B R MARSHBURN
J A ELLIOTT
A L GARCIA
A L GARCIA
J A ELLIOTT
CONST. CONTR.
MECHANICAL PLANS
1 3
SYM DATE APPROVED
REVISIONS
P4 MECH ROOM ACCESS
STAIRS TO 2ND LEVEL INSIDE
MEZZANINE ACCESS
FROM ROOF
LADDER ACCESS
TO ROOF FROM MECH RM
LO
W R
OO
F A
RE
A GYMNASIUM
CU-7CU-8
HOT WATER SUPPLYHWS
HOT WATER RETURNHWR
THERMAL EXPANSION VALVE
SOLENOID VALVE / 2-POSITION CONTROL VALVE
REPLACEABLE CORE FILTER/DRIER
SIGHT GLASS
MODULATING CONTROL VALVE
CIRCUIT SETTER
GATE VALVE
STRAINER WITH BLOWDOWN VALVE
PRESSURE GAUGE
THERMOMETER
P/T PLUG
DRAIN
CONNECT NEW AT THIS POINT
DEMOLISH TO THIS POINT
103'
35'
IN LINE FILTER/DRIER
UNDERGROUND PIPING
LEAVE IN PLACE
(2) EXISTING 7/8" LIQUID LINE TO REMAIN
(2) EXISTING 2 1/8" SUCTION LINE:
REMOVE 2 1/8" SUCTION LINE - COMPRESSOR 2 ONLY
PROVIDE 2 5/8" SUCTION LINE - COMPRESSOR 2 ONLY
(2) EXISTING 7/8" LIQUID LINE TO REMAIN
(2) EXISTING 2 1/8" SUCTION LINE TO REMAIN
AH8 SUCTION LINE, REMOVE TO BOTTOM OF DROP
BALL VALVE
LEGEND
SCALE 1/8" = 1'0"
BUILDING LAYOUT PLAN
INVENSYS CONTROLS IN
FITNESS TRAINERS ROOM 1ST
FLOOR. PARTIALLY REMOVE
CONTROLS AND PROVIDE NEW.
SEE M2 & M3.
(IN
TE
RI
OR
R
OO
MS
N
OT
S
HO
W N
TH
IS
A
RE
A)
AH7 ON MEZZANINE
PROVIDE MODIFICATION TO AH7 & PIPING.
SEE SHEET M2
AH8 ON MEZZANINE
PROVIDE MODIFICATION TO AH8 & PIPING.
SEE SHEET M2
3-WAY VALVE
TITLENAVFAC #
PIPING AND CONTROLS
PIPING AND CONTROLS AH7/AH8
MECHANICAL PLANS
M3
M2
M1
12504938
12504937
12504936
DRAWING INDEX
B R MARSHBURN AUG 8, 2007
A L GARCIA
A L GARCIA
J A ELLIOTT
CONST. CONTR.
PIPING AND CONTROLS - AH7/AH8
2 3
SYM DATE APPROVED
REVISIONS
FAN
TEMP SENSOR
RETURN AIR
OUTSIDE AIR
HOT WATER
FILTERS
FACE & BYPASS
DAMPERS
CO2
SMOKE DETECTOR
DX COOLING
OUTSIDE AIR/
RETURN AIR
DAMPERS
AH7/AH8 AIR FLOW DIAGRAM - EXISTING
HWS
HWR
SEE SCHEMATIC AT RIGHT FOR EXISTING REFRIGERANT PIPING
AH7/AH8 NEW REFRIGERANT PIPE SCHEMATIC
AH7/AH8 EXISTING REFRIGERANT PIPE SCHEMATIC
H G
B P
/8
7/8"
/8
/8
/8
ST
AG
E 1
ST
AG
E 2
ST
AG
E 3
ST
AG
E 4
-1
/8
/8
NOT TO SCALE
NOT TO SCALE
ST
AG
E 4
ST
AG
E 1
ST
AG
E 2
ST
AG
E 3
H G
B P
/8
-1
/8
-1
/8
-1
/8
-1
/8
-1
/8
CUT HERE FOR AH7.
AH8 - REMOVE TO BASE OF VERTICAL RUN ON
EXTERIOR WALL (NEAR CONDENSING UNIT).
-1
/8
/8
7/8"
/8
/8
/8
7/8"
AH7 CONNECT NEW HERE.
