REPLACE BOILER AT BUILDING - AS710
CONTRACT 14-0146
MARINE CORPS AIR STATION, CAMP LEJEUNE, NORTH CAROLINA
NEW RIVER
HADNOT
POINT
HOSPITAL
POINT
NC ROUTE 24HOLOCOMB
BLVD
MAR
INES
ROAD
US
R
OU
TE
N.C. HIGHWAY172
CURTIS ROAD
FINAL SUBMISSION
INDEX OF DRAWINGS
G1 COVER SHEET AND DRAWING INDEX
M1 MECHANICAL NOTES, LEGEND & ABBREVIATIONS
MECHANICAL UL DETAILS
MECHANICAL DEMOLITION PLAN
MECHANICAL MEZZANINE DEMOLITION PLAN
MECHANICAL DOMESTIC WATER AND NATURAL GAS PLAN
BASE MAP
NO SCALE
MARINE CORPS AIR STAION NEW RIVER SITE MAP
NO SCALE
LOCATION MAP
NO SCALE
NORTH
NORTH
NORTH
MAIN GATE
AS710
FLOUNDER ROAD
COURTHOUSE
BAY
3808 Park Avenue
Wilmington, NC 28403
Phone: 910.791.4000
Fax: 910.791.5266 www.cbhfengineers.com
NC# P-0506
c
Copyright 2015 CBHF Engineers, PLLC
Engineers, PLLC
MARINE CORPS AIR
STATION NEW RIVER
M2 M3 M4 M5
MECHANICAL HEATING HOT WATER PLANM6
MECHANICAL MEZZANINE HEATING HOT WATER PLANM7
MECHANICAL HVAC PLANM8
MECHANICAL DEMOLITION ISOMETRIC DIAGRAMSM10
MECHANICAL DEMOLITION ISOMETRIC DIAGRAMSM11
E1 ELECTRICAL LEGEND, RISER, ABBREVIATIONS, NOTES AND DETAIL
E2 ELECTRICAL GENERAL AND DEMOLITION NOTES
E3 ELECTRICAL DEMOLITION, PLANS AND SCHEDULES
E4 ELECTRICAL POWER PLANS
E5 ELECTRICAL PANEL SCHEDULES - REVISED
E6 ELECTRICAL UL DETAILS
FA1 FIRE ALARM DEMOLITION PLAN
FA2 FIRE ALARM RENOVATION PLAN
FA3 FIRE ALARM DETAILS
MECHANICAL NEW WORK ISOMETRIC DIAGRAMSM12
MECHANICAL NEW WORK ISOMETRIC DIAGRAMM13
MECHANICAL DIAGRAMS, CONTROLS & SEQUENCESM14
MECHANICAL SCHEDULESM15
MECHANICAL DETAILSM16
MECHANICAL ROOF PLAN AND DOMESTIC WATER PLANM9
PLATE # DESCRIPTION
60016360
DRAWING # CONTRACT #
14-0146
14-0146 14-0146 14-0146 14-0146 14-0146 14-0146 14-0146 14-0146
14-0146 14-0146
14-0146 14-0146 14-0146 14-0146 14-0146 14-0146
14-0146 14-0146 14-0146
14-0146 14-0146 14-0146 14-0146 14-0146
14-0146
DISCLOSURE OF INFORMATION:
CONTRACTOR SHALL COMPLY AS FOLLOWS:
A. THE CONTRACTOR SHALL NOT RELEASE TO ANYONE OUTSIDE THE CONTRACTOR'S ORGANIZATION ANY UNCLASSIFIED INFORMATION, REGARDLESS OF MEDIUM (E.G. FILM, TAPE, DOCUMENT), PERTAINING
TO ANY PART OF THIS CONTRACTOR ANY PROGRAM RELATED TO THIS CONTRACT, UNLESS-
1. THE CONTRACTING OFFICER HAS GIVEN PRIOR WRITTEN APPROVAL;
OR
2. THE INFORMATION IS OTHERWISE IN THE PUBLIC DOMAIN BEFORE THE DATE OF THE RELEASE.
B. REQUESTS FOR APPROVAL SHALL IDENTIFY THE SPECIFIC INFORMATION TO BE RELEASED, THE MEDIUM TO BE USED, AND THE PURPOSE FOR THE RELEASE. THE CONTRACTOR SHALL SUBMIT ITS
REQUEST TO THE CONTRACTING OFFICER AT LEAST 45 DAYS BEFORE THE PROPOSED DATE FOR
RELEASE.
C. THE CONTRACTOR AGREES TO INCLUDE A SIMILAR REQUIREMENT IN EACH SUBCONTRACT UNDER THIS CONTRACT . SUBCONTRACTORS SHALL SUBMIT REQUESTS FOR AUTHORIZATION TO RELEASE
THROUGH THE PRIME CONTRACTOR TO THE CONTRACTING OFFICER.
60016361 60016362 60016363 60016364 60016365 60016366 60016367 60016368 60016369 60016370 60016371 60016372 60016373 60016374 60016375 60016376
60016377 60016378 60016379 60016380 60016381 60016382
60016383 60016384 60016385
RECORD DRAWING
This document reflects changes to the design documents made during construction by the Contractor and submitted to the Engineer after construction. Field verification by the Engineer was not provided.
3808 Park Avenue
Wilmington, NC 28403
Phone: 910.791.4000
Fax: 910.791.5266 www.cbhfengineers.com
NC# P-0506
c
Copyright 2015 CBHF Engineers, PLLC
Engineers, PLLC
MECHANICAL ABBREVIATIONS
(X) EXISTING
AS AIR SCOOP/AIR SEPARATOR
B HOT WATER BOILER
BP HOT WATER BOILER PUMP
CHW CHILLED WATER
CHWS CHILLED WATER SUPPLY
DBP DOMESTIC WATER BOILER PUMP
DCW DOMESTIC COLD WATER
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DHWS DOMESTIC HOT WATER SUPPLY
DTR DUAL TEMPERATURE RETURN
DTWR DUAL TEMPERATURE WATER RETURN
DWB DOMESTIC WATER BOILER
DWP DOMESTIC WATER PUMP
FS FLOW SENSOR
DTWS DUAL TEMPERATURE WATER SUPPLY
GWH GAS WATER HEATER
EWH ELECTRIC WATER HEATER
AGA AMERICAN GAS ASSOCIATION
EF EXHAUST FAN
EBH ELECTRIC BASEBOARD HEATER
DTS DUAL TEMPERATURE SUPPLY
DTP DUAL TEMPERATURE PUMP
AI ANALOG INPUT
DO DIGITAL OUTPUT
F FAHRENHEIT
DTW DUAL TEMPERATURE WATER
DEG DEGREES
DDC DIRECT DIGITAL CONTROL
CHWP CHILLED WATER PUMP
GCO GRADE CLEANOUT
FD FLOOR DRAIN
MECHANICAL LEGEND
T
E
FS
BFP
GM
T
GDF GAS FIRED DUCT FURNACE
CP CONDENSATE PUMP
BLDG BUILDING
CONV CONVECTOR
DHWC DOMESTIC HOT WATER CONVERTER
BI BINARY INPUT
GM GAS METER
CHWR CHILLED WATER RETURN
t tt ttt t(X) tt(X) ttt (X) t S tt S ttt S tS(X) ttS(X) ttt S(X)
S
S(X)
SP(X)
SP
SMOKE BARRIER
SMOKE BARRIER EXISTING
ONE HOUR FIRE BARRIER
TWO HOUR FIRE BARRIER
THREE HOUR FIRE BARRIER
ONE HOUR FIRE BARRIER EXISTING
TWO HOUR FIRE BARRIER EXISTING
THREE HOUR FIRE BARRIER EXISTING
ONE HOUR FIRE BARRIER + SMOKE BARRIER
TWO HOUR FIRE BARRIER + SMOKE BARRIER
THREE HOUR FIRE BARRIER + SMOKE BARRIER
ONE HOUR FIRE BARRIER + SMOKE BARRIER EXISTING
TWO HOUR FIRE BARRIER + SMOKE BARRIER EXISTING
THREE HOUR FIRE BARRIER + SMOKE BARRIER EXISTING
SMOKE PARTITION EXISTING
SMOKE PARTITION
GUH GAS UNIT HEATER
CS CIRCUIT SETTER
M
HWP HOT WATER PUMP
HWR HOT WATER RETURN
HWS HOT WATER SUPPLY
M/U MAKE UP
NIC NOT IN CONTRACT
PRV PRESSURE REDUCING VALVE
PT PRESSURE TRANSMITTER
RCP REHEAT COIL PUMP
RPZ REDUCE PRESSURE ZONE
ST STORAGE TANK
TT TEMPERATURE TRANSMITTER
UH GAS UNIT HEATER
UHW WATER UNIT HEATER
VFD VARIABLE FREQUENCY DRIVE
XP EXPANSION TANK
HC HEATING COIL
PAC PACKAGED AIR CONDITIONER
VTR VENT THRU ROOF
ODU OUTDOOR UNIT
IDU INDOOR UNIT
H HORSEPOWER
HPC HEAT PUMP COIL
VRF VARIABLE REFRIGERANT FLOW
WGP WALL MOUNT GAS PACK
HP HEAT PUMP
L LOUVER
RP RECIRCULATION PUMP
HV HEATING AND VENTILATING
MAU MAKE-UP AIR UNIT
NG NATURAL GAS
HX HEAT EXCHANGER
HHW HEATING HOT WATER
SIM SIMILAR
TMV THERMOSTATIC MIXING VALVE
HFC HORIZONTAL FAN COIL
PD PRESSURE DROP
VFC VERTICAL FAN COIL
PHE POOL HEAT EXCHANGER
X CHAIN LINK TYPE FENCEX X X
1. THE CONTRACTOR SHALL REVIEW THE DRAWINGS AND SPECIFICATIONS FOR DEMOLITION REQUIREMENTS AND LAYOUT HIS WORK IN A COMPATIBLE AND COMPLEMENTARY MANNER. REMOVE ALL EQUIPMENT, DUCTWORK, SUPPORTS, CONTROLS, ACCESSORIES, ETC..., AND MECHANICAL ITEMS MADE OBSOLETE BY THESE ALTERATIONS AS SHOWN IN THE MECHANICAL DRAWINGS. ALL ITEMS TO BE REMOVED OR MODIFIED MAY NOT BE SHOWN, HOWEVER, THIS CONTRACTOR SHALL REMOVE ANY MECHANICAL WORK AS REQUIRED BY THE CONSTRUCTION OR AS DIRECTED BY THE GOVERNMENT CONTRACTING OFFICER. SURVEY THE AFFECTED
AREAS BEFORE SUBMITTING A BID.
2. SCHEDULING OF DEMOLITION - COORDINATE SCHEDULING OF MECHANICAL DEMOLITION WORK WITH THE CONTRACTING OFFICER SO AS TO MINIMIZE DISRUPTION OF THE GOVERNMENT'S USE OF THE FACILITIES AND MAINTAIN THE CONSTRUCTION SEQUENCE. SEE DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL
INSTRUCTIONS CONCERNING PHASING AND SEQUENCE OF WORK.
