MIDLANT
EPROJECTS NO. 1565917
SOLICITATION NO. N40085-20-R-0037
REPLACE SSN BERTHING PIER 32
at
NAVAL SUBMARINE BASE NEW LONDON
GROTON, CT
PREPARED BY
MN-FST Joint Venture 101 West Main Street, Suite 800
Norfolk, VA 23510
A/E Contract Number: N40085-14-D-8113 Delivery Order: 0031 MOD 03
Cathodic Protection: John Contillo, Jr, NACE Geotechnical: Philip Dunaj, PE Civil: David Anderson, PE HAZMAT: Robert Rooks, PE Dredging: Mikele Winters, PE Mechanical: Alain Haddad, PE Electrical: David Glennon, PE Structural: Mikele Winters, PE Fire Protection: Kevin Cox, PE
Submitted By: ________________________________________ Date: January 31, 2020 Christopher LaPlatney, PE
APPROVED BY:
For Commander, NAVFAC: ________________________________ Date: ____________
P-898 Replace SSN Berthing Pier 32 eProject No. 1565917 Naval Submarine Base New London - Groton, CT
THIS PAGE INTENTIONALLY LEFT BLANK
PROJECT TABLE OF CONTENTS Page 1
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 15 LIST OF DRAWINGS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 20 00.00 20 PRICE AND PAYMENT PROCEDURES
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 31 23.13 20 ELECTRONIC CONSTRUCTION AND FACILITY SUPPORT CONTRACT
MANAGEMENT SYSTEM
01 32 17.00 20 COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS)
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 35 40.00 25 MARINE MAMMAL PROTECTION
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 20 QUALITY CONTROL
01 45 35 SPECIAL INSPECTIONS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 57 24 TURBIDITY CONTROL AND MONITORING
01 58 00 PROJECT IDENTIFICATION
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 78 24.00 20 FACILITY ELECTRONIC OPERATION AND MAINTENANCE SUPPORT
INFORMATION (eOMSI)
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
02 61 13 EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL
02 82 00 ASBESTOS REMEDIATION
02 83 00 LEAD REMEDIATION
02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs
AND MERCURY
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
03 31 30 MARINE CONCRETE
03 42 13.00 10 PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE
CONSTRUCTION
03 45 33 PRECAST STRUCTURAL CONCRETE
DIVISION 05 - METALS
05 05 23.16 STRUCTURAL WELDING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES
06 71 00 FIBERGLASS REINFORCED PLASTIC (FRP) LUMBER
06 90 00 COMPOSITE CAMELS
PROJECT TABLE OF CONTENTS Page 2
DIVISION 09 – FINISHES
09 90 00 PAINTS AND COATINGS
09 97 13.26 COATING OF STEEL WATERFRONT STRUCTURES
DIVISION 13 – SPECIAL CONSTRUCTION
13 34 19 METAL BUILDING SYSTEMS
DIVISION 21 – FIRE SUPPRESSION
21 12 00 STANDPIPE SYSTEMS
DIVISION 22 – PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
22 15 09.00 40 GENERAL SERVICE COMPRESSED-AIR SYSTEMS CLEANING
PROCEDURES
22 15 14.00 40 GENERAL SERVICE COMPRESSED-AIR SYSTEMS, LOW PRESSURE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 37 13.00 40 DIFFUSERS, REGISTERS, AND GRILLS
23 82 46.00 40 ELECTRIC UNIT HEATERS
DIVISION 25 – INTEGRATED AUTOMATION
25 05 11 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 33 DOCKSIDE POWER CONNECTION STATIONS
26 08 00 APPARATUS INSPECTION AND TESTING
26 11 16 SECONDARY UNIT SUBSTATIONS
26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS
26 13 00 SF6/HIGH-FIREPOINT INSULATED PAD-MOUNTED SWITCHGEAR
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 23 00 LOW-VOLTAGE SWITCHGEAR
26 27 14.00 20 ELECTRICITY METERING
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION
26 42 13.00 20 CATHODIC PROTECTION BY GALVANIC ANODES
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 63.00 20 ANALOG FIRE ALARM MONITORING SYSTEM
PROJECT TABLE OF CONTENTS Page 3
DIVISION 31 - EARTHWORK
31 09 13 SURVEY AND VIBRATION MONITORING
31 23 00.00 20 EXCAVATION AND FILL
31 62 16.19 STEEL PIPE PILES
31 63 29 DRILLED CONCRETE SHAFTS
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 11 23 AGGREGATE BASE COURSES
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 17 23 PAVEMENT MARKINGS
32 31 13.53 HIGH-SECURITY CHAIN LINK FENCES AND GATES
DIVISION 33 - UTILITIES
33 11 00 FRESH WATER UTILITY DISTRIBUTION PIPING
33 30 00 SANITARY SEWERAGE
33 31 23.00 10 SANITARY SEWER FORCE MAIN PIPING
33 40 00 STORM DRAINAGE UTILITIES
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 81 27 PIER TELECOMMUNICATIONS DISTRIBUTION SYSTEMS
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
DIVISION 34 - TRANSPORTATION
34 71 13.16 VEHICLE CRASH BARRIERS
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 20 23 DREDGING
35 51 13.00 20 BROW AND PLATFORM
35 59 13.14 20 POLYMERIC FENDER PILES
35 59 13.16 MARINE FENDERS
35 59 13.19 ARCH-TYPE RUBBER MARINE FENDERS
