1502000 FAP Facility Investment ver 2.5.doc

DOC document 103 KB Posted

Attached to
Above Ground / Underground Storage Tank Services, NAVAL STATION NEWPORT, NEWPORT RI
Solicitation number
N4008521B2500
Issued by

View the file

Other files

File Type Posted
Revised ELINs- AST-UST 12.14.20.xlsx XLSX spreadsheet
Revised AST UST Inventory 12 14 20.xlsx XLSX spreadsheet
Amendment 4 N4008521B2500 REVISED INVENTORY AND ELINS and RFI Questions and Answeres.pdf PDF
Amendment 3 N4008521B2500 Attachment Revision- Bid Due date extension- clarification.pdf PDF
RFI ELINs - AST-UST.xlsx XLSX spreadsheet
Revised 1502000 C UST-AST SOW (FFP).docx DOCX document
Revised UST-AST Tank Inventory 12-11-20.xlsx XLSX spreadsheet
Amendment 2 N4008521B2500 BID OPENING INFORMATION.pdf PDF
NSNTanksMapbook_20201104 FINAL.pdf PDF
Amendment 1 N4008521B2500 Add Attachment Tank Mapbook.pdf PDF
Current NSN Tank Inventory 21 April 2020.xlsx XLSX spreadsheet
0200000 F Management and Administration v2.8 (track changes).docx DOCX document
PAP AST UST.doc DOC document
1502000 C UST-AST SOW (FFP) w EM comments.docx DOCX document
1502000 J Facility Investment ver 2.4 F.doc DOC document
Wage Determination.pdf PDF
Solicitation AST-UST Services Contract Naval Station Newport N4008521R2516.pdf PDF
ELINs - AST-UST Completed.xlsx XLSX spreadsheet
0200000 J Management and Administration v2.6 (track changes).docx DOCX document
0200000 C Management and Administration v2.9 (track changes).docx DOCX document
0100000 C General Information.docx DOCX document
1502000 J Facility Investment ver 2.4.doc DOC document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FUNCTIONAL ASSESSMENT PLAN (FAP)

AST/UST

FACILITY INVESTMENT

1502000

FACILITY INVESTMENT FAP

Assessment Levels (AL)
Assessment Frequency (Freq)

A – Annually

Q – Quarterly

M – Once per month

BW – Once every 13-16 days

W – Once per week

R – As required

Method of Assessment (MOA)

PS – Periodic Sampling

VCC – Validated Customer Complaints

UV – Unscheduled Visits

CE – Customer’s Evaluation

AL1
Start assessment at this Level
AL2
Add this Level if Contractor performance for AL1 is Unsatisfactory
AL3
Add this Level if Contractor performance at AL1 or AL2 is Unsatisfactory

Note: Return to appropriate Assessment Level when performance improves.

Note: The first method listed in the MOA column below is the primary assessment method.

Spec

Item

Performance Objective
Performance Standard
MOA
Assessment Level
Sample Size
Freq
AL1
AL2
AL3
UOM (total)
Normal
Reduced
3.1
Service Orders

The Contractor shall perform service order work in a timely manner and ensure facilities, ground structures, personal property equipment and installed equipment and systems are restored to a safe, normal working condition and function properly.

Service order work is responded to and completed within the specified time.

Facilities, ground structures, and installed equipment and systems are restored to normal working condition, including recertification if applicable.

When repair is complete, the facility, ground structure, equipment or installed equipment and system does not present danger to personnel or equipment.

PS

VCC

N/A
N/A
10%
5%
M
3.1.1
Routine Service Work Orders

The Contractor shall respond to a Routine Service within one (1) workday after notification and ensure facilities and installed equipment and systems are restored to a safe, normal working condition and function properly.

Routine service orders responded to within one workday of receipt of call.

Work is continued without interruption until condition is arrested

PS

N/A

N/A

10%
N/A
M
3.1.2
Emergency Service Order

The Contractor shall respond to emergency service orders within one (1) hour after notification and arrest emergent conditions to minimize and mitigate damage to facilities, ground structures, personal property equipment, and installed equipment and systems and danger to personnel, and two (2) hours after regular working hours

Emergency service orders responded to within one hour of receipt of call.

Emergency service orders are arrested within 24 hours of receipt of call.

Work is continued without interruption until emergent condition is arrested.

PS

N/A

N/A

10%
N/A
M
3.1.2.1
Work Order Summary Report

The Contractor shall provide a “Work Order Summary Report” each Month

The Contractor delivers the report on time each month.
PS

N/A

N/A

10%
N/A
M
3.2
Intergraded Maintenance Program (IMP)

The Contractor shall develop and implement an IMP to ensure systems are safe, fully functional and operational.

A monthly schedule will be provided to the FSC PAR by the fifth of every month.

The Contractor’s IMP is submitted with Bid.

IMP is accomplished per Contractors program and work schedule.

The contractor provides a Monthly Schedule to the PAR

Work is accomplished per Workmanship and Material Standards in Annex 2

PS

N/A
N/A
10%
5%
M
3.2.1
AST/UST Reports

The Contractor shall provide an Electronic/CD copy along with (2) two hard (Paper) copies of all Monthly/Annual Inspection Reports

All Reports are Accurate, Up to date, and turned in by the 10th of every month.
PS
N/A

N/A

10%
N/A
M
3.2.2
Hazardous Waste (HW) Disposal

The Contractor shall dispose of HW to ensure the installation complies with Federal, state and local statutes and regulations, and with DoD policies, instructions and guidance.

HW disposal complies with Federal, state and local statutes and regulations, and with DoD policies, instructions and guidance.
PS
N/A

N/A

10%
N/A
M
3.3
ERP Compliance Certification Checklist for UST Only

The Contractor shall provide the “ERP Compliance Certification Checklist for UST’s once every three (3) Years

All forms are filled out correctly and submitted on time.
PS
N/A
N/A
10%
N/A
M
4
IDIQ Work

IDIQ work may be ordered utilizing DoD EMALL in accordance with Section H or on a task order in accordance with the PROCEDURES FOR ISSUING ORDERS clause in Section G. The order will specify the exact locations and types of work to be accomplished. The period of performance will be specified in each order.

PS
N/A
N/A
N/A
10%
N/A
M

Monthly Performance Assessment Summary Contract #: NXXXXX-16-D-XXXX Installation/Site:

Annex/sub-annex: 1502000 Facility Investment Month/Year:

Spec
Title
AL1
AL2/AL3
VCC
Safety
QMS review

Item

E
M
N
E
M
N
Pos
Neg
Issues
# Samples
A
U
3.1
Service Orders
3.1.1
Routine Service Work Orders
3.1.2
Emergency Service Order
3.1.2.1
Work Order Summary Report
3.2
Intergraded Maintenance Program (IMP)
3.2.1
AST/UST Reports
3.2.2
Hazardous Waste (HW) Disposal
3.3
ERP Compliance Certification Checklist for UST Only
4
Non-Recurring Work TO

Comments:

Recommended Actions:

Technical Ratings (mark using "X")

E
VG
S
M
U

Overall Technical Rating for Recurring Work

Overall Technical Rating for Non-Recurring Work

COR Signature:

Date:

E = Standards Exceeded; M = Standards Met; N = Standards Not Met

PAGE