This document provides details of a federal solicitation for construction services. The solicitation is number N4008519R9146 issued by the Department of the Navy Naval Facilities Engineering Command for a firm-fixed price design-bid-build construction contract. The project involves road improvements to Birch Street and Birch Street North at Marine Corps Base Camp Lejeune in North Carolina. Interested offerors should review the solicitation for additional requirement details. The closing date is not specified in this document.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OUTPUT REFERENCE SCHEDULE
OUTPUT 42 = Overlap C Red
OUTPUT 50 = Overlap A Red
OUTPUT 43 = Overlap C Yellow
OUTPUT 44 = Overlap C Green
OUTPUT 51 = Overlap A Yellow
OUTPUT 52 = Overlap A Green
(program controller as shown below)
LOGICAL I/O PROCESSOR PROGRAMMING DETAIL
PROCESSOR).
2. FROM MAIN MENU PRESS '6' (OUTPUTS), THEN '3' (LOGICAL I/O
1. FROM MAIN MENU PRESS '2' (PHASE CONTROL), THEN '1' (PHASE
CONTROL FUNCTIONS). SCROLL TO THE BOTTOM OF THE MENU AND
TO PRODUCE SPECIAL FYA-PPLT SIGNAL SEQUENCE
FROM PHASE 1
FROM PHASE 5
SCROLL DOWN ~
LOGICAL I/O COMMAND #1 (+/-COMMAND#)
THEN:
SET OUTPUT ASSIGNMENT #50 ON
PRESS '+'
SCROLL DOWN ~
LOGICAL I/O COMMAND #2 (+/-COMMAND#)
THEN:
SET OUTPUT ASSIGNMENT #52 OFF
PRESS '+'
LOGICAL I/O COMMAND #4 (+/-COMMAND#)
THEN:
SET OUTPUT ASSIGNMENT #42 ON
IF ACTIVE PHASE #5 IS ON
SCROLL DOWN
LOGIC I/O PROCESSOR PROGRAMMING COMPLETE
LOGICAL I/O COMMAND #5 (+/-COMMAND#)
THEN:~ ~~SCROLL DOWN
PRESS '+'
IF ACTIVE PHASE #5 IS ON
IF ACTIVE PHASE #1 IS ON
AND RED CLEAR ON PHASE #1 IS ON
IF ACTIVE PHASE #1 IS ON
AND RED CLEAR ON PHASE #5 IS ON
SET OUTPUT ASSIGNMENT #44 OFF
NOTE: LOGIC FOR
PHASE 1 RED
CLEAR WHEN
TRANSITIONING
FROM PHASE 1
NOTE: LOGIC FOR
SWITCHING
FLASHING YELLOW
ARROW "OFF"
DURING PHASE 1
(HEAD 11).
TO PHASE 2
(HEAD 11).
NOTE: LOGIC FOR
PHASE 5 RED
CLEAR WHEN
TRANSITIONING
FROM PHASE 5
NOTE: LOGIC FOR
SWITCHING
FLASHING YELLOW
ARROW "OFF"
DURING PHASE 5
(HEAD 51).
TO PHASE 6
(HEAD 51).
SCROLL DOWN ~
LOGICAL I/O COMMAND #3 (+/-COMMAND#)
THEN:
SET OUTPUT ASSIGNMENT #51 ON
PRESS '+'
NOTE: LOGIC FOR
(HEAD 11).
LOGICAL I/O COMMAND #6 (+/-COMMAND#)
THEN:~ ~~SCROLL DOWN
SET OUTPUT ASSIGNMENT #43 ON
PRESS '+'
IF YELLOW ON PHASE #1 IS ON
IF YELLOW ON PHASE #5 IS ON
YELLOW
ARROW
CLEARANCE
NOTE: LOGIC FOR
(HEAD 51).
YELLOW
ARROW
CLEARANCE
SET OUTPUT ASSIGNMENT #51 OFF
SET OUTPUT ASSIGNMENT #43 OFF
THIS ELECTRICAL DETAIL IS FOR
THE SIGNAL DESIGN: Birch/Service Rd
REVISED: N/A
SEALED:
(program controller as shown below)
CHANGING OUTPUT ASSIGNMENTS
2. CYCLE TO PED DETECTOR #8 BY REPEATEDLY DEPRESSING '+' KEY
PROGRAMMING COMPLETE
1. FROM MAIN MENU SELECT '6' (OUTPUTS), THEN '1' (OUTPUT ASSIGNMENTS)
PED 3 PROGRAMMING DETAIL
3. SCROLL DOWN TO 'PEDESTRIAN PHASE' AND ENTER 'Y' REGARDLESS OF DEFAULT PROGRAMMING!
4. ENTER '3' FOR 'SELECT PEDESTRIAN PHASE'. NO CHANGE NEEDED FOR 'SELECT COLOR'
BUTTON ON KEYBOARD.