35 59 20 HDPE PIPE PILE SLEEVES
35 59 35 MOORING FITTINGS
DIVISION 41 – MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 22 13.19 JIB CRANES
PROJECT TABLE OF CONTENTS Page 4
TABLE OF CONTENTS
ATTACHMENTS, EXHIBITS AND APPENDICES
ATTACHMENTS TO THE SPECIFICATIONS
(Located at the end of the indicated sections)
ATTACHMENTS
01 35 40.00 25 MARINE MAMMAL PROTECTION PLAN
01 45 00.00 20 QUALITY CONTROL QC FORMS
01 45 35 SCHEDULE OF SPECIAL INSPECTIONS
01 58 00 PLATES 2-5 STANDARD NAVY SIGN REQUIREMENTS
02 61 13 ATTACHMENT A
1. ESTABLISHMENT & MAINTENANCE OF ENVIRONMENTAL
RESTORATION (ER) LAND USE CONTROLS (LUCS) &
RESTRICTIONS
2. MAP – PUBLIC WORKS RADIOLOGICAL SITES
3. P-898 REPLACE SSN BERTHING PIER 32 – EXCERPTS FROM
RECORD OF DECISION
4. SOIL MANAGEMENT STANDARD OPERATING PROCEDURES (SOP)
5. NSB-NEW LONDON, OU4 LOWER SUBASE – ZONES 1-7
CONTAMINATION FIGURES
31 23 00.00 20 ATTACHMENT A
1. REQUEST FOR PERMIT TO EXCAVATE
2. IR SITE EXCAVATION PROCEDURES
APPENDICES TO THE SPECIFICATIONS
(Under Separate Cover)
APPENDICES
APPENDIX A REFERENCE DRAWINGS
1. 1959 REPLACEMENT OF PIER 10 (72 SHEETS)
2. 1982 QUAYWALL – PIER 17 STUB (3 SHEETS)
3. 1976 MCON P-112 SSN BERTHING PIER 32 (80 SHEETS)
4. 2011 WATERFRONT REPAIRS – QUAYWALL (60 SHEETS)
APPENDIX B GEOTECHNICAL ENGINEERING REPORT
APPENDIX C ENVIRONMENTAL CONCURRENCE AND PERMIT DOCUMENTS
1. WATER QUALITY CERTIFICATE & FEDERAL CONSISTENCY
CONCURRENCE
2. MEMORANDUM FOR RECORD
3. CLEAN WATER ACT 404 & 408 PERMITS
APPENDIX D HAZARDOUS MATERIALS SURVEY REPORT
APPENDIX E SEDIMENT SAMPLING AND TESTING RESULTS
1. PIER 32 SEDIMENT SAMPLING AND TESTING RESULTS -
JANUARY 2014
2. PIER 10 SEDIMENT SAMPLING AND TESTING RESULTS -
NOVEMBER 2014
APPENDIX F STORMWATER MANAGEMENT PLAN AND PERMIT
1. GENERAL PERMIT FOR THE DISCHARGE OF STORMWATER FORM
SMALL MUNICIPAL SEPARATE STORM SEWER SYSTEMS
2. STORMWATER POLLUTION PREVENTION PLAN
3. STORMWATER MANAGEMENT PLAN
PROJECT TABLE OF CONTENTS Page 5
APPENDIX G TEMPORARY ENVIRONMENTAL CONTROL ATTACHMENTS
1. MAPS
1.1. MAP – ZONES 1 & 2 LOWER SUBBASE, OPERABLE UNIT
(OU) 4 – MONITORING WELL LOCATIONS
1.2. MAP – LAND USE CONTROL REMEDIAL DESIGN – ZONE 6
LOWER SUBBASE OPERABLE UNIT 4 – MONITORING WELL
LOCATIONS
1.3. MAP – LAND USE CONTROL REMEDIAL DESIGN – ZONE 7
LOWER SUBBASE, OPERABLE UNIT 4
2. HAZARDOUS WASTE MANAGEMENT PLAN (HWMP)
3. GENERAL PERMIT FOR MISCELLANEOUS DISCHARGES OF SEWER
COMPATIBLE (MISC) WASTEWATER
4. GENERAL PERMIT FOR THE DISCHARGE OF GROUNDWATER
REMEDIATION WASTEWATER
5. GENERAL PERMIT REGISTRATION FORM FOR THE DISCHARGE OF
GROUNDWATER REMEDIATION WASTEWATER
6. INSTRUCTIONS FOR COMPLETING THE GENERAL PERMIT
REGISTRATION FORM FOR THE DISCHARGE OF GROUNDWATER
REMEDIATION WASTEWATERS
7. COASTAL CONSISTENCY REVIEW FORM
8. REQUEST FOR NATURAL DIVERSITY DATA BASE (NDDB) STATE
LISTED SPECIES REVIEW
9. GROUNDWATER REMEDIATION TO SURFACE WATER AQUATIC
TOXICITY MONITORING REPORT
10. MONITORING REPORT FORM – GENERAL PERMIT FOR THE
DISCHARGE OF GROUNDWATER REMEDIATION WASTEWATER
11. NOTICE OF TERMINATION FORM – GENERAL PERMIT FOR THE
DISCHARGE OF GROUNDWATER REMEDIATION WASTEWATER
12. 2002 CONNECTICUT GUIDELINES FOR SOIL EROSION AND
SEDIMENT CONTROL
-- End of Project Table of Contents --
DOCUMENT 00 01 15
LIST OF DRAWINGS
02/11
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."
1.2 CONTRACT DRAWINGS
The list of drawings included as ATTACHMENT 'A' - LIST OF CONTRACT DRAWINGS follows this Section.
1.3 REFERENCE DOCUMENTS
These reference documents may not be a part of the contract but are included with the drawings for information.
1.3.1 Reference Drawings
Reference drawings contained in APPENDIX 'A' - REFERENCE DRAWINGS are intended only to show the original construction. Drawings are the property of the Government and shall not be used for any purpose other than that intended by the contract.
1.3.2 Boring Logs
Logs of recent investigations, geotechnical test data, and environmental test data performed for the project, and logs of historical geotechnical borings from the project area are contained in APPENDIX 'B' - GEOTECHNICAL ENGINEERING REPORT. The Government does not guarantee that borings indicate actual conditions, except for the exact locations and the time that they were made.
1.3.3 Appendices
The following appendices are attached to the end of these specifications.
The appendices are only distributed electronically.
DOCUMENT
LOCATION
DOCUMENT NO.
OR DATE
TI TLE OR DESCRI PTI ON
Appendix 'A' Various Reference Drawings
Appendix 'B' November, 2019 Geotechnical Engineering Report
Appendix 'C' 2020 Environmental Documents Including Project Permit Documents
DOCUMENT 00 01 15 Page 1
DOCUMENT
LOCATION
DOCUMENT NO.