AH8 - REPLACE FROM HERE TO BASE OF VERTICAL
RUN ON EXTERIOR WALL WITH 2 5/8"
2-5/8" - AH8 ONLY
A
CC
A
D
D
E
E
F
FG
G
MANUFACTURED 'U' BEND FOR OIL/LIQUID TRAP
B
B B
B
TAKE DRAIN TO OUTSIDE OF MEZZANINE PLATFORM
2"
2"
1. REMOVE EXISTING PIPING AND APPURTENANCES FROM POINTS SPECIFIED TO COILS.
2. REMOVE FACE & BYPASS DAMPER AND ACTUATOR.
3. REMOVE BYPASS DUCT.
4. PROVIDE BLANK TO PATCH OPENING LEFT BY BYPASS DUCT REMOVAL.
5. REMOVE DX COOLING COIL & HOT WATER COIL.
6. REINSTALL COILS SUCH THAT HW COIL IS IN REHEAT POSITION.
7. PROVIDE THE FOLLOWING APPURTENANCES FOR REFRIGERATION LINES:
A. (4) REPLACEABLE CORE FILTER/DRIER (2 @ 1-1/8", 2 @ 7/8")
B. (8) BALL VALVES (2 @ 1-1/8", 6 @ 7/8")
C. (4) SIGHT GLASS (2 @ 1-1/8", 2 @ 7/8")
D. (4) SOLENOIDS, 10 TON CAPACITY (7/8")
E. (4) SOLENOIDS, 15 TON CAPACITY (7/8")
F. (4) EXTERNALLY EQUALIZED TXV, 10 TON CAPACITY (7/8")
G. (4) EXTERNALLY EQUALIZED TXV, 15 TON CAPACITY (7/8")
8. PROVIDE THE FOLLOWING APPURTENANCES FOR HW LINES (2"):
H. (4) GATE VALVES
I. (4) P/T PLUGS
J. (2) TEMPERATURE GAUGES
K. (2) PRESSURE GAUGES
L. (2) CIRCUIT SETTERS
M. (2) STRAINERS WITH BLOWDOWN VALVE
N. (2) MODULATING CONTROL VALVES
9. REPIPE AIR HANDLER UNITS AS SHOWN.
10. REPIPE CONDENSATE DRAIN TO INCLUDE PROPER TRAP (SEE DETAIL BELOW). PIPE TO
OUTSIDE OF MEZZANINE ACCESS TO AVOID CUTTING PLATFORM.
CONSTRUCTION NOTES (TYPICAL FOR AH7 & AH8)
2"
2"
SEE SCHEMATIC AT RIGHT FOR NEW REFRIGERANT PIPING
HWS
HWR
SMOKE DETECTOR
CO2
FANFILTERS
HOT WATERDX COOLING
OUTSIDE AIR
RETURN AIR
AH7/AH8 AIR FLOW DIAGRAM - RECONFIGURED
OUTSIDE AIR/
RETURN AIR
DAMPERS
A L GARCIA
A L GARCIA
J A ELLIOTT
CONST. CONTR.
PIPING AND CONTROLS
3 3
SYM DATE APPROVED
REVISIONS
FACE & BYPASS
DAMPERDAMPERS
FANOUTSIDE AIR STEAM COIL
FILTER DX COOLING
PROCESS AND INSTRUMENTATION AH6
RETURN AIR TEMP SENSOR
PROCESS AND INSTRUMENTATION AH1-5
DX COOLING
SMOKE DETECTOR
FILTER HOT WATER
OUTSIDE AIR
RETURN AIR
FAN
CONTROL NOTES (AHU 1 THRU 5):
SCOPE OF WORK:
- REMOVE EXISTING AIR HANDLER CONTROLLER
- PROVIDE BACnet MS/TP NETWORKED THERMOSTAT (ONE PER AH/CU)
- REMOVE RETURN AIR DUCT MOUNTED TEMPERATURE SENSOR
- VERIFY ACCURACY AND WHERE APPLICABLE RE-USE: SUPPLY AIR DUCT MOUNTED
TEMPERATURE SENSOR, OUTDOOR AIR DAMPER AND ACTUATOR, HOT WATER CONTROL
VALVE, FREEZE STAT, SMOKE DETECTOR.
- CONTROL WIRING MAY BE RE-USED AS APPROPRIATE
- PROVIDE ALL ADDITIONAL APPURTENANCES FOR COMPLETE AND USEABLE SYSTEM.
1. EACH AIR HANDLER SHALL HAVE OCCUPIED AND UNOCCUPIED MODES, INDEXED
FROM THE SUPERVISORY BUILDING CONTROLLER (SBC). IN THE EVENT OF THE LOSS
OF COMMUNICATION WITH THE SBC THE THERMOSTAT WILL RETURN TO OCCUPIED
OPERATION. THE THERMOSTAT SHALL INCLUDE OVER-RIDE BUTTON TO RETURN THE
SYSTEM FROM THE UNOCCUPIED MODE TO THE OCCUPIED MODE FOR A PERIOD OF 2
HOURS. ADDITIONAL PRESSING OF THE BUTTON SHALL RESET THE TIME TO 2 HOURS,
BUT SHALL NOT ADD THE TIME CUMULATIVELY.
IN THE OCCUPIED MODE: THE FAN SHALL RUN CONTINUOUSLY, TEMPERATURE, AND
HUMIDITY WILL BE SENSED AND CONTROLLED AND THE OUTDOOR AIR DAMPER WILL
BE OPENED.
IN THE UNOCCUPIED MODE: THE FAN SHALL CYCLE ON DEMAND, TEMPERATURE SHALL
BE CONTROLLED TO A NIGHT SETBACK TEMPERATURE, HUMIDITY SHALL BE
CONTROLLED ON A HIGH LIMIT, AND OUTSIDE AIR DAMPERS WILL REMAIN CLOSED.
2. THE THERMOSTAT SHALL AUTOMATICALLY INDEX TO CONTROL MECHANICAL
COOLING, DEHUMIDIFICATION, AND HOT WATER HEATING. HOT WATER HEATING
SHALL BE TWO POSITION. ON A RISE IN ROOM TEMPERATURE ABOVE HEATING
SETPOINT, THE HEATING STAGE OF THE ROOM THERMOSTAT SHALL BY-PASS HOT
WATER FROM FULL FLOW THROUGH THE HEATING COIL TO FULL BY-PASS AROUND THE
HEATING COIL (UTILIZING CV-6 THRU CV-10). IN THE DEHUMIDIFICATION CYCLE THE
MECHANICAL COOLING SHALL BE ENERGIZED, AND THE HOT WATER VALVE CYCLED TO
MEET COOLING SETPOINT.
3. THE THERMOSTAT SHALL COMMUNICATE WITH THE SUPERVISORY BUILDING
CONTROLLER (SBC). THE FOLLOWING POINTS SHALL BE WRITTEN FROM THE
THERMOSTAT TO THE SBC: FAN, COOLING, HEATING, AND DEHUMIDIFICATION STATUS
& SETPOINTS, ROOM & SUPPLY AIR TEMPERATURES, ROOM HUMIDITY. THE
FOLLOWING SHALL BE WRITTEN FROM THE SBC TO THE THERMOSTAT: HEATING,
COOLING, AND DEHUMIDIFICATION SET POINTS, OCCUPIED/UNOCCUPIED OPERATION,
FAN ON/AUTO OPERATION.
4. A NON-AVERAGING AUTOMATIC RESET FREEZE STAT MOUNTED ON THE LEAVING
SIDE OF THE HOT WATER COIL SHALL CLOSE THE OUTSIDE AIR DAMPER AND OPEN
THE HOT WATER CONTROL VALVE TO 100%.
5. A SMOKE DETECTOR IN THE RETURN AIR SHALL SHUT DOWN THE AIR HANDLER AND
SIGNAL THE FIRE ALARM SYSTEM.
6. CONTROLS SHALL BE WIRED SUCH THAT WHEN POWER IS INTERRUPTED TO ANY
AHU, ITS RESPECTIVE CONDENSING UNIT SHOULD STOP.
7. THE THERMOSTAT SETPOINTS SHALL BE LOCKED FROM OCCUPANT ADJUSTMENT.
THE THERMOSTAT SHALL HAVE A LOCAL READOUT OF RELATIVE HUMIDITY AND ROOM
TEMPERATURE IN °F.
8. INITIAL THERMOSTAT SETPOINTS: 70°F HEATING, 76°F COOLING, AND 70%
RELATIVE HUMIDITY.