3. EXISTING MECHANICAL SYSTEMS - VERIFY CONDITION OF EXISTING MECHANICAL SYSTEMS TO BE REUSED SO THAT COMPLETE, FULLY OPERATIONAL AND RELIABLE SYSTEMS ARE OBTAINED AT THE COMPLETION OF THE WORK. NOTIFY CONTRACTING OFFICER OF ANY SYSTEMS FOUND TO BE OF QUESTIONABLE CONDITION.
4. ALL EXISTING MECHANICAL EQUIPMENT AND DEVICES SHALL REMAIN UNLESS SPECIFICALLY NOTED TO BE
REMOVED.
5. DEMOLISHED MATERIALS - UNLESS SPECIFICALLY REQUESTED BY THE GOVERNMENT, ALL DEMOLISHED MECHANICAL MATERIALS SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE REMOVED
FROM THE SITE AND DISPOSED OF PROPERLY.
6. CUTTING AND PATCHING - PERFORM CUTTING AND PATCHING FOR MECHANICAL WORK SO AS TO MINIMIZE
DAMAGE TO CEILINGS, FLOORS AND WALLS.
7. THESE DRAWINGS ARE COMPILED BY THE ENGINEER FROM THE GOVERNMENT'S AS-BUILT RECORD DRAWINGS AND LIMITED FIELD VERIFICATION OF EXISTING CONDITIONS FOR THE PURPOSE OF INDICATING THE WORK REQUIRED AND ARE BELIEVED TO BE CORRECT. NOTWITHSTANDING, THE CONTRACTOR SHALL VERIFY ALL DUCTWORK, EQUIPMENT LOCATIONS, DIMENSIONS AND ALL FIELD CONDITIONS AFFECTING HIS WORK.
8. WHERE MECHANICAL SYSTEMS PASS THROUGH THE DEMOLITION AREAS TO SERVE OTHER PORTIONS OF THE PREMISES, THEY SHALL REMAIN OR BE SUITABLY RELOCATED AND THE SYSTEM RESTORED TO NORMAL OPERATION. ADVISE THE CONTRACTING OFFICER IMMEDIATELY IF SUCH CONDITIONS ARE UNCOVERED
BEFORE PROCEEDING WITH ADDITIONAL WORK.
9. PROTECT ALL EXISTING LIFE SAFETY SYSTEMS, FIRE ALARM AND PUBLIC ADDRESS SYSTEMS AND MAINTAIN THEM IN OPERATION THROUGHOUT THE PROGRESS OF THE WORK. NOTIFY THE CONTRACTING OFFICER IN WRITING OF SHUTDOWNS ARE REQUIRED PRIOR TO ANY OUTAGE OF SERVICE. WHERE THE DURATION OF A PROPOSED OUTAGE CANNOT BE TOLERATED BY THE GOVERNMENT, PROVIDE TEMPORARY CONNECTIONS AS
REQUIRED MAINTAINING SERVICE.
10. SURVEY THE AFFECTED AREAS BEFORE STARTING DEMOLITION AS ALL EXISTING CONDITIONS CANNOT BE
COMPLETELY DEPICTED ON THE DRAWINGS AND SOME UNUSUAL CONDITIONS EXIST.
11. IF ANY UNUSUAL STRUCTURAL OR ARCHITECTURAL CONDITIONS ARE ENCOUNTERED DURING DEMOLITION, CONTACT THE CONTRACTING OFFICER FOR ASSISTANCE.
MECHANICAL DEMOLITION NOTES
1. SCOPE OF WORK: THESE DRAWINGS AND ACCOMPANYING SPECIFICATIONS DESCRIBE THE SCOPE OF WORK REQUIRED FOR PROJECT MECHANICAL HEATING, VENTILATING AND AIR CONDITIONING SYSTEMS.
CONTRACTOR SHALL PROVIDE ALL LABOR AND MATERIAL REQUIRED FOR COMPLETE, FULLY FUNCTIONING
MECHANICAL SYSTEMS COMPLYING WITH THE INTENT OF THE DRAWINGS AND SPECIFICATIONS.
2. DRAWINGS: DRAWINGS ARE DIAGRAMMATIC AND MAY NOT COMPLETELY DESCRIBE EVERY DETAIL OF THE
INSTALLATION. HOWEVER, CONTRACTOR IS RESPONSIBLE FOR FURNISHING COMPLETE SYSTEMS
INCLUDING ALL REQUIRED EQUIPMENT AND ACCESSORIES TO OBTAIN FULLY FUNCTIONING HVAC SYSTEMS.
3. CODE COMPLIANCE - COMPLY WITH THE LATEST EDITIONS OF THE FOLLOWING STANDARDS AND CODES, INSOFAR AS THEY APPLY:
A. NORTH CAROLINA STATE BUILDING CODE, LATEST EDITION AND REVISIONS
B. UFC 3-400-01 ENERGY CONSERVATION
C. UFC 3-400-10 MECHANICAL ENGINEERING
D. MCB CAMP LEJEUNE, NC MECHANICAL POLICIES
INCLUDE ALL WORK TO COMPLY WITH CODES WHETHER INDICATED ON DRAWINGS OR NOT. NOTIFY CONTRACTING OFFICER OF DISCREPANCIES BETWEEN DRAWINGS AND CODES PRIOR TO BEGINNING WORK.
4. MANUFACTURER'S RECOMMENDATIONS - INSTALL ALL EQUIPMENT IN STRICT ACCORDANCE WITH
MANUFACTURER'S RECOMMENDATIONS.
5. WORKMANSHIP - UTILIZE SKILLED MECHANICS TO OBTAIN A HIGH QUALITY PROFESSIONAL FINISH INSTALLATION WHEN COMPLETED. WORK OF UNACCEPTABLE QUALITY SHALL BE REMOVED AND REWORKED AT NO ADDITIONAL COST. CONTRACTING OFFICER SHALL BE THE JUDGE OF WORKMANSHIP AND THEIR OPINION WILL BE FINAL. IN ADDITION, ANY EXISTING CONSTRUCTION DAMAGED BY THE CONTRACTOR SHALL BE REPAIRED OR REPLACED TO THE SATISFACTION OF THE CONTRACTING OFFICER BY THE CONTRACTOR
AT NO ADDITIONAL COST.
6. SUPERVISION: PROVIDE SKILLED SUPERINTENDENTS TO SUPERVISE THE WORK FROM THE BEGINNING TO
COMPLETION AND FINAL INSPECTION.
7. PROGRESS OF WORK: PERFORM WORK IN ACCORDANCE WITH SCHEDULE AND REQUIREMENTS OF THE OWNER. UNDER NO CIRCUMSTANCES SHALL THIS CONTRACTOR DELAY THE OVERALL PROJECT SCHEDULE.
8. COORDINATION: COORDINATE MECHANICAL WORK WITH THE WORK OF OTHER TRADES. LOCATIONS SHOWN ON THE DRAWINGS ARE APPROXIMATE UNLESS SPECIFICALLY DIMENSIONED. LAYOUT MECHANICAL WORK SO AS NOT TO INTERFERE WITH THE WORK OF OTHER TRADES. VERIFY ACTUAL BUILDING STRUCTURE PRIOR TO DUCT FABRICATION AND ADJUST ARRANGEMENT AS REQUIRED. INCLUDE ALL OFFSETS IN DUCTS, FITTINGS, PIPING, ETC. AS REQUIRED TO PROPERLY INSTALL EQUIPMENT.
9. EQUIPMENT LOCATIONS: DETERMINE EXACT EQUIPMENT AND MATERIALS LOCATIONS TO PROVIDE BEST
ARRANGEMENT AND TO FACILITATE PROPER MAINTENANCE AND SERVICING OF EQUIPMENT.
10. LISTING AND LABELING: ALL EQUIPMENT SHALL BE LABELED OR LISTED BY UL OR OTHER APPROVED
TESTING AGENCY WHERE REQUIRED.
11. CLEANUP: REMOVE ALL DEBRIS GENERATED IN THE ACCOMPLISHMENT OF WORK UNDER THIS PROJECT.
CLEAN, REPLACE OR REPAIR ALL SURFACES SOILED OR DAMAGED DURING THE COURSE OF THE WORK.
REMOVE DEBRIS DAILY SO TO MAINTAIN SAFE WORKING CONDITIONS.
12. COORDINATE MECHANICAL ROOM GAS LINE ENTRANCE LOCATION WITH GAS SUPPLIER.
13. MECHANICAL ROOF PENETRATIONS SHALL BE COORDINATED BETWEEN MECHANICAL CONTRACTOR AND
ROOFING CONTRACTOR.
14. UNIT HEATERS TO BE VENTED IN ACCORDANCE WITH MANUFACTURER'S AND NC FUEL CODE
REQUIREMENTS.
15. MODIFY OR DEMOLISH EXISTING EQUIPMENT PADS AS REQUIRED TO ACCOMMODATE NEW EQUIPMENT
LAYOUT.
16. FIRE ALARM / CO DETECTION INTERFACE - SIGNAL SHALL BE TIED INTO EXISTING JCI METASYS DDC SYSTEM .
MECHANICAL GENERAL NOTES
DISCLOSURE OF INFORMATION:
CONTRACTOR SHALL COMPLY AS FOLLOWS:
A. THE CONTRACTOR SHALL NOT RELEASE TO ANYONE OUTSIDE THE CONTRACTOR'S ORGANIZATION ANY UNCLASSIFIED INFORMATION, REGARDLESS OF MEDIUM (E.G. FILM, TAPE, DOCUMENT), PERTAINING
TO ANY PART OF THIS CONTRACTOR ANY PROGRAM RELATED TO THIS CONTRACT, UNLESS-
1. THE CONTRACTING OFFICER HAS GIVEN PRIOR WRITTEN APPROVAL;
OR
2. THE INFORMATION IS OTHERWISE IN THE PUBLIC DOMAIN BEFORE THE DATE OF THE RELEASE.
B. REQUESTS FOR APPROVAL SHALL IDENTIFY THE SPECIFIC INFORMATION TO BE RELEASED, THE MEDIUM TO BE USED, AND THE PURPOSE FOR THE RELEASE. THE CONTRACTOR SHALL SUBMIT ITS
REQUEST TO THE CONTRACTING OFFICER AT LEAST 45 DAYS BEFORE THE PROPOSED DATE FOR
RELEASE.
C. THE CONTRACTOR AGREES TO INCLUDE A SIMILAR REQUIREMENT IN EACH SUBCONTRACT UNDER THIS CONTRACT . SUBCONTRACTORS SHALL SUBMIT REQUESTS FOR AUTHORIZATION TO RELEASE
THROUGH THE PRIME CONTRACTOR TO THE CONTRACTING OFFICER.