5. BACKUP TO 'OUTPUT ASSIGNMENTS AND SETTINGS MENU:' BY PRESSING THE 'ESC'
6. SELECT '1' (OUTPUT ASSIGNMENTS)
8. REPEAT STEPS # 3 AND # 4.
ASSIGNMENTS)
1. FROM MAIN MENU SELECT '7' (DETECTORS), THEN '2' (PEDESTRIAN DETECTOR
3. MODIFY PHASE ASSIGNED TO PED DETECTOR # 8 FROM PHASE 8 TO PHASE 3
CHANGING INPUT ASSIGNMENTS
2. ENTER 17 (PHASE 8 DW) FOR OUTPUT ASSIGNMENT #.
7. ENTER 18 (PHASE 8 W) FOR OUTPUT ASSIGNMENT #.
ENABLE ACT LOGIC COMMANDS 1, 2, 3, 4, 5, AND 6.
B
IR
C H
S T
R E
E
A
R V
IC
R O
D
L E
C T
R
IC
T
IL
E E
F
CZ303
12816839
DESIGNED: June 2020
N O
R
T
H CAROL
I N
NOFO
P
ISSE
L
A
R
EENIGN
E
030912
SEAL
REYOB .M I
RO
L
AS SHOWN
RText (RText)
N A
V A
L F
A C
IL
IT
IE
S E
N G
IN
E E
R
IN
G C
O M
M A
N D M
ID
-A
T L
A N
T
IC
M
ID
L A
I
C O
R E
N A
V
A T
IO
R F
O L
K
V
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
S Y
M D
E S
C R
IP
T
IO
Y P -1
B B
IR
C H S
T R
E E
T R
O A
D I
M P
R O
V E
M E
N T S
M
B
M P
J E
U N
E C
A
J E
U N
E
N
1374744
M D
E S
C R
IP
T
IO
N
IS
S U
N S
T R
U C
T
IO
N
D E
P A
R T
M E
V Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N A
V
C
IL
IT
IE
G
IN
E E
R
IN
G
M M
A N
D
DES DRW
S Y
M D
E S
C R
IP
T
IO
N D
A T E
A P
P R
DRAWFORM REVISION: 07 AUG 2018
CHK
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
UNCLASSIFIED
U N
C L
A S
S
IF
IE
D
UNCLASSIFIED
SGL/CLS
DLB
EJA
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
PORTDAVEN
HOME OFFICE
WINSTON-SALEM, NC 27101
336.744.1636 www.davenportworld.com
NCBELS FIRM LICENSE NO. C-2522
119 BROOKSTOWN AVE. SUITE PH1
TSW TSW LMB
6/12/2020
AT MCB CAMP LEJEUNE. VIA EMAIL
DIRECTOR, INSTALLATION DEVELOPMENT
APPROVED BY EMILY SYLVESTER,
6/12/2020
N O
R
T
H CAROL
I
P
ISSE
L
A
R
EENIGN
E
030912
SEAL
REYOB .M I
RO
SEAL
FROM MAIN MENU PRESS '8' (OVERLAPS),
THEN '1' (VEHICLE OVERLAP SETTINGS).
PHASE: 12345678910111213141516
PAGE 1: VEHICLE OVERLAP 'A' SETTINGS
VEH OVL PARENTS:
VEH OVL NOT VEH:
VEH OVL NOT PED:
VEH OVL GRN EXT:
STARTUP COLOR: _ RED _ YELLOW _ GREEN
SELECT VEHICLE OVERLAP OPTIONS: (Y/N)
FLASH YELLOW IN CONTROLLER FLASH?...Y
GREEN EXTENSION (0-255 SEC)
YELLOW CLEAR (0=PARENT,3-25.5 SEC)..0.0
RED CLEAR (0=PARENT,0.1-25.5 SEC)...0.0
OUTPUT AS PHASE # (0=NONE, 1-16)
XX
FLASH COLORS: _ RED _ YELLOW X GREEN
PHASE: 12345678910111213141516
VEH OVL PARENTS:
VEH OVL NOT VEH:
VEH OVL NOT PED:
VEH OVL GRN EXT:
STARTUP COLOR: _ RED _ YELLOW _ GREEN
SELECT VEHICLE OVERLAP OPTIONS: (Y/N)
FLASH YELLOW IN CONTROLLER FLASH?...Y
GREEN EXTENSION (0-255 SEC)
YELLOW CLEAR (0=PARENT,3-25.5 SEC)..0.0
RED CLEAR (0=PARENT,0.1-25.5 SEC)...0.0
OUTPUT AS PHASE # (0=NONE, 1-16)
XX
FLASH COLORS: _ RED _ YELLOW X GREEN
PAGE 1: VEHICLE OVERLAP 'C' SETTINGS
OVERLAP PROGRAMMING COMPLETE
NOTICE
GREEN
FLASH
NOTICE
GREEN
FLASH
OVERLAP PROGRAMMING DETAIL FOR ALTERNATE PHASING
FROM MAIN MENU PRESS '8' (OVERLAPS),
THEN '1' (VEHICLE OVERLAP SETTINGS).