CONTROL NOTES (AHU 6):
SCOPE OF WORK:
- REMOVE EXISTING AIR HANDLER CONTROLLER
- PROVIDE BACnet MS/TP NETWORKED AIR HANDLER CONTROLLER
- VERIFY ACCURACY AND WHERE APPLICABLE RE-USE: SUPPLY AIR DUCT MOUNTED
TEMERATURE SENSOR, OUTDOOR AIR DAMPER AND ACTUATOR, FACE AND BYPASS DAMPER
AND ACTUATOR, FREEZE STAT, SMOKE DETECTOR AND HOT WATER CONTROL VALVE
- CONTROL WIRING MAY BE REUSED AS APPROPRIATE
- PROVIDE ALL ADDITIONAL APPURTENANCES FOR COMPLETE AND USEABLE SYSTEM
1. AIR HANDLER SHALL HAVE OCCUPIED AND UNOCCUPIED MODES, INDEXED FROM THE
SUPERVISORY BUILDING CONTROLLER (SBC). IN THE EVENT OF THE LOSS OF
COMMUNICATION WITH THE SBC, THE CONTROLLER WILL RETURN TO OCCUPIED
OPERATION. THE CONTROLLER SHALL INCLUDE OVER-RIDE BUTTON TO RETURN THE
SYSTEM FROM THE UNOCCUPIED MODE TO THE OCCUPIED MODE FOR A PERIOD OF 2
HOURS. ADDITIONAL PRESSING OF THE BUTTON SHALL RESET THE TIME TO 2 HOURS,
BUT SHALL NOT ADD THE TIME CUMULATIVELY.
IN THE OCCUPIED MODE: EXHAUST FAN (EF-1) WILL BE ENERGIZED, OUTSIDE AIR AND
EXHAUST DAMPERS WILL OPEN. TEMPERATURE WILL BE SENSED AND CONTROLLED.
IN THE UNOCCUPIED MODE: SYSTEM WILL NOT RUN.
2. THE THERMOSTAT SHALL AUTOMATICALLY INDEX TO CONTROL MECHANICAL COOLING
AND STEAM HEATING. SINGLE STAGE ON COOLING WILL BE CYCLED TO MAINTAIN
COOLING SETPOINT. ON A DROP IN ROOM TEMPERATURE, THE 2-POSITION STEAM
CONTROL VALVE (CV-5) WILL OPEN AND THE FACE AND BYPASS DAMPERS WILL BE
MODULATED TO MAINTAIN HEATING SETPOINT.
3. THE CONTROLLER SHALL COMMUNICATE WITH THE SUPERVISORY BUILDING
CONTROLLER (SBC). THE FOLLOWING POINTS SHALL BE WRITTEN FROM THE CONTROLLER
TO THE SBC: AIR HANDLER FAN STATUS, ROOM & SUPPLY AIR TEMPERATURES, EXHAUST
FAN STATUS, AND COOLING/HEATING SETPOINTS. THE FOLLOWING SHALL BE WRITTEN
FROM THE SBC TO THE CONTROLLER: HEATING AND COOLING SETPOINTS,
OCCUPIED/UNOCCUPIED OPERATION, AIR HANDLER FAN ON/AUTO OPERATION, AND
EXHAUST FAN OPERATION.
4. A NON-AVERAGING AUTOMATIC RESET FREEZE STAT MOUNTED ON THE LEAVING SIDE
OF THE HEATING COIL (BEFORE COOLING COIL), SHALL CLOSE THE OUTIDE AIR DAMPER
AND OPEN THE STEAM CONTROL VALVE TO 100%.
5. A SMOKE DETECTOR IN THE RETURN AIR SHALL SHUT DOWN THE AIR HANDLER, CLOSE
OUTSIDE AIR DAMPER, AND SIGNAL THE FIRE ALARM SYSTEM.
6. CONTROLS SHALL BE WIRED SUCH THAT WHEN POWER IS INTERRUPTED TO ANY AHU,
ITS RESPECTIVE CONDENSING UNIT SHOULD STOP.
7. THE THERMOSTAT SETPOINTS SHALL BE LOCKED FROM OCCUPANT ADJUSTMENT. THE
THERMOSTAT SHALL HAVE A LOCAL READOUT OF ROOM TEMPERATURE IN FAHRENHEIT.
