections
3.2.1.3
UST Yearly Inspections
3.3
Hazardous Waste Disposal
4
IDIQ Work

1502000 – Facility Investment Table of Content

Spec Item
Title
Description
1
General Information
The Contractor shall provide all labor, management, supervision, tools, material, and equipment required to perform Facility Investment services for facilities at the Naval Station Newport, Naval Undersea Warfare Center
1.1
Concepts of Operations
The Contractor shall perform maintenance, repair, alteration, demolition and minor construction for the following:

- AST/UST

1502000 – Facility Investment

Spec Item
Title
Description
2
Management and Administration
2.1
Definitions and Acronyms
N/A
2.2
Personnel
The Contractor shall provide personnel with the qualifications, technical knowledge, experience and skills required for efficient operation, maintenance and repair within the SRM function.
2.2.1
Certification and Licenses
At a minimum the following personnel certifications/qualifications are required:

(1) The personnel working under this contract shall be qualified and licensed for the work they are performing as required by the General Laws of the State of Rhode Island particularly those laws described in Chapters 23, 42, and 46. Additionally all personnel performing work under this contract shall be qualified and licensed as required by all other federal state, and local regulations.

(2) All Leak Detection System technicians shall be qualified for the systems worked and trained/certified as required by the equipment manufacturers.

(3) Tank inspectors will be STI SP001 and/or API 653 certified (2.2.1 Certification & Licenses)

(4) Within 15 days of contract award, the Contractor shall submit a copy of all required license(s) for all employees that will be assigned to this contract. If the contractor hires new employees, he shall submit a copy of required license(s) prior to the personnel performing work on this contract.

2.3
Special Requirements
N/A
2.3.1
Workmanship and Material Standards
The Contractor shall be responsible for maintaining all facilities, systems, and equipment, identified in this technical sub-annex, to a standard that prevents deterioration beyond that which results from normal wear and tear and corrects deficiencies in a timely manner to assure full life expectancy of the facilities, systems, and equipment. Best commercial practices shall be applied in the performance of work. All work shall be completed per approved and accepted industry and equipment manufacturers’ standards and shall comply with building, safety, codes, applicable activity, local, state, and federal regulations, and other technical requirements identified within this technical sub-annex.

Workmanship for maintenance and repair shall include all work necessary to complete facility and system restoration, including touch-up painting and operational checks. Upon completion of work, the Contractor shall ensure all facilities, systems, and equipment are free of missing components or defects which would affect the safety, appearance, or habitability of the facilities and structures or would prevent any electrical, mechanical, plumbing or structural system from functioning in accordance with design intent. Repairs shall be made in accordance with the manufacturers’ specifications and guidelines, and standard building codes. The quality of repairs shall meet the applicable standards and shall prevent any malfunction reoccurrences caused by poor workmanship or other contractor inadequacies. The quality of the repaired areas shall be fully compatible with adjacent surfaces or equipment. Except where otherwise specified, replacements shall match existing in dimensions, finish, color, design, and functionality and shall have an appearance similar to the original finished appearance with only minor unobjectionable deterioration resulting from normal use.

The Contractor shall not allow debris to spread unnecessarily into adjacent areas nor accumulate in the work area (to include the sump aprons and generator enclosures). All such debris, excess material, and parts shall be cleaned up and removed at the completion of the job and at the end of each day work is in progress. Upon completion of work, any stains and other unsightly marks shall be removed.

The Contractor shall maintain sufficient materials and equipment on hand to support service call work requirements. Lack of availability of material or equipment will not relieve the Contractor from the requirement to complete service call work within the time limits specified.