PRESS 'NEXT' TO ADVANCE TO PAGE 2.
PAGE 2: VEHICLE OVERLAP 'A' SETTINGS
PAGE 2: VEHICLE OVERLAP 'C' SETTINGS
X
X
NOTICE
(program controller as shown below)
OVERLAP PROGRAMMING COMPLETE
PHASE: 12345678910111213141516
VEH OVL PARENTS:
VEH OVL NOT VEH:
VEH OVL NOT PED:
VEH OVL GRN EXT:
STARTUP COLOR: _ RED _ YELLOW _ GREEN
SELECT VEHICLE OVERLAP OPTIONS: (Y/N)
FLASH YELLOW IN CONTROLLER FLASH?...Y
GREEN EXTENSION (0-255 SEC)
YELLOW CLEAR (0=PARENT,3-25.5 SEC)..0.0
RED CLEAR (0=PARENT,0.1-25.5 SEC)...0.0
OUTPUT AS PHASE # (0=NONE, 1-16)
FLASH COLORS: _ RED _ YELLOW _ GREEN
PHASE: 12345678910111213141516
VEH OVL PARENTS:
VEH OVL NOT VEH:
VEH OVL NOT PED:
VEH OVL GRN EXT:
STARTUP COLOR: _ RED _ YELLOW _ GREEN
SELECT VEHICLE OVERLAP OPTIONS: (Y/N)
FLASH YELLOW IN CONTROLLER FLASH?...Y
GREEN EXTENSION (0-255 SEC)
YELLOW CLEAR (0=PARENT,3-25.5 SEC)..0.0
RED CLEAR (0=PARENT,0.1-25.5 SEC)...0.0
OUTPUT AS PHASE # (0=NONE, 1-16)
FLASH COLORS: _ RED _ YELLOW _ GREEN
NOTICE
(program controller as shown below)
OVERLAP PROGRAMMING DETAIL FOR DEFAULT PHASING
THIS ELECTRICAL DETAIL IS FOR
THE SIGNAL DESIGN: Birch/Service Rd
REVISED: N/A
SEALED:
INTERVAL/TIMING CLEAR/DWELL PHASES
GRN YEL RED 12345678910111213141516
3 0 0.0 0.0
4 0 0.0 0.0
EXIT CALLS
OPTIONS
DELAY TIMER (0-255 SEC)
MIN GREEN BEFORE PRE (0= DEFAULT)
LATCH CALL? .........................N
LINK TO NEXT PREEMPT? ...............N
DWELL MAX TIMER (0=OFF,1-255MIN)
DWELL HOLD-OVER TIMER (0-255)
HOLD CLEAR 1 PHASES DURING DELAY? ...N
FAST GREEN FLASH DWELL PHASES? ......N
INHIBIT OVERLAP GREEN EXTENSION? ....N
REST IN RED DURING DWELL INTERVAL? ..N
FLASH DWELL INTERVAL? ...............N
ALLOW PEDS IN DWELL INTERVAL? .......N
RE-TIME DWELL INTERVAL? .............N
OVERLAPS: ABCDEFGHIJKLMNOP
DWELL INT FLASH YELLOW
PED CLEAR BEFORE PRE (0= DEFAULT)
2 0 0.0 0.0
PRIORITY (Y/N TO SELECT) ............MED
YELLOW CLEAR BEFORE PRE (0= DEFAULT).0.0
RED CLEAR BEFORE PRE (0= DEFAULT)....0.0
SERVICE DURING SOFTWARE FLASH? ......N
ENABLE BACKUP PROTECTION? ...........N
PREEMPTION #3 SETTINGS (NEXT:1-10)
INTERVAL/TIMING CLEAR/DWELL PHASES
GRN YEL RED 12345678910111213141516
3 0 0.0 0.0
4 0 0.0 0.0
EXIT CALLS
OPTIONS
DELAY TIMER (0-255 SEC)
MIN GREEN BEFORE PRE (0= DEFAULT)
LATCH CALL? .........................N
LINK TO NEXT PREEMPT? ...............N
DWELL MAX TIMER (0=OFF,1-255MIN)
DWELL HOLD-OVER TIMER (0-255)
HOLD CLEAR 1 PHASES DURING DELAY? ...N
FAST GREEN FLASH DWELL PHASES? ......N
INHIBIT OVERLAP GREEN EXTENSION? ....N
REST IN RED DURING DWELL INTERVAL? ..N
FLASH DWELL INTERVAL? ...............N
ALLOW PEDS IN DWELL INTERVAL? .......N
RE-TIME DWELL INTERVAL? .............N
OVERLAPS: ABCDEFGHIJKLMNOP
DWELL INT FLASH YELLOW
PED CLEAR BEFORE PRE (0= DEFAULT)
2 0 0.0 0.0
