This notice provides details for a proposed design-build contract for construction services at Camp Lejeune in North Carolina. The project includes construction of a battalion headquarters, automotive vehicle maintenance shop, humidity controlled warehouse, electronics communications maintenance shop, combat vehicle maintenance shop, armory addition, and high-explosive magazine. The contract value is estimated between $25-100 million. The solicitation will utilize two-phase design-build selection procedures and be full and open competition. The Navy is the contracting agency. The proposal due date is in July 2019 with an anticipated award date in late 2019. Large businesses must submit a subcontracting plan.

View the file

Other files

File Type Posted
Amendment 0008.pdf PDF
Attachment H - Price Proposal Form (005) - Amendment 0008.pdf PDF
PPI 41 HIMARS Battery Vehicle List.pdf PDF
PPI 43 Designer's Cert.pdf PDF
PPI 75 P1495 Magazine Revised Exhibit.pdf PDF
PPI 43 DWQ Permit Renewal.pdf PDF
PPI 43 Pond Drawings.pdf PDF
Attachment H - Price Proposal Form (004) - Amendment 0006.pdf PDF
AMENDMENT 0006.pdf PDF
PPI 43 DWQ Permit.pdf PDF
WATER FLOW TEST FOR HP500.pdf PDF
AMENDMENT 0005.pdf PDF
2020_01_02_BUILDING_1445_PPI_49.pdf PDF
Attachment H - Price Proposal Form (003).docx DOCX document
2020_01_02_HIMARS_SITE_PPI_53.pdf PDF
WATER FLOW TEST FOR NEW SITE.pdf PDF
P1495 Site Visit.pdf PDF
2020_01_02_HIMARS MAGAZINE_PPI_54.pdf PDF
Amendment 0004 Attachment H - Price Proposal Form.pdf PDF
AMENDMENT 0004.pdf PDF
AMENDMENT 0004 24592 20181026 5090 21 ESS DR P1495.pdf PDF
AMENDMENT 0004 ESSDR_P1495_SYSCOM_Apvl20181105.pdf PDF
AMENDMENT 0003.pdf PDF
Attachment F - Small Business Participation and Commitment Strategy.docx DOCX document
Attachment E - Small Business Subcontracting Record.docx DOCX document
Attachment H - Price Proposal Form.pdf PDF
Attachment G- SBSP Template.doc DOC document
1611501rfp02of05.pdf PDF
1611501rfp01of05.pdf PDF
1611501rfp05of05.pdf PDF
1611501rfp03of05.pdf PDF
Amendment 0002.pdf PDF
1611501rfp04of05.pdf PDF
AMENDMENT_0001.pdf PDF
Attachment_B__SECNAV_5512_Attachment_B.pdf PDF
N40085-19-R-9156.pdf PDF
Attachment_A_PPII_log.doc DOC document
ATTACHMENT_C_Construction_Design_Exp.docx DOCX document
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SOLICITATION NO. N40085-19-R-9156, DESIGN-BUILD (DB), P-1495, 5TH BATTALION, 10TH MARINES, HIGH MOBILITY ARTILLERY ROCKET

SYSTEM (HIMARS), MARINE CORPS BASE (MCB), CAMP LEJEUNE, NORTH CAROLINA

The purpose of this amendment is to provide the final responses to pre-proposal inquiries.

The proposal due date of Wednesday, 12 February 2020, not later than 2:00 PM EST remains unchanged.

See Continuation Page(s).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 04-Feb-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N4008519R9156

X 9B. DATED (SEE ITEM 11)

05-Sep-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

04-Feb-2020

CODE

NAVFAC MID ATLANTIC

ACQUISITION CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008519R9156

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0007

Contractor

PPI#

Section of RFP or Page Number

Paragraph Reference

Drawing Number

Question RESPONSE Amendment #

175 Part 3, Chapter 6 D209002 The RFP notes to provide acid waste system. Please provide the various buildings, rooms, functional areas that would require an acid waste system Please provide the expected usage & volume needed, dilution tank, containment tank, and other system requirements for the various areas requiring acid waste collection.

Acid waste systems are not required for any of the buildings.

184 Part 3 Chapter 1

RFP Part 3 Chapter 1 Page 2 in the project description for the Armory Addition, the contractor is told that the existing above ground fuel tanks currently located in the area designated for the addition will need to be relocated.

Will the Government drain and disconnect the existing fuel tanks prior to the relocation by the general contractor?

Contractor should assume that they will be responsible for draining and disconnecting the existing fuel tank. The contractor will also be responsible for reconnecting the tank and adding additional piping as needed.