OR DATE
TI TLE OR DESCRI PTI ON
Appendix 'D' August, 2019 Hazardous Materials Survey Report
Appendix 'E' 2014 Sediment Sampling and Testing Results
Appendix 'F' 2017 Stormwater Management Plan and Permit
Appendix 'G' Various Temporary Environmental Controls Attachments
-- End of Document --
DOCUMENT 00 01 15 Page 2
P-898 Replace SSN Berthing Pier 32 eProject No. 1566917
INDEX
NUMBER
SHEET
NUMBER SHEET TITLE
NAVFAC
DRAWING
NUMBER
1 G-001 COVER SHEET 12805516
2 G-002 INDEX OF DRAWINGS SHEET 1 OF 2 12805517
3 G-003 INDEX OF DRAWINGS SHEET 2 OF 2 12805518
4 G-004 INDEX OF REFERENCE DRAWINGS 12805519
5 G-005 ABBREVIATIONS 12805520
6 G-006 GENERAL NOTES 12805521
7 G-101 OVERALL SITE PLAN 12805522
8 G-102 CODE COMPLIANCE PLAN - PIER 32 END, FIRE
LANE STRIPING PLAN
12805523
9 G-103 CODE COMPLIANCE PLAN - PIER 32 MIDDLE 12805524
10 G-104 CODE COMPLIANCE PLAN - PIER 32 LAND SIDE
NORTH
12805525
11 G-105 PHASING PLAN SHEET 1 OF 11 12805526
12 G-106 PHASING PLAN SHEET 2 OF 11 12805527
13 G-107 PHASING PLAN SHEET 3 OF 11 12805528
14 G-108 PHASING PLAN SHEET 4 OF 11 12805529
15 G-109 PHASING PLAN SHEET 5 OF 11 12805530
16 G-110 PHASING PLAN SHEET 6 OF 11 12805531
17 G-111 PHASING PLAN SHEET 7 OF 11 12805532
18 G-112 PHASING PLAN SHEET 8 OF 11 12805533
19 G-113 PHASING PLAN SHEET 9 OF 11 12805534
20 G-114 PHASING PLAN SHEET 10 OF 11 12805535
21 G-115 PHASING PLAN SHEET 11 OF 11 12805536
22 G-116 CONTRACTOR ACCESS ROUTE PLAN 12805537
23 G-117 SSN 688 MOORING ARRANGEMENT PLAN 12805538
24 G-118 SSN 774 MOORING ARRANGEMENT PLAN 12805539
25 V-001 EXISTING CONDITIONS KEY PLAN, NOTES AND
ABBREVIATIONS
12805542
26 V-101 EXISTING CONDITIONS - PIER 17 STUB 12805543
27 V-102 EXISTING CONDITIONS - PIER 32 12805544
28 V-103 EXISTING CONDITIONS - PIER 32 LANDSIDE 12805545
29 V-104 EXISTING CONDITIONS - CRANE WEIGHT
HANDLING AREA
12805546
30 B-101 GEOTECHNICAL INVESTIGATIONS PLAN 12805549
31 B-301 GEOLOGIC PROFILE 12805550
32 B-302 GEOLOGIC PROFILE 12805551
33 B-601 SOIL BORING LOGS SHEET 1 OF 13 12805552
34 B-602 SOIL BORING LOGS SHEET 2 OF 13 12805553
35 B-603 SOIL BORING LOGS SHEET 3 OF 13 12805554
36 B-604 SOIL BORING LOGS SHEET 4 OF 13 12805555
37 B-605 SOIL BORING LOGS SHEET 5 OF 13 12805556
38 B-606 SOIL BORING LOGS SHEET 6 OF 13 12805557
39 B-607 SOIL BORING LOGS SHEET 7 OF 13 12805558
40 B-608 SOIL BORING LOGS SHEET 8 OF 13 12805559
GENERAL
SURVEY
GEOTECHNICAL
DOCUMENT 00 01 15 - ATTACHMENT PAGE 1
eProject No. 1566917
41 B-609 SOIL BORING LOGS SHEET 9 OF 13 12805560
42 B-610 SOIL BORING LOGS SHEET 10 OF 13 12805561
43 B-611 SOIL BORING LOGS SHEET 11 OF 13 12805562
44 B-612 SOIL BORING LOGS SHEET 12 OF 13 12805563
45 B-613 SOIL BORING LOGS SHEET 13 OF 13 12805564
46 C-001 LEGEND, ABBREVIATIONS AND GENERAL NOTES 12805567
47 CD101 SITE DEMOLITION PLAN - PIER 10 LAND SIDE 12805568
48 CD102 SITE DEMOLITION PLAN - PIER 17 STUB 12805569
49 CD103 SITE DEMOLITION PLAN - PIER 32 LAND SIDE
SOUTH
12805570
50 CD104 SITE DEMOLITION PLAN - PIER 32 LAND SIDE
NORTH
12805571
51 CD105 SITE DEMOLITION PLAN - CRANE WEIGHT
HANDLING AREA
12805572
52 CD106 UTILITY DEMOLITION PLAN - PIER 10 END 12805573
53 CD107 UTILITY DEMOLITION PLAN - PIER 10 MIDDLE 12805574
54 CD108 UTILITY DEMOLITION PLAN - PIER 10 LAND
SIDE
12805575
55 CD109 UTILITY DEMOLITION PLAN - PIER 17 STUB 12805576
56 CD110 UTILITY DEMOLITION PLAN - PIER 32 END 12805577
57 CD111 UTILITY DEMOLITION PLAN - PIER 32 MIDDLE 12805578
58 CD112 UTILITY DEMOLITION PLAN - PIER 32 LAND
SIDE SOUTH
12805579
59 CD113 UTILITY DEMOLITION PLAN - PIER 32 LAND
SIDE NORTH
12805580
60 CD301 UTILITY DEMOLITION SECTION - PIER 10 12805581
61 CD302 UTILITY DEMOLITION SECTION - PIER 32 12805582
62 CD501 DEMOLITION DETAILS 12805583
63 C-101 SITE PLAN - PIER 17 STUB 12805584
64 C-102 SITE PLAN - PIER 32 LAND SIDE SOUTH 12805585
65 C-103 SITE PLAN - PIER 32 LAND SIDE NORTH 12805586
66 C-104 SITE PLAN - CRANE WEIGHT HANDLING AREA 12805587
67 C-105 UTILITY PLAN - PIER 32 END 12805588
68 C-106 UTILITY PLAN - PIER 32 MIDDLE 12805589
69 C-107 UTILITY PLAN - PIER 32 LAND SIDE NORTH 12805590
70 C-108 PLAN - LAND SIDE PHASE 1 AND 2 12805591
71 C-201 UTILITY PROFILES - SHEET 1 OF 4 12805592
72 C-202 UTILITY PROFILES - SHEET 2 0F 4 12805593
73 C-203 UTILITY PROFILES - SHEET 3 OF 4 12805594
74 C-204 UTILITY PROFILES - SHEET 4 OF 4 12805595
75 C-301 UTILITY SECTIONS - SHEET 1 OF 2 12805596
76 C-302 UTILITY SECTIONS - SHEET 2 OF 2 12805597
77 C-401 UTILITY STATION PART PLAN AND SECTION
NORTH
12805598
CIVIL
DOCUMENT 00 01 15 - ATTACHMENT PAGE 2
eProject No. 1566917
78 C-402 UTILITY STATION PART PLAN AND SECTION
SOUTH
12805599
79 C-403 REDUCED PRESSURE BACKFLOW PREVENTER PART
PLAN & SECTION
12805600
80 C-501 SITE DETAILS - SHEET 1 OF 2 12805601
81 C-502 SITE DETAILS - SHEET 2 OF 2 12805602
82 C-503 CRANE WEIGHT HANDLING AREA DETAILS - FENCE
AND GATE
12805603
83 C-504 CRANE WEIGHT HANDLING AREA DETAILS -
GUARDRAIL
12805604
84 C-505 CRANE WEIGHT HANDLING AREA - FENCE
OPENINGS
12805605
85 C-506 EROSION CONTROL NOTES AND DETAILS 12805606
86 C-507 UTILITY DETAILS - SHEET 1 OF 2 12805607
