This amendment modifies a solicitation for Package 7 of facilities recovery projects at Marine Corps Air Station New River in North Carolina. The package includes replacement projects for a classroom building, bachelor enlisted quarters, CH-53K maintenance hangar, and C-12W aircraft maintenance hangar.
The amendment provides clarifications to HVAC specifications. For buildings under 60 tons of cooling load, constant primary pumping is required. For loads over 60 tons up to 160 tons, constant primary variable secondary pumping is specified with primary pumps per chiller. Loads over 160 tons also use constant primary variable secondary but with two primary pumps per chiller. Pump arrangements and standby requirements are defined based on building size. Chillers for loads over 160 tons are to be split evenly among multiple units.
View the file
Other files
Show 40 more
Latest 50 of 52 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to provide clarif ications to the specifications.
See SF30 Block 14 Continuation Page.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 20-Jul-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008519R9257
X 9B. DATED (SEE ITEM 11)
15-Nov-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
20-Jul-2020
CODE
NAVFAC MID ATLANTIC
ACQUISITION CORE
9324 VIRGINIA AVENUE
NORFOLK VA 23511-3095
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008519R9257
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0012
The purpose of this amendment is to provide clarifications to the specifications.
Continuation Page
On RFP, Part 3a, P378F CH‐53K Maintenance Hanger Replacement, Section 6 Engineering Systems Requirements, ESR D30 HVAC, Section D303001
Replace the first two paragraphs with:
Provide multiple independent high‐efficiency air‐cooled chillers for each squadron. Where space allows, evaporators are preferred to be Shell and Tube type due to water issues local to MCB Camp Lejeune. Evaporators must be provided with factory‐installed electric freeze protection.
Provide constant primary/variable secondary pumping systems on single chiller systems greater than 60 tons and on multiple chiller systems. Primary pumping may be used only on single chiller systems less than 60 tons. Keep flow through the chiller constant; do not use variable primary flow. A buffer tank must be provided on all systems to provide thermal inertia. Provide multiple chillers for each squadron where loads greater than 160 tons with each chiller sized for 50% of the total squadron cooling load.
On RFP, Part 3a, P378F CH‐53K Maintenance Hanger Replacement, Section 6 Engineering Systems Requirements, ESR D30 HVAC, Section D304006
Replace the first two paragraphs with:
For buildings with less than 60 tons of cooling load, provide a constant primary pumping system to serve the HVAC chilled water equipment throughout the facility. For buildings with more than 60 tons of cooling load, provide a constant primary/variable secondary pumping arrangement with a single primary pump per chiller for each squadron. If only one chiller is utilized for each squadron provide two primary pumps for each chiller. Each pump must be sized for 100% flow. For buildings with more than 160 tons of cooling load, provide a constant primary/variable secondary pumping arrangement with two primary pumps per chiller. In all cases, keep flow through the chiller constant.
For building less than 160 tons, provide a single secondary pump per chiller for each squadron. If only one chiller is utilized for each squadron provide two secondary pumps for each chiller. Each pump must be sized for 100% flow.
For buildings with more than 160 tons, provide three secondary pumps, for each squadron, each sized for 50% of maximum squadron flow. Two pumps must operate as duty pumps and the third must act as standby. Provide a control sequence to rotate pump duty/standby assignments monthly and equalize running hours.”