Admin/Whse/Mtr-T Fac Repairs, Bldgs 905, 1116, 1855, & FC45Work Order #19-0147
Camp Lejeune, Jacksonville, NC
PROJECT TABLE OF CONTENTS Page 1
PROJECT TABLE OF CONTENTS
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
02 82 16 REMOVAL AND DISPOSAL OF ASBESTOS MATERIALS
02 82 30 RE-ESTABLISHING VEGETATION
02 82 33.12 PREPARATION OF SURFACES COATED WITH CONTAMINATED PAINT
02 82 33.13 REMOVAL AND DISPOSAL OF MATERIALS COATED WITH
LEAD-CONTAINING PAINT
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 61 15.00 20 ALUMINUM STANDING SEAM ROOFING
DIVISION 08 - OPENINGS
08 33 23 OVERHEAD COILING DOORS
08 51 13 ALUMINUM WINDOWS
08 81 00 GLAZING
08 91 00 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 67 23.13 STANDARD RESINOUS FLOORING
DIVISION 10 - SPECIALTIES
10 14 00.20 INTERIOR SIGNAGE
10 22 13 WIRE MESH PARTITIONS
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
22 15 14.00 40 GENERAL SERVICE COMPRESSED-AIR SYSTEMS, LOW PRESSURE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 INSULATION OF MECHANICAL SYSTEMS
23 09 23.13 BACnet DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC
23 35 00.00 10 OVERHEAD VEHICLE TAILPIPE EXHAUST REMOVAL SYSTEM(S)
23 52 43.00 20 LOW PRESSURE WATER HEATING BOILERS (UNDER 800,000 BTU/HR
OUTPUT)
23 73 33 HEATING, VENTILATING, AND COOLING SYSTEM
DIVISION 26 - ELECTRICAL
26 00 00 BASIC ELECTRICAL MATERIALS AND METHODS
26 08 00 APPARATUS INSPECTION AND TESTING
26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 24 13 SWITCHBOARDS
26 27 14.00 20 ELECTRICITY METERING
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 51 00.00 22 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
Admin/Whse/Mtr-T Fac Repairs, Bldgs 905, 1116, 1855, & FC45Work Order #19-0147
Camp Lejeune, Jacksonville, NC
PROJECT TABLE OF CONTENTS Page 2
DIVISION 27 - COMMUNICATIONS
27 05 29.00 10 PROTECTIVE DISTRIBUTION SYSTEM (PDS) FOR SIPRNET
COMMUNICATION SYSTEMS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 54 00.00 20 COMMUNITY ANTENNA TELEVISION (CATV) SYSTEMS
DIVISION 33 - UTILITIES
33 71 01 OVERHEAD TRANSMISSION AND DISTRIBUTION
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
-- End of Project Table of Contents --