S
THROTTLING VALVE
3-WAY CONTROL VALVE
2-WAY CONTROL VALVE
BLOCK VALVE
AUTOMATIC FLOW CONTROL VALVE
CHECK VALVE
STRAINER w/ BLOWDOWN VALVE
TRIPLE DUTY VALVE
SOLENOID VALVE
CIRCUIT SETTER
PRESSURE RELIEF VALVE
BACK FLOW PREVENTER
FLOW SENSOR
AIR SEPARATOR / AIR SCOOP
EXPANSION TANK
IN-LINE FILTER WITH ISOLATION VALVES
PUMP
THERMOSTAT
EMERGENCY STOP SWITCH
INDICATES TO DEMOLISH
PRESSURE REGULATOR
GAS METER
GAS SHUTOFF VALVE
STEAM TRAP
EXTENT OF DEMOLITION
POINT OF CONNECTION
MIXING VALVE
REDUCER
FIRE DAMPER
DOMESTIC HOT WATER RETURN PIPING
EXISTING DOMESTIC HOT WATER PIPING
DOMESTIC COLD WATER PIPING
LPS
LOW PRESSURE STEAM PIPING
CD
CONDENSATE PIPING
BBD
BOILER BLOW DOWN PIPING
HWS
HEATING HOT WATER SUPPLY PIPING
HWR
HEATING HOT WATER RETURN PIPING
140F
140F DHW PIPING
G
NATURAL GAS PIPING
BUTTERFLY VALVE
AIR VENT
THERMOMETER
PRESSURE GAUGE
1. THE BUILDING CAN BE CLOSED FOR A MAXIMUM 5 DAYS TO ALLOW THE EXISTING DISHWASHER COMPLETE REMOVAL AND THE NEW DISHWASHER TO BE INSTALLED AND OPERATIONAL. THE DISHWASHER SHALL BE CONSIDERED OPERATIONAL ONCE THE VENDOR HAS COMMISSIONED THE INSTALLATION, STARTED UP THE DISHWASHER AND THE DISHWASHER IS AVAILABLE FOR WASHING DISHES. THE CONTRACTOR SHALL INCLUDE IN BID PRICE AND PROVIDE A TEMPORARY WAY TO WASH DISHES IF PROVIDING AN OPERATIONAL
DISHWASHER AND REMOVING THE EXISTING DISHWASHER REQUIRES MORE THAN 5 DAYS.
2. THE CONTRACTOR SHALL NOT WORK IN THE DINING AREA DURING THE DAILY LUNCH RUSH, 1100-1330.
3. THE CONTRACTOR SHALL ONLY CLOSE ONE HEAD AT A TIME, THE OPERATIONAL HEAD WILL BE CONVERTED
TO UNISEX UNTIL BOTH HEADS ARE COMPLETE.
PHASING NOTES
PRESSURE GAUGE
T/P
TEMPERATURE SENSORT
RECORD DRAWING 09/08/16
RECORD DRAWING
This document reflects changes to the design documents made during construction by the Contractor and submitted to the Engineer after
Phone: 910.791.4000
Fax: 910.791.5266 www.cbhfengineers.com
NC# P-0506
c
Copyright 2015 CBHF Engineers, PLLC
Engineers, PLLC
DISCLOSURE OF INFORMATION:
CONTRACTOR SHALL COMPLY AS FOLLOWS:
A. THE CONTRACTOR SHALL NOT RELEASE TO ANYONE OUTSIDE THE CONTRACTOR'S ORGANIZATION ANY UNCLASSIFIED INFORMATION, REGARDLESS OF MEDIUM (E.G. FILM, TAPE, DOCUMENT), PERTAINING
TO ANY PART OF THIS CONTRACTOR ANY PROGRAM RELATED TO THIS CONTRACT, UNLESS-
1. THE CONTRACTING OFFICER HAS GIVEN PRIOR WRITTEN APPROVAL;
OR
2. THE INFORMATION IS OTHERWISE IN THE PUBLIC DOMAIN BEFORE THE DATE OF THE RELEASE.
B. REQUESTS FOR APPROVAL SHALL IDENTIFY THE SPECIFIC INFORMATION TO BE RELEASED, THE MEDIUM TO BE USED, AND THE PURPOSE FOR THE RELEASE. THE CONTRACTOR SHALL SUBMIT ITS
REQUEST TO THE CONTRACTING OFFICER AT LEAST 45 DAYS BEFORE THE PROPOSED DATE FOR
RELEASE.
C. THE CONTRACTOR AGREES TO INCLUDE A SIMILAR REQUIREMENT IN EACH SUBCONTRACT UNDER THIS CONTRACT . SUBCONTRACTORS SHALL SUBMIT REQUESTS FOR AUTHORIZATION TO RELEASE
THROUGH THE PRIME CONTRACTOR TO THE CONTRACTING OFFICER.
GENERAL NOTES THIS DRAWING:
1. THROUGH PENETRATIONS SHALL BE PROTECTED BY AN APPROVED THROUGH-PENETRATION FIRESTOP
SYSTEM INSTALLED AND TESTED IN ACCORDANCE WITH ASTM E814 OR UL 1479.
2. VERIFY PIPE MATERIAL TO SELECT PROPER UL DESIGN NUMBER FOR PROTECTING THE
THROUGH-PENETRATION, EQUAL TO WALL RATING (1 HOUR MINIMUM).
3. VERIFY INSULATION MATERIAL AND THICKNESS OF INSULATED PIPES TO SELECT PROPER UL DESIGN NUMBER
FOR PROTECTING THE THROUGH-PENETRATION, EQUAL TO WALL RATING (1 HOUR MINIMUM).
4. THE PENETRATION DETAILS SHOULD BE A UL LISTED ASSEMBLY. AT A MINIMUM, PENETRATION DETAILS SHOULD BE BASED ON A SPECIFIC UL ASSEMBLY (REFERENCING A PARTICULAR UL ASSEMBLY) WITH A NOTE STATING 'OR EQUIVALENT'. SUGGESTED UL ASSEMBLIES HAVE BEEN PROVIDED ON THIS SHEET.
5. UL ASSEMBLIES ARE BASED ON A SPECIFIC MANUFACTURER. ONE MANUFACTURER SHOULD BE CHOSEN, SINCE DIFFERENT MANUFACTURER PRODUCTS CANNOT BE MIXED AND PRODUCTS ARE NOT
'INTERCHANGEABLE'. (i.e, CONSISTENT WITH THE UL DETAILS PROVIDED. THIS DOES NOT MEAN ANOTHER MANUFACTURER CANNOT BE USED IN ACTUAL CONSTRUCTION-AS LONG AS THEY HAVE AN EQUIVALENT FIRESTOP SYSTEM. IT IS RECOMMEND THAT SPECIFIED TECHNOLOGY, Inc (STI) IS CHOSEN. OF THE OVER 3,000 UL ASSEMBLIES FOR PENETRATIONS, STI HAS OVER 1,000. THUS, A LARGE SELECTION AND VARIETY OF UL
ASSEMBLIES ARE AVAILABLE THROUGH THIS MANUFACTURER.)
1 CONCRETE/CONCRETE BLOCK WALL OR FLOOR ASSEMBLY,
MAX. OPENING 7 FT² MAX. DIMENSION 32 INCHES.
2 STEEL, IRON OR COPPER PIPE, COPPER TUBING OR CONDUIT
3 FORMS (NOT SHOWN)
4 21
2" STI SPECSEAL MORTAR
1 CONCRETE/CONCRETE BLOCK WALL OR FLOOR ASSEMBLY,
MAX. OPENING IS 1,024 FT² MAX. DIMENSION 32 INCHES.
2 STEEL, IRON OR COPPER PIPE; CONDUIT OR COPPER TUBING
3 PIPE INSULATION
4 PVC OR CPVC PIPE, ENT OR RIGID NONMETALLIC CONDUIT
5 CABLES
6 CABLE TRAY
7 BUSWAY
8 AIR CONDITIONING (AC) LINE SET
9 STEEL DUCT (NOT SHOWN)
MINERAL WOOL BATT INSULATION
2" STI SPECSEAL SEALANT
10A
10B
1 CONCRETE BLOCK WALL ASSEMBLY
2 OPTIONAL STEEL SLEEVE
3 STEEL, IRON OR COPPER PIPE; COPPER TUBING
4 PIPE COVERING MATERIALS
MINERAL WOOL BATT INSULATION
1" STI SPECSEAL SEALANT
5A
5B
ITEM DESCRIPTION
ITEM DESCRIPTION
ITEM DESCRIPTION
5A
5B
2 5A
5B
A
A
10B
10A
5 3
SECTION A-A
10A
10B
A
A
A A
SECTION A-A
SECTION A-A
SYSTEM NO. C-AJ-1613
SYSTEM NO. C-AJ-8113
SYSTEM NO. W-J-5072
F Rating - 2 Hr
T Rating - 0 Hr
F Rating - 2 Hr
T Rating - 0, 1/4, 1/2, 3/4, and 2 Hr
ANSI/UL1479 (ASTM E814)
F Rating - 4 Hr
T Rating - 2 Hr
L rating At Amblent - Less Than 2 CFM/sq ft
L Rating At 400 F - Less Than 1 CFM/sq ft
ANSI/UL1479 (ASTM E814)
F Ratings - 2 and 3 Hr (See Items 3, 4, 6 and 8)
T Ratings - 0, 1/4, 1/2, 3/4, 1-1/2 and 2 Hr (See Items 2 through 9)
L Rating At Ambient - Less than 1, 1.6, and 3.2 CFM/sq ft (See Item 2, 4, 5, 6, 8 and 9B)
L Rating at 400 F - Less than 1, 1.6, and 2 CFM/sq ft (See Item 2, 4, 5, 6, 8 and 9B)
SYSTEM NO. C-AJ-8093
9A
9A
9C
Section A-A
A
A
1 CONCRETE/CONCRETE BLOCK WALL OR FLOOR ASSEMBLY,
MAX. OPENING IS 18 FT² MAX. DIMENSION 6 FT.
2 STEEL, IRON OR COPPER PIPE; CONDUIT OR COPPER TUBING
3 PIPE INSULATION
4 PVC OR CPVC PIPE, ENT OR RIGID NONMETALLIC CONDUIT
5 CABLES
6 CABLE TRAY
7 BUSWAY
8 STEEL DUCT (NOT SHOWN)
SPECSEAL FIRESTOP PILLOW
2" STI SPECSEAL SEALANT (NOT SHOWN)
WIRE MESH
9A
9C
ITEM DESCRIPTION
9B
SYSTEM NO. W-J-7112
F Rating - 2 Hr
T Rating - 0 Hr
Section A-A A
A
1 CONCRETE/CONCRETE BLOCK WALL OR FLOOR ASSEMBLY,
MAX. AREA OF OPENING IS 76.2 FT² WITH A MAX. WIDTH OF 105-1/2 IN.
2 STEEL DUCT MAX. 100 X 100 INCHES.
3 BATTS AND BLANKETS - NOM. 1-1/2 TO 2 IN THICK GLASS FIBER JACKETED
WITH FOIL-SCRIM-KRAFT FACING.
