This notice summarizes a federal solicitation for design-build construction services. The solicitation will result in a firm-fixed price contract to construct multiple facilities at Camp Lejeune in North Carolina for the 5th Battalion, 10th Marines. Facilities include a battalion/company headquarters, automotive vehicle maintenance shop, humidity controlled warehouse, electronics communications maintenance shop, combat vehicle maintenance shop, armory addition, and high-explosive magazine. Construction must comply with anti-terrorism standards and is required to be complete within 934 calendar days of award. The solicitation will utilize two-phase design-build procedures and be full and open competition in accordance with FAR 36.3. Offerors must submit non-cost and cost proposals for evaluation. Large businesses must submit subcontracting plans. The request for proposals will issue on July 24, 2019 via the Navy Electronic Commerce Online website.

View the file

Other files

File Type Posted
Amendment 0008.pdf PDF
Attachment H - Price Proposal Form (005) - Amendment 0008.pdf PDF
Amendment 0007.pdf PDF
PPI 41 HIMARS Battery Vehicle List.pdf PDF
PPI 43 Designer's Cert.pdf PDF
PPI 75 P1495 Magazine Revised Exhibit.pdf PDF
PPI 43 DWQ Permit Renewal.pdf PDF
PPI 43 Pond Drawings.pdf PDF
Attachment H - Price Proposal Form (004) - Amendment 0006.pdf PDF
AMENDMENT 0006.pdf PDF
PPI 43 DWQ Permit.pdf PDF
WATER FLOW TEST FOR HP500.pdf PDF
AMENDMENT 0005.pdf PDF
2020_01_02_BUILDING_1445_PPI_49.pdf PDF
Attachment H - Price Proposal Form (003).docx DOCX document
2020_01_02_HIMARS_SITE_PPI_53.pdf PDF
WATER FLOW TEST FOR NEW SITE.pdf PDF
P1495 Site Visit.pdf PDF
2020_01_02_HIMARS MAGAZINE_PPI_54.pdf PDF
Amendment 0004 Attachment H - Price Proposal Form.pdf PDF
AMENDMENT 0004.pdf PDF
AMENDMENT 0004 24592 20181026 5090 21 ESS DR P1495.pdf PDF
AMENDMENT 0004 ESSDR_P1495_SYSCOM_Apvl20181105.pdf PDF
AMENDMENT 0003.pdf PDF
Attachment F - Small Business Participation and Commitment Strategy.docx DOCX document
Attachment E - Small Business Subcontracting Record.docx DOCX document
Attachment H - Price Proposal Form.pdf PDF
Attachment G- SBSP Template.doc DOC document
1611501rfp02of05.pdf PDF
1611501rfp01of05.pdf PDF
1611501rfp05of05.pdf PDF
1611501rfp03of05.pdf PDF
1611501rfp04of05.pdf PDF
AMENDMENT_0001.pdf PDF
Attachment_B__SECNAV_5512_Attachment_B.pdf PDF
N40085-19-R-9156.pdf PDF
Attachment_A_PPII_log.doc DOC document
ATTACHMENT_C_Construction_Design_Exp.docx DOCX document
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to issue Phase II documents, only to those offerors that w ere selected to participate in Phase II of this solicitation.

Phase II proposals are due on 23 January 2020 at 2:00 P.M (EST).

See Section SF 30 Black 14 Continuation Page The follow ing documents have been included in this amendment:

P-1495, 5th Battalion, 10th Marines, HIMARS, Marine Corps Base (MCB), Camp Lejeune, North Carolina Final RFP Wage Determination, General Decision Number: NC20190038 09/13/2019 Attachment E - Small Business Subcontracting Record Attachment F - Small Business Participation and Commitment Strategy Attachment G - Small Business Subcontracting Plan Attachment H - Price Proposal Form *Site Visit information w ill be provided via an Amendment

1. CONTRACT ID CODE PAGE OF PAGES

1 13

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 05-Dec-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008519R9156

X 9B. DATED (SEE ITEM 11)

05-Sep-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

05-Dec-2019

CODE

NAVFAC MID ATLANTIC

ACQUISITION CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008519R9156

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0002

THIS AMENDMENT IS ISSUED TO INITATE PHASE II. ONLY OFFERORS SELECTED SHALL

SUBMIT PROPOSALS FOR PHASE II.

