N4008520R0104 Amendment 0009.pdf
PDF 22 KB Posted
- Attached to
- P997 Design-Build, Combat Service Support Facilities, JEB Little Creek-Fort Story, Virginia Beach, Virginia
- Solicitation number
- N4008520R0104
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. PROJECT NO. (If applicable) 0009 02/03/2021
6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code
NAVFAC MID ATLANTIC
ACQUISITION CORE
9324 VIRGINIA AVENUE
NORFOLK, VA 23511
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.
N40085-20-R-0104
9B. DATED (SEE ITEM 11)
10/13/2020
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning _1 _ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER: (specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
N4008520R0104 P997-DESIGN-BUILD, COMBAT SERVICE SUPPORT FACILITIES, JOINT EXPEDITIONARY BASE
(JEB) LITTLE CREEK- FORT STORY, VIRGINIA BEACH, VIRGINIA
SEE SF 30 BLOCK 14 CONTINUATION PAGE
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR (Same as Item 8)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)
PREVIOUS EDITION UNUSABLE Prescribed by GSA
SECTION SF30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
AMENDMENT 0009
The purpose of this amendment is to provide the following:
1. Revise Factor 2, Energy Design Reduction
2. Acknowledgement of Amendment
All other terms and conditions remain unchanged.
I. Revise Factor 2, Energy Design Reduction
The Government did not provide the information in Part 6 of the RFP for Building Simulation under Factor 2 – Energy Design Reduction. Therefore, the Building Simulation is hereby removed from Factor 2 – Energy Design Reduction and removed from consideration in proposal evaluation. See the revised Factor 2 – Energy Design Reduction below.
Factor 2, Energy Design Reduction is hereby removed and replaced with:
Factor 2 – Energy Design Reduction:
(a) Solicitation Submittal Requirements:
(1) Energy Efficiency Narrative:
Provide a detailed narrative describing how the proposed solution for each facility will meet at least a 30% energy reduction below the ASHRAE 90.1-2013 baseline. Also describe how the solution for each facility will provide baseline ASHRAE 90.1, based on life cycle cost effectiveness. Refer to RFP Part 2 General Requirements, section 01 33 29.05 20 Sustainability Reporting for Design-Build and section 01 91 00.15 Total Building Commissioning for a complete list of requirements for each facility. The facilities must demonstrate energy consumption of at least 30% below performance of a similar ASHRAE 90.1-2013 baseline building. This performance must be calculated on a consumption basis (Btus) rather than a cost basis (dollars), with unregulated and receptacle loads excluded from both the baseline and proposed building totals. Refer to the Part 6 Attachment, “NAVFAC Capital Improvements Gov Energy Baseline & Offerors Model Performance Rating Assumptions (PRA) for additional guidance.
Organize narrative in four parts: 1) Orientation, Configuration, and Shape; 2) Envelope properties (fenestration, solar heat gain coefficients (SHGC), wall and roof insulation values (U-values), window U-values); 3) Mechanical (HVAC, plumbing, and domestic hot water heating systems, including any solar hot water systems); and 4) Electrical Systems (lighting and control systems, including any interior and exterior lighting systems, renewable energy and control systems).
Where 30% reduction is not lifecycle cost effective, provide highest percent energy reduction that is lifecycle cost effective.
Note: Building performance rating and percent energy reduction are calculated in terms of energy rather than energy cost.
Do not exceed two (2) double-sided pages (or four (4) single-sided pages).
(b) Basis of Government Evaluation:
1) Energy Efficiency Narrative and Solution: The Government will evaluate the Offeror’s proposed energy efficiency narrative and solution.
II. Acknowledgement of Amendment
Proposal revisions are not required nor will be accepted as a result of the Amendment.
Acknowledgement of this amendment is required and shall be provided to the Contract Specialist, Stephen Astwood via email at stephen.d.astwood@navy.mil no later than 2:00PM, Monday, February 8, 2021.
(End of Summary of Changes)