87 C-508 UTILITY DETAILS - SHEET 2 OF 2 12805608
88 C-509 GUARD BOOTH PLANS AND ELEVATIONS 12805609
89 CN101 OVERALL DREDGING SITE PLAN 12805610
90 CN102 DREDGING PLAN - WINDOW 2 12805611
91 CN103 DREDGING PLAN - WINDOW 3 12805612
92 CN104 DREDGING PLAN - WINDOW 4 12805613
93 CN105 CAD CELL PLAN 12805614
94 CN301 DREDGING TYPICAL SECTIONS 12805615
95 CN302 WINDOW 2 DREDGING SECTIONS
SHEET 1 OF 3
12805616
96 CN303 WINDOW 2 DREDGING SECTIONS
SHEET 2 OF 3
12805617
97 CN304 WINDOW 2 DREDGING SECTIONS
SHEET 3 OF 3
12805618
98 CN305 WINDOW 3 DREDGING SECTIONS
SHEET 1 OF 3
12805619
99 CN306 WINDOW 3 DREDGING SECTIONS
SHEET 2 OF 3
12805620
100 CN307 WINDOW 3 DREDGING SECTIONS
SHEET 3 OF 3
12805621
101 CN308 WINDOW 4 DREDGING SECTIONS
(BID OPTION 3)
12805622
102 CN309 CAD CELL CROSS SECTIONS SHEET 1 OF 2 12805623
103 CN310 CAD CELL CROSS SECTIONS SHEET 2 OF 2 12805624
104 S-001 STRUCTURAL GENERAL NOTES SHEET 1 OF 3 12805627
105 S-002 STRUCTURAL GENERAL NOTES SHEET 2 OF 3 12805628
106 S-003 STRUCTURAL GENERAL NOTES SHEET 3 OF 3 12805629
107 SD001 STRUCTURAL DEMOLITION NOTES 12805630
108 SD101 OVERALL STRUCTURAL DEMOLITION PLAN 12805631
109 SD102 PIER 10 DEMOLITION PLAN (BID OPTION 1) 12805632
110 SD103 PIER 17 STUB PIER DEMOLITION PLAN
(BID OPTION 2)
12805633
111 SD104 EXISTING PIER 32 DEMOLITION PLAN 12805634
112 SD105 QUAYWALL DEMOLITION PLAN AT UTILITY VAULT 12805635
STRUCTURAL
DOCUMENT 00 01 15 - ATTACHMENT PAGE 3
eProject No. 1566917
113 SD106 CRANE WEIGHT TEST AREA QUAYWALL DEMOLITION
PLAN (BID OPTION 5)
12805636
114 SD301 PIER 10 DEMOLITION SECTIONS
(BID OPTION 1)
12805637
115 SD302 PIER 17 STUB PIER DEMOLITION SECTION (BID
OPTION 2)
12805638
116 SD303 EXISTING PIER 32 DEMOLITION SECTIONS 12805639
117 SD304 QUAYWALL DEMOLITION SECTION AT UTILITY
VAULT
12805640
118 SD305 CRANE WEIGHT TEST AREA QUAYWALL DEMO
SECTION (BID OPTION 5)
12805641
119 SD601 PIER 10 DEMOLITION PHOTOGRAPHS
SHEET 1 OF 2 (BID OPTION 1)
12805642
120 SD602 PIER 10 DEMOLITION PHOTOGRAPHS
SHEET 2 OF 2 (BID OPTION 1)
12805643
121 SD603 PIER 17 STUB PIER DEMOLITION PHOTOGRAPHS
(BID OPTION 2)
12805644
122 SD604 PIER 32 DEMOLITION PHOTOGRAPHS
SHEET 1 OF 2
12805645
123 SD605 PIER 32 DEMOLITION PHOTOGRAPHS
SHEET 2 OF 2
12805646
124 SD606 CRANE WEIGHT TEST AREA DEMOLITION
PHOTOGRAPHS (BID OPTION 5)
12805647
125 S-101 OVERALL STRUCTURAL PLAN 12805648
126 S-102 PIER 32 STRUCTURAL KEY PLAN 12805649
127 S-103 PILE PLAN - AREA A 12805650
128 S-104 PILE PLAN - AREA B 12805651
129 S-105 PILE PLAN - AREA C 12805652
130 S-106 FRAMING PLAN - AREA A 12805653
131 S-107 FRAMING PLAN - AREA B 12805654
132 S-108 FRAMING PLAN - AREA C 12805655
133 S-109 PRECAST CONCRETE PLANK PLAN - AREA A 12805656
134 S-110 PRECAST CONCRETE PLANK PLAN - AREA B 12805657
135 S-111 PRECAST CONCRETE PLANK PLAN - AREA C 12805658
136 S-112 DECK PLAN - AREA A 12805659
137 S-113 DECK PLAN - AREA B 12805660
138 S-114 DECK PLAN - AREA C 12805661
139 S-115 FENDER PILE PLAN - AREA A 12805662
140 S-116 FENDER PILE PLAN - AREA B 12805663
141 S-117 FENDER PILE PLAN - AREA C 12805664
142 S-118 DECK DRAINAGE PLAN 12805665
143 S-119 CRANE WEIGHT TEST AREA QUAYWALL PLAN (BID
OPTION 5)
12805666
144 S-120 PIER 32 FLOATING SECURITY BARRIER PLAN 12805667
145 S-121 PIER 32 FLOATING SECURITY BARRIER PLAN 12805668
146 S-201 NORTH AND SOUTH ELEVATIONS 12805669
147 S-301 TYPICAL PIER SECTIONS 12805670
148 S-302 TYPICAL PIER SECTIONS 12805671
149 S-303 TYPICAL PIER SECTIONS 12805672
150 S-304 TYPICAL PIER SECTIONS 12805673
DOCUMENT 00 01 15 - ATTACHMENT PAGE 4
eProject No. 1566917
151 S-305 CRANE WEIGHT TEST AREA QUAYWALL SECTION
(BID OPTION 5)
12805674
152 S-401 UTILITY VAULT PARTIAL PLAN 12805675
153 S-402 PIER 10 FENDER SYSTEM (BID OPTION 1) 12805676
154 S-403 PIER 17 STUB PIER FENDER SYSTEM
(BID OPTION 2)
12805677
155 S-404 EXISTING PIER 32 FENDER SYSTEM 12805678
156 S-501 PILE DETAILS SHEET 1 OF 2 12805679
157 S-502 PILE DETAILS SHEET 2 OF 2 12805680
158 S-503 PILE CAP SECTION AND ELEVATIONS 12805681
159 S-504 PILE CAP DETAILS 12805682
160 S-505 BEAM SECTIONS AND DETAILS 12805683
161 S-506 CRANE WEIGHT TEST AREA DETAILS 12805684
162 S-507 PRECAST CONCRETE PLANK DETAILS
SHEET 1 OF 2
12805685
163 S-508 PRECAST CONCRETE PLANK DETAILS
SHEET 2 OF 2
12805686
164 S-509 MISCELLANEOUS SECTIONS AND DETAILS 12805687
165 S-510 MANHOLE SECTIONS AND DETAILS 12805688
166 S-511 OUTBOARD SUBSTATION PLATFORM 12805689
167 S-512 INBOARD SUBSTATION PLATFORM 12805690
168 S-513 MOORING HARDWARE DETAILS 12805691
169 S-514 MISCELLANEOUS SECTIONS AND DETAILS 12805692
170 S-515 COMPOSITE FENDER PILE DETAILS 12805693
171 S-516 COMPOSITE FENDER PILE SECTIONS 12805694
172 S-517 COMPOSITE CAMEL NOTES AND DETAILS
(BID OPTION 4)
12805695
173 S-518 COMPOSITE CAMEL PLAN & ELEVATIONS
(BID OPTION 4)
12805696
174 S-519 COMPOSITE CAMEL SECTIONS SHEET 1 OF 2 (BID
OPTION 4)
12805697
175 S-520 COMPOSITE CAMEL SECTIONS SHEET 2 OF 2 (BID
OPTION 4)
12805698
176 S-521 COMPOSITE CAMEL DETAILS (BID OPTION 4) 12805699
177 S-522 POWER CABLE JIB CRANE DETAILS
SHEET 1 OF 2
12805700
178 S-523 POWER CABLE JIB CRANE DETAILS
