Bldg 13 Site Visit Log.pdf

PDF 264 KB Posted

Attached to
Bldg 13 Base Communications Renovation, Portsmouth Naval Shipyard, Kittery, Maine
Solicitation number
N4008520R0075
Issued by

About this file

This document outlines a federal contract opportunity for renovation work at Portsmouth Naval Shipyard in Kittery, Maine. The solicitation seeks bids to conduct a total interior and partial exterior renovation of a three-story historic masonry building comprising approximately 14,650 square feet. Scope of work includes abating hazardous materials, replacing the south stair tower, upgrading structural systems, restoring original windows, modernizing office and meeting spaces as well as restrooms, adding accessibility via ramp and elevator, and overhauling mechanical, electrical, data and fire protection systems. Exterior work involves site improvements to paving, walks, utility areas, and landscaping. Utilities to be provided include electrical, fire protection, water, sanitation, steam connections and relocations. The solicitation is designated as a total small business set-aside issued by the Department of the Navy's Naval Facilities Engineering Command.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .