This federal solicitation seeks design-build services to replace an aging 77-year-old 50,000 gallon per minute river water cooling system with a new 8,200 gallon per minute cooling tower capable of rejecting up to 75 million British Thermal Units per hour of heat. The new cooling water system will support research, development, testing and evaluation missions performed at Building 633 of the Philadelphia Naval Business Center. Bids are due by January 28, 2021 with award expected shortly thereafter. The selected contractor will be responsible for repairing or replacing piping, pumps, controls and other components to provide a reliable cooling water supply on demand to support critical testing activities while minimizing environmental impacts. The Department of the Navy Naval Facilities Engineering Command is the contracting agency overseeing this project.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
SOLICITATION NO. N40085-20-R-0079 DESIGN-BID-BUILD (DBB), REPLACE COOLING WATER SYSTEM, BUILDING 633, PHILADELPHIA
NAVAL BUSINESS CENTER (PNBC), PHILADELPHIA, PA
The purpose of this amendment is to provide responses to Pre-Proposal Inquiries (PPI's).
The proposal due date of 28 January 2021 NLT 2:00 PM EST remains unchanged.
See Continuation Page(s).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 19
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 13-Jan-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008520R0079
X 9B. DATED (SEE ITEM 11)
30-Nov-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
13-Jan-2021
CODE
NAVFACSYSCOM MID-ATLANTIC
ACQUISITION CORE
9324 VIRGINIA AVENUE
NORFOLK VA 23511-3095
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008520R0079
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0004
Contractor
PPI#
Section of RFP or Page Number
Paragraph Reference
Drawing Number
Question RESPONSE
1 C1/S-504 Have the existing roof steel in building 519/520, and any other existing steel locations, been analyzed as adequate to support new loads?
Existing structural elements, except the following, have been verified to be adequate to support new loads.
Existing steel framing used to support piping in the mezzanine level of Area 519/520 has not been analyzed by WRA. The design of pipe supports in this area, including analysis of existing steel elements used to support the new pipes, must be shown to be adequate by the Contractor's engineer. Existing steel dimensions must be field measured by the Contractor.
For analysis purposes assume a steel yield stress of 30 ksi.
2 MD105 Since Bldg 531 is not normally occupied can any outages be performed during normal work hours/days?
Per specification and drawings, all outages must be arranged and scheduled in advance via the contracting officer. Outages shall be performed outside normal working hours.
Please provide 21 days advance notice.
3 Are there any work restrictions based on CTF testing?
Please see SPC Section 01 14 00 for work restrictions.
4 Will any of the bridge cranes in Building 633 be available for contractor use?
Specifically the north bay bridge crane for removal of the existing steel duct 24-28' AFF at
CL F11-19.
Please see G-005 General Sheet Notes #5 for bridge crane usage.
5 Structural Steel note
S-001 This note states "Coat structural steel with high performance coating as specified."
However, there is no specification as to which steel members receive certain high performance coatings. Please provide direction as to which steel members receive the specified coatings.
All structural steel shown must receive a high-performance coating as specified in specification section 09 96 00. This inlcudes all steel shown on structural drawings and mechanical drawings (pipe supports, cooling tower supports, etc.)
6 Should the exterior structural steel be galvanized instead of painted?
Provide a high-performance coating for all structural steel, including exterior steel.
7 M-001, note
In coordinating potentially disruptive work with building occupants will the Government require that this work be completed outside the normal hours of 0700 – 1530, Monday – Friday?
Disruptive work is not exclusively required to be completed outside of normal hours (defined as M to F, 0700 to 1530), however, this depends on the nature of the disruptions. Any work that is considered disruptive shall be scheduled and coordinated via the contracting officer.
8 23 05 93 Para 1.3 Is there any testing, adjusting, balancing (TAB) required for the relocated Air Cooled Condensing Unit (ACCU) at building 531?
No TAB is required for the associated indoor AHUs asssociated with the relocated ACCUs.
9 01 78 00 1.6.1.c Is it accurate to assume that the standard 1-year builders’ warranty would not apply to the relocated ACCU since their age/condition is not known and that maintenance of any existing warranty is the responsibility of the Government?
The stated assumption is correct.
10 C4/M-501 Note 3; S-001 Delegated Design Note 3
As this is a DBB, for bidding purpose contractors must assume that the specified cooling tower will work (weight and dimensions) with the structural steel frame support as designed by WR&A, likewise for structural pipe supports. Please confirm.
Undersood. However, the Delegated Design Note 3 on S-001 applies to the pipe supports in the mezzanine level of Area 519/520, not the cooling tower. The basis-of-design cooling tower dimensions and weights used to design the steel supports are indicated on S-001 Design Loads.
Contact the Contracting Officer if the dimensions and/or weight exceed that indicated. Contractor must coordinate steel shop drawings with approved cooling tower shop drawings.
11 MD-102 Are steel pipe supports that are not called out to remain required to be removed? i.e 20"
RWR
Correct, pipe supports that are not called out to remain must be removed when associated piping is being removed.
12 Page 1, RFP
Since AAM 212 has been rescinded and AAM 235 was released by the Trump Administration does this remove the application of the Davis-Bacon act for survey crews for this project?
Propose to RFP.
13 31 62 19 S-102 Regarding the last pipe support before entry into building 633, this is an extremely tight space between B531 and B520 such that any means and methods for doing so may not prove feasible. Is the Government amenable to alternate deep foundation options for this location if needed?
Alternate deep foundation options would be considered for the referenced location in accordance with the specification Section 01 33 00 Submittal Procedures, Paragraph 1.8 Variations which includes provisions for a Value Engineering Change Proposal.
Contractor's engineer must submit stamped and signed calcualtions for approval showing the proposed alternate deep foundations are at least equal to piles indicated on the Drawings.
Submission of proposed alternate foundations does not guarantee approval.
14 Can any additional photos taken by
NAVFAC/NSWC
personnel be made available prior to the bid due date?
Additional photographs taken during 12/17/2020 site visit are provided. Photos are provided with this Amendment.
15 Please confirm whether or not Division 23 09 13, 23 09 33 and 23 09 53, automation technicians are to be paid prevailing wages to match Electricians’ rate.
NAVFACSYSCOM is not the determining authority on the assignment of prevailing wage rates. This contract could potentially be audited by the Department of Labor for adherence to the wage decision.
16 Regarding Specification 23 09
53.00 20 Page 4, Paragraph 1.10.1, the proposed products must include a minimum of 2 years satisfactory commercial or industrial use.
Please confirm, company qualifications for Division 23 09
53.00 contractors.
Shall any firms not regularly engaged in completed project at the Philadelphia
The referenced specification does not apply to the installing contractor. Refer to para. 1.2 and 1.4 for subcontractor special requirements and system requirements.
Navy Yard likewise have a minimum of 2 years’ experience implementing the proposed products.
17 Specification 23 09 33 Page 5, Paragraph 2.3.3 Individual System Control Panels – please confirm controllers to be used for these panels and as shown on drawings shall be BACnet Advanced Application Controllers, fully programmable and able to provide standalone operation as shown on drawings.
The referenced paragraph describes the control panel enclosure and general contents within.
Controllers and control devices must comply with the requirements as specified for those for individual components.
Controllers should be fully programmable and able to provide standalone operation, but are not restricted to those that are certified as BACnet Advanced Application Controllers. If BACnet is used, controllers need to be able to seamlessly interface BACnet and Ethernet/IP systems.
18 Specification 23 09 33 Page 7, Paragraph 3.3.1 Operator Training – If a new DDC System is proposed other than the existing Automated Logic WebCTRL system, shall the bidder include more than 8 hours of training?
The 8 hours of training identified in this section is specific to the devices and equipment specified in this section. These training hours may be incorporated into the more extensive training desctribed in Section 23 09 53.00 20.
Note that DDC is not the intended control method at present. As is noted in 23 09 53.00 20 para. 1.4 "provide control systems composed of any combination of electric or analog electronic devices" with the intent that the new equipment can be made to easily interface with the existng DDC system in the future. See also para. 1.6
19 Specification 23 09 53 Page 14, Paragraph 3.4 Training is more detailed, including additional requirements beyond those specified in 23 09 33 Paragraph 3.3.1 Operator Training.
Please clarify training requirements.
The 8 hours of training identified in Section 23 09
33.00 40 is specific to the devices and equipment specified in that section.
Those training hours may be incorporated into the more extensive training desctribed in Section 23 09 53.00 20
20 Specification 23 09 33, Page 7 Paragraph 3.3.12.
Special Tools – If a new DDC Systems is proposed other than the existing Automated Logic WebCTRL system, please confirm it is the intent of this paragraph that the new system vendor shall provide all necessary software tools to permit the Navy to self-perform all programming and database manipulation of the DDC system.
Correction: information provided in paragraph 3.3.2.
Concur, intent of the paragraph includes all necessary software tools, as well as any associated hardware required (e.g. a specifically designed cable needed to connect to the controller for software adjustments)
DDC is not the intended control method at present.