SHEET 2 OF 2
12805701
179 S-524 JIB CRANE POWER CABLE RACK DETAILS 12805702
180 S-530 BROW - PLAN AND SECTION 12805703
181 S-531 BROW - SECTIONS 12805704
182 S-532 BROW - ELEVATION, DETAIL AND SECTION 12805705
183 S-533 BROW - RETRACTABLE PLATFORM ELEVATION &
SECTION
12805706
184 S-534 BROW - SWIVEL PLATFORM DETAILS 12805707
185 S-535 BROW SWIVEL PLATFORM SECTION AND DETAILS 12805708
186 S-536 BROW SUPPORT SLAB AND BEAM DETAILS 12805709
187 S-537 BROW AND POST ELEVATIONS 12805710
188 S-538 BROW SUPPORT POST DETAILS 12805711
DOCUMENT 00 01 15 - ATTACHMENT PAGE 5
eProject No. 1566917
189 S-539 BROW CONNECTION DETAILS 12805712
190 S-550 MISCELLANEOUS DETAILS SHEET 1 OF 2 12805713
191 S-551 MISCELLANEOUS DETAILS SHEET 2 OF 2 12805714
192 S-552 TURBIDITY CURTAIN NOTES AND DETAILS 12805715
193 S-601 PILE SCHEDULES 12805716
194 S-602 PIER 32 COMPOSITE FENDER PILE SCHEDULES
SHEET 1 OF 2
12805717
195 S-603 PIER 32 COMPOSITE FENDER PILE SCHEDULES
SHEET 2 OF 2
12805718
196 S-604 QUAYWALL POST DEMOLITION COMPOSITE FENDER
PILE SCHEDULE
12805719
197 SU401 BACKFLOW PREVENTER STRUCTURE PLAN AND
SECTIONS
12805723
198 SU402 ELEVATED SWITCHGEAR PLATFORM PART PLAN AND
SECTIONS
12805724
199 SU501 STRUCTURAL PIPE SUPPORT DETAILS 12805725
200 SU502 CRANE WEIGHT TEST PAD AND LIGHT POLE 12805726
201 SU503 ELEVATED PLATFORM DETAILS 12805727
202 F-101 FIRE PROTECTION PLAN - PIER 32 END 12805730
203 F-102 FIRE PROTECTION PLAN - PIER 32 MIDDLE 12805731
204 F-103 FIRE PROTECTION PLAN - PIER 32 LAND SIDE
NORTH
12805732
205 F-401 FIRE PROTECTION CONNECTION PLANS AND
SECTIONS
12805733
206 F-501 FIRE PROTECTION REDUCED PRESSURE BACKFLOW
PREVENTER DETAIL
12805734
207 FA101 FIRE ALARM PLAN- PIER 32 LAND SIDE NORTH 12805735
208 FA501 FIRE ALARM DETAILS 12805736
209 M-001 LEGEND, ABBREVIATIONS AND GENERAL NOTES 12805739
210 M-101 COMPRESSED AIR PLAN - PIER 32 LAND SIDE
NORTH
12805740
211 M-501 COMPRESSED AIR DETAILS 12805741
212 M-502 PIPE SUPPORT DETAILS - SHEET 1 OF 2 12805742
213 M-503 PIPE SUPPORT DETAILS - SHEET 2 OF 2 12805743
214 M-601 COMPRESSED AIR SCHEDULES 12805744
215 M-701 HVAC SEQUENCE OF OPERATIONS 12805745
216 E-001 LEGEND, ABBREVIATIONS AND GENERAL NOTES 12805748
217 ED101 ELECTRICAL DEMOLITION PLAN - PIER 10 END 12805749
218 ED102 ELECTRICAL DEMOLITION PLAN - PIER 10
MIDDLE
12805750
219 ED103 ELECTRICAL DEMOLITION PLAN - PIER 10 LAND
SIDE
12805751
STRUCTURAL UTILITY
FIRE PROTECTION
ELECTRICAL
MECHANICAL
DOCUMENT 00 01 15 - ATTACHMENT PAGE 6
eProject No. 1566917
220 ED104 ELECTRICAL DEMOLITION PLAN - PIER 17 STUB 12805752
221 ED105 ELECTRICAL DEMOLITION PLAN - PIER 32 END 12805753
222 ED106 ELECTRICAL DEMOLITION PLAN - PIER 32
MIDDLE
12805754
223 ED107 ELECTRICAL DEMOLITION PLAN - PIER 32 LAND
SIDE SOUTH
12805755
224 ED108 ELECTRICAL DEMOLITION PLAN - PIER 32 LAND
SIDE NORTH
12805756
225 E-101 ELECTRICAL PLAN - PIER 32 END 12805757
226 E-102 ELECTRICAL PLAN - PIER 32 MIDDLE 12805758
227 E-103 ELECTRICAL PLAN - PIER 32 LAND SIDE NORTH 12805759
228 E-104 ELECTRICAL PLAN - CRANE WEIGHT HANDLING
AREA
12805760
229 E-301 SECTION THROUGH PIER AND DETAILS 12805761
230 E-401 UNIT SUBSTATION NORTH P32N PART PLAN AND
ELEVATION
12805762
231 E-402 UNIT SUBSTATION SOUTH P32S PART PLAN AND
ELEVATION
12805763
232 E-501 MANHOLE AND DUCTBANK DETAILS 12805764
233 E-502 SF6 SWITCH PLATFORM DETAILS 12805765
234 E-503 NORTH SWITCHGEAR P32N ELEVATION DETAIL 12805766
235 E-504 SOUTH SWITCHGEAR P32N ELEVATION DETAIL 12805767
236 E-505 COMMUNICATIONS STATION DETAILS 12805768
237 E-506 UTILITY OUTLET STATION DETAILS 12805769
238 E-507 HOTEL AND TEST STATION DETAILS 12805770
239 E-508 GROUNDING PLAN AND DETAILS 12805771
240 E-509 HEAT TRACE CABINET AND DETAILS 12805772
241 E-510 AMI SYSTEM DETAILS SHEET 1 OF 3 12805773
242 E-511 AMI SYSTEM DETAILS SHEET 2 OF 3 12805774
243 E-512 AMI SYSTEM DETAILS SHEET 3 OF 3 12805775
244 E-513 LUMINAIRE SCHEDULE AND DETAILS 12805776
245 E-514 LUMINAIRE DETAILS 12805777
246 E-515 MISCELLANEOUS DETAILS 12805778
247 E-516 CCTV DETAILS 12805779
248 E-530 CATHODIC PROTECTION PILE PLAN 12805780
249 E-531 CATHODIC PROTECTION DETAILS 12805781
250 E-601 ELECTRIAL ONE LINE DIAGRAM NO. 1 - NORTH
SIDE SERVICES
12805782
251 E-602 ELECTRIAL ONE LINE DIAGRAM NO. 1 - SOUTH
SIDE SERVICES
12805783
252 E-603 15kV ONE LINE DIAGRAM 12805784
253 E-604 COMMUNICATIONS RISER DIAGRAM 12805785
254 E-605 RELAYING, TRANSFER AND INSTRUMENTATION ONE
LINE DIAGRAM (P32N)
12805786
255 E-606 RELAYING, TRANSFER AND INSTRUMENTATION ONE
LINE DIAGRAM (P32S)
12805787
256 E-607 SWITCHGEAR CONTROL DIAGRAMS 12805788
DOCUMENT 00 01 15 - ATTACHMENT PAGE 7
eProject No. 1566917
257 E-608 HEAT TRACE ONE LINE DIAGRAM AND SCHEDULES 12805789
258 E-609 LIGHTING CONTROL DIAGRAMS 12805790
259 E-610 UNIT SUBSTATION NORTH P32N SWITCHGEAR
SCHEDULE
12805791
260 E-611 UNIT SUBSTATION SOUTH P32S SWITCHGEAR
SCHEDULE
12805792
261 E-612 UTILITY OUTLET STATIONS NORTH SIDE
PANELBOARD SCHEDULES
12805793
262 E-613 UTILITY OUTLET STATIONS SOUTH SIDE
PANELBOARD SCHEDULES
12805794
263 E-614 SWITCHGEAR NORTH HOUSE PANELBOARD