8. INITIAL THERMOSTAT SETPOINTS: 70°F HEATING, 76°F COOLING.
CONTROL NOTES
SUPERVISORY BUILDING CONTROLLER (SBC)
SCOPE OF WORK:
- REMOVE EXISTING CONTROLS
- PROVIDE BACnet MS/TP NETWORKED SUPERVISORY BUILDING CONTROLLER
- INTERFACE ALL NEW CONTROLS WITH NEW SBC
- EXISTING WIRING MAY BE REUSED AS APPROPRIATE
CONTROLS INTERFACE SHALL INCLUDE:
1. CLOCK CONTROL: THE 7-DAY TIME CLOCK SHALL INDEX AIR HANDLING UNITS AND CONDENSING
UNITS FOR OCCUPIED OR UNOCCUPIED OPERATION IN THE AUTOMATIC POSITION. THE
UNOCCUPIED OPERATION SHALL MAINTAIN ALL SYSTEMS IN A 'NIGHT SETBACK' MODE. PROVIDE
TIMED OVERRIDE TO PLACE SYSTEMS IN THE OCCUPIED MODE FOR A 2-HOUR PERIOD.
2. BUILDING HEATING PUMP (WP-1): WHEN THE OUTDOOR TEMPERATURE IS BELOW 65°F OR THERE
IS A CALL FOR DEHUMIDIFICATION, AND THE HOT WATER PUMP SWITCH IS IN THE 'AUTO'
POSITION, THE BUILDING HEATING PUMP (WP-1) SHALL BE ENERGIZED. UPON SENSING WATER FLOW IN THE HEATING SYSTEM, THE STEAM CONTROL VALVE (CV-2) SHALL MODULATE TO MAINTAIN LEAVING WATER TEMPERATURE SETPOINT FROM THE HEATING SYSTEM HEAT EXCHANGER (HX-1).
3. HOT WATER SETPOINT SHALL BE RESET AS FOLLOWS:
OA LWT
85°F 130°F 35°F 180°F
4. ALL FIELD CONTROL DEVICES SHALL INTERFACE WITH THE SBC. THE SBC SHALL PROVIDE
ON-SITE ACCESS TO THE FOLLOWING POINTS:
- CONDENSING UNIT ON/OFF STATUS (CU-1, CU-2, CU-3, CU-4, CU-5, CU-6, CU-7, CU-8, RT-1)
- AIR HANDLER ON/OFF STATUS (AH-1, AH-2, AH-3, AH-4, AH-5, AH-6, AH-7, AH-8, RT-1)
- SUPPLY & RETURN AIR TEMP (AH-1, AH-2, AH-3, AH-4, AH-5, AH-6, AH-7, AH-8, RT-1)
- PUMP ON/OFF STATUS (WP-1, WP-2, WP-3)
- SUPPLY & RETURN WATER TEMP (WP-1, WP-2, WP-3)
5. THE FOLLOWING DATA SHALL BE PROVIDED FROM THE SBC TO THE FIELD DEVICES:
- OCCUPIED/UNOCCUPIED
EXISTING CONTROLS - NO WORK REQUIRED
1. DOMESTIC HOT WATER PUMP (WP-2): UPON A FALL IN THE TANK WATER TEMPERATURE BELOW
110°F, THE THERMOSTAT SHALL ENERGIZE THE DOMESTIC HOT WATER PUMP. THE THERMOSTAT
SHALL DE-ENERGIZE THE PUMP AT A WATER TEMP ABOVE 120°F.
2. DOMESTIC HOT WATER RECIRCULATING PUMP (WP-3): UPON A FALL IN TEMPERATURE BELOW
105°F, THE AQUASTAT SHALL ENERGIZE THE DOMESTIC HOT WATER CIRCULATING PUMP.
3. EXHAUST FAN CONTROL:
- EXHAUST FANS (EF-3, EF-4, EF-6) FOR EQUIPMENT ROOMS SHALL BE CONTROLLED FROM A
ROOM THERMOSTAT THAT MAKES 'ON' AT TEMPERATURE RISE ABOVE 85°F. FANS SHALL BE
INTERLOCKED WITH O.A. DAMPERS.
- EXHAUST FANS (EF-2, EF-5) SERVING STORAGE ROOMS SHALL BE CONTROLLED BY THE
SPACE LIGHT SWITCH.