As is noted in 23 09 53.00 20 para. 1.4 "provide control systems composed of any combination of electric or analog electronic devices" with the intent that the new equipment can be made to easily interface with the existng DDC system in the future. See also para. 1.6.
21 Specification 23 09 33 Page 7, Paragraph 3.3.12.
Special Tools – shall the new control panels provide the ability to be programmed utilizing the existing tools owned by the Navy for the existing system?
Correction: information provided in paragraph 3.3.2.
While preferred, this is not necessary. If programming requires new tools, those shall be provided to the Navy. It is preferred that the software necessary to implement changes can be used on a Windows 7 or 10 operating system for lab development.
Where applicable, existing tools owned by the Navy may be used; however, that is not a strict requirement.
22 Specification 23 09 33 Page 7, Paragraph 3.3.12.
Special Tools – If a new DDC Systems is proposed other than the existing Automated Logic WebCTRL system, please confirm it is the intent of this paragraph that the new system vendor shall provide all necessary administrator level usernames and passwords to permit the Navy to self-perform all programming and database manipulation of the DDC system.
DDC is not the intended control method at present.
As is noted in 23 09 53.00 20 para. 1.4 "provide control systems composed of any combination of electric or analog electronic devices" with the intent that the new equipment can be made to easily interface with the existng DDC system in the future. See also para. 1.6.
All administrator level usernames and passwords shall be provided.
23 Specification 23 09 33 Page 7, Paragraph 3.3.12.
Special Tools – please confirm administrator level usernames and passwords shall be provided to the Navy at the time of submittals.
DDC is not the intended control method at present.
As is noted in 23 09 53.00 20 para. 1.4 "provide control systems composed of any combination of electric or analog electronic devices" with the intent that the new equipment can be made to easily interface with the existng DDC system in the future. See also para. 1.6.
All administrator level usernames and passwords shall be provided.
24 Specification 23 09 53 Page 2, Paragraph 1.4 -please confirm the future interface of the new panels with the existing Automated Logic WebCTRL system shall be seamless without the need for a new separate system database.
DDC is not the intended control method at present.
New equipment must be compatible with the existing control system so as to be easily interfaced with the existing DDC system in the future.
25 Please confirm the new Pressure Sensors shown on M-107 shall be hardwired to the stand-alone control panels CWCP-1 and
LCP-HX2.
Correct - each of these new sensors should be hardwired to the new stand-alone control panels.
26 Drawing M-607 regarding the status lights for cooling tower status. Please confirm the intent is to hardwire status and alarm points from the cooling tower/pumps to the CWCP-1 panel controller and not through integration.
Correct - intent is to hardwire status and alarm points.
27 Drawing M-607 regarding the status lights for cooling tower status. Please confirm the intent is to hardwire status and alarm points from the cooling tower/pumps to the CWCP-1 panel controller and not directly to the status lights. Wiring the input points to the CWCP-1 panel controller will provide some trend information is needed for the Navy.
Correct. Devices should be hardwired.
28 Should a small stand-alone PC be provided in one of the control panels to provide trending of some duration? (1 month, 2 months, etc.)
No, a stand-alone PC should not be provided.
29 Drawing M-609 – is the network wiring shown intended to be CAT cable or twisted shielded pair?
Communication between DDC modules should be wired with a cable capable of handling Ethernet/IP data transmission. Cables used for equivalent needs in the facility currently are standard Cat5 cables.
The network wiring (shown between DDC modules in LCP-1, LCP-HX2, and CWCP-1) must be twisted shielded pair.
30 Please provide network wiring specifications to meet the network infrastructure shown on Drawing M-609.
Communication between DDC modules should be wired with a cable capable of handling Ethernet/IP data transmission. Cables used for equivalent needs in the facility currently are standard Cat5 cables.
The network wiring (shown between DDC modules in LCP-1, LCP-HX2, and CWCP-1) must be twisted shielded pair.
Refer to paragraph 2.3 on specification 23 09 13 and paragraph 2.10.5 on specification 23 09 53.00 20.
31 Specification 23 09 13 Page 16, Paragraph 3.1.8 references 26 20 00 for Interior Distribution System.
Specification 26 20 00 does not appear to be issued as part of these documents.
Please clarify.
Specification 26 20 00 is included in this project.
32 Specification 23 09 13 Page 16, Paragraph 3.1.8 Wire and Cable states that wiring external to enclosures must be run in raceways.
