Amendment 0010.pdf

PDF 34 KB Posted

Attached to
P898, REPLACE PIER 32 AT NAVSUBASE NEW LONDON, CT
Solicitation number
N4008520R0037
Issued by

View the file

Other files

File Type Posted
Amendment 0009.pdf PDF
Amendment 0008.pdf PDF
Amendment 0007.pdf PDF
Amendment 0006.pdf PDF
Site Visit Log.pdf PDF
Amendment 0005.pdf PDF
Amendment 0004.pdf PDF
Amendment 0003.pdf PDF
dwg 7of11 structural 2of2 R9.pdf PDF
dwg 7of11 structural 2of2 R7.pdf PDF
dwg 7of11 structural 2of2 R8.pdf PDF
Amendment 0002.pdf PDF
dwg 9of11 electrical 1of2.pdf PDF
dwg 8of11 structural utility fire protection mechanical.pdf PDF
dwg 4of11 civil.pdf PDF
dwg 6of11 structural 1of2.pdf PDF
dwg 3of11 geotechnical 2of2.pdf PDF
dwg 5of11 civil dredge.pdf PDF
dwg 2of11 geotechnical 1of2.pdf PDF
dwg 10of11 electrical 2of2.pdf PDF
dwg 1of11 general survey.pdf PDF
dwg 11of11 reference.pdf PDF
Amendment 0001.pdf PDF
Attachment A - Pre-Proposal Inquiry Form.xlsx XLSX spreadsheet
1565917 spc 1of1_appendix c.pdf PDF
1565917 spc 1of1.pdf PDF
Attachment B_SECNAV_5512_1_11787.pdf PDF
1565917 spc 1of1_appendix a 2of3.pdf PDF
1565917 spc 1of1_appendix g.pdf PDF
Solicitation No. N4008520R0037.pdf PDF
Attachment C - Construction Experience Project Data Sheet.docx DOCX document
Attachment G - Small Business Participation and Commitment Strategy.docx DOCX document
Attachment D - Past Performance Questionnaire.docx DOCX document
1565917 spc 1of1_appendix a 3of3.pdf PDF
Attachment F - Small Business Subcontracting Record.docx DOCX document
1565917 spc 1of1_appendix e.pdf PDF
Attachment E - Small Business Subcontracting Plan.docx DOCX document
1565917 spc 1of1_appendix f 2of2.pdf PDF
1565917 spc 1of1_appendix a 1of3.pdf PDF
1565917 spc 1of1_appendix f 1of2.pdf PDF
Attachment H - Price Proposal.docx DOCX document
1565917 spc 1of1_appendix b.pdf PDF
1565917 spc 1of1_appendix d.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Design-Bid-Build P898, Replace Pier 32 at NAVSUBASE New London, CT

The purpose of this amendment is to provide the follow ing:

1. Responses to PPIs.

SEE BLOCK 14 CONTINUATION PAGE

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 01-Jun-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008520R0037

X 9B. DATED (SEE ITEM 11)

07-Apr-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

01-Jun-2020

CODE

NAVFAC MID ATLANTIC

ACQUISITION CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008520R0037

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

BLOCK 14 CONTINUATION PAGE

1. The purpose of this amendment is as follows:

1. Provide responses to PPIs

Responses to PPIs:

PPI

Date

Submitted Reference Question Response

Leave Blank

Page

Section Paragraph

22 04/29/20 s-121 When does the NAVFAC anticipate relocating the security barrier?

Will this be at the start of construction?

Contractor may plan movement of the barrier to fit their construction Schedule.

Contractor will need to submit request to Navy Port Operations 3 weeks prior to planned relocation to allow New London Security Team to set up extra security measures.

24 04/29/20 G-106 Will the area North of the existing pier 32 to the new pier 32 be accessible to the contractor for the duration of the new construction and the demolition of the existing pier 32?

Bid Per Contract Documents

25 04/29/20 G-106 Will the area North of the new pier 32 inside of the security barriers designeated as the dredging area be accessible for contractor barges and equipment though the completion of phase 5?

Yes

44 05/06/20 Will vessels entering and existing the submarine gates be subject to inspection by Navy personnel and/or dogs? If so, how much time should the dredge contractor allot for the inspection of a vessel? Are there any costs associated with these inspections?

Any time vessels come inside the waterfront security barriers it MUST be inspected. Contractor shall notify Security and Port Operations a minimum 48hrs prior to bringing in equipment coming through the barriers with a time and date. More notice time is appreciated. Note: Security will respond if they can make the appointment or will give a time due to demands with work. Contractor may have a wait up to an hour at times due to ongoing security drills. There is no cost associated with the this inspection

54 05/05/20 327 to 363 Volume 1 Specifications

It has come to our attention that portions of the specifications included in the P- 409 solicitation contain a section marked “For Official Use Only”, “Export Controlled”. The portions of the specifications that we are aware of with this language is located in Volume 1 of the Specifications on pages 327 to 363.

In an effort to move forward on our price proposal development efforts, we are beginning communication with potential subcontractors and suppliers. We are requesting direction how to handle these documents, if any special care is to be taken.

For Official Use Only (FOUO) is a document designation, not a classification.

This designation is used by Department of Defense and a number of other federal agencies to identify information or material which, although unclassified, may not be appropriate for public release.

In all cases the designations refer to unclassified, sensitive information that is or may be exempt from public release under the Freedom of Information Act. FOUO information may be disseminated within the DoD components and between officials of the DoD components and DoD contractors as necessary in the conduct of official business. FOUO information may also be released to officials in other departments and agencies of the executive and judicial branches in performance of a valid U.S.

Government function. Documents containing FOUO information shall be marked as follows: Documents will be marked FOR OFFICIAL USE ONLY at the bottom of the front cover, the title page, the first page, and the outside of the back cover (if there is one). Pages of the document that contain FOUO information shall be marked FOR OFFICIAL USE ONLY at the bottom. Each paragraph containing FOUO information shall be marked with the abbreviation FOUO in parentheses at the beginning of the FOUO portion. Material other than paper documents (for example, slides, computer media, films, etc.) shall bear markings which alert the holder or viewer that the material contains FOUO information. FOUO documents and material transmitted outside the Department of Defense must bear an expanded marking on the face of the document so that non-DoD holders understand the status of the information. FOUO documents and material may be transmitted via first class mail.

78 05/07/20 The State of Connecticut permit mentions a dewatering barge and utilizing a floating barge dewatering system which infers dewatering The sediment prior to placement. In order to place cap material utilizing The tremie pipe method, it will most likely require adding water to The sediment to create a slurry that can be pumped. Please clarify how The permit restriction will be handled should it be necessary for The dredging contractor to add water to pump The material.

Contractor will not be required to dewater prior to placing dredge material in the CADD Cell. Contractor will be required to us a tremmie pipe to place dredge material in the CADD Cell

(End of Summary of Changes)