PROPOSAL DUE DATE: Thursday, 23 January, 2020 at 2:00 p.m. (EST)

PROPOSAL SUBMISSION INSTRUCTIONS: SEE PROPOSAL SUBMISSION INSTRUCTIONS INCLUDED

IN THE ORIGINAL SOLICITATION. The evaluation factors, including both non-price/technical and price submittal requirements are available in the original Request for Proposal document (and any applicable amendments) and have not been reproduced in this amendment.

(See N40085-19-R-9156 for Phase II Evaluation Factors and Submittal Requirements).

PRICE FACTOR submission instructions begin on page six (include all information in the “Additional information to be submitted with Price Proposal Package (PHASE II).

Attachment H - Price Proposal Form is included in this amendment notice.

NON-PRICE FACTORS submission instructions begin on Page 14 (Factors 5-7).

Proposals may be sent via express mail carriers or Hand-delivered to the following address:

NAVFAC MIDLANT

9324 Virginia Avenue, Building Z-140, Room 225 Norfolk, Virginia 23511-3624 Attn: Brittany Cristelli, Contract Specialist – ACQ21

(MAILED PROPOSALS ARE PREFERRED/HIGHLY ENCOURAGED DUE TO RECENT SECURITY

CHANGES REQUIRED TO GAIN BASE ACCESS)

Important note: Contractors are not permitted to work in Room 225 prior to delivery while finalizing the proposal.

Once the proposal is formally delivered, the contractor’s business is considered complete and the contractor is expected to promptly depart Room 225.

See original solicitation for instructions regarding new access using the SEC-NAV 5512. ALL REQUESTS FOR HAND DELIVERING PROPOSALS (i.e. Form SEC-NAV 5512) MUST BE RECEIVED NO LATER THAN Tuesday, 07 January 2020 by 2PM EST.

PRE PROPOSAL INQUIRIES (PPIs): See original solicitation. PPI Form is within the additional documents. PPI cutoff is Thursday, 9 January 2020 by 2PM EDT.

SITE VISIT INFORMATION: The site visit details will be provided via an amendment.

SECTION 00 10 00 - SOLICITATION

CLIN 0001 is added as follows:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Base Price

FFP

The total amount for CLIN 0001 shall provide te full project scope, excluding Options (CLIN 0002 - CLIN 0006), complete and in accordance with the drawings and specifications.

FOB: Destination

PSC CD: Y1JZ

NET AMT

CLIN 0002 is added as follows:

OPTION Option 01

FFP

Price for construction and design of the Operational Hazards/Flammable Storage complete to the 5-foot line outside of the buildings, in accordance with the drawings and specifications, but excluding work described in Contact Line Item

(CLIN)

CLIN 0003 is added as follows:

OPTION Option 02

FFP

Price for construction and design of the Communications Addition complete to the 5-foot line outside of the buildings, in accordance with the drawings and specifications, but excluding work described in Contract Line Item (CLIN)

CLIN 0004 is added as follows:

OPTION Option 03

FFP

Price for construction and design of the Armory Addition complete to the 5-foot line outside of the buildings, in accordance with the drawings and specifications, but excluding work described in Contract Line Item (CLIN)

CLIN 0005 is added as follows:

OPTION Option 04

FFP

Price to include concrete hardstand in lieu of asphalt for the hardstand area in the compound.

CLIN 0006 is added as follows:

OPTION Option 05

FFP

Price to include full height brick veneer on PEMBs in lieu of partial brick veneer.

