Attachment B - Construction Experience Data Sheet.docx

DOCX document 14 KB Posted

Attached to
Design-Bid-Build (DBB), Building 633 River Water Cooling System, Philadelphia Naval Business Center (PNBC), Philadelphia, PA
Solicitation number
N4008520R0079
Issued by

About this file

This document contains an attachment for collecting construction experience data and details of a federal solicitation for repair and replacement of a river water cooling system. The attachment requests information on up to five prior construction projects, including award and completion dates, type of work, contract details, descriptions of relevancy and self-performed work. The solicitation is for a design-bid-build project to replace an aging 77-year old 50,000 gallon per minute river water cooling system at the Philadelphia Naval Business Center with a new 8,200 gallon per minute cooling tower capable of rejecting up to 75 million British thermal units per hour. The new system will provide reliable cooling water on demand to support research, development, testing and evaluation activities, including testing of the Columbia Class Program Integrated Power System. The solicitation was issued by the Naval Facilities Engineering Command on behalf of the Department of the Navy.

View the file

Other files

File Type Posted
Amendment 0006.pdf PDF
AMENDMENT 0005.pdf PDF
AMENDMENT 0005 Attachment E - Price Proposal Form (Rev).pdf PDF
AMENDMENT 0005 - Drum Disposal Characterization Composite Sample Results.pdf PDF
AMENDMENT 0005 - Soil Boring Environmental Sample Results.pdf PDF
AMENDMENT 0004.pdf PDF
AMENDMENT 0004 - PICTURES.pdf PDF
AMENDMENT 0003.pdf PDF
AMENDMENT 0002.pdf PDF
AMENDMENT 0002 Sign-In Sheet.pdf PDF
AMENDMENT 0002 Attachment E - Price Proposal Form (Rev).pdf PDF
Ref O CTF COVID-19 Screening Questionnaire_REV2_2020.07.06.pdf PDF
REF E NSWCPD ENTRY SCREENING ASSESSMENT 2 DEC 2020 Rev 9.pdf PDF
COVID-19 Building Access and Badge Instructions_2020-11-20.docx DOCX document
Ref B TD_CO VISIT APPROVALS _REVISED_5_13_20.xlsx XLSX spreadsheet
AMENDMENT 0001.pdf PDF
Ref H NMCI Version CTF COVID 19 Response Training rev4.pdf PDF
Attachment F - SECNAV_5512_1 APPROVED PASS ID FORM.pdf PDF
Ref G Building 633 Specific Requirements_2020-11-12.pdf PDF
Attachment D - Small Business Subcontracting Plan Template.doc DOC document
N4008520R0079.pdf PDF
Attachment A - PPI Inquiry Log.doc DOC document
Attachment E - Price Proposal Form.pdf PDF
1596134_SPC_01of01.pdf PDF
1596134_DWG_01of01.pdf PDF
Attachment C - Past Performance Questionnaire.docx DOCX document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT B

CONSTRUCTION EXPERIENCE PROJECT DATA SHEET

Project No. (check one) : |_| CON #1 |_| CON #2 |_| CON #3 |_| CON #4 |_| CON #5

1. Experience for: |_| Offeror |_| Joint-Venture |_| Other (Explain)

Firm Name:

Address:

Phone Number:

DUNS Number:

Point of Contact: Contact Phone Number:

2. Work Performed as: |_| Prime Contractor |_| Sub Contractor |_| Joint Venture |_| Other (Explain)

Percent of project work performed:

If subcontractor, who was prime (Name/Phone #):

3. Contract Number: Delivery/Task Order Number:

Title:

Location:

4. Award Date (mm/dd/yy): Completion Date (mm/dd/yy):

5. Type of work:

|_| New Construction |_| Renovation |_| Repair |_| Alteration |_| Other (explain):

6. Type of Contract/Task Order: (Check ALL that apply)

|_| Firm-Fixed Price |_| Cost/Time and Material |_| Other (explain):

Complete Block 7 for Construction Projects.

7. Construction Project:

Award Amount: Final Price:

Type of Contract/Task Order: (Check ALL that apply)

|_| Design-Build |_| Design-Bid-Build |_| Delivery/Task Order (IDIQ) |_| Other (explain):

If Design-Build, identify the Lead Design Firm:______________________________________________

8. Provide a detailed description of the project and the relevancy to the project requirements of this RFP (i.e.: unique features, square footage, construction methods), including any sustainable features or USGBC LEED certifications. If design-build, include a description of the design-effort.

9. Provide a detailed description of what work your firm self-performed on this project:

10. Other Information:

File details come from the government source that posted it. Updated .