11 24 24 ROOF FALL PROTECTION-30oct2019.pdf

PDF 97 KB Posted

Attached to
DB Administrative and Warehouse Facility Repairs
Solicitation number
N4008520R0008
Issued by

View the file

Other files

File Type Posted
Amnd 0005 20R0008 FINAL.pdf PDF
Amnd 0004 20R0008 FINAL.pdf PDF
EC_Wastewater_F8.pdf PDF
01 31 19.5 20 POST AWARD MEETINGS 10-2019.pdf PDF
PART 6 ATTACHMENT C_19-0145 SITE PLAN COMBINED.pdf PDF
EC_Wastewater_F9.pdf PDF
Amnd 0003 20R0008 FINAL.pdf PDF
Part 5 Spec TOC.pdf PDF
EC_Electrical_F9.pdf PDF
EC_Storm_G8.pdf PDF
EC_Water_G8.pdf PDF
Attachment H1-Bldg 905 Furniture Inventory.pdf PDF
Amnd 0002 20R0008 FINAL.pdf PDF
EC_Storm_G9.pdf PDF
EC_Electrical_F8.pdf PDF
EC_Water_G9.pdf PDF
01 33 10.5 20 DESIGN SUBMITTAL PROCEDURES 10-2019.pdf PDF
EC_Communication_G9.pdf PDF
EC_Wastewater_G8.pdf PDF
EC_Electrical_G8.pdf PDF
Part 4 TOC.pdf PDF
EC_Communication_G8.pdf PDF
EC_Communication_F8.pdf PDF
Part 2 Spec TOC.pdf PDF
07 52 00 MODIFIED BITUMEN 25_SEP2019.pdf PDF
EC_Wastewater_G9.pdf PDF
19-0145 Part 3_04DEC2019.pdf PDF
EC_Water_F8.pdf PDF
EC_Storm_F8.pdf PDF
EC_Storm_F9.pdf PDF
EC_Water_F9.pdf PDF
EC_Electrical_G9.pdf PDF
EC_Communication_F9.pdf PDF
19-0145_PART_2_TOC.pdf PDF
19-0145_PART_3_13AUG2019.pdf PDF
19-0145_PART_2_-_Admin-Whse-Mtr-T_Fac_Repairs.pdf PDF
19-0145_PART_5.pdf PDF
19-0145_PART_5_TOC.pdf PDF
19-0145_PART_4.pdf PDF
Amnd_0001_20R0008_FINAL.pdf PDF
Waiver.pdf PDF
N4008520R0008_DB_Admin_WH_Repairs.pdf PDF
Master_PPI_Form_Template.xls XLS spreadsheet
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11 24 24

MCBCL FALL PROTECTION STANDARD NOVEMBER 2018

SSM FALL PROTECTION FOR TO BE USED IN ALL SSM ROOFS WITH SLOPES GREATER THAN 3/12

BEST VALUE SPEC DESCRIPTION

Design, furnish, install, and certify a complete and useable permanent fall protection system, inclusive of all components, appurtenances, fasteners, end stops, carriages, and equipment necessary for safety of maintenance workers. Salient characteristics which will be reviewed under best value source selection include:

1. Compliance with all Occupational Health and Safety regulations. The fall protection system shall allow the user to walk uninterrupted the entire horizontal length of the system without having to unhook from the system to pass through intermediate support points and provide secure anchorage to arrest a fall by the user.

2. Design system to accommodate 3 users at one time.

3. Design must be performed, signed, and sealed by a Professional Engineer from the manufacturer experienced in horizontal fall protection systems. Submit qualifications of engineer.

4. Design must provide for access from the roof hatch (where existing) to the roof ridge, allowing for continuous worker tie off to reach the ridge line. For buildings without an existing roof hatch, design must provide for access from the roof eave (at an acceptable location) to the roof ridge, allowing for continuous worker tie off to reach the ridge line. D‐rings are acceptable for ascent and decent parallel to standing seams, or propose alternative method.

5. Low profile and architecturally pleasing systems are preferred, and will be evaluated higher than more obtrusive designs. Choice of finishes in powder coated or anodized aluminum alloy are preferred. Concealed fasteners are preferred.

6. Provide three harnesses per Quad (six total for this contract). Each harness shall be complete and useable with all necessary hardware, lanyards, connectors, and energy absorbing device as recommended by the fall protection system supplier.

7. After fall protection system is installed, the manufacturer's authorized representative shall inspect and operate the system and make any final adjustments. The manufacturer's authorized representative shall issue a certificate attesting to the system's design and installation, and formally submit to the USG.

8. Fall protection system shall be installed under the direction of manufacturer's authorized trained personnel.

9. Train designated US Government personnel on‐site regarding proper use of system, as well as on techniques of rescue and retrieval of fallen personnel.

10. Suggested Source: 3M/Capital Safety Roofsafe Rail System distributed by Engineered Fall Protection, St Louis, MO (314) 707‐4760. https://www.fallprotect.com/wp‐ content/uploads/roofsafe‐rail‐system.pdf https://www.fallprotect.com/wp‐ content/uploads/roofsafe‐rail‐system.pdf. Other systems may be acceptable but will be reviewed on a case by case basis for performance, maintenance, and aesthetic considerations.

Systems which penetrate the roof or are aesthetically unpleasing will be rated a lower value.

11. Color must comply with the MCBCL Base Exterior Architectural Plan (BEAP) and the USG Architect. Submit color samples for approval.

File details come from the government source that posted it. Updated .