SCHEDULES
12805795
264 E-615 SWITCHGEAR SOUTH HOUSE PANELBOARD
SCHEDULES
12805796
265 E-616 POWER CONDUIT AND CABLE SCHEDULE 12805797
266 E-617 COMMUNICATIONS CONDUIT AND CABLE SCHEDULE 12805798
267 R-001 LEGEND, SURVEY NOTES AND ABBREVIATIONS 12805801
268 R-002 CONTROL PLAN, REFERENCE SKETCHES AND
DIAGRAM OF DATUM PLANE
12805802
269 R-003 UTILITY STRUCTURE DATA 12805803
270 R-004 UTILITY STRUCTURE DATA 12805804
271 R-005 UTILITY STRUCTURE DATA 12805805
272 R-006 TOPOGRAPHIC SURVEY 12805806
REFERENCE
DOCUMENT 00 01 15 - ATTACHMENT PAGE 8
SECTION 01 11 00
SUMMARY OF WORK
08/15
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Salvage Plan; G
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
The work includes constructing Pier 32, demolishing existing Pier 32, demolishing existing submarine berthing Pier 10, and demolishing the stub pier adjacent to Pier 17 and incidental related work at Naval Submarine Base New London. Major work elements include, but are not limited to:
a. Concrete filled steel pipe pile supported pier with concrete deck;
b. Mooring fitings;
c. Composite fender system and specialized equipment including fendering camels;
d. Pier utilities including:
(1) Low pressure compressed air station with distribution lines and risers;
(2) Electrical shore power including primary and secondary distribution, transformers, substations, primary switches, grounding/lightning protection;
(3) Fire protection water distribution lines and riser;
(4) Potable water distribution lines and riser;
(5) Salt water distribution lines and riser;
(6) Sanitary sewer distribution lines and riser; and
(7) Telecommunication infrastructure for Nonclassified Internet
Protocol Router Network (NIPRNET).
e. Passive cathodic protection system;
f. Retractable crane-less brows;
g. Jib cranes for supporting electrical cables between the pier and the submarines;
h. Strengthening a portion of the quaywall apron north of Pier 33 to accommodate crane test weights.
i. Anti-Terrorism/Force Protection (AT/FP) features;
j. Dredging pier and turning basin areas;
k. Site grading, paving, and drainage.
1.2.2 Location
The work is located at the Naval Submarine Base New London (NSB NLON), SECTION 01 11 00 Page 1
Groton, CT, approximately as indicated. The exact location will be shown by the Contracting Officer.
1.3 OCCUPANCY OF PREMISES
Building(s) and areas immediately adjacent to the project site will be occupied during performance of work under this Contract. Existing Pier 32 will be occupied and remain in service until construction of the New Pier 32 is complete.
Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.
1.4 EXISTING WORK
In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.
1.5 LOCATION OF UNDERGROUND UTILITIES
Obtain digging permits prior to start of excavation, and comply with Installation requirements for locating and marking underground utilities.
Contact local utility locating service a minimum of 21 days prior to excavating, to mark utilities. Verify existing utility locations indicated on contract drawings, within area of work.
Scan the construction site with Ground Penetrating Radar (GPR), electromagnetic, or sonic equipment, and mark the surface of the ground, pier deck or paved surface where existing underground utilities or utilities encased in pier structures are discovered. Verify the elevations of existing piping, utilities,and any type of underground or encased obstruction not indicated, or specified to be removed, that is indicated or discovered during scanning, in locations to be traversed by piping, ducts, and other work to be conducted or installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.
1.5.1 Notification Prior to Excavation
Notify the Contracting Officer at least 15 days prior to starting excavation work.
1.6 UTILITY OUTAGES AND CONNECTIONS
The following procedure shall apply to all utility outages, connections, and excavations related thereto:
a. Pre-outage request = submit 28 days before work is scheduled to begin.
SECTION 01 11 00 Page 2
b. Utility locating = complete 21 days before work is scheduled to begin.
c. Utility outage plan submittal = 14 days before work is scheduled to begin.
d. Pre-outage coordination meeting = 7 days before work is scheduled to begin.
1.7 NAVY AND MARINE CORPS (NMCI) COORDINATION REQUIREMENTS
1.7.1 NMCI Contractor Access
Allow the NMCI Contractor access to the facility towards the end of construction (finishes 90 percent complete, rough-in 100 percent complete, Inside Plant (ISP)/Outside Plant (OSP) infrastructure in place) to provide equipment in the telecommunications rooms and make final connections.
Coordinate efforts with the NMCI Contractor to facilitate joint use of building spaces during the final phases of construction. After the Contracting Officer has facilitated coordination meetings between the two contractors, within one week, incorporate the effort of additional coordination with the NMCI Contractor into the construction schedule to demonstrate a plan for maintaining the contract duration.