CV6 THRU CV10
CV5
CONTROL NOTES (AHU7 AND AHU8):
SCOPE OF WORK:
- PROVIDE BACnet MS/TP NETWORKED AIR HANDLER CONTROLLERS (ONE PER AIR
HANDLER)
- REMOVE HEATING/COOLING COIL BYPASS DAMPER AND ACTUATOR
- REMOVE EXISTING AND PROVIDE NEW CO2 SENSORS, RELIEF DAMPER ACTUATORS,
AND ALL REFRIGERATION CONTROLS
- VERIFY ACCURACY AND WHERE APPLICABLE RE-USE: RETURN AIR MOUNTED
THERMOSTAT, RETURN AIR MOUNTED HUMIDITY SENSOR, OUTDOOR AIR AND RETURN
AIR DAMPERS AND ACTUATORS, RELIEF DAMPERS
- REMOVE JUMPERS ON TERMINAL STRIPS IN AIR COOLED CONSDENSING UNITS TO
EFFECT 5 STAGE OPERATION
- PULL NEW CONTROL WIRING TO CONDENSING UNITS - OTHER WIRING MAY BE
REUSED AS APPROPRIATE
- PROVIDE ALL NECESSARY APPURTENANCES FOR COMPLETE AND USEABLE SYSTEM
1. EACH AIR HANDLER SHALL HAVE OCCUPIED AND UNOCCUPIED MODES. THE
OCCUPIED SCHEDULE SHALL BE SETTABLE BY INDIVIDUAL DAYS. A WALL MOUNTED
AND LABELED OVER-RIDE BUTTON SHALL RETURN THE SYSTEM FROM THE
UNOCCUPIED MODE TO THE OCCUPIED MODE FOR A PERIOD OF 2 HOURS.
ADDITIONAL PRESSING OF THE BUTTON SHALL RESET THE TIME TO 2 HOURS, BUT
SHALL NOT ADD THE TIME CUMULATIVELY.
IN THE OCCUPIED MODE: THE AIR HANDLER FAN SHALL RUN CONTINUOUSLY,
TEMPERATURE, HUMIDITY, AND INDOOR AIR QUALITY WILL BE SENSED AND
CONTROLLED, ECONOMIZER CYCLE SHALL BE ENABLED BELOW 55°F AMBIENT.
IN THE UNOCCUPIED MODE: THE FAN SHALL CYCLE ON DEMAND, TEMPERATURE SHALL
BE CONTROLLED ONLY IN HEATING WITH A SETPOINT OF 55°F (ADJUSTABLE),
HUMIDITY SHALL BE CONTROLLED ON A HIGH LIMIT, AND INDOOR AIR QUALITY WILL
NOT BE CONTROLLED IE: FRESH AIR DAMPERS WILL REMAIN CLOSED.
2. MECHANICAL COOLING AND DEHUMIDIFICATION SHALL BE ENABLED ABOVE 55°F
AMBIENT. COOLING SHALL HAVE A PROPORTIONAL-INTEGRAL-DERIVATIVE (PID)
CONTROL LOOP TO STEP THE MECHANICAL COOLING THROUGH 5 STAGES.
STAGE 1 WILL ENERGIZE THE FIRST STAGE OF COMPRESSOR 1 AND STAGE 1
EVAPORATOR SOLENOID VALVE.
STAGE 2 WILL ENERGIZE THE FIRST STAGE OF COMPRESSOR 2 AND STAGE 2
EVAPORATOR SOLENOID VALVE.
STAGE 3 WILL ENERGIZE THE SECOND STAGE OF COMPRESSOR 2 AND STAGE 3
EVAPORATOR SOLENOID VALVE.
STAGE 4 WILL ENERGIZE THE SECOND STAGE OF COMPRESSOR 1 AND STAGE 4
EVAPORATOR SOLENOID VALVE.
STAGE 5 WILL ENERGIZE THE THIRD STAGE OF COMPRESSOR 2.
DEHUMIDIFICATION MODE (DEHUM) WILL BE INITIATED WHENEVER THE HUMIDITY
SENSOR EXCEEDS SET POINT OF 60%RH (ADJUSTABLE). DEHUM WILL INITIATE ALL 5
STAGES OF COOLING AND MODULATE THE HOT WATER CONTROL VALVE WITH A PID
CONTROL LOOP TO MAINTAIN COOLING TEMPERATURE SET POINT.