4 MINERAL WOOL BATT INSULATION.
5 MINIMUM 5/8" FS-ONE SEALANT OR FS-ONE MAX INTUMESCENT SEALANT.
6 STEEL RETAINING ANGLES - MIN 16 GA. SIZED TO LAP STEEL DUCT A MIN OF
1 IN AND LAP WALL SURFACES A MIN OF 3 IN.
3 3
RECORD DRAWING 09/08/16
RECORD DRAWING
This document reflects changes to the design documents made during construction by the Contractor and submitted to the Engineer after
LPS
LPS
L P
S L P
S
LPS
L P
S L P
S L P
S
L P
S
LPS
L P
S
LPS LPS LPS LPS
L P
S L P
S
CD CD
C D
C D
C D
C D
B B
D B
B D
BBD
CD CD
C D
C D
CD
C D
(X)1-1/2" DCW
(X)1-1/2" DCW
(X)STEAM PIPING
(X)STEAM PIPING
3/4" DHWR DOWNSTREAM OF (X)RP (TO REMAIN)
(X)1" DCWDEMO (X)STEAM
PIPING
DEMO (X) STEAM PIPING,
REFER TO MEZZANINE
PLAN FOR CONTINUATION
(X)3"DCW
(X)3"DCW
(X)1"DCW
AT TEE
DEMO (X)1"DCW
DEMO (X)1"DCW
DEMO (X)STEAM CONDENSATE DRAIN
DEMO (X)DISHWASHER
DEMO (X)STEAM PIPING
DEMO (X)FLUE PIPING
BACK TO BOILER.
WELD PLATE TO FLUE
AT CHIMNEY
ENTRANCE TO SEAL
PENETRATION
COMPLETELY.
DEMO (X)BOILER
(X)CWP
(X)FLOOR
DRAIN (TYP)
(X)LOUVER
DEMO ALL (X)STEAM
CONDENSATE PIPING
DEMO (X)CONDENSATE FLASH
TANK AND CONDENSATE PUMP
DEMO (X)MECHANICAL
CONDENSATE PUMP
DEMO (X)DHW HEAT EXCHANGER 1
DEMO (X)DCW WATER
CONDITIONER
(X)PIT
(X)SUMP PIT
(X)1" DCW
COOLER
[E32]
WASHING
DISH
[E31]
STOR.
[E34]
STOR.
[E35]
ROOM
ELECTRICAL
[E37]
ROOM
BOILER
[E42]
HALL
[E33]
HALL
PORCH
[E36]
(X)3/4"DHWR
3 6
(X)1-1/2 DHW
IN VERTICAL
3808 Park Avenue
Wilmington, NC 28403
Phone: 910.791.4000
Fax: 910.791.5266 www.cbhfengineers.com
NC# P-0506
c
Copyright 2015 CBHF Engineers, PLLC
Engineers, PLLC
BUILDING AS710 KEY PLAN
AREA OF WORK
GROUND FLOOR PLAN DEMOLITION 1
REMOVE/DISPOSE OF DHW HEAT EXCHANGER AND SUPPORTS. DEMOLISH ALL STEAM AND
CONDENSATE PIPING (NOT SHOWN) BACK TO MAIN. COORDINATE WITH THE CONTRACTING OFFICER OR THEIR REPRESENTATIVE TO SHUTOFF DHWS AND DCW MAKEUP, SHUT VALVES AND CUT PIPING
LOOSE FROM DHW HEAT EXCHANGER. ALL INSULATION AND HANGERS SHALL BE DEMOLISHED.
REFER TO PLAN 1.M5 FOR NEW PIPING INCLUDING TEMPORARY DCW, DHW AND DHWR TIE-IN.
PROVIDE TEMPORARY TIE-IN PRIOR TO SYSTEM DEMOLITION IN ORDER TO MAINTAIN DHW BUILDINGS
SERVICES WITH CONTRACTOR PROVIDED TEMPORARY DHW HEATER. PROVIDE TEMPORARY DHW
SUPPLY CAPACITY EQUAL TO SCHEDULED GAS-FIRED WATER HEATER.
REMOVE EXISTING DISHWASHER AND TURN OVER TO GOVERMENT. COORDINATE DELIVERY LOCATION AND DELIVERY TIME WITH CONTRACTING OFFICER. REMOVE/DISPOSE OF DCW AND DHW PIPING BACK TO NEAREST SHUT-OFF VALVE(S). REMOVE/DISPOSE OF STEAM AND CONDENSATE PIPING BACK TO SOURCE IN MECHANICAL ROOM.REMOVE/DISPOSE OF EXISTING INDIRECT DRAIN PIPING. REMOVE
EXISTING EXHAUST DUCT PLENUM AND STORE FOR REUSE WITH OWNER PROVIDED DISHWASHER.
REMOVE/DISPOSE OF BOILER INCLUDING BUT NOT LIMITED TO ALL ASSOCIATED FUEL OIL PIPING, STEAM AND CONDENSATE PIPING, DUCT, HANGERS, SUPPORTS, INSULATION, ETC. THROUGH-PIPING
EMBEDDED IN FLOORS SHALL BE CUT FLUSH WITH SURFACE AND FILLED. THROUGH-PIPING
EMBEDDED IN WALLS SHALL BE CUT 12" BEYOND MECHANICAL ROOM WALLS. PIPING CONCEALED IN
WALLS AND CHASES MAY BE ABANDONED. PIPING ABOVE CEILINGS SHALL BE DEMOLISHED.
REPAIR/REPLACE CEILINGS AND WALLS, PROTECT ALL FURNISHING AND SURFACES.
REMOVE/DISPOSE OF WATER CONDITIONING SYSTEM AND ALL ASSOCIATED PIPING, HANGERS,
SUPPORTS, ETC.. DEMOLISH DCW TO NEAREST ACTIVE BRANCH, CAP.
REMOVE/DISPOSE OF DCW PIPING IN VERTICAL. REFER TO ISOMETRIC PLAN FOR CAP LOCATION.
REMOVE/DISPOSE OF EXISTING MECHANICAL CONDENSATE PUMP AND ALL ASSOCIATED PIPING,
STAND, SUPPORTS, INSULATION, ETC.
REMOVE/DISPOSE OF EXISTING CONDENSATE FLASH TANK AND CONDENSATE PUMP AND ALL
ASSOCIATED PIPING, STAND, SUPPORTS, INSULATION, ECT.
REMOVE/DISPOSE OF CONDENSTE PIPING OFF OF BOILER BLOW DOWN LINE.
REFER TO KEY PLAN FOR KEYED NOTE. DEMO EXISTING FUEL OIL TANK, TANK SUPPORTS,
FOUNDATION, FENCING AND CONTAINMENT ENCLOSURE COMPLETE. RE-SOD ANY AREA DISTURBED BY CONSTRUCTION AND DEMOLITION. PRIOR TO DEMOLITION, CONTACT EMD AT 910-451-1482 TO
REQUEST DE-FUELING OF THE VESSEL. CAP SUPPLY AND RETURN PIPING BELOW GROUND AND
ABANDONED IN PLACE. PATCH ASPHALT TO MATCH ADJACENT.
DEMOLITION KEYED NOTES
DISCLOSURE OF INFORMATION:
CONTRACTOR SHALL COMPLY AS FOLLOWS:
A. THE CONTRACTOR SHALL NOT RELEASE TO ANYONE OUTSIDE THE CONTRACTOR'S ORGANIZATION ANY UNCLASSIFIED INFORMATION, REGARDLESS OF MEDIUM (E.G. FILM, TAPE, DOCUMENT), PERTAINING
TO ANY PART OF THIS CONTRACTOR ANY PROGRAM RELATED TO THIS CONTRACT, UNLESS-
1. THE CONTRACTING OFFICER HAS GIVEN PRIOR WRITTEN APPROVAL;
OR
2. THE INFORMATION IS OTHERWISE IN THE PUBLIC DOMAIN BEFORE THE DATE OF THE RELEASE.
B. REQUESTS FOR APPROVAL SHALL IDENTIFY THE SPECIFIC INFORMATION TO BE RELEASED, THE MEDIUM TO BE USED, AND THE PURPOSE FOR THE RELEASE. THE CONTRACTOR SHALL SUBMIT ITS
REQUEST TO THE CONTRACTING OFFICER AT LEAST 45 DAYS BEFORE THE PROPOSED DATE FOR
RELEASE.
C. THE CONTRACTOR AGREES TO INCLUDE A SIMILAR REQUIREMENT IN EACH SUBCONTRACT UNDER THIS CONTRACT . SUBCONTRACTORS SHALL SUBMIT REQUESTS FOR AUTHORIZATION TO RELEASE
THROUGH THE PRIME CONTRACTOR TO THE CONTRACTING OFFICER.
RECORD DRAWING 09/08/16
RECORD DRAWING
This document reflects changes to the design documents made during construction by the Contractor and submitted to the Engineer after t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t
UPPER PART OF
BOILER ROOM
MECHANICAL
ROOM
[E43]
HWR
H W
R
H W
S
H W
S
DEMO (X) AIR
SEPARATOR
(X)EXPANSION TANK
TO REMAIN
(X)ROOF
ACCESS DOOR
(X)3" HWS TO BUILDING~
(X)5"HWR AT 90
(X)HWR FROM (X)AHU1
(X)HWS TO AHU1
(X)5"HWS AT 90 DOWN
3"HWS TO BUILDING
DEMO (X)HWP
DEMO(X)TRIPLE
DUTY VALVE
DEMO (X)HHW HEAT
EXCHANGER
CD
(X)DCW SUPPLY
DEMO
(X)COND
(X)PRV W/ BYPASS
(X)PRV WITH
BYPASS
L P
S
LPS
DEMO
(X)LPS
1 1
HWS
, CAP AT TEE ADJACENT
TO (X)EXPANSION TANK
3/4" MAKEUP (BELOW)
3808 Park Avenue
Wilmington, NC 28403
Phone: 910.791.4000
Fax: 910.791.5266 www.cbhfengineers.com
NC# P-0506
c
Copyright 2015 CBHF Engineers, PLLC
Engineers, PLLC
BUILDING AS710 KEY PLAN
AREA OF WORK
MEZZANINE DEMOLITION PLAN 1
REMOVE/DISPOSE OF HHW HEAT EXCHANGER AND SUPPORTS. REMOVE/DISPOSE ALL STEAM AND
CONDENSATE PIPING BACK TO MAIN. REMOVE/DISPOSE OF (X)HWP AND PIPING INDICATED ON PLAN.
COORDINATE WITH THE CONTRACTING OFFICER OR THEIR REPRESENTATIVE TO SHUTOFF HWS AND HWR, SHUT VALVES AND CUT PIPING LOOSE FROM HHW HEAT EXCHANGER. ALL INSULATION AND HANGERS SHALL BE DEMOLISHED. REFER TO PLAN 1/M7 FOR NEW PIPING INCLUDING TEMPORARY HWS AND HWR TIE-INS. PROVIDE TEMPORARY TIE-IN PRIOR TO SYSTEM DEMOLITION IN ORDER TO
MAINTAIN HHW BUILDING SERVICE WITH CONTRACTOR PROVIDED TEMPORARY HHW BOILER.