Please provide further detail
It is intended that control wiring should not be exposed and subject to damage. Refer to Div 26 for conduit and raceway requirements. Cable and conduit are manufacturer specific. Required cables and conduits are dependent upon control system regarding control system installation requirements.
approved shop drawings.
33 In what locations is EMT conduit acceptable for the automation scope of work?
Conduit and Fittings must ahere to Specfication Section 26 20 00 2.2. All conduit must be Rigid, Threaded Zinc-Coated Steel.
34 In what locations, if any, is Galvanized Rigid Conduit necessary for the automation scope of work?
Conduit and Fittings must ahere to Specfication Section 26 20 00 2.2. Rigid, Threaded Zinc-Coated Steel Conduit is used for exterior and interior applications.
35 Please confirm compression fittings are required for all outdoor installation.
Exterior Conduit and Fittings must ahere to Specfication Section 26 20 00 2.2. Set secrew fittings are not approved for this installation.
36 What are the refrigerant sizes shown for the relocated ACCU’s?
What is the refrigerant type?
Refer to sheet keynote 6 on drawing M-104; size of refrigerant piping must be in accordance with manufacturer's written instructions.
Refrigerant pipe material must be copper Tube, ASTM B280, type ACR, hard drawn straight lengths only, no coil lengths allowed, brazed joints.
37 What is the pipe size, material & system for the pipes to be relocated?
Refer to sheet keynote 6 on drawing M-104; size of refrigerant piping must be in accordance with manufacturer's written instructions.
Refrigerant pipe material must be copper Tube, ASTM B280, type ACR, hard drawn straight lengths only, no coil lengths allowed, brazed joints.
38 The drawings show butterfly valves.
There are a total of 63 required from sizes 3” thru 24”.
The spec lists under 2.4.1, Ball and Butterfly Valves AND 2.4.2 list High Performance Butterfly Valves.
The documents do not indicate if any of the butterfly valves are required to be High Performance?
There’s a big difference in cost to purchase a high-performance butterfly valve.
They are usually 4-5 times the cost.
Refer to Spec Section 23 05 15, bottom of page 30.
Butterfly valves on pipe sizes 3" - 6"; High Performance Butterfly valves on pipes larger than 6"
39 M-104 On drawing M-104 Sheet Keynote #13 instructs us to “Provide Swing Check Valve in 24” CWS”. Valve vendors state that they don’t make swing check valves over 14”. Is it OK to substitute a Silent Check Valve for any Check Valve Over 14” shown on the drawings?
Swing check valves are available as 24-in size.
Refer to valve manufacturer Milwaukee, model F-2974 for an acceptable swing check valve.
40 23 05 15 2.4.13 Valve vendor also stated that they cannot provide a Venturi Type Balancing Valve for any size over 14”. a.
If a 14” Balancing Valve can handle the required flow would it be acceptable to provide this size valve and reducers from the larger pipe (16” & 18”)?
b. If not, would an Armstrong Flo-Trex
Venturi type balacing valves are available for pipe sizes over 14-in. Refer to valve manufacturer IMI Flow Design, model F212.12 AF for acceptable fitting.
Triple duty valves are not acceptable.
Valve be acceptable? We can get these “Triple Duty” Valves up to 24”.
41 M-106 Sheet Key Notes 14 and 15 on drawing M-106 instruct us to relocate some existing piping.
Please provide the size of this piping and what system it is for so we know what piping material will be required? a.
Will this pipe require insulation?
If so, please provide an insulation specification?
b. Is key note 14 referring to the existing Unit Heater Flue Piping that is shown on Note 16 on Photograph D2 on Drawing G-008?
Sheet keynote 14 on drawing M-106 refers to sheetkeynote 16 on D2/G-
008. Sheet keynote 15 on M-106 refers to sheet keynote 22 on D1/-G-008.
42 23 05 48.00
Is there any Vibration Isolation required on the cooling towers? a.
Spec section 23 05
48.00 40 shows Vibration Isolation on Towers with different Roof-Span Provisions. Since our towers will be mounted on a steel platform off the ground is any Vibration Isolation
Vibration isolation on cooling tower is not required.
Required?
43 M-501, M-602 Pumps CWP-1/2/3 – The piping detail on drawing M-501 shows the installation of balancing valves and strainers on each of the pumps.
Flow sheet M-602 does not show the strainers or balancing valves.
The specifications for the balancing valves only go to 14” size. Also, graphically the detail on drawing M-501 shows the balancing valve as approximately 6” long, a 16” balancing valve would be between 18” to 24” OAL.
Please clarify.
