19-0145_PART_5_TOC.pdf
PDF 27 KB Posted
- Attached to
- DB Administrative and Warehouse Facility Repairs
- Solicitation number
- N4008520R0008
About this file
Part 5 TOC - Administrative and Warehouse Facility Repairs
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Admin/Whse/Mtr-T Fac Repairs, Bldgs 905, 1116, 1855, & FC45 Work Order #19-0147 Camp Lejeune, Jacksonville, NC
PROJECT TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 20 00.05 20 PRICE AND PAYMENT PROCEDURES FOR DESIGN-BUILD
01 30 00.05 20 ADMINISTRATIVE REQUIREMENTS FOR DESIGN-BUILD
01 31 19.05 20 POST AWARD MEETINGS
01 31 50 TRANSFER AND ACCEPTANCE OF MILITARY REAL PROPERTY
01 32 16 CONSTRUCTION PROGRESS DOCUMENTATION
01 32 17.00 20 COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS)
01 33 00.05 20 CONSTRUCTION SUBMITTAL PROCEDURES
01 33 10.05 20 DESIGN SUBMITTAL PROCEDURES
01 33 29.05 20 SUSTAINABILITY REPORTING FOR DESIGN-BUILD
01 35 26.05 20 GOVERNMENT SAFETY REQUIREMENTS FOR DESIGN-BUILD
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.05 20 DESIGN AND CONSTRUCTION QUALITY CONTROL
01 45 35.05 20 SPECIAL INSPECTIONS FOR DESIGN-BUILD
01 50 00.05 20 TEMPORARY FACILITIES AND CONTROLS FOR DESIGN-BUILD
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 57 19.01 20 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS
01 58 00 PROJECT IDENTIFICATION
01 59 00 TEMPORARY TRAILERS FOR DISPLACED TENANTS
01 60 00 REQUIREMENTS FOR PESTICIDE AND HERBICIDE COORDINATION
01 74 19.05 20 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT FOR
DESIGN-BUILD
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 78 24.00 20 FACILITY ELECTRONIC OPERATION AND MAINTENANCE SUPPORT
INFORMATION (eOMSI)
01 78 30.00 22 GIS DATA DELIVERABLES
01 91 00.15 TOTAL BUILDING COMMISSIONING
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 41 00 DEMOLITION
02 82 16 REMOVAL AND DISPOSAL OF ASBESTOS MATERIALS
02 82 30 RE-ESTABLISHING VEGETATION
02 82 33.12 PREPARATION OF SURFACES COATED WITH CONTAMINATED PAINT
02 82 33.13 REMOVAL AND DISPOSAL OF MATERIALS COATED WITH
LEAD-CONTAINING PAINT
DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON
07 61 15.00 20 ALUMINUM STANDING SEAM ROOFING
DI VI SI ON 08 - OPENI NGS
08 33 23 OVERHEAD COILING DOORS
08 51 13 ALUMINUM WINDOWS
08 81 00 GLAZING
08 91 00 METAL WALL LOUVERS
DI VI SI ON 09 - FI NI SHES
09 67 23.13 STANDARD RESINOUS FLOORING
DI VI SI ON 10 - SPECI ALTI ES
PROJECT TABLE OF CONTENTS Page 1
Admin/Whse/Mtr-T Fac Repairs, Bldgs 905, 1116, 1855, & FC45 Work Order #19-0147 Camp Lejeune, Jacksonville, NC
10 14 00.20 INTERIOR SIGNAGE
10 22 13 WIRE MESH PARTITIONS
DI VI SI ON 22 - PLUMBI NG
22 00 00 PLUMBING, GENERAL PURPOSE
22 15 14.00 40 GENERAL SERVICE COMPRESSED-AIR SYSTEMS, LOW PRESSURE
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 INSULATION OF MECHANICAL SYSTEMS
23 09 23.13 BACnet DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC
23 35 00.00 10 OVERHEAD VEHICLE TAILPIPE EXHAUST REMOVAL SYSTEM(S)
23 52 43.00 20 LOW PRESSURE WATER HEATING BOILERS (UNDER 800,000 BTU/HR
OUTPUT)
23 73 33 HEATING, VENTILATING, AND COOLING SYSTEM
DI VI SI ON 26 - ELECTRI CAL
26 00 00 BASIC ELECTRICAL MATERIALS AND METHODS
26 08 00 APPARATUS INSPECTION AND TESTING
26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 24 13 SWITCHBOARDS
26 27 14.00 20 ELECTRICITY METERING
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 51 00.00 22 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DI VI SI ON 27 - COMMUNI CATI ONS
27 05 29.00 10 PROTECTIVE DISTRIBUTION SYSTEM (PDS) FOR SIPRNET
COMMUNICATION SYSTEMS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 54 00.00 20 COMMUNITY ANTENNA TELEVISION (CATV) SYSTEMS
DI VI SI ON 33 - UTI LI TI ES
33 71 01 OVERHEAD TRANSMISSION AND DISTRIBUTION
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 2
| PROJECT TABLE OF CONTENTS |
| DIVISION 01 - GENERAL REQUIREMENTS |
| 01 11 00 - SUMMARY OF WORK |
| PART 1 GENERAL |
| 1.1 WORK COVERED BY CONTRACT DOCUMENTS |
| 1.1.1 Project Description |
| 1.1.2 Location |
| 1.2 OCCUPANCY OF PREMISES |
| 1.3 EXISTING WORK |
| 1.4 LOCATION OF UNDERGROUND FACILITIES |
| 1.4.1 Notification Prior to Excavation |
| 1.5 GOVERNMENT-FURNISHED MATERIAL AND EQUIPMENT |
| 1.6 GOVERNMENT-INSTALLED WORK |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
File details come from the government source that posted it.