2.3.2
Historical Preservation
Buildings and facilities designated as historical sites shall be maintained in accordance with Federal, State, and local historical policies and regulations.
2.4
References and Technical Documents
References and Technical Documents are listed in J-2000000.03

1502000 – Facility Investment

Spec Item
Title
Performance Objective
Related Information
Performance Standard
3
FFP Work
The Contractor shall perform inspections, Maintenance, & Certification of above ground storage tanks, underground storage tanks, leak detection systems, to ensure they are fully functional and in normal working condition.
Clarifying Information:

The Contractor shall comply with all Federal, state and local statutes and regulations, and with DoD policies, instructions and guidance such as

(1) OPNAVINST 5090.1E

(2) RICR140-25-2

(4) P.L. 91-596

(5) EM 385-1-1

(6) AST Regulation #2

(7) RIDEM UST 250-140-25-1

(8) In addition to local, state & federal standards, call out:

a.Fire codes:
i.NFPA 30
ii.NFPA 30A
iii.NFPA 31
iv.NFPA 37
v.NFPA 70
vi.NFPA 77
vii.NFPA 110
viii.NFPA 704
b.Applicable standards:
i.API 653
ii.STI SP001
c.Federal Standards:
i.40 CFR 280
ii.40 CFR 112
iii.29 CFR 1910.06
iv.29 CFR 1910.106
d.State regulations:
i.250-RICR-140-25-1
ii.250-RICR-140-25-2
iii.250-RICR-140-30-1
iv.250-RICR-150-05-3
v.250-RICR-120-05-11

Services are performed in accordance with industry environmental standards.

If environmental related procedures or operations are found to be out of compliance, the Contractor shall immediately notify the KO/PAR and the installation's Environmental Office with recommendations for appropriate action.

Regulatory compliance and adherence to policies, instructions and guidance, may be determined by planned sampling, validated customer complaints and documented citations if applicable.

Contractor shall provide advanced notification to the Air Program Manager regarding testing dates for annual State I Vapor testing at least 14 days before conducting the testing.

Services are performed in a timely manner and in compliance with Federal, state and local statutes and regulations, and with DoD policies, instructions and guidance.

Installed Equipment & Systems are in normal working condition & functioning properly in accordance with specified standards.

No documented citations such as NOV (Notice of Violation), NON (Notice of non-compliance), warning letters or citizen suits due to Contractor’s non-performance, mismanagement or negligence

3.1
Service Orders
The Contractor shall perform service order work in a timely manner and ensure facilities, ground structures, personal property equipment and installed equipment and systems are restored to a safe, normal working condition and function properly.

Requirement Information:

The Contractor shall receive service orders in accordance with the work reception requirements in Annex 2.

The Contractor shall schedule and perform service orders in a way that minimizes disruptions to customers and Government operations.

The Government may issue service orders for work requirements at any location within the defined boundaries of this contract for any reason at the discretion of the KO.

Service order work may include repairs to existing facility assets and equipment. and newly installed facility assets and equipment, work to facilities and structures located on the installation, but not listed in the facilities listing, facilities and equipment that are not maintained through a recurring work schedule or program, labor hour support for non-contract projects, and any work requirements typical to the annexes and sub-annexes contained in this PWS.

Service orders are not limited to work performed on existing facilities, structures and equipment identified in the respective Section J attachments or spec items for each Annex. Additional facilities, structures and equipment added during the course of the contract will become part of the service order program at no additional cost to the Government.

Samples of required work and historical service order workload are provided in J-1502000-05. Historical data and supporting information provided is intended to illustrate the volume of service orders issued and examples of work that has been performed in the past and is not to be construed as a limiting factor to services ordered and performed in the future.

The Contractor shall maintain sufficient materials and equipment on hand, to support service order work requirements. Lack of availability of material or equipment will not relieve the Contractor from the requirement to complete service order work within the time limits specified.

The Government may combine multiple repair requirements received for the same trade in the same building or structure at the same time into one service order as long as the service order threshold is not exceeded ($2,500)

The Contractor shall notify the KO upon identification that the service order will exceed the liability limits specified below in accordance with reporting requirements in Annex 2. If Non-recurring work is issued for repairs, the Government will only pay for the portion of labor and/or material that exceeds the service order limits.

The Contractor shall submit a monthly summary of completed service orders per Section F

Service order work is responded to and completed within the specified time.

Facilities, ground structures, and installed equipment and systems are restored to normal working condition, including recertification if applicable.

When repair is complete, the facility, ground structure, equipment or installed equipment and system does not present danger to personnel or equipment.