3. ECONOMIZER COOLING SHALL BE ENABLED BELOW 55°F AMBIENT. COOLING SHALL
HAVE A PROPORTIONAL-INTEGRAL-DERIVATIVE (PID) CONTROL LOOP TO MODULATE
THE OUTSIDE AND RETURN AIR DAMPERS. THE RELIEF DAMPER WILL BE MODULATED
0-100% IN CONJUNCTION WITH THE OUTSIDE AIR DAMPER SIGNAL OF 20-100%.
DEHUMIDIFICATION MODE (DEHUM) WILL NOT BE INITIATED BELOW 55°F AMBIENT.
4. HEATING SHALL BE CONTROLLED WITH A PROPORTIONAL-INTEGRAL-DERIVATIVE
(PID) CONTROL LOOP BY MODULATING THE HOT WATER CONTROL VALVE. HEATING
SET POINT SHALL BE SET INDEPENDENTLY FROM THE COOLING SET POINT, BUT SHALL
NOT BE EQUAL OR HIGHER THAN THE COOLING SET POINT. THE OUTSIDE AIR DAMPER
SHALL BE OPENED TO THE MINIMUM POSITION DURING OCCUPIED PERIODS, AND
SHUT DURING UNOCCUPIED PERIODS.
5. INDOOR AIR QUALITY WILL BE MONITORED BY A RETURN AIR CO2 SENSOR. THE
OUTSIDE/RETURN AIR DAMPERS WILL BE MODULATED BY A PID LOOP TO MAINTAIN
SET POINT OF 700 PPM (ADJUSTABLE). THE RELIEF DAMPER WILL BE MODULATED
0-100% IN CONJUNCTION WITH THE OUTSIDE AIR DAMPER SIGNAL OF 20-100%.
6. A NON-AVERAGING AUTOMATIC RESET FREEZE STAT MOUNTED ON THE LEAVING
SIDE OF THE HOT WATER COIL SHALL CLOSE THE OUTSIDE AIR DAMPER AND OPEN
THE HOT WATER CONTROL VALVE TO 100%.
7. CONTROLS SHALL BE WIRED SUCH THAT WHEN POWER IS INTERRUPTED TO ANY
AHU, ITS RESPECTIVE CONDENSING UNIT SHOULD STOP.
8. A SMOKE DETECTOR IN THE RETURN AIR SHALL SHUT DOWN THE AIR HANDLER AND
SIGNAL THE FIRE ALARM SYSTEM.
9. INITIAL THERMOSTAT SETPOINTS: 68°F HEATING, 76°F COOLING, 60% RELATIVE
HUMIDITY.
CONNECTION TO BASE WIDE EMCS
THE CONTROL SYSTEM SPECIFIED MUST INTERFACE TO AND SHALL BE COMPLETELY
INCORPORATED INTO THE CAMP LEJEUNE BASE WIDE ENERGY MANAGEMENT AND CONTROL
SYSTEM (EMCS) LOCATED IN BLDG 24 BY THE CONTRACTOR. THE CONTRACTOR IS
RESPONSIBLE FOR ALL WORK INSIDE THE PROJECT BUILDING. CAMP LEJEUNE WILL MAKE
ALL MODIFICATIONS TO THE EMCS SERVERS. ALL POINTS LISTED ON THE MECHANICAL
DRAWINGS, SUCH AS: AI, BI, AO, BO, SETPOINT ADJUSTMENTS, ALARMS, EQUIPMENT
START/STOP SCHEDULAES AND LOAD MANAGEMENT SHEDDING OBJECTS FOR MECHANICAL
EQUIPMENT SHALL COMMUNICATE VIA BACNet PROTOCOL AND BE DISPLAYED AND
MANAGED BY THE CAMP LEJEUNE EMCS SERVER. THE CAMP LEJEUNE EMCS SYSTEM
UTILIZES THE JOHNSON CONTROLS, INC. METASYS EXTENDED ARCHITECTURE ADX
PLATFORM. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING CONSISTENCY ON
OBJECT IDENTIFIER NAMES, DESCRIPTIONS, AND GRAPHICAL PRESENTATION OF THE DATA.