PROVIDE TEMPORARY HHW SUPPLY CAPACITY EQUAL TO SCHEDULED GAS-FIRED BOILERS.
(X)HHW CHEMICAL SHOT FEEDER SHALL BE SALVAGED FOR RECONNECTION.
DEMOLITION KEYED NOTES
RECORD DRAWING 09/08/16
RECORD DRAWING
This document reflects changes to the design documents made during construction by the Contractor and submitted to the Engineer after
CD
G
G G
G G
G G
G G
G
G
G G G G G G G G G G G
G
G
G
F
F
(X)HWRP
AS710-GWH1-1
AS710-B1-02
AS710-B1-01
NEUTRALIZATION KIT4
M16
M16
M16 TYP
1 1/2"DCW
3/4"DHWR
1 1/2"DHW
(X)1 1/2"DCW
(X)1"DCW
(X)NG
M16
M16
M16
M
F
140F
F
F
140F
1-1/2"DHW
1-1/2"DHW
1"DHW1"DHW
1"DHW
(X)3/4"DHWR
(X)3/4"DHWR
CAP (X)1"DCW IN VERTICAL AT TEE
E
(X)1"DCW
BOILER CONDENSATE
DRAIN PIPING
EXHAUST VENT
G
G
(X)NG ON ROOF
(X)NG TO KITCHEN
EQUIPMENT
t t t t t t t t t t t t t t t t t t t t t
G G
G G
G G
1-1/4"NG
1/2"NG
(X)FD
2"W
(X)3"DCW
(X)3"DCW
1"NG
3/4"NG
1"NG
1"
1-1/2"DCW FOR
TEMPORY UTILITIES
3808 Park Avenue
Wilmington, NC 28403
Phone: 910.791.4000
Fax: 910.791.5266 www.cbhfengineers.com
NC# P-0506
c
Copyright 2015 CBHF Engineers, PLLC
Engineers, PLLC
BUILDING AS710 KEY PLAN
AREA OF WORK
PLUMBING PLAN 1
DISCLOSURE OF INFORMATION:
CONTRACTOR SHALL COMPLY AS FOLLOWS:
A. THE CONTRACTOR SHALL NOT RELEASE TO ANYONE OUTSIDE THE CONTRACTOR'S ORGANIZATION ANY UNCLASSIFIED INFORMATION, REGARDLESS OF MEDIUM (E.G. FILM, TAPE, DOCUMENT), PERTAINING
TO ANY PART OF THIS CONTRACTOR ANY PROGRAM RELATED TO THIS CONTRACT, UNLESS-
1. THE CONTRACTING OFFICER HAS GIVEN PRIOR WRITTEN APPROVAL;
OR
2. THE INFORMATION IS OTHERWISE IN THE PUBLIC DOMAIN BEFORE THE DATE OF THE RELEASE.
B. REQUESTS FOR APPROVAL SHALL IDENTIFY THE SPECIFIC INFORMATION TO BE RELEASED, THE MEDIUM TO BE USED, AND THE PURPOSE FOR THE RELEASE. THE CONTRACTOR SHALL SUBMIT ITS
REQUEST TO THE CONTRACTING OFFICER AT LEAST 45 DAYS BEFORE THE PROPOSED DATE FOR
RELEASE.
C. THE CONTRACTOR AGREES TO INCLUDE A SIMILAR REQUIREMENT IN EACH SUBCONTRACT UNDER THIS CONTRACT . SUBCONTRACTORS SHALL SUBMIT REQUESTS FOR AUTHORIZATION TO RELEASE
THROUGH THE PRIME CONTRACTOR TO THE CONTRACTING OFFICER.
REFER TO RISER DIAGRAMS FOR PIPE SIZES NOT SHOWN ON PLAN.
REFER TO SPECIFICATIONS FOR TYPE AND THICKNESS OF INSULATION.
MANIFOLD BOILER CONDENSATE PIPING TO NEUTRALIZATION KIT WITH MINIMUM CAPACITY
OF 0.25 CUBIC FEET OF LIMESTONE. DISCHARGE TO PIT.
CONNECT NATURAL GAS PIPING TO OWNER PROVIDED DISHWASHER. INSTALL PER
MANUFACTURERS RECOMMENDED INSTALLATION. CONFIRM GAS USAGE REQUIREMENTS
PRIOR TO PIPE ROUTING.
CONNECT SANITARY DRAINAGE AND DHW PIPING TO OWNER PROVIDED DISHWASHER.
INSTALL PER MANUFACTURERS RECOMMENDED INSTALLATION. CONFIRM DHW AND DRAIN
PIPING REQUIREMENTS PRIOR TO PIPE ROUTING. ROUTE DRAIN PIPING AS SHOWN TO
EXISTING INDIRECT DRAIN.
ALL PIPING PENETRATIONS IN FIRE BARRIER WHETHER SHOWN OR NOT SHALL BE SEALED
TO MAINTAIN FIRE RATING. REFER TO UL DETAILS FOR METHOD OF PROTECTION.
POINT OF CONNECTION INCLUDES TEMPORARY TIE-IN ASSEMBLY.
CONSTRUCTION KEYED NOTES
RECORD DRAWING 09/08/16
RECORD DRAWING
This document reflects changes to the design documents made during construction by the Contractor and submitted to the Engineer after t t t t t t t t t t t t t t t t t t t t
H W
R
H W
R
H W
S
AS710-GWH1-1
AS710-BP1-01
AS710-B1-01
AS710-BP1-02
AS710-B1-02
M16 TYP
HWS
AS710-HWP1-02
AS710-HWP1-01(BELOW)
4"HWS FROM AS710-HWP1-01
4"HWS-UP; SEE M7 FOR
CONT.
SUPPORT PUMPS
FROM WALL
4"HWR; SEE M7 FOR CONT. 4"HWS; SEE M7
FOR CONT.
2"HWR
2"HWS
2"HWR
2"HWR-DN
2"HWS-DN
2"HWR-DN2"HWS-DN
AS710-BP1-01
AS710-BP1-02
4"HWS-UP; SEE M7 FOR CONT.
3808 Park Avenue
Wilmington, NC 28403
Phone: 910.791.4000
Fax: 910.791.5266 www.cbhfengineers.com
NC# P-0506
c
Copyright 2015 CBHF Engineers, PLLC
Engineers, PLLC
BUILDING AS710 KEY PLAN
AREA OF WORK
HEATING HOT WATER PLAN 1
DISCLOSURE OF INFORMATION:
CONTRACTOR SHALL COMPLY AS FOLLOWS:
A. THE CONTRACTOR SHALL NOT RELEASE TO ANYONE OUTSIDE THE CONTRACTOR'S ORGANIZATION ANY UNCLASSIFIED INFORMATION, REGARDLESS OF MEDIUM (E.G. FILM, TAPE, DOCUMENT), PERTAINING
TO ANY PART OF THIS CONTRACTOR ANY PROGRAM RELATED TO THIS CONTRACT, UNLESS-
1. THE CONTRACTING OFFICER HAS GIVEN PRIOR WRITTEN APPROVAL;
OR
2. THE INFORMATION IS OTHERWISE IN THE PUBLIC DOMAIN BEFORE THE DATE OF THE RELEASE.
B. REQUESTS FOR APPROVAL SHALL IDENTIFY THE SPECIFIC INFORMATION TO BE RELEASED, THE MEDIUM TO BE USED, AND THE PURPOSE FOR THE RELEASE. THE CONTRACTOR SHALL SUBMIT ITS
REQUEST TO THE CONTRACTING OFFICER AT LEAST 45 DAYS BEFORE THE PROPOSED DATE FOR
RELEASE.
C. THE CONTRACTOR AGREES TO INCLUDE A SIMILAR REQUIREMENT IN EACH SUBCONTRACT UNDER THIS CONTRACT . SUBCONTRACTORS SHALL SUBMIT REQUESTS FOR AUTHORIZATION TO RELEASE
THROUGH THE PRIME CONTRACTOR TO THE CONTRACTING OFFICER.
REFER TO RISER DIAGRAMS FOR PIPE SIZES NOT SHOWN ON PLANS.
REFER TO SPECIFICATIONS FOR TYPE AND THICKNESS OF INSULATION.
ALL PIPING PENETRATIONS IN FIRE BARRIER WHETHER SHOWN OR NOT SHALL BE SEALED
TO MAINTAIN FIRE RATING. REFER TO UL DETAILS FOR METHOD OF PROTECTION.
CONSTRUCTION KEYED NOTES
RECORD DRAWING 09/08/16
RECORD DRAWING
This document reflects changes to the design documents made during construction by the Contractor and submitted to the Engineer after t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t t
MECHANICAL
ROOM
[E43]
H W
R
H W
S
H W
S
HWR
HWS
H W
R
H W
S
4"-HWS-DN; SEE M6 FOR CONT.
4"-HWR-DN
(X)1"-DCW
3/4"-MAKE-UP TO AS710-AS1-1
3/4"-HWS, PRESSURE
(X)EXPANSION TANK
(X)5"-HWR
(X)5"-HWS, IN VERTICAL
4"-HWR, TEMPORARY CONNECTION
3/4"-HWS, PRESSURE
(X)3/4"-MAKE-UP
(X)CHW-MAKE-UP
4"HWS TEMPORARY CONNECTION
TO (X)AHU1
FIRE BARRIER REQUIREMENTS
LIMITED FROM ADJACENT ROOF
LEVEL TO GROUND FLOOR
(X)AHU1
(X)CHEMICAL
SHOT FEEDER
(X)12X14(X)58X16 (X)28X16
(X)LOUVER
1 2
4"HWS-DN; SEE M7 FOR CONT.
4"HWS; SEE M6 FOR CONT.
4"HWR; SEE M6 FOR CONT.
(X)RPZ
4"HWR
4"
HW
R
4"
HW
S
4"HWS
5"
HW
R
5"
HW
S
4"HWR
AS710-AS1-01
3808 Park Avenue
Wilmington, NC 28403
Phone: 910.791.4000
Fax: 910.791.5266 www.cbhfengineers.com
NC# P-0506
c
Copyright 2015 CBHF Engineers, PLLC
Engineers, PLLC
BUILDING AS710 KEY PLAN
AREA OF WORK
MEZZANINE HEATING HOT WATER PLAN 1
REFER TO RISER DIAGRAMS FOR PIPE SIZES.
REFER TO SPECIFICATIONS FOR TYPE AND THICKNESS OF INSULATION.
TEMPORARY TIE-IN LOCATION.
INSTALL RELAY PROVIDED BY FIRE ALARM CONTRACTOR TO SHUT DOWN AIR HANDLER ON
FIRE ALARM ACTIVATION.
REPLACE 2-WAY CONTROL VALVE WITH 3-WAY CONTROL VALVE. REFER TO DETAIL 2.M10.
