Amnd 0002 20R0008 FINAL.pdf

PDF 36 KB Posted

Attached to
DB Administrative and Warehouse Facility Repairs
Solicitation number
N4008520R0008
Issued by

View the file

Other files

File Type Posted
Amnd 0005 20R0008 FINAL.pdf PDF
Amnd 0004 20R0008 FINAL.pdf PDF
EC_Wastewater_F8.pdf PDF
01 31 19.5 20 POST AWARD MEETINGS 10-2019.pdf PDF
PART 6 ATTACHMENT C_19-0145 SITE PLAN COMBINED.pdf PDF
EC_Wastewater_F9.pdf PDF
Amnd 0003 20R0008 FINAL.pdf PDF
11 24 24 ROOF FALL PROTECTION-30oct2019.pdf PDF
Part 5 Spec TOC.pdf PDF
EC_Electrical_F9.pdf PDF
EC_Storm_G8.pdf PDF
EC_Water_G8.pdf PDF
Attachment H1-Bldg 905 Furniture Inventory.pdf PDF
EC_Storm_G9.pdf PDF
EC_Electrical_F8.pdf PDF
EC_Water_G9.pdf PDF
01 33 10.5 20 DESIGN SUBMITTAL PROCEDURES 10-2019.pdf PDF
EC_Communication_G9.pdf PDF
EC_Wastewater_G8.pdf PDF
EC_Electrical_G8.pdf PDF
Part 4 TOC.pdf PDF
EC_Communication_G8.pdf PDF
EC_Communication_F8.pdf PDF
Part 2 Spec TOC.pdf PDF
07 52 00 MODIFIED BITUMEN 25_SEP2019.pdf PDF
EC_Wastewater_G9.pdf PDF
19-0145 Part 3_04DEC2019.pdf PDF
EC_Water_F8.pdf PDF
EC_Storm_F8.pdf PDF
EC_Storm_F9.pdf PDF
EC_Water_F9.pdf PDF
EC_Electrical_G9.pdf PDF
EC_Communication_F9.pdf PDF
19-0145_PART_2_TOC.pdf PDF
19-0145_PART_3_13AUG2019.pdf PDF
19-0145_PART_2_-_Admin-Whse-Mtr-T_Fac_Repairs.pdf PDF
19-0145_PART_5.pdf PDF
19-0145_PART_5_TOC.pdf PDF
19-0145_PART_4.pdf PDF
Amnd_0001_20R0008_FINAL.pdf PDF
Waiver.pdf PDF
N4008520R0008_DB_Admin_WH_Repairs.pdf PDF
Master_PPI_Form_Template.xls XLS spreadsheet
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 11)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

1 1

AMENDMENT NO. 0002 11/18/19 1634034

ACQ1

NAVAL FACILITIES ENGINEERING COMMAND,

MID-ATLANTIC

9742 MARYLAND AVENUE

NORFOLK, VA 23511-3095

See Item 6

✘ N4008520R0008

10/15/19

N4008520R0008 Design Build Administrative and Warehouse Facility Repairs

The date and the hour for the receipt of proposals is extended to 13 December 2019 no later than 2:00 pm (EDT).

File details come from the government source that posted it. Updated .