part_1 REV 20200717.pdf
PDF 76 KB Posted
- Attached to
- Building 178 High Density Storage Stacker Federal contract opportunity
- Solicitation number
- N40085-20-B-2540
About this file
This document outlines a federal solicitation for the design, procurement, and installation of a high density storage system at Portsmouth Naval Shipyard. The solicitation includes four contract line items. Contract Line Item 0001 requests pricing for the base system, including two narrow aisle forklifts, chargers, floor guide wires, racks, fire suppression, alarm modifications, electrical work, and concrete floor changes. Contract Line Item 0002 requests pricing for removing an existing stacker and terminating utilities. Contract Line Item 0003 seeks pricing for an additional narrow aisle forklift and one standard forklift. Contract Line Item 0004 is an optional item for a fire pump, including associated alarm, electrical, and floor work, if determined necessary. Offerors are instructed to provide lump sum pricing for each line item. The solicitation is issued by the Department of the Navy's Naval Facilities Engineering Command for work at Portsmouth Naval Shipyard.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N40085N40085-20-B-2540 Amendment 0003.pdf | ||
| part_3 RFP B178 HDSS REV 20200717.pdf | ||
| N40085N40085-20-B-2540 Amendment 0002.pdf | ||
| OF_1419 B178 Stacker.pdf | ||
| 178-362 strutural design loads.pdf | ||
| B178 stacker RFI Set 3.pdf | ||
| N40085-20-B-2540 Amendment 0001.pdf | ||
| B178 High Density Storage System DB BID RFI RTW.pdf | ||
| ASI 002 Fence Gate Change (RFI HDSS 2a).pdf | ||
| 178-420-utility trench detail.pdf | ||
| SEC 10 22 14 INT CHAIN LINK FENCE GATES RFI 1.pdf | ||
| part_6 RFP ATTB EQS B178 HDSS 20200430.pdf | ||
| part_6 RFP ATTA DWG B178 HDSS 20200519.pdf | ||
| part_5 RFP B178 HDSS 20200413.pdf | ||
| part_4 RFP B178 HDSS 20200413.pdf | ||
| Master Scope of Work HDSS 20200506.pdf | ||
| N40085-20-B-2540 Solicitation_B178 Storage Stacker PNSY.pdf | ||
| part_1 RFP B178 HDSS 20200413.pdf | ||
| part_2 RFP B178 HDSS 20200413.pdf | ||
| part_3 RFP B178 HDSS 20200413.pdf | ||
| part_6 RFP B178 HDSS 20200413.pdf |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
High Density Storage System PNS-B178 eProjects # 1602745 Portsmouth Naval Shipyard, Kittery, Maine
SMALL PROJECT TEMPLATE - PART 1 PROPOSAL FORMS AND DOCUMENTS - Page 1
Part 1 Proposal Forms and Documents
High Density Storage System PNS-B178 B178HDS
Document 00 22 13.00 20 Page 1
DOCUMENT 00 22 13.00 20
SUPPLEMENTARY INSTRUCTIONS TO OFFERORS
02/14
PART 1 GENERAL
1.1 CONTRACT LINE ITEMS
The terms Offeror and Bidder and versions thereof (offer/bid) have the same definition as used within this contract.
Provide the Contract Line Item (CLIN) lump sum price for the following items:
CLIN 0001 - BASE PRICE. Price includes the following: Design, Procure, and Installation of the High Density Storage Systems Equipment ((TWO (2))Narrow Aisle Fork Trucks, Fork Truck Chargers, in floor guide wire systems, and Rack Systems,) in rack fire suppression, fire alarm modifications, electrical utilities, and concrete floor modifications to meet the requirements of the system. All items to be included for designed, installed and coordinated by the systems equipment manufacture for functional install and use in accordance with the drawings and specifications, but excluding work described in Contract Line Item CLIN 0002, CLIN 0003, and CLIN 0004.
TOTAL AMOUNT FOR CLIN 001 $____________________________
CLIN 0002. Remove existing stacker and terminate utilities in accordance with the drawings and specifications, but excluding work described in Contract Line Item CLIN 0001, CLIN 0003 and CLIN 0004.
TOTAL AMOUNT FOR CLIN 002 $____________________________
CLIN 0003. Price Design, Procure, and Installation of for ONE (1) additional Narrow Aisle Fork Truck, and ONE (1) (non-narrow aisle) Fork Truck as described in these documents. Exclude work described in Contract Line Item CLIN 0001, CLIN 0002 and CLIN 0004.
TOTAL AMOUNT FOR CLIN 003 $____________________________
OPTION 1 FIRE PUMP
CLIN 0004. Price Design, Procure, Installation, and provide utilities for a fire suppression pump “fire pump” if determined to be required by the designer of record to support the requirements of the rack systems to be procured and installed. Include fire alarm modifications, electrical utilities, concrete floor modifications and other modifications and proposed work to meet the requirements of the system if required. Exclude work described in Contract Line Item CLIN 0001, CLIN 0002, and CLIN 0003.
TOTAL AMOUNT FOR CLIN 004 $____________________________
High Density Storage System PNS-B178 B178HDS
Document 00 22 13.00 20 Page 2
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Document --