PRIORITY (Y/N TO SELECT) ............MED
INTERVAL/TIMING CLEAR/DWELL PHASES
GRN YEL RED 12345678910111213141516
3 0 0.0 0.0
4 0 0.0 0.0
EXIT CALLS
OPTIONS
DELAY TIMER (0-255 SEC)
MIN GREEN BEFORE PRE (0= DEFAULT)
LATCH CALL? .........................N
LINK TO NEXT PREEMPT? ...............N
DWELL MAX TIMER (0=OFF,1-255MIN)
DWELL HOLD-OVER TIMER (0-255)
HOLD CLEAR 1 PHASES DURING DELAY? ...N
FAST GREEN FLASH DWELL PHASES? ......N
INHIBIT OVERLAP GREEN EXTENSION? ....N
REST IN RED DURING DWELL INTERVAL? ..N
FLASH DWELL INTERVAL? ...............N
ALLOW PEDS IN DWELL INTERVAL? .......N
RE-TIME DWELL INTERVAL? .............N
OVERLAPS: ABCDEFGHIJKLMNOP
DWELL INT FLASH YELLOW
PED CLEAR BEFORE PRE (0= DEFAULT)
2 0 0.0 0.0
PRIORITY (Y/N TO SELECT) ............MED
PROGRAMMING COMPLETE
YELLOW CLEAR BEFORE PRE (0= DEFAULT).0.0
RED CLEAR BEFORE PRE (0= DEFAULT)....0.0
SERVICE DURING SOFTWARE FLASH? ......N
RED CLEAR BEFORE PRE (0= DEFAULT)....0.0
YELLOW CLEAR BEFORE PRE (0= DEFAULT).0.0
ENABLE BACKUP PROTECTION? ...........N
SERVICE DURING SOFTWARE FLASH? ......N
(program controller as shown below)
PROGRAMMING DETAIL
EMERGENCY VEHICLE PREEMPTION
ENABLE BACKUP PROTECTION? ...........N
Program extend time on optical detector unit for 2.0 sec.
PREEMPTION #5 SETTINGS (NEXT:1-10)
INTERVAL/TIMING CLEAR/DWELL PHASES
GRN YEL RED 12345678910111213141516
3 0 0.0 0.0
4 0 0.0 0.0
EXIT CALLS
OPTIONS
DELAY TIMER (0-255 SEC)
MIN GREEN BEFORE PRE (0= DEFAULT)
LATCH CALL? .........................N
LINK TO NEXT PREEMPT? ...............N
DWELL MAX TIMER (0=OFF,1-255MIN)
DWELL HOLD-OVER TIMER (0-255)
HOLD CLEAR 1 PHASES DURING DELAY? ...N
FAST GREEN FLASH DWELL PHASES? ......N
INHIBIT OVERLAP GREEN EXTENSION? ....N
REST IN RED DURING DWELL INTERVAL? ..N
FLASH DWELL INTERVAL? ...............N
ALLOW PEDS IN DWELL INTERVAL? .......N
RE-TIME DWELL INTERVAL? .............N
OVERLAPS: ABCDEFGHIJKLMNOP
DWELL INT FLASH YELLOW
2 0 0.0 0.0
PRIORITY (Y/N TO SELECT) ............MED
RED CLEAR BEFORE PRE (0= DEFAULT)....0.0
YELLOW CLEAR BEFORE PRE (0= DEFAULT).0.0
ENABLE BACKUP PROTECTION? ...........N
SERVICE DURING SOFTWARE FLASH? ......N
PREEMPTION #4 SETTINGS (NEXT:1-10)
PREEMPTION #6 SETTINGS (NEXT:1-10)
5 0 0.0 0.0 X X
PED CLEARANCE THROUGH YELLOW? .......Y
DWELL MIN TIMER (0-255 SEC)
DWELL MIN TIMER (0-255 SEC)
PED CLEAR BEFORE PRE (0= DEFAULT)
PED CLEARANCE THROUGH YELLOW? .......Y
PRESS '+' TWICE
PRESS '+' TWICE
1 255 0.0 0.0 X
5 0 0.0 0.0 X
5 0 0.0 0.0 X
1 255 0.0 0.0 X
1 255 0.0 0.0 X X
5 0 0.0 0.0 X X
1 255 0.0 0.0 X X
OMIT OVERLAPS:
OMIT OVERLAPS:
OMIT OVERLAPS:
OMIT OVERLAPS:
PED CLEARANCE THROUGH YELLOW? .......Y
PED CLEARANCE THROUGH YELLOW? .......Y
DWELL MIN TIMER (0-255 SEC)
DWELL MIN TIMER (0-255 SEC)
to advance to Preempts 3, 4, 5, and 6.