ALL PIPING AND DUCTWORK PENETRATIONS IN FIRE BARRIER WHETHER SHOWN OR NOT
SHALL BE SEALED TO MAINTAIN FIRE RATING. REFER TO UL DETAILS FOR METHOD OF
PROTECTION.
MEZZANINE FLOOR REQUIRES 1-HOUR FIRE BARRIER.
CONSTRUCTION KEYED NOTES
DISCLOSURE OF INFORMATION:
CONTRACTOR SHALL COMPLY AS FOLLOWS:
A. THE CONTRACTOR SHALL NOT RELEASE TO ANYONE OUTSIDE THE CONTRACTOR'S ORGANIZATION ANY UNCLASSIFIED INFORMATION, REGARDLESS OF MEDIUM (E.G. FILM, TAPE, DOCUMENT), PERTAINING
TO ANY PART OF THIS CONTRACTOR ANY PROGRAM RELATED TO THIS CONTRACT, UNLESS-
1. THE CONTRACTING OFFICER HAS GIVEN PRIOR WRITTEN APPROVAL;
OR
2. THE INFORMATION IS OTHERWISE IN THE PUBLIC DOMAIN BEFORE THE DATE OF THE RELEASE.
B. REQUESTS FOR APPROVAL SHALL IDENTIFY THE SPECIFIC INFORMATION TO BE RELEASED, THE MEDIUM TO BE USED, AND THE PURPOSE FOR THE RELEASE. THE CONTRACTOR SHALL SUBMIT ITS
REQUEST TO THE CONTRACTING OFFICER AT LEAST 45 DAYS BEFORE THE PROPOSED DATE FOR
RELEASE.
C. THE CONTRACTOR AGREES TO INCLUDE A SIMILAR REQUIREMENT IN EACH SUBCONTRACT UNDER THIS CONTRACT . SUBCONTRACTORS SHALL SUBMIT REQUESTS FOR AUTHORIZATION TO RELEASE
THROUGH THE PRIME CONTRACOTR TO THE CONTRACTING OFFICER,
(X)28X14
RECORD DRAWING 09/08/16
RECORD DRAWING
This document reflects changes to the design documents made during construction by the Contractor and submitted to the Engineer after t t t t t t t t t t t t t t t t t t t t
AS710-B1-01
AS710-B1-02
AS710-GWH1-01
4"Ø INTAKE AIR
4"Ø INTAKE AIR
4"Ø EXHAUST AIR
4"Ø EXHAUST AIR
4"Ø INTAKE AIR
(X)EXHAUST PLENUM,
MODIFY TO CONNECT
TO DISHWASHER
FLUE, DOWN
M16
M16
M161
M16
M16
M16
(X)LOUVER
3808 Park Avenue
Wilmington, NC 28403
Phone: 910.791.4000
Fax: 910.791.5266 www.cbhfengineers.com
NC# P-0506
c
Copyright 2015 CBHF Engineers, PLLC
Engineers, PLLC
BUILDING AS710 KEY PLAN
AREA OF WORK
HVAC PLAN 1
DISCLOSURE OF INFORMATION:
CONTRACTOR SHALL COMPLY AS FOLLOWS:
A. THE CONTRACTOR SHALL NOT RELEASE TO ANYONE OUTSIDE THE CONTRACTOR'S ORGANIZATION ANY UNCLASSIFIED INFORMATION, REGARDLESS OF MEDIUM (E.G. FILM, TAPE, DOCUMENT), PERTAINING
TO ANY PART OF THIS CONTRACTOR ANY PROGRAM RELATED TO THIS CONTRACT, UNLESS-
1. THE CONTRACTING OFFICER HAS GIVEN PRIOR WRITTEN APPROVAL;
OR
2. THE INFORMATION IS OTHERWISE IN THE PUBLIC DOMAIN BEFORE THE DATE OF THE RELEASE.
B. REQUESTS FOR APPROVAL SHALL IDENTIFY THE SPECIFIC INFORMATION TO BE RELEASED, THE MEDIUM TO BE USED, AND THE PURPOSE FOR THE RELEASE. THE CONTRACTOR SHALL SUBMIT ITS
REQUEST TO THE CONTRACTING OFFICER AT LEAST 45 DAYS BEFORE THE PROPOSED DATE FOR
RELEASE.
C. THE CONTRACTOR AGREES TO INCLUDE A SIMILAR REQUIREMENT IN EACH SUBCONTRACT UNDER THIS CONTRACT . SUBCONTRACTORS SHALL SUBMIT REQUESTS FOR AUTHORIZATION TO RELEASE
THROUGH THE PRIME CONTRACTOR TO THE CONTRACTING OFFICER.
CONNECT EXISTING EXHAUST PLENUM TO OWNER PROVIDED DISHWASHER, MODIFY AS
REQUIRED. INSTALL PER MANUFACTURERS RECOMMENDED INSTALLATION.
PROVIDE 5" LISTED TYPE B VENT AT FLUE GAS EXIT AT REAR OF BOOSTER HEATER. EXTEND
VENT THROUGH WALL USING LISTED THIMBLES MAINTAINING PROPER CLEARANCE TO
COMBUSTIBLES. TERMINATE ABOVE ROOF USING A LISTED WIND CAP.
ALL PIPING AND DUCTWORK PENETRATIONS IN FIRE BARRIER WHETHER SHOWN OR NOT
SHALL BE SEALED TO MAINTAIN FIRE RATING. REFER TO UL DETAILS FOR METHOD OF
PROTECTION.
CONSTRUCTION KEYED NOTES
RECORD DRAWING 09/08/16
RECORD DRAWING
This document reflects changes to the design documents made during construction by the Contractor and submitted to the Engineer after
Phone: 910.791.4000
Fax: 910.791.5266 www.cbhfengineers.com
NC# P-0506
c
Copyright 2015 CBHF Engineers, PLLC
Engineers, PLLC
BUILDING AS710 KEY PLAN
HEATING HOT WATER ROOF PLAN
REMOVE/REPLACE EXISTING DISHWASHER EXHAUST FAN WITH NEW FAN (AS710-EF1-1).
REPLACE 2-WAY VALVE WITH 3-WAY VALVE.
INSTALL RELAY PROVIDED BY FIRE ALARM CONTRACTOR TO SHUT DOWN AIR HANDLER
UPON FIRE ALARM ACTIVATION.
SEAL TOP OF CHIMNEY WITH ANCHORED WEATHER-TIGHT CONCRETE LID.
PROVIDE THERMOSTATIC MIXING VALVE FOR EACH LAVATORY.
CONSTRUCTION KEYED NOTES
(X)RTU-2
(X)RTU-3
(X)RTU-1
M16
M16
DISCLOSURE OF INFORMATION:
CONTRACTOR SHALL COMPLY AS FOLLOWS:
A. THE CONTRACTOR SHALL NOT RELEASE TO ANYONE OUTSIDE THE CONTRACTOR'S ORGANIZATION ANY UNCLASSIFIED INFORMATION, REGARDLESS OF MEDIUM (E.G. FILM, TAPE, DOCUMENT), PERTAINING
TO ANY PART OF THIS CONTRACTOR ANY PROGRAM RELATED TO THIS CONTRACT, UNLESS-
1. THE CONTRACTING OFFICER HAS GIVEN PRIOR WRITTEN APPROVAL;
OR
2. THE INFORMATION IS OTHERWISE IN THE PUBLIC DOMAIN BEFORE THE DATE OF THE RELEASE.
B. REQUESTS FOR APPROVAL SHALL IDENTIFY THE SPECIFIC INFORMATION TO BE RELEASED, THE MEDIUM TO BE USED, AND THE PURPOSE FOR THE RELEASE. THE CONTRACTOR SHALL SUBMIT ITS
REQUEST TO THE CONTRACTING OFFICER AT LEAST 45 DAYS BEFORE THE PROPOSED DATE FOR
RELEASE.
C. THE CONTRACTOR AGREES TO INCLUDE A SIMILAR REQUIREMENT IN EACH SUBCONTRACT UNDER THIS CONTRACT . SUBCONTRACTORS SHALL SUBMIT REQUESTS FOR AUTHORIZATION TO RELEASE
THROUGH THE PRIME CONTRACTOR TO THE CONTRACTING OFFICER.
DOMESTIC WATER PLAN 2
MECHANICAL CONTRACTOR TO LOCATE
DHW AND DCW PIPING, ABOVE LAY-IN
CEILING, GOING TO POOL BUILDING AND
INSTALL THERMOSTATIC MIXING VALVE AS
PIPING IN POOL BUILDING IS ENCASED IN
WALL AND FLOOR AND INACESSIBLE.
AREA OF WORK
AS710-EF1-1
RECORD DRAWING 09/08/16
RECORD DRAWING
This document reflects changes to the design documents made during construction by the Contractor and submitted to the Engineer after
B B
D
B
B
D
B
B
D
B
B
D
L
P
S
H
W
R
H
W
R
H W
R H
W R
H
W
S
H W
S
H W
S
H
W
S
C D
C D
1 REMOVE/DISPOSE OF ALL (X)HWS PIPING, FITTINGS AND ACCESSORIES
BACK TO POINT OF DEMOLITION SHOWN ON PLAN.
REMOVE/DISPOSE OF ALL (X)LPS PIPING, FITTINGS AND ACCESSORIES
BACK TO POINT OF DEMOLITION SHOWN ON PLAN.
REMOVE/DISPOSE OF (X) HEAT EXCHANGER AND ALL RELATED STEAM,
CONDENSATE, MAKE-UP WATER, HWS AND HWR PIPING, FITTINGS AND
ACCESSORIES
REMOVE/DISPOSE OF (X) BOILER BLOW DOWN PIPING, FITTINGS AND
ACCESSORIES
REMOVE/DISPOSE OF (X) AIR SEPARATOR AND ALL RELATED PIPING,
FITTINGS AND ACCESSORIES.
REMOVE/DISPOSE OF (X) PIPING, FITTINGS AND ACCESSORIES FOR
CHEMICAL SHOT FEEDER. (X) CHEMICAL SHOT FEEDER TO BE SALVAGED
FOR RELOCATION.
2 3
MEZZANINE STEAM, CONDENSATE,
HWS, HWR DEMOLITION KEYED NOTES:
(X)CONDENSATE TRAP TO BE DEMOLISHED
(X)HWP
(X)3"HWS
(X)3"HWR
(X)HWS TO AHU1
(X)HWR FROM AHU1 (X)5"HWR
(X)5"HWS
C
D
C
D
B
B
D
B
B
D
B
B
D
B B
D B
B D
C D
B B
D B
B D
B B
D
B B
D
L
P
S
L
P
S
C
D
C
D
C D
C
D
C
D
C
D
C
D
C
D
C
D
C
D
C
D
C
D
C
D
C
D
C D
C
D
L
P
S
L
P
S
L
P
S
L
P
S
C
D
L
P
S
L
P
S
L P
S
L
P
S
(X)PIT
DEMO (X)CONDENSATE TRAP; TYP.