Refer to detail C1/M-501 for piping and fittings required on CWP-1/2/3.
Provide pump suction strainers, as indicated on paragraph 2.3.9, specification 23 05 15.
Provide balancing valve, as indicated on paragraph 2.4.13, specification 23 05
15. Refer to valve manufacturer IMI Flow Design, model F212.12 AF for acceptable fitting. The 16-in balancing valve includes butterfly shut-off valve. This valve arrangement is 22 inches long (approximately).
44 23 05 15 2.5.3 Please provide a Basis-of-Design for the Receiver Tank specified in 23-05- 15 Section 2.5.3.
This will help mitigate potential cost impacts at time of submittal.
Refer to tank manufacturer PVI Industries, model LH 300A-TR for an acceptable receiver tank.
45 M-702 Please provide a Basis-of-Design or detailed specification for the Flow Straighteners scheduled on M-
702. This will help mitigate potential
Refer to pipe fittings manufacturer Vortab for an acceptable flow straighteners.
cost impacts at time of submittal.
46 Is vibration monitoring required for the duration of the timber pile driving? If so, please provide a specification.
Vibration monitoring is not required for the duration of the timber pile driving.
Please note requirements for notification and scheduling of disruptive work.
47 Please clarify the extent of coordination with cybersecurity and electronic security with regard to controls and other electronic equipment
PENDING RESPONSE
48 262413 2.5.4 & 3.1.4.6
Specifications state “Coordinate the controls system with other electronic systems including but not limited to the electronic security and cybersecurity systems as required.
Furnish a certification that control systems are designed and tested in accordance with DoD Instruction
8500.01 and as required by individual Service Implementation Policy”. Please clarify the coordination with DoD 8500.01, and define who provides referenced certification.
PENDING RESPONSE
49 Please provide details of grounding requirement for fencing, equipment pads, cooling tower structure, etc.
Provide a ground ring #3/0 AWG bare copper buried 24" below grade encircling the cooling tower structure.
Install copper ground rods 5/8" in diameter by 10'-0" in length, spaced at 20'-0" apart and connect to the ground ring with using #3/0 bare copper. Ground ring must be tested 25 ohms or less with additional rods if necessary. Include a total of 2 test wells at opposite corners of the structure that are flush with the finished grade. Ground each steel support beam above the grade using #3/0 AWG Bare Copper connected to ground ring. All grounding connections must be irreversible exothermic welds. Grounding for fencing and equipment pads is not required.
50 Drawing E-
Keynote #1 indicates (4) GRS feeders for the
HX2P-1 & HX2P-2
feeders, the feeder schedule does not call for parallel runs, is this an errant note that should be for the MDS conduit runs?
Provide feeders for HX2P-1 and HX2P-2 per the feeder schedule shown on drawing E-701
51 The next 3 questions compare the plan drawings with M-602
M-602 There appears to be a missing 10” Butterfly Valve between the 24” CWR Header and the 3-Way Valve tagged V-2.1. The reason we bring this up is because the flow diagram shows a butterfly valve in this location before the three (3) other 3-way valves (V-1.1, V-3.1 & V-4.1). Is an additional 10” Butterfly Valve Required in this
Correct, 10-in butterfly valve is required in this location.
location?
52 M-602 There appears to be a missing 10” Butterfly Valve between the 24” CWS Header and the 2-Way Valve tagged V-1.2. The reason we bring this up is because the flow diagram shows a butterfly valve in this location before the three (3) other 2-way valves (V-2.2, V-3.2 & V-4.2). Is an additional 10” Butterfly Valve Required in this location?
Correct, 10-in butterfly valve is required in this location.
53 M-602 This flow diagram also shows butterfly valve on the 3” Overflow drain connection to each tower. This piping is specified to be cast iron pipe with no-hub connections per Table I in specification schedule 22 00 00 Subsection 3.7 titled “Tables”. In our experience, we don’t have any way to install a Butterfly Valve in Cast Iron Piping. We normally don’t see a valve installed in the overflow drain line
Remove butterfly valve from 3-in overflow drain pipe to each tower.
for cooling tower applications. Please advise.
54 Are electrical load banks required for any of the electrical testing or system commissioning? If so, who is to provide?
Electrical load banks are not required on this project.
55 We would like to request a bid extension. Due to the holidays, subcontractors are requesting more time to review the bid documents and submit RFI questions (many companies were closed between Christmas and New Year’s Day). Some subcontractors are also requesting a second site visit.
Proposal due date has been extended to 28 January 2021. Another site visit cannot be supported.
(End of Summary of Changes)