(Standard Preemptions). Press 'NEXT' as needed
From Main Menu press 'A' (Preemption), then '1'
PRESS 'NEXT'
PRESS 'NEXT'
PRESS 'NEXT'
B
IR
R E
R V
E
C T
R
IC
T
E E
CZ304
12816840
DESIGNED: June 2020
N O
R
T
H CAROL
I
P
ISSE
L
A
R
EENIGN
E
030912
SEAL
REYOB .M I
RO
L
AS SHOWN
RText (RText)
N A
V A
L F
A C
IL
IT
IE
S E
N G
IN
E E
R
IN
G C
O M
M A
N D M
ID
-A
T L
A N
T
IC
M
ID
L A
C O
R E
N A
V
A T
IO
R F
O L
K
CHIEF ENG/ARCH
FIRE PROTECTION
S Y
M D
E S
C R
IP
T
P -1
B B
IR
C H S
T R
E E
T R
O A
D I
M P
R O
V E
M E
N T S
M
J E
U N
E C
A
J E
U N
E
N
M D
E S
C R
IP
T
IO
N
IS
S U
N S
T R
U C
T
IO
N
D E
P A
R T
M E
V Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N A
V
C
IL
IT
G
IN
E E
R
M M
A N
D
DES DRW
S Y
M D
E S
C R
IP
T
IO
N D
A T E
A P
P R
DRAWFORM REVISION: 07 AUG 2018
CHK
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
UNCLASSIFIED
U N
C L
A S
S
IF
IE
D
UNCLASSIFIED
SGL/CLS
DLB
EJA
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
PORTDAVEN
HOME OFFICE
WINSTON-SALEM, NC 27101
336.744.1636 www.davenportworld.com
NCBELS FIRM LICENSE NO. C-2522
119 BROOKSTOWN AVE. SUITE PH1
TSW TSW LMB
6/12/2020
AT MCB CAMP LEJEUNE. VIA EMAIL
DIRECTOR, INSTALLATION DEVELOPMENT
APPROVED BY EMILY SYLVESTER,
6/12/2020
(program controller as shown below)
DEBOUNCE TIME (0-25.5 SEC)..........0.5
SPECIAL FUNCTION ALARM (1-8)........_
TOD HOUR SYCHRONIZATION (0-23)......_
PLAN (65=FLSH,66=FREE).._ OFFSET#.._
CHANGE PHASE SEQUENCE PAGE (1-12)..._
CHANGE PHASE TIMING PAGE (1-4)......_
CHANGE PHASE CONTROL PAGE (1-4)....._
CHANGE OVERLAP CONTROL PAGE (1-4)..._
CHANGE INPUT PAGE (1-4)............._
OVERRIDE PHASE CONTROL FUNCTION (Y)._
DELAY TIME (0-25.5 SEC).............0.0
HOLD-OVER TIME (0-25.5 SEC).........0.0
ASSIGNMENT SELECTION:
PEDESTRIAN DETECTOR (1-16).........._
PREEMPT (1-10)......................_
INVERTED PREEMPT (1-10)............._
STOP TIME (Y/N)....................._
ALTERNATE PED DETECTOR (1-16)......._
FLASH SENSE (Y/N)..................._
DOOR OPEN (Y/N)....................._
MANUAL CONTROL ENABLE (Y/N)........._
MANUAL CONTROL ADVANCE (Y/N)........_
FORCE OFF RING (1-4)................_
HOLD PHASES (1-16).................._
CHANGE OUTPUT PAGE (1-4)............_
DEBOUNCE TIME (0-25.5 SEC)..........0.5
SPECIAL FUNCTION ALARM (1-8)........_
TOD HOUR SYCHRONIZATION (0-23)......_
PLAN (65=FLSH,66=FREE).._ OFFSET#.._
CHANGE PHASE SEQUENCE PAGE (1-12)..._
CHANGE PHASE TIMING PAGE (1-4)......_
CHANGE PHASE CONTROL PAGE (1-4)....._
CHANGE OVERLAP CONTROL PAGE (1-4)..._
CHANGE INPUT PAGE (1-4)............._
OVERRIDE PHASE CONTROL FUNCTION (Y)._
DELAY TIME (0-25.5 SEC).............0.0
HOLD-OVER TIME (0-25.5 SEC).........0.0
ASSIGNMENT SELECTION:
PEDESTRIAN DETECTOR (1-16).........._
PREEMPT (1-10)......................_
INVERTED PREEMPT (1-10)............._
STOP TIME (Y/N)....................._
ALTERNATE PED DETECTOR (1-16)......._
FLASH SENSE (Y/N)..................._
DOOR OPEN (Y/N)....................._
MANUAL CONTROL ENABLE (Y/N)........._
MANUAL CONTROL ADVANCE (Y/N)........_
FORCE OFF RING (1-4)................_
HOLD PHASES (1-16).................._
CHANGE OUTPUT PAGE (1-4)............_
DEBOUNCE TIME (0-25.5 SEC)..........0.5
SPECIAL FUNCTION ALARM (1-8)........_
TOD HOUR SYCHRONIZATION (0-23)......_
PLAN (65=FLSH,66=FREE).._ OFFSET#.._
CHANGE PHASE SEQUENCE PAGE (1-12)..._
CHANGE PHASE TIMING PAGE (1-4)......_
CHANGE PHASE CONTROL PAGE (1-4)....._
CHANGE OVERLAP CONTROL PAGE (1-4)..._
CHANGE INPUT PAGE (1-4)............._
OVERRIDE PHASE CONTROL FUNCTION (Y)._
DELAY TIME (0-25.5 SEC).............0.0
HOLD-OVER TIME (0-25.5 SEC).........0.0
ASSIGNMENT SELECTION:
PEDESTRIAN DETECTOR (1-16).........._
PREEMPT (1-10)......................_