3.1.1
Routine Service Work Orders
The Contractor shall respond to a Routine Service within one (1) workday after notification and ensure facilities and installed equipment and systems are restored to a safe, normal working condition and function properly.
Requirement Information:

The Contractor shall perform routine service orders to repair deficiencies and return facilities and installed equipment and systems to normal working condition.

Routine service order work shall be responded to within one workday.

The Routine service order response time shall commence upon reception of the routine service order by the Contractor and shall terminate upon Contractor’s arrival at the site where work is to be performed.

Routine Service Orders are limited to a FFP ceiling of $2,500 combined Labor and Materials Work Oder work exceeding the $2,500 labor/ parts limit must be approved by the KO before starting work.

Historically there has been an average of 10 Service Work Orders a year.

See Spec Item 3.1.

Routine service orders responded to within one workday of receipt of call.

Work is continued without interruption until condition is arrested

3.1.2
Emergency Service Order
The Contractor shall respond to emergency service orders within one (1) hour after notification and arrest emergent conditions to minimize and mitigate damage to facilities, ground structures, personal property equipment, and installed equipment and systems and danger to personnel, and two (2) hours after regular working hours

Requirement Information:

The Contractor shall perform emergency service orders 24 hours a day, seven days a week throughout the contract period.

The Contractor shall respond to emergency service orders with the appropriate service personnel and equipment to commence work immediately.

Emergency service orders are limited to a ceiling of 2 labor hours or $500.00 in material cost.

The Contractor shall remain at the work site until the emergency has been arrested.

The emergency service order is complete once the emergency has been arrested. The Government may issue a routine service order or non-recurring work task order for the follow-on work required to repair/restore the facility, ground structure, personal property equipment or installed equipment and system.

Emergency service orders responded to within one hour of receipt of call.

Emergency service orders are arrested within 24 hours of receipt of call.

Work is continued without interruption until emergent condition is arrested.

3.2
Preventative Maintenance Program (PM)
The Contractor shall develop and implement a Preventative Maintenance program to ensure systems are safe, fully functional and operational.

A Monthly schedule will be provided to the FSC/ PAR by the fifth of every month.

The Contractor shall provide a Preventative Maintenance Checklist (PMC) the first workday of each week

The Contractor shall provide a “Work Order Summary” Report” by the First Business Day of each Month.

The Contractor shall provide an AST/UST report via Electronic/CD copy along with (2) two hard (Paper) copies of all Monthly Inspection Reports by the 10th of each month. The Annual Report must be received by the KO/PAR by the end of current Option Year.

The Contractor shall provide the “ERP Compliance Certification Checklist” for UST’s once every three (3) Years Required Information:

The Contractor shall submit a Preventative Maintenance Plan to the KO/PAR to validate completeness. Preventative Maintenance shall include the Contractor’s approach for AST/UST PM, including maintenance and inspection tasks, schedules for planed work accomplishment, plan for minimizing occurrence of repair and downtime on Alarm Systems, process for the identification of the need for repairs, and the process for scheduling and completing repair work.

The AST/UST current system inventory is provided in J-150200-03.

The AST/UST Inspections shall include all items in Section J-150200-03

The GW wells at ASTs R168 & R169 shall be opened once every month. The GW will be measured and observed for presence of oil.

Readings will be recorded on the provided Monthly Tank Inspection Report. Contractor will submit completed forms to Navy.

The Systems and equipment, including associated inventories in the PM Plan Spec Items below;

As part of the PM, the Contractor has full responsibility for Minor Repairs, Items costing $2,500.00 time and material. The Contractor will notify the KO/PAR upon identification that the repair will exceed the liability limit listed above. If the estimated cost of the repair exceeds the Contractors liability limit, the Government may order under the IDIQ section of this contract.

If a repair or replacement will exceed the Contractors liability limit, the Contractor shall provide a detailed cost breakdown to the KO within (5) five working days. This cost breakdown shall separately show the following:

Materials, labor rate (for calculating labor costs) shall be the IQ labor rate indicated in the ELINS.