1 REMOVE/DISPOSE OF BOILER AND ALL RELATED STEAM, CONDENSATE,
AND FUEL OIL PIPING.
REMOVE/DISPOSE OF (X)FLASH TANK, CONDENSATE PUMP AND ALL
RELATED PIPING
REMOVE/DISPOSE OF (X)CONDENSATE PUMP AND ALL RELATED PIPING.
REMOVE/DISPOSE OF (X)HEAT EXCHANGER AND ALL RELATED PIPING
REMOVE/DISPOSE OF (X)LPS PIPING TO (X)HEAT EXCHANGER ON
MEZZANINE LEVEL.
REMOVE/DISPOSE OF (X)CONDENSATE PIPING FROM (X) HEAT
EXCHANGER ON MEZZANINE LEVEL.
GROUND FLOOR STEAM/CONDENSATE
DEMOLITION KEYED NOTES:
STRAINER; TYPICAL
UNION; TYPICAL
CONDENSATE TRAP; TYPICAL
CONDENSATE TRAP; TYPICAL
CONTROL
VALVE
SHUT OFF VALVE;
TYPICAL
(X)MAKE-UP WATER
SUPPLY TO REMAIN
(X)PRESSURE REGULATOR
(X)CHWS MAKE-UP
WATER TO REMAIN
(X)HEAT EXCHANGER TO BE
DEMOLISHED
1 REMOVE/DISPOSE OF ALL (X)MAKE-UP WATER SUPPLY PIPING AND
FITTINGS BACK TO POINT OF DEMOLITION SHOWN ON PLAN.
(X)EXPANSION TANK TO REMAIN AND BE RE-USED.
MEZZANINE MAKE-UP WATER
DEMOLITION KEYED NOTES:
(X)PRESSURE REGULATOR
(X)STRAINER/BLOW DOWN
(X)GATE
VALVE; TYP.
(X)BYPASS
(X)BYPASS
(X)STRAINER/BLOW
DOWN
(X)RPZ
(X)3/4"
(X) EXPANSION
TANK TO
REMAIN
DEMO (X)3/4"DCW
DEMO (X)3/4"DCW
MEZZANINE STEAM, CONDENSATE, HWS, HWR DEMOLITION ISOMETRIC 2
3808 Park Avenue
Wilmington, NC 28403
Phone: 910.791.4000
Fax: 910.791.5266 www.cbhfengineers.com
NC# P-0506
c
Copyright 2015 CBHF Engineers, PLLC
Engineers, PLLC
STEAM/CONDENSATE DEMOLITION ISOMETRIC 1
MEZZANINE MAKE-UP WATER DEMOLITION ISOMETRIC 3
DISCLOSURE OF INFORMATION:
CONTRACTOR SHALL COMPLY AS FOLLOWS:
A. THE CONTRACTOR SHALL NOT RELEASE TO ANYONE OUTSIDE THE CONTRACTOR'S ORGANIZATION ANY UNCLASSIFIED INFORMATION, REGARDLESS OF MEDIUM (E.G. FILM, TAPE, DOCUMENT), PERTAINING
TO ANY PART OF THIS CONTRACTOR ANY PROGRAM RELATED TO THIS CONTRACT, UNLESS-
1. THE CONTRACTING OFFICER HAS GIVEN PRIOR WRITTEN APPROVAL;
OR
2. THE INFORMATION IS OTHERWISE IN THE PUBLIC DOMAIN BEFORE THE DATE OF THE RELEASE.
B. REQUESTS FOR APPROVAL SHALL IDENTIFY THE SPECIFIC INFORMATION TO BE RELEASED, THE MEDIUM TO BE USED, AND THE PURPOSE FOR THE RELEASE. THE CONTRACTOR SHALL SUBMIT ITS
REQUEST TO THE CONTRACTING OFFICER AT LEAST 45 DAYS BEFORE THE PROPOSED DATE FOR
RELEASE.
C. THE CONTRACTOR AGREES TO INCLUDE A SIMILAR REQUIREMENT IN EACH SUBCONTRACT UNDER THIS CONTRACT . SUBCONTRACTORS SHALL SUBMIT REQUESTS FOR AUTHORIZATION TO RELEASE
THROUGH THE PRIME CONTRACTOR TO THE CONTRACTING OFFICER.
RECORD DRAWING 09/08/16
RECORD DRAWING
This document reflects changes to the design documents made during construction by the Contractor and submitted to the Engineer after
(X)RPZ
(X)1"MAKE-UP WATER
SUPPLY TO MEZZANINE
(X)CIRCULATION
PUMP TO
REMAIN
REMOVE/DISPOSE OF DHW HEAT EXCHANGER AND SUPPORTS. COORDINATE WITH THE CONTRACTING OFFICER OR THEIR REPRESENTATIVE TO SHUTOFF DHWS AND DCW MAKEUP, SHUT VALVES AND CUT PIPING LOOSE FROM DHW HEAT EXCHANGER. ALL INSULATION AND HANGERS SHALL BE DEMOLISHED. REFER TO PLAN ? FOR NEW PIPING INCLUDING TEMPORARY DCW, DHW AND DHWR TIE-IN. PROVIDE TEMPORARY TIE-IN PRIOR TO SYSTEM DEMOLITION IN ORDER TO MAINTAIN DHW BUILDINGS SERVICES WITH CONTRACTOR PROVIDED TEMPORARY DHW HEATER. PROVIDE TEMPORARY DHW SUPPLY CAPACITY EQUAL TO SCHEDULED GAS-FIRED WATER HEATER.
REMOVE/DISPOSE OF WATER CONDITIONING SYSTEM AND ALL ASSOCIATED PIPING, HANGERS, SUPPORTS, ETC.. DEMOLISH DCW TO NEAREST ACTIVE BRANCH, CAP.
REMOVE/DISPOSE OF DWHR PIPNG FROM POINT OF DEMOLITION SHOWN BACK TO CONNECTION AT HEAT EXCHANGER.
REMOVE/DISPOSE OF BOILER FEED MAKE-UP WATER PIPNG AND ALL ASSOCICATED FITTINGS, VALVES ETC., BACK TO POINT OF DEMOLITION SHOWN.
REMOVE/DISPOSE OF 1"-DCW TO DISHWASHER. CAP TEE AND BRANCH MAIN.
DOMESTIC AND MAKE-UP WATER DEMOLITION KEYED NOTES
(X)DWHR
(X)WATER METER
TO REMAIN
DEMO
DEMO
DEMO
DEMO
DEMO
DEMO
DEMO
DEMO
DEMO
DEMO
(X)TO REMAIN
(X)TO REMAIN
(X)TO REMAIN
(X)TO REMAIN
(X)TO REMAIN
(X)TO REMAIN
(X)TO REMAIN
(X)TO REMAIN
(X)TO REMAIN
(X)1"DCW AT TEE
(X)1-1/2"DHW
(X)1-1/2"DCW
(X)3/4"DHWR
(X)1-1/2"DCW AT TEE
DOMESTIC AND MAKE-UP WATER DEMOLITION ISOMETRIC 1
3808 Park Avenue
Wilmington, NC 28403
Phone: 910.791.4000
Fax: 910.791.5266 www.cbhfengineers.com
NC# P-0506
c
Copyright 2015 CBHF Engineers, PLLC
Engineers, PLLC
DISCLOSURE OF INFORMATION:
CONTRACTOR SHALL COMPLY AS FOLLOWS:
A. THE CONTRACTOR SHALL NOT RELEASE TO ANYONE OUTSIDE THE CONTRACTOR'S ORGANIZATION ANY UNCLASSIFIED INFORMATION, REGARDLESS OF MEDIUM (E.G. FILM, TAPE, DOCUMENT), PERTAINING
TO ANY PART OF THIS CONTRACTOR ANY PROGRAM RELATED TO THIS CONTRACT, UNLESS-
1. THE CONTRACTING OFFICER HAS GIVEN PRIOR WRITTEN APPROVAL;
OR
2. THE INFORMATION IS OTHERWISE IN THE PUBLIC DOMAIN BEFORE THE DATE OF THE RELEASE.
B. REQUESTS FOR APPROVAL SHALL IDENTIFY THE SPECIFIC INFORMATION TO BE RELEASED, THE MEDIUM TO BE USED, AND THE PURPOSE FOR THE RELEASE. THE CONTRACTOR SHALL SUBMIT ITS
REQUEST TO THE CONTRACTING OFFICER AT LEAST 45 DAYS BEFORE THE PROPOSED DATE FOR
RELEASE.
C. THE CONTRACTOR AGREES TO INCLUDE A SIMILAR REQUIREMENT IN EACH SUBCONTRACT UNDER THIS CONTRACT . SUBCONTRACTORS SHALL SUBMIT REQUESTS FOR AUTHORIZATION TO RELEASE
THROUGH THE PRIME CONTRACTOR TO THE CONTRACTING OFFICER.
RECORD DRAWING 09/08/16
RECORD DRAWING
This document reflects changes to the design documents made during construction by the Contractor and submitted to the Engineer after
H
W
R
H
W
S
H W
R
H
W
R
H
W
R
H
W
R
H
W
R
H
W
R
H
W
R
H
W
S
H
W
S
H
W
S
H
W
S
H
W
S
H
W
S
H
W
R
H
W
R
H
W
R
H W
S
H W
S
H
W
S
H
W
S
H
W
S
H W
S
H
W
R
H W
R H
W R
H W
S
H
W
S
H
W
S
H
W
S
H W
R
H W
S
TEMPORARY HWR TIE-IN LOCATION
TEMPORARY HWS TIE-IN LOCATION
CONNECT TO EXISTING MAKE-UP WATER SUPPLY ON MEZZANINE AND EXTEND TO AIR SEPARATOR .
CONNECT NEW 4"HWR PIPING TO EXISTING 5"HWR PIPING ON MECHANICAL MEZZANINE.
CONNECT NEW 4"HWS PIPING TO EXISTING 5"HWS PIPING ON MECHANICAL MEZZANINE.
CONNECT AND ROUTE NEW 3/4" LINE FROM (X)EXPANSION TANK TO 4"HWS BEFORE RELOCATED AIR SEPARATOR
AS710 (X)AS
HWS, HWR AND MAKE-UP WATER NEW WORK KEYED NOTES:
AS710-B1-01
AS710-BP1-01
NEUTRALIZATION KIT
AS710-HWP1-01
AS710-HWP1-02
(X)5"HWR
4"HWR
4"HWR
4"HWR
2"HWR
2"HWR
2"HWS
4"HWS
4"HWS
4"HWS
4"HWS
4"HWS
4"HWS
(X)5"HWS
(X)3"HWR
(X)3"HWS
(X) EXPANSION TANK
AS710 (X)XP
H
W
S
H
W
S
H
W
S
3/4"MAKE-UP
AS710-AS1-01
3/4"
FROM (X)AHU1
TO (X)AHU1
FS
AS710-B1-02
AS710-BP1-02
2"HWS
FS
BLOCK VALVE; TYP.