INVERTED PREEMPT (1-10)............._
STOP TIME (Y/N)....................._
ALTERNATE PED DETECTOR (1-16)......._
FLASH SENSE (Y/N)..................._
DOOR OPEN (Y/N)....................._
MANUAL CONTROL ENABLE (Y/N)........._
MANUAL CONTROL ADVANCE (Y/N)........_
FORCE OFF RING (1-4)................_
HOLD PHASES (1-16).................._
CHANGE OUTPUT PAGE (1-4)............_
DEBOUNCE TIME (0-25.5 SEC)..........0.5
SPECIAL FUNCTION ALARM (1-8)........_
TOD HOUR SYCHRONIZATION (0-23)......_
PLAN (65=FLSH,66=FREE).._ OFFSET#.._
CHANGE PHASE SEQUENCE PAGE (1-12)..._
CHANGE PHASE TIMING PAGE (1-4)......_
CHANGE PHASE CONTROL PAGE (1-4)....._
CHANGE OVERLAP CONTROL PAGE (1-4)..._
CHANGE INPUT PAGE (1-4)............._
OVERRIDE PHASE CONTROL FUNCTION (Y)._
DELAY TIME (0-25.5 SEC).............0.0
ASSIGNMENT SELECTION:
PEDESTRIAN DETECTOR (1-16).........._
PREEMPT (1-10)......................_
INVERTED PREEMPT (1-10)............._
STOP TIME (Y/N)....................._
FLASH SENSE (Y/N)..................._
DOOR OPEN (Y/N)....................._
MANUAL CONTROL ENABLE (Y/N)........._
MANUAL CONTROL ADVANCE (Y/N)........_
FORCE OFF RING (1-4)................_
HOLD PHASES (1-16).................._
CHANGE OUTPUT PAGE (1-4)............_
(program controller as shown below)
DELAY (0-255 SEC)
MIN CALLS/DIAGNOSTIC PERIOD (0-255).0
EXTENSION DISABLE TIME (0-255 SEC)..0
MODE 2 STOP BAR.....................N
DUPLICATING DETECTOR................N
ENABLE FULL TIME DELAY..............N
IF FAILED, SET MAX2 RECALL?.........N
SPEED TRAP DISTANCE (0-255 FT)
STOP BAR TIME (0-255 SEC)
SPEED TRAP..........................N
SWITCHING DETECTOR..................N
PHASE# 12345678910111213141516
SWITCH/DUPLICATE
LOOP SIZE (0-255 FT)
STRETCH (0-25.5 SEC)................0.0
MAX OCCUPANCY (0-100%)
PHASES ASSIGNED
SETTING: (Y/N)
IF FAILED, SET MIN RECALL?..........N
IF FAILED, SET MAX1 RECALL?.........N
VEHICLE DETECTOR #51 SETTINGS (+-,1-64)
ENABLE DETECTOR.....................N
ENABLE LOGGING......................N
ENABLE DIAGNOSTICS..................N
CALL DETECTOR.......................Y
EXTENSION DETECTOR..................Y
QUEUE MAX OCCUPANCY TIME (0-255)
QUEUE GAP RESET TIME (0-25.5).......0.0
MAX CALLS/MIN (0-255)
PREEMPTION INDEX FOR QUEUE (0-10)...0
MIN CALLS/DIAGNOSTIC PERIOD (0-255).0
EXTENSION DISABLE TIME (0-255 SEC)..0
MODE 2 STOP BAR.....................N
DUPLICATING DETECTOR................N
ENABLE FULL TIME DELAY..............N
IF FAILED, SET MAX2 RECALL?.........N
SPEED TRAP DISTANCE (0-255 FT)
STOP BAR TIME (0-255 SEC)
SPEED TRAP..........................N
SWITCHING DETECTOR..................N
PHASE# 12345678910111213141516
SWITCH/DUPLICATE
LOOP SIZE (0-255 FT)
STRETCH (0-25.5 SEC)................0.0
MAX OCCUPANCY (0-100%)
PHASES ASSIGNED
SETTING: (Y/N)
IF FAILED, SET MIN RECALL?..........N
IF FAILED, SET MAX1 RECALL?.........N
X
VEHICLE DETECTOR #51 SETTINGS (+-,1-64)
ENABLE DETECTOR.....................Y
ENABLE LOGGING......................N
ENABLE DIAGNOSTICS..................N
CALL DETECTOR.......................Y
EXTENSION DETECTOR..................Y
QUEUE MAX OCCUPANCY TIME (0-255)
QUEUE GAP RESET TIME (0-25.5).......0.0
MAX CALLS/MIN (0-255)
PREEMPTION INDEX FOR QUEUE (0-10)...0
DETECTOR PROGRAMMING COMPLETE
ENTER 'Y' FOR ENABLE DETECTOR
ENTER '1' FOR PHASES ASSIGNED
ENSURE DELAY IS '0' DELAY (0-255 SEC)
ALTERNATE PED DETECTOR (1-16)......._
PROGRAMMING COMPLETE
HOLD-OVER TIME (0-25.5 SEC).........0.0
NOT ENABLED (Y/N)...................Y NOT ENABLED (Y/N)...................Y
VEHICLE DETECTOR (1-64)............._
NOT ENABLED (Y/N)..................._ NOT ENABLED (Y/N)..................._ENTER A 'Y' FOR NOT ENABLED
UNTIL 'NOT ENABLED' IS ENTERED.