1.8 SALVAGE MATERIAL AND EQUIPMENT
Items designated by the Contracting Officer to be salvaged remain the property of the Government. Segregate, itemize, deliver and off-load the salvaged property at the Government designated storage area located within 5 miles of the construction site.
Provide a salvage plan, listing material and equipment to be salvaged, and their storage location. Maintain property control records for material or equipment designated as salvage. Use a system of property control that is approved by the Contracting Officer. Store and protect salvaged materials and equipment until disposition by the Contracting Officer.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
SECTION 01 11 00 Page 3
SECTION 01 11 00 Page 4
SECTION 01 14 00
WORK RESTRICTIONS
11/11
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
List of Contact Personnel; G
1.2 SPECIAL SCHEDULING REQUIREMENTS
a. Work must be phased as indicated on the the Contract Drawings.
b. Have materials, equipment, and personnel required to perform the work at the site prior to the commencement of the work.
c. Permission to interrupt any Activity roads, railroads, or utility service must be requested in writing a minimum of 15 calendar days prior to the desired date of interruption.
d. The work under this contract requires special attention to the scheduling and conduct of the work in connection with existing operations. Identify on the construction schedule each factor which constitutes a potential interruption to operations, including the following:
(1) Electrical System Connections
(2) Telecommunications Systems Connections
(3) Water and Salt Water Connections
(4) Compressed Air Connections
1.3 CONTRACTOR ACCESS AND USE OF PREMISES
1.3.1 Activity Regulations
Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. To minimize traffic congestion, delivery of materials shall be outside of peak traffic hours (6:30 to 8:00 a.m. and 3:30 to 5:00 p.m.) unless otherwise approved by the Contracting Officer. Wear hard hats in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Mark Contractor equipment for identification.
SECTION 01 14 00 Page 1
1.3.1.1 Subcontractors and Personnel Contacts
Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.
1.3.1.2 Installation Access
Obtain access to Navy installations through participation in the Defense Biometrics Identification System (DBIDS). Requirements for Contractor employee registration, and transition for employees currently under Navy Commercial Access Control System (NCACS), are available at https://www.cnic.navy.mil/om/dbids.html . No fees are associated with obtaining a DBIDS credential.
Participation in the DBIDS is not mandatory, and Contractor personnel may apply for One-Day Passes at the Base Visitor Control Office to access an installation.
1.3.1.2.1 Registration for DBIDS
Registration for DBIDS is available at https://www.cnic.navy.mil/om/dbids.html . Procedure includes:
a. Present a letter or official award document (i.e. DD Form 1155 or SF 1442) from the Contracting Officer, that provides the purpose for access, to the base Visitor Control Center representative.
b. Present valid identification, such as a passport or Real ID Act-compliant state driver's license.
c. Provide completed SECNAV FORM 5512/1 to the base Visitor Control Center representative to obtain a background check. This form is available for download at https://www.cnic.navy.mil/om/dbids.html .
d. Upon successful completion of the background check, the Government will complete the DBIDS enrollment process, which includes Contractor employee photo, finger prints, base restriction and several other assessments.
e. Upon successful completion of the enrollment process, the Contractor employee will be issued a DBIDS credential, and will be allowed to proceed to worksite.
f. Present DBIDS credential and completed SECNAV FORM 5512/1 to the base Visitor Control Center representative for each additional U.S. Navy installation to which access is required. The representative add base access authorization to the existing DBIDS credential and the Contractor employee will be allowed to proceed to the worksite.
g. Notify the correct point of contact within the DBIDS system and ensure that badge permissions reflect work hours outside of normal schedule if required.
1.3.1.2.2 DBIDS Eligibility Requirements
Throughout the length of the contract, the Contractor employee must
SECTION 01 14 00 Page 2 continue to meet background screen standards. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges. DBIDS access privileges will be immediately suspended or revoked if at any time a Contractor employee becomes ineligible.
An adjudication process may be initiated when a background screen failure results in disqualification from participation in the DBIDS, and Contractor employee does not agree with the reason for disqualification.
The Government is the final authority.
1.3.1.2.3 DBIDS Notification Requirements
a. Immediately report instances of lost or stolen badges to the Contracting Officer.
b. Immediately collect DBIDS credentials and notify the Contracting Officer in writing under the following circumstances:
(1) An employee has departed the company without having properly returned or surrendered their DBIDS credentials.
(2) There is a reasonable basis to conclude that an employee, or former employee, might pose a risk, compromise, or threat to the safety or security of the Installation or anyone therein.
1.3.1.2.4 One-Day Passes
Personnel applying for One-Day passes at the Base Visitor Control Office are subject to daily mandatory vehicle inspection, and will have limited access to the installation. The Government is not responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections incurred by non-participants in the DBIDS.
1.3.1.3 No Smoking Policy
Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.
1.3.2 Entry to Radiologically Controlled Areas
Contractor personnel must not, under any circumstances, enter a radiologically controlled area or cross any posted radiological boundary.
This paragraph applies to all phases of contract work. Radiation areas are posted with signs consistent with OSHA requirements. Ensure that employees are familiar with the radiation signs and symbols. All personnel entering NAVSUBASE for the first time are required to receive radiological indoctrination training.
Should contract workers encounter radiological postings or boundaries which appear to limit their ability to access or carry out their intended work, they must notify their contract administrator for resolution of the problem.
SECTION 01 14 00 Page 3
1.3.2.1 Radioactive Materials and Equipment
All testing equipment, containing a radioactive source, must be operated in accordance with an approved radioactive equipment plan. This plan must be submitted to the Contracting Officer and approved by the Radiation Officer (Code 105.5), prior to bringing the equipment into NAVSUBASE.
This plan must include:
a. The name and type of equipment.
b. The type and size of radiation source.
c. The dates and locations of the equipment's usage.
d. The radiological controls that the Contractor will use while operating the equipment.
A different radioactive equipment plan will be required for each different type of equipment, type of radioactive source, or size of radioactive source. A data sheet of for each piece of new radioactive equipment must be submitted to the Contracting Officer to forward to NAVSUBASE's Radiation Safety Officer. The data sheet must contain the following information:
a. Name of equipment.
b. Name and address of equipment manufacturer.
c. Type and size of radiation source.
d. The location of the installed radioactive equipment (i.e. building no., floor, code/shop area).
1.3.3 Working Hours
Regular working hours must consist of an 8 1/2 hour period established by the Contracting Officer, between 7 a.m. and 5:00 p.m., Monday through Friday, excluding Government holidays.
1.3.4 Work Outside Regular Hours
Work outside regular working hours requires Contracting Officer approval.
Make application 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer. Make utility cutovers after normal working hours or on Saturdays, Sundays, and Government holidays unless directed otherwise.
1.3.5 Waterfront Access
The Base is protected by a waterfront security barrier located between the main channel of the Thames River and the project site. The waterfront security barrier can only be opened Monday through Friday between 0900 and 1500. It cannot be opened on Government holidays or weekends. Schedule all movement of floating equipment, boats, and barges through the security
SECTION 01 14 00 Page 4 barrier around this schedule at least 24 hours in advance of the required opening.