If the Government identifies a problem or a need for repair, the Government will contact the Contractors work reception desk. Service Orders will not be issued for accomplishment of repairs on systems and equipment maintained under the PM.

The Contractors shall submit an PM schedule and PM Maintenance and Repair Status. Report in accordance with Annex 2

Requirement Information:

The Contractor shall provide the Work Order Summary Report by the first business day of each Month.

Informational Note:

The Work Order Summary will contain updates and information on all on-going work (i.e. PM, Service Work Orders etc...)

Requirement Information:

The service provider reports will encompass all items in Section J 0200000-05 One copy pf the Monthly Reports will be given to the FMFS PAR, and one to the Tank Program Manager, no later than (10) ten days after the previous Month. Annual reports must be received by June of 2021. ERP Compliance Certification Checklist must be received by 01 June of 2021 and 01 June of 2023.

All inspections must be at least (21) twenty-one days apart

Clarifying Information:

The Contractor shall fill out the ERP Compliance Certification Form and present the form to the FSC PAR/COR once every Three (3) Years

All Contractor inputs to reports must be written in “Times New Roman” @ 12 Font.

The Contractor Shall list on all pages “Titles/Facility” on all pages

The Contractor’s PM Plan is submitted with Bid.

PM is accomplished per Contractors program and work schedule.

The contractor provides a Monthly Schedule to the PAR

Work is accomplished per Workmanship and Material Standards in Annex 2 The Contractor delivers Work Order Summary report on time each month.

All AST/UST Monthly Reports are Accurate, Up to date, and turned in by the 10th of every month.

Annual Report by the end of the current Option Year.

All ERP Compliance Check lists forms are filled out correctly and submitted on time.

3.2.1
AST Monthly Inspections
The Contractor shall provide Monthly AST Inspections to assure all Tanks are performing up to all Federal/State and local regulations

Informational Note;

Any disruptions to the Inspections shall be reported to the KO/PAR for action if necessary.

All Monthly inspections are completed in accordance with Local/State and Federal requirements

3.2.1.1
AST Yearly Inspections
The Contractor shall provide Yearly AST Inspections to assure all Tanks are performing up to all Federal/State and local regulations
Informational Note;

Any disruptions to the Inspections shall be reported to the KO/PAR for action if necessary.

All Yearly inspections are completed in accordance with Local/State and Federal requirements

3.2.1.2
UST Monthly Inspections
The Contractor shall provide Monthly UST Inspections to assure all Tanks are performing up to all Federal/State and local regulations
Informational Note;

Any disruptions to the Inspections shall be reported to the KO/PAR for action if necessary.

All Monthly inspections are completed in accordance with Local/State and Federal requirements

3.2.1.3
UST Yearly Inspections
The Contractor shall provide Yearly UST Inspections to assure all Tanks are performing up to all Federal/State and local regulations
Informational Note;

Any disruptions to the Inspections shall be reported to the KO/PAR for action if necessary.

All Yearly inspections are completed in accordance with Local/State and Federal requirements

3.2.2

Hazardous Waste (HW) Disposal

The Contractor shall dispose of HW to ensure the installation complies with Federal, state and local statutes and regulations, and with DoD policies, instructions and guidance.
Clarifying Information:

The Contractor shall provide fifty-five gallon (55 gal.) drums for the disposal of waste off the work site. Drums are to be returned to Bldg. 15 at the end of every day.

The Contractor will comply with Federal, state and local statutes and regulations, and with DoD policies, instructions

HW disposal complies with Federal, state and local statutes and regulations, and with DoD policies, instructions and guidance.

4
IDIQ Work
IDIQ work may be ordered utilizing DoD EMALL in accordance with Section H or on a task order in accordance with the PROCEDURES FOR ISSUING ORDERS clause in Section G. The order will specify the exact locations and types of work to be accomplished. The period of performance will be specified in each order.
Refer to IDIQ ELINs for task listings, descriptions, and related requirements. All periods of performance are measured from issue date of order to acceptance of the work. Performance standards for IDIQ work will be the same as those in Spec Item 3 where applicable.

File details come from the government source that posted it. Updated .