DEFAULT DETECTOR NUMBER WILL REMAIN
GET TO VEHICLE DETECTOR #51.
'1' FOR VEHICLE DETECTORS. PRESS THE '-' KEY TO
FROM MAIN MENU PRESS '7' (DETECTORS), THEN PRESS
(LOOP 1A - PHASE 6) (LOOP 1A - PHASE 1)
PAGE: 2 C1 PIN:48 VEHICLE DETECTOR
INPUT ASSIGNMENT #
VEHICLE DETECTOR (1-64)
PAGE: 2 C1 PIN:48 NOT ENABLED
INPUT ASSIGNMENT #
PRESS '+' TO ADVANCE TO INPUT 18
PAGE: 2 C1 PIN:56 VEHICLE DETECTOR
INPUT ASSIGNMENT #
VEHICLE DETECTOR (1-64)
FOR THIS INPUT
THE VEHICLE DETECTOR
ENTER '51' TO REASSIGN
PAGE: 2 C1 PIN:56 VEHICLE DETECTOR
INPUT ASSIGNMENT #
VEHICLE DETECTOR (1-64)
INPUT PAGE 2 ASSIGNMENT PROGRAMMING DETAIL FOR ALTERNATE PHASING - LOOP 1A
'+' KEY UNTIL INPUT 10 IS REACHED.
'NEXT' TO GET TO INPUT PAGE '2'. PRESS THE
FROM MAIN MENU PRESS '5' (INPUTS), THEN PRESS
SPECIAL DETECTOR PROGRAMMING DETAIL - LOOP 1A (ALT.)
DURING ALTERNATE PHASING OPERATION.
DEFAULT SETTINGS. THIS PROGRAMMING IS NECESSARY FOR PROPER DETECTOR OPERATION
NOTES: 1. THIS PROGRAMMING APPLIES FOR INPUT PAGE 2 ONLY. INPUT PAGE 1 WILL USE STANDARD
INPUT #18 SO THAT THE DELAY ON LOOP 1A CAN BE REDUCED FROM 15 SECONDS TO 0 SECONDS.
THE SECOND TASK THIS PROGRAMMING ACCOMPLISHES IS THAT IT REASSIGNS DETECTOR 51 TO
SO THAT A VEHICLE CALL WILL NOT BE PLACED TO PHASE 6 DURING ALTERNATE PHASING OPERATION.
2. THE FIRST TASK THIS PROGRAMMING ACCOMPLISHES IS THE DISABLING OF INPUT #10 (DETECTOR 26)
THIS ELECTRICAL DETAIL IS FOR
REVISED:
THIS ELECTRICAL DETAIL IS FOR
THE SIGNAL DESIGN: Birch/Service Rd
REVISED: N/A
SEALED:
CHART SHOWN ON SHEET CZ-302.