THE CONTRACTOR SHALL WORK WITH THE BASE ENERGY MANAGER TO DEFINE THE LOAD
GROUPS TO BE INCORPORATED INTO THE EMCS LOAD MANAGEMENT PROGRAM. AT A
MINIMUM, ALL MAJOR MECHANICAL SYSTEMS SHALL BE INCORPORATED INTO THE LOAD
REDUCTION PROGRAM SUCH AS CHILLERS, ELECTRIC BOILERS, AND AIR HANDLING UNIT'S.
THE LOAD REDUCTION PROGRAM INCORPORATES THE BASE WIDE DEMAND LIMITING/LOAD
ROLLING (DLLR) PROGRAM. THE DLLR PROGRAM LIMITS PEAK ENERGY USAGE BY
MONITORING REAL TIME ENERGY CONSUMPTION FROM SIX (6) ELECTRICAL SUBSTATIONS
SERVING THE BASE AND SHEDDING THE APPROPRIATE ELECTRICAL LOADS TO MEET TARGET
SET POINTS. BUILDING DDC SUPERVISORY CONTROLLERS MUST HAVE THE ABILITY TO
SEND/RECEIVE/PROGRAM/LOAD THE OBJECT INFORMATION TO THE EMCS UTILIZING
BACnet/IP PROTOCOL.
THE EMCS SYSTEM RESIDES ON A LAN MANAGED BY MARINE CORPS BASE CAMP LEJEUNE.
THIS REQUIRES ALL I/P DEVICES CONNECTED AND UTILIZING THIS NETWORK TO BE
CERTIFIED BY THE DEFENSE INFORMATION SYSTEMS AGENCY (DISA), IN COORDINATION
WITH THE NATIONAL SECURITY AGENCY (NSA) AND THE SERVICES AND AGENCIES
THROUGHOUT THE DEPARTMENT OF DEFENSE (DoD). THE STANDARD PROCESS KNOWN AS DoD INFORMATION TECHNOLOGY SECURITY CERTIFICATION AND ACCREDITATION PROCESS
(DITSCAP), INTEGRATES SECURITY DIRECTLY INTO THE SYSTEM LIFECYCLE AND IS APPLIED
UNIFORMLY ACROSS DoD. AS PART OF THE DITSCAP PROCESS, VENDORS I/P DEVICES
MUST BE LISTED ON THE EMCS SYSTEM SECURITY AUTHORIZATION AGREEMENT (SSAA).
THIS IS A LIVING DOCUMENT THAT PROVIDES INFORMATION RELATED TO THE
CERTIFICATION AND ACCREDITATION (C&A) OF A SYSTEM IN ACCORDANCE WITH THE
DITSCAP. THIS SSAA IS TAILORED TO MEET THE REQUIREMENTS OF THE SYSTEM UNDER
REVIEW. IT ALSO PROVIDES THE CERTIFICATION AUTHORITY (CA) AND THE DESIGNATED
APPROVING AUTHORITY (DAA) AT EACH ECHELON WITH A SOURCE DOCUMENT FOR
INFORMATION ON THE SYSTEM. IT IS A USER DOCUMENT TO ASSIST IN ESTABLISHING
SOUND SECURITY POLICIES AND PRACTICES. PERSONNEL RESPONSIBLE FOR THE SECURITY
OF THE SYSTEM WILL BE FAMILIAR WITH THE CONTENTS OF THIS DOCUMENT.
THE SSAA MUST BE COMPLETED PRIOR TO FINAL ACCEPTANCE OF THE HVAC CONTROLS
CONSTRUCTION UNDER THIS SECTION. IT IS THE CONTRACTORS RESPONSIBILITY TO
ENSURE ACCEPTABLE EQUIPMENT IS PROPOSED AND INSTALLED. FINAL APPROVAL OF THE
PROPOSED EQUIPMENT WILL NOT BE GIVEN UNTIL THE SSAA IS COMPLETE AND APPROVAL
TO OPERATE (ATO) IS GRANTED FROM MARINE CORPS BASE CAMP LEJEUNE DAA. TO AVOID
CONSTRUCTION DELAYS, EARLY SUBMISSION IS ADVISED AS THE APPROVAL PROCESS CAN
BE LENGTHY.
| N40085-06-R-0096 DRAWINGS |
| MECHANICAL PLANS |
| 12504936, M-1, MECHANICAL PLANS |
| 12504937, M-2, PIPING AND CONTROLS AH7/AH8 |
| 12504938, M-3, PIPING AND CONTROLS |