185 Part 6 In the RFP File 5 of 5 in the As-Built Drawings for the 10th Marine and Combat Engineers Battalion Armories sheets C-4, C-5, and C-6 are listed in the drawing index located on sheet T-1 but they appear to be missing from the government supplied As-Built Drawings. Will the government please supply sheets C-4, C-5, and C-6?

C-4, C-5 and C-6 are for a different armory.

187 Part 3 Chapter 1

In the RFP Part 3 Chapter 1 Page 2 in the Armory Addition, the contractors are told to relocate an above ground fuel tank. Will the contractor be required to fill this fuel tank once relocated?

The tank will be filled under the current contract at Camp Lejeuene.

188 Part 3 Chapter 1

In the RFP Part 3 Chapter 1 Page 2 in the Armory Addition, the contractors are told to relocate an above ground fuel tank. 1.) Will the Government please direct the contractors to the new location for this existing above ground fuel tank?

2.) Will the tank be

1. The tank must be moved so that there is 30 ft clear inside of the fence and 20 ft outside the fence.

2. The tank will be relocated in its current condition.

relocated as is in its current condition or will the contractor be responsible for code compliance and potential repairs the current tank requires?

204 D306001 RFP 01 Section D306001 1.1 states to tie into the existing Utility Monitoring and Control System.

What is the existing control system on the base?

The EMCS at Camp Lejeune is an enterprise system that actively receives energy and building condition information from multiple sources and provides load shedding, electric metering, alarming, trending, scheduling, set point adjustment and device status of all supervisory building controllers for maintenance personnel. The EMCS receives real time electrical utility pricing data and automatically manages to Camp Lejeune's energy target. The existing EMCS consists of two servers, 1) Johnson Controls Incorporated (JCI) Metasys Extended Architecture (ADX server), and 2) Niagara AX supervisor (JCI FX web supervisor). Both of the systems communicate over the MRAN and either may be used to fulfill the requirements of this specification.

205 D309090 RFP 01 Section D309090 states to provide a point-use lubrication distribution system to serve the vehicle maintenance requirements.

What lubrication distribution systems are required for this project?

SPECIALTY OILS/FLUIDS

DISTRIBUTION

Automotive Fluids Storage A 55 gallon length pump, 10:1 ratio, pneumatically operated, double-ball and double acting pump. Air motor diameter is 4.25 inches with a 4 inches stroke. The air motor, air motor valves and lower pump are to be of the "in-line" design. The air motor assembly has four moving members. The normal air requirements are 40-180 psi with air consumption of 40 scfm @100 psi. Maximum fluid pressure of 1100 psi and a continuous duty flow rate of 6 gpm. Included with package shall be a pump, drum cover, hose/fitting kit.

Kit includes 6 feet by 3/4-inch fluid hose, and 6 feet by 1/2-inch air hose. Pump must have a 30 year limited warranty. Accessories shall include thermal relief kit, air regulator, air pressure gauge, and low level cutoff.

Fluids Dispenser Wand Electronic meter with 75 degree angle 3/8-inch rigid extension for U.S. measure.

Meter to have 6 gpm and maximum operating pressure of 1500 psi. Valve equipped with screw-tight nozzle for positive shut-off, ball bearing swivel, trigger-lock, and impact guard. Operating temperature range is minus 4 to 130 degrees F. Meter accuracy plus/minus 65%.

Meter must have a 2 year limited warranty.

Air Hose Reels Kit includes 100 feet by 1/2 inch id hose with a maximum 300 psi, ball stop, and an adjustable roller guide assembly. All steel construction and baked on powder coat finish, dual pedestal base and guide arm.

Five in one heat treated aluminum casting incorporates main shaft, ratchet, spring arbor and inlet/outlet plumbing in one piece casting. Containerized spring assembly. Two sealed ball bearings for smooth rotation of main shaft. Guide arm is field adjustable for wall, ceiling, or truck mounting positions.

Oil Hose Reels Kit includes 75 feet by 1/2 inch id hose with a maximum 1500 psi, ball stop, and an adjustable roller guide assembly. All steel construction and baked on powder coat finish, dual pedestal base and guide arm.

Five in one heat treated aluminum casting incorporates main shaft, ratchet, spring arbor and inlet/outlet plumbing in one piece casting. Containerized spring assembly. Two sealed ball bearings for smooth rotation of main shaft. Guide arm is field adjustable for wall, ceiling, or truck mounting positions.

(End of Summary of Changes)