CLIN 0007 is added as follows:

OPTION Planned Modification 01

FFP

Price for provision, installation, testing, and associated training for the Electronic Security System (ESS) equipment necessary for this facility. The ESS includes, but is not limited to, Intrusion Detection System (IDS), Access Control System (ACS), and Closed Circuit Television (CCTV). Equipment includes items such as Premise Control Units (PCU), central processing units, field panels, sensors, card readers, keypads, cameras, switches, video recorders, workstations, and the communication cabling connecting these devices together. Include the price for supporting, permanent infrastructure under CLIN 0001 - BASE PRICE. Interior supporting infrastructure includes items such as conduit, junction boxes, electronic door strikes, door hardware, mounting hardware, and power connections. Exterior supporting infrastructure includes items such as exterior ductbanks, manholes, utility poles, utility connections, and power connections.

CLIN 0008 is added as follows:

OPTION Planned Modification 02

FFP

Furniture, Fixtures and Equipment (FF&E)

CLIN 0009 is added as follows:

OPTION Planned Modification 03

FFP

Audio/Visual

SECTION 00 70 00 - CONDITIONS OF THE CONTRACT

The following Acceptance/Inspection Schedule was added for CLIN 0001:

INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

N/A N/A N/A Government

The following Acceptance/Inspection Schedule was added for CLIN 0002:

The following Acceptance/Inspection Schedule was added for CLIN 0003:

The following Acceptance/Inspection Schedule was added for CLIN 0004:

The following Acceptance/Inspection Schedule was added for CLIN 0005:

The following Acceptance/Inspection Schedule was added for CLIN 0006:

The following Acceptance/Inspection Schedule was added for CLIN 0007:

The following Acceptance/Inspection Schedule was added for CLIN 0008:

The following Acceptance/Inspection Schedule was added for CLIN 0009:

SECTION 01 00 00 - GENERAL REQUIREMENTS

The following have been added by full text:

WAGE DETERMINATION NC20190038

General Decision Number: NC20190038 09/13/2019

Superseded General Decision Number: NC20180038

State: North Carolina

Construction Type: Building

County: Onslow County in North Carolina.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2019. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate, if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/04/2019 1 09/13/2019

IRON0848-005 02/01/2018

Rates Fringes

IRONWORKER, STRUCTURAL...........$ 25.00 13.50

* PLUM0421-003 07/01/2018

Rates Fringes

PIPEFITTER.......................$ 28.00 12.01

SUNC2011-019 08/24/2011

Rates Fringes

BRICKLAYER.......................$ 19.00 0.00

CARPENTER (Drywall Hanging Only)............................$ 13.83 0.00

CARPENTER (Form Work Only).......$ 13.38 1.80

CARPENTER, Excludes Drywall Hanging, and Form Work...........$ 16.39 4.26

CEMENT MASON/CONCRETE FINISHER...$ 15.80 0.00

ELECTRICIAN......................$ 20.64 6.68

HVAC MECHANIC (HVAC Duct Installation Only)...............$ 17.37 1.82

LABORER: Common or General......$ 11.13 0.32

LABORER: Landscape & Irrigation.......................$ 9.13 0.28

LABORER: Pipelayer..............$ 13.35 2.80

LABORER: Mason Tender-Brick/Cement/Concrete.....$ 12.00 0.00

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 18.47 2.41

OPERATOR: Bulldozer.............$ 16.00 1.87

OPERATOR: Crane.................$ 19.77 4.48

OPERATOR: Forklift..............$ 13.86 0.00

OPERATOR: Grader/Blade..........$ 15.72 1.49

OPERATOR: Loader................$ 16.17 0.25

PAINTER: Brush, Roller and

Spray............................$ 12.35 0.00

PLUMBER..........................$ 18.48 3.93

ROOFER...........................$ 11.75 1.06

SHEET METAL WORKER, Excludes HVAC Duct Installation...........$ 15.81 1.40

TRUCK DRIVER.....................$ 13.38 1.48

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year. Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example: PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).

Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

The following have been deleted:

WAGE DETERMINATION

(End of Summary of Changes)