1.3.6 Occupied Buildings
The Contractor will be working around existing buildings which are occupied. Do not enter the buildings without prior approval of the Contracting Officer.
1.3.7 Utility Cutovers and Interruptions
a. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures required in paragraph WORK OUTSIDE REGULAR HOURS.
b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.
c. Interruption to water, sanitary sewer, storm sewer, telecommunications services, electric service, fire alarm, security systems, compressed air, and steam are considered utility cutovers pursuant to the paragraph WORK OUTSIDE REGULAR HOURS.
d. Operation of Station Utilities: The Contractor must not operate nor disturb the setting of control devices in the station utilities system, including water, sewer, electrical, and steam services. The Government will operate the control devices as required for normal conduct of the work. The Contractor must notify the Contracting Officer giving reasonable advance notice when such operation is required.
e. Connection to Existing Sanitary Sewer Line: Provide positive verification that the existing line conveys sanitary sewer; verify line is not incorrectly connected to a storm drain.
f. Contractor is responsible for locking out and tagging out of service, all equipment/utility systems involved under this contract. All locks used to control hazardous energy for personnel shall have red bodies, and red bodied locks shall be used for no other purpose at NSB NLON.
After an outage has been approved, Government personnel will secure the equipment/utility distribution systems and tag those systems outside the building. Operation and isolation of utility services within the building are the responsibility of the Contractor. Where possible, the Contractor shall provide any necessary locks and chains to secure utility systems (i.e. steam, water, air, electricity) and to achieve a zero mechanical state (ZMS) for all machinery involved. ZMS is defined as the mechanical state of a machine in which:
(1) Every power source that can produce machine movement has been locked off.
(2) The mechanical potential energy of all portions of the machine is at its lowest potential value so opening of pipes, valves, hoses, or actuation of any valve will not produce a movement that could easily cause injury.
(3) The kinetic energy of the machine is at its lowest practical value.
(4) Pressurized fluid (air, oil, or other) trapped in the machine
SECTION 01 14 00 Page 5 lines, cylinders, or other components is not capable of producing a machine motion upon actuation of any valve.
1.3.7.1 Location of Underground Utilities
Obtain digging permits prior to start of excavation by contacting the Contracting Officer 15 calendar days in advance. Scan the construction site with electromagnetic or sonic equipment, and mark the surface of the ground or paved surface where existing underground utilities or utilities encased in pier structures are discovered. Verify the elevations of existing piping, utilities, and any type of underground or encased obstruction not indicated to be specified or removed but indicated or discovered during scanning in locations to be traversed by piping, ducts, and other work to be conducted or installed.
Notification Prior to Excavation: Notify the Contracting Officer at least 15 days prior to starting excavation work.
1.3.8 NAVSUBASE Area Work Clearance Request
1.3.8.1 NAVSUBASE Hazardous Areas
Do not enter into work areas where NAVSUBASE personnel are using protective equipment such as respirator and masks or marked boundary areas without prior approval.
1.4 SECURITY REQUIREMENTS
Contract Clause FAR 52.204-2 Security Requirements and Alternate II and the following apply:
1.4.1 Naval Submarine Base New London, Groton, CT
In addition to the requirements described in the Paragraph CONTRACTOR ACCESS AND USE OF PREMISES, the Contractor is advised of the following:
a. Vehicles and Equipment - In addition to other conditions and requirements set forth hereinbefore, attenuation is invited to the fact that vehicles and equipment admitted to the Naval Submarine Base New London, Groton CT will be required to meet standards established by the Station Safety Department.
b. Contractor responsibility for employees - The Contractor is responsible for employees under his employment. Ensure that employees are familiar with and obey station traffic safety, and security regulations.
c. Photographs - Taking photographs is prohibited on the Naval Submarine Base New London, Groton, CT. When operationally required, submit a written request containing justification and details to the Security Officer and receive written permission prior to taking photographs.
d. Storage and office trailer registration. Register storage and office trailers to be used on base with the truck investigation team.
Trailers shall meet State law requirements and shall be in like new condition.
(1) Trailers shall be lockable and shall be locked when not in use.
SECTION 01 14 00 Page 6
(2) Trailers shall have a sign in the lower left hand corner of all trailer doors with the following information: Company name, address, registration number of trailer or vehicle identification number, duration of contract or stay on base, contract number, local on-base phone number, off-base phone number of main office, and emergency recall person and phone number.
e. Equipment markings-equipment owned or rented by the company shall have the company name painted or stenciled on the equipment in a conspicuous location. Rented equipment is to be conspicuously marked with a tag showing who rented the equipment. Register the equipment with the truck investigation team.
1.4.2 Inspection
Personnel and equipment are subject to inspection. Personnel are also subject to physical searches at random intervals. Contractor shall take into consideration that due to increased security there may be delays, as much as 2 hours, entering the Base.
1.4.3 Parking
Do not park in or block any marked fire lanes at any time. The Contractor will be permitted 2 parking spaces in the Lower Base area. Contractor's workers shall park in the first come, first serve open parking area indicated near Building 410. Transportation from the parking area to the work site is at the Contractor's expense.
1.4.4 Radiological Accident (RADCON) Drills
RADCON drills are conducted about once every three (3) months. Traveling throughout the lower base (west of the railroad tracks) is prohibited throughout the duration of the drill. The drills are from two (2) to four
(4) hours duration. During the drill:
a. All personnel shall take cover in the nearest building.
b. All vehicles shall stop and vehicle occupants shall take cover in the nearest building.
c. There shall be no eating, drinking or smoking.
d. All windows and building ventilation shall be secured.
All personnel on the Upper and Lower Base shall listen to the public address system for specific instructions. Upper Base personnel may be required to take actions as described for Lower Base personnel. All costs associated with delays due to RADCON drills are the responsibility of the Contractor.
1.4.5 Work in the Thames River
No underwater excavation or disposal of dredged material will be permitted for all projects where work is to be performed in the Thames River or along the shoreline of the Thames River at the Naval Submarine Base New London, Groton, CT, during the environmentally sensitive period between 1 February and 30 September.
SECTION 01 14 00 Page 7
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
SECTION 01 14 00 Page 8
SECTION 01 20 00.00 20
PRICE AND PAYMENT PROCEDURES
11/11
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EP 1110-1-8 (2016) Construction Equipment Ownership and Operating Expense Schedule
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Schedule of Prices; G
1.3 SCHEDULE OF PRICES
1.3.1 Data Required
Within 15 calendar days of notice of award, prepare and deliver to the Contracting Officer a Schedule of Prices (construction contract) as directed by the Contracting Officer. Provide a detailed breakdown of the contract price, giving quantities for each of the various kinds of work, unit prices, and extended prices. Costs shall be summarized and totals provided for each construction category.
1.3.2 Schedule Instructions
Payments will not be made until the Schedule of Prices has been submitted to and accepted by the Contracting Officer.
1.3.3 Real Property…