STRAINER W/ BLOWDOWN VALVE
P/T PORT; TYP.
UNION; TYP.
PRESSURE RELIEF VALVE
SET @ 150PSI
FLOW SENSOR
COMBINATION
PRESSURE/TEMPERATURE GAUGE; TYP.
CHECK VALVE; TYP.
CIRCUIT SETTER; TYP.
2"HWR
2"HWR
6"CONCRETE PAD
(X) SHOT FEEDER
UNION; TYP.
HOSE BIBB
BLOCK VALVE
PLUGGED
CROSSES; TYP.
THROTTLING
VALVE
TWIST OFF
PRESSURE CAP
6"THICK CONCRETE PAD
(X)MAKE-UP WATER
SUPPLY TO REMAIN
(X)PRESSURE REGULATOR
SET @ 12PSI
(X)CHWS MAKE-UP
WATER TO REMAIN
(X)PRESSURE REGULATOR
(X)STRAINER/BLOW DOWN
(X)GATE
VALVE; TYP.
(X)BYPASS
(X)BYPASS
(X)STRAINER/BLOW
DOWN
(X)RPZ
(X)3/4"
3/4"
DRAIN VALVE
PRESSURE GAUGE
GAUGE COCK
FLOAT VENT
3/4"
FLOAT VENT
PRESSURE RELIEF VALVE SET @ 30PSI
ROUTE FULL SIZE TO FLOOR DRAIN
4"HWR
4"HWS
4"HWS
4"HWR
1/4"Ø
PRESSURE GAUGE
0-80 PSIG RANGE;
TYP.
GAUGE COCK; TYP.
GAUGE COCK; TYP.
1/4"Ø
UNION; TYP.
CIRCUIT SETTER; TYP.
BLOW DOWN
T
T TEMPERATURE
SENSOR; TYP.
3/4"
STRAINER WITH
BLOWDOWN
PT
PT
PT
PT
GROUND FLOOR AND MEZZANINE HWS, HWR AND MAKE-UP WATER ISOMETRIC DIAGRAM 1
3808 Park Avenue
Wilmington, NC 28403
Phone: 910.791.4000
Fax: 910.791.5266 www.cbhfengineers.com
NC# P-0506
c
Copyright 2015 CBHF Engineers, PLLC
Engineers, PLLC
DISCLOSURE OF INFORMATION:
CONTRACTOR SHALL COMPLY AS FOLLOWS:
A. THE CONTRACTOR SHALL NOT RELEASE TO ANYONE OUTSIDE THE CONTRACTOR'S ORGANIZATION ANY UNCLASSIFIED INFORMATION, REGARDLESS OF MEDIUM (E.G. FILM, TAPE, DOCUMENT), PERTAINING
TO ANY PART OF THIS CONTRACTOR ANY PROGRAM RELATED TO THIS CONTRACT, UNLESS-
1. THE CONTRACTING OFFICER HAS GIVEN PRIOR WRITTEN APPROVAL;
OR
2. THE INFORMATION IS OTHERWISE IN THE PUBLIC DOMAIN BEFORE THE DATE OF THE RELEASE.
B. REQUESTS FOR APPROVAL SHALL IDENTIFY THE SPECIFIC INFORMATION TO BE RELEASED, THE MEDIUM TO BE USED, AND THE PURPOSE FOR THE RELEASE. THE CONTRACTOR SHALL SUBMIT ITS
REQUEST TO THE CONTRACTING OFFICER AT LEAST 45 DAYS BEFORE THE PROPOSED DATE FOR
RELEASE.
C. THE CONTRACTOR AGREES TO INCLUDE A SIMILAR REQUIREMENT IN EACH SUBCONTRACT UNDER THIS CONTRACT . SUBCONTRACTORS SHALL SUBMIT REQUESTS FOR AUTHORIZATION TO RELEASE
THROUGH THE PRIME CONTRACTOR TO THE CONTRACTING OFFICER.
RECORD DRAWING 09/08/16
RECORD DRAWING
This document reflects changes to the design documents made during construction by the Contractor and submitted to the Engineer after
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
(X)3/4"-DHWR
AS710-GWH1-01
(X)HWRP
(X)3/4"-DHWR
1-1/2"-DHW
(X)METER
(X)3"-DCW
1-1/2"-DCW
(X)3/4"DHWR
(X)1-1/2"-DCW
(X)1"-DCW
(X)1"-DCW
(X)BFP
(X)DCW
(X)3"-DCW
F
F
F
F
F
F
F
F
1"-DHW
1"-DHW, CONNECT TO NEW
DISHWASHER
(X)DWHR
1-1/2"-DCW
M16
1-1/2"-DHW
CAP 1"DCW
1-1/2"DHW FOR TEMPORY UTILITIES
1-1/2"DCW FOR
TEMPORARY UTILITIES
DOMESTIC WATER ISOMETRIC 1
3808 Park Avenue
Wilmington, NC 28403
Phone: 910.791.4000
Fax: 910.791.5266 www.cbhfengineers.com
NC# P-0506
c
Copyright 2015 CBHF Engineers, PLLC
Engineers, PLLC
DISCLOSURE OF INFORMATION:
CONTRACTOR SHALL COMPLY AS FOLLOWS:
A. THE CONTRACTOR SHALL NOT RELEASE TO ANYONE OUTSIDE THE CONTRACTOR'S ORGANIZATION ANY UNCLASSIFIED INFORMATION, REGARDLESS OF MEDIUM (E.G. FILM, TAPE, DOCUMENT), PERTAINING
TO ANY PART OF THIS CONTRACTOR ANY PROGRAM RELATED TO THIS CONTRACT, UNLESS-
1. THE CONTRACTING OFFICER HAS GIVEN PRIOR WRITTEN APPROVAL;
OR
2. THE INFORMATION IS OTHERWISE IN THE PUBLIC DOMAIN BEFORE THE DATE OF THE RELEASE.
B. REQUESTS FOR APPROVAL SHALL IDENTIFY THE SPECIFIC INFORMATION TO BE RELEASED, THE MEDIUM TO BE USED, AND THE PURPOSE FOR THE RELEASE. THE CONTRACTOR SHALL SUBMIT ITS
REQUEST TO THE CONTRACTING OFFICER AT LEAST 45 DAYS BEFORE THE PROPOSED DATE FOR
RELEASE.
C. THE CONTRACTOR AGREES TO INCLUDE A SIMILAR REQUIREMENT IN EACH SUBCONTRACT UNDER THIS CONTRACT . SUBCONTRACTORS SHALL SUBMIT REQUESTS FOR AUTHORIZATION TO RELEASE
THROUGH THE PRIME CONTRACTOR TO THE CONTRACTING OFFICER.
RECORD DRAWING 09/08/16
RECORD DRAWING
This document reflects changes to the design documents made during construction by the Contractor and submitted to the Engineer after
Phone: 910.791.4000
Fax: 910.791.5266 www.cbhfengineers.com
NC# P-0506
c
Copyright 2015 CBHF Engineers, PLLC
Engineers, PLLC
HEATING HOT WATER FLOW DIAGRAM
NO SCALE 1
AS710 BP1-01
AS710 B1-01
4"
2"
4"4"
4"
2"
2"
AS710 BP1-02
AS710 B1-02
AS710 HWP1-01
5" HWS
4"
4" 4"
4"
5" HWR
2"
AS710 (X)AS
4"
RPZ
AS710 (X)XP
G
G G
NOTE: GAS PIPING SIZED PER TABLE
402.4(3) OF THE 2012 NC FUEL GAS CODE
FOR SCHEDULE 40 PIPE BASED ON 250'
DEVELOPED LENGTH.
ES
G G G
GG
AS710
B1-01
600MBH
G
NOTE: APPLIANCE GAS SHUTOFF VALVE SHALL BE LOCATED IN THE
SAME ROOM AS THE APPLIANCE, WITHIN 6 FEET OF THE APPLIANCE
AND SHALL BE INSTALLED UPSTREAM OF THE UNION, CONNECTOR
OR QUICK DISCONNECT DEVICE IT SERVES.
G G
G
G G
(X)FIRE PLACE
G
(X)FIRE PIT
G
(X)KITCHEN
G G
DISHWASHER
195MBH
AS710
B1-02
600MBH
AS710
GWH1-01
400MBH
SIZED PER MANUFACTURER
REQUIREMENTS, (TYP)
APPLIANCE PRESSURE
REGULATOR, (TYP)
(X)GAS METER
2 PSIG AGA APPROVED REGULATOR
(3155 MBH TOTAL LOAD) BY UTILITY
(X)2"
(X)1 1/2"
(X)1 1/2"
1 1/4"
(X)1 1/2"
HEATING WATER SYSTEM
GENERAL: THE PRIMARY BOILER SHALL ACT AS THE SEQUENCING CONTROLLER FOR ALL
BOILERS AND RESPECTIVE CIRCULATING PUMPS. ALL BOILERS SHALL PROVIDE INTERFACE TO
THE DDC SYSTEM VIA A BACNET MS/TP INTERFACE.
THE ALTERNATE, REDONDANT, BUILDING LOOP PUMPS ARE ENABLED BY EXISTING CONTROLS.
WHEN IN AUTO, THE LEAD PUMP SHALL RUN CONTINUOUSLY. THE DDC SHALL ALTERNATE
PUMPS TWICE MONTHLY ON THE 1ST AND 15TH DAYS. THE VFD'S ARE FOR BALANCING ONLY.
WHEN THE BUILDING LOOP FLOW IS PROVEN, THE BOILER CONTROLLER WILL BE ENABLED FOR
OPERATION. THE BOILER CONTROLLER SHALL SEQUENCE BOILER STAGING TO MAINTAIN THE
BUILDING LOOP HOT WATER RESET SETPOINT. THE HOT WATER SETPOINT SHALL BE RESET
ACCORDING TO OUTSIDE AIR TEMPERATURE SUCH THAT WHEN THE OAT IS 30°F(ADJUSTABLE)
THE HWS SHALL BE 180°F(ADJUSTABLE) AND WHEN THE OAT IS 60°F THE HWS SHALL BE
120°F(ADJUSTABLE).
EMERGENCY GAS VALVE
A MANUAL PUSH BUTTON AT THE DOOR OF THE MECHANICAL ROOM SHALL CLOSE AN
AUTOMATED VALVE IN THE GAS LINE TO THE BOILERS. A KEY WILL BE REQUIRED TO RESET THE
BUTTON.
DOMESTIC WATER HEATER
THE WATER HEATER SHALL CONTROL TANK STORAGE TEMPERATURE AT 140 F. THE MIXING
VALVE SHALL CONTROL SUPPLY WATER TEMPERATURE AT 110 F. THE HOT WATER RECIRC
PUMP SHALL RUN CONTINUOUSLY. THE WATER HEATER CONTROLS SHALL PROVIDE INTERFACE
TO THE DDC SYSTEM VIA BACNET MSTP INTERFACE.
SEQUENCES OF OPERATION
1/2"
1 1/4"
1"3/4"
1"…