INPUT FILE CONNECTION AND PROGRAMMING
NOTE: DETECTOR IS PROGRAMMED PER THE
B
IR
R E
R V
E
C T
R
IC
T
E E
CZ305
12816841
DESIGNED: June 2020
N O
R
T
H CAROL
I
P
ISSE
L
A
R
EENIGN
E
030912
SEAL
REYOB .M I
RO
L
AS SHOWN
RText (RText)
N A
V A
L F
A C
IL
IT
IE
S E
N G
IN
E E
R
IN
G C
O M
M A
N D M
ID
-A
T L
A N
T
IC
M
ID
L A
C O
R E
N A
V
A T
IO
R F
O L
K
CHIEF ENG/ARCH
FIRE PROTECTION
S Y
M D
E S
C R
IP
T
P -1
B B
IR
C H S
T R
E E
T R
O A
D I
M P
R O
V E
M E
N T S
M
J E
U N
E C
A
J E
U N
E
N
M D
E S
C R
IP
T
IO
N
IS
S U
N S
T R
U C
T
IO
N
D E
P A
R T
M E
V Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N A
V
C
IL
IT
G
IN
E E
R
M M
A N
D
DES DRW
S Y
M D
E S
C R
IP
T
IO
N D
A T E
A P
P R
DRAWFORM REVISION: 07 AUG 2018
CHK
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
UNCLASSIFIED
U N
C L
A S
S
IF
IE
D
UNCLASSIFIED
SGL/CLS
DLB
EJA
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
PORTDAVEN
HOME OFFICE
WINSTON-SALEM, NC 27101
336.744.1636 www.davenportworld.com
NCBELS FIRM LICENSE NO. C-2522
119 BROOKSTOWN AVE. SUITE PH1
TSW TSW LMB
6/12/2020
AT MCB CAMP LEJEUNE. VIA EMAIL
DIRECTOR, INSTALLATION DEVELOPMENT
SPECIAL FUNCTION ALARM (1-8)........_
TOD HOUR SYCHRONIZATION (0-23)......_
PLAN (65=FLSH,66=FREE).._ OFFSET#.._
CHANGE PHASE SEQUENCE PAGE (1-12)..._
CHANGE PHASE TIMING PAGE (1-4)......_
CHANGE PHASE CONTROL PAGE (1-4)....._
CHANGE OVERLAP CONTROL PAGE (1-4)..._
CHANGE INPUT PAGE (1-4)............._
OVERRIDE PHASE CONTROL FUNCTION (Y)._
DELAY TIME (0-25.5 SEC).............0.0
HOLD-OVER TIME (0-25.5 SEC).........0.0
ASSIGNMENT SELECTION:
PEDESTRIAN DETECTOR (1-16).........._
PREEMPT (1-10)......................_
INVERTED PREEMPT (1-10)............._
STOP TIME (Y/N)....................._
ALTERNATE PED DETECTOR (1-16)......._
FLASH SENSE (Y/N)..................._
DOOR OPEN (Y/N)....................._
MANUAL CONTROL ENABLE (Y/N)........._
MANUAL CONTROL ADVANCE (Y/N)........_
FORCE OFF RING (1-4)................_
HOLD PHASES (1-16).................._
CHANGE OUTPUT PAGE (1-4)............_
DEBOUNCE TIME (0-25.5 SEC)..........0.5
SPECIAL FUNCTION ALARM (1-8)........_
TOD HOUR SYCHRONIZATION (0-23)......_
PLAN (65=FLSH,66=FREE).._ OFFSET#.._
CHANGE PHASE SEQUENCE PAGE (1-12)..._
CHANGE PHASE TIMING PAGE (1-4)......_
CHANGE PHASE CONTROL PAGE (1-4)....._
CHANGE OVERLAP CONTROL PAGE (1-4)..._
CHANGE INPUT PAGE (1-4)............._
OVERRIDE PHASE CONTROL FUNCTION (Y)._
DELAY TIME (0-25.5 SEC).............0.0
HOLD-OVER TIME (0-25.5 SEC).........0.0
ASSIGNMENT SELECTION:
PEDESTRIAN DETECTOR (1-16).........._
PREEMPT (1-10)......................_
INVERTED PREEMPT (1-10)............._
STOP TIME (Y/N)....................._
ALTERNATE PED DETECTOR (1-16)......._
FLASH SENSE (Y/N)..................._
DOOR OPEN (Y/N)....................._
MANUAL CONTROL ENABLE (Y/N)........._
MANUAL CONTROL ADVANCE (Y/N)........_
FORCE OFF RING (1-4)................_
HOLD PHASES (1-16).................._
CHANGE OUTPUT PAGE (1-4)............_
DEBOUNCE TIME (0-25.5 SEC)..........0.5
SPECIAL FUNCTION ALARM (1-8)........_
TOD HOUR SYCHRONIZATION (0-23)......_
PLAN (65=FLSH,66=FREE).._ OFFSET#.._
CHANGE PHASE SEQUENCE PAGE (1-12)..._
CHANGE PHASE TIMING PAGE (1-4)......_
CHANGE PHASE CONTROL PAGE (1-4)....._
CHANGE OVERLAP CONTROL PAGE (1-4)..._
CHANGE INPUT PAGE (1-4)............._
OVERRIDE PHASE CONTROL FUNCTION (Y)._
DELAY TIME (0-25.5 SEC).............0.0
HOLD-OVER TIME (0-25.5 SEC).........0.0
ASSIGNMENT SELECTION:
PEDESTRIAN DETECTOR (1-16).........._
PREEMPT (1-10)......................_
INVERTED PREEMPT (1-10)............._
STOP TIME (Y/N)....................._
ALTERNATE PED DETECTOR (1-16)......._
FLASH SENSE (Y/N)..................._
DOOR OPEN (Y/N)....................._
MANUAL CONTROL ENABLE (Y/N)........._
MANUAL CONTROL ADVANCE (Y/N)........_
FORCE OFF RING (1-4)................_
HOLD PHASES (1-16).................._
CHANGE OUTPUT PAGE (1-4)............_
DEBOUNCE TIME (0-25.5 SEC)..........0.5
SPECIAL FUNCTION ALARM (1-8)........_
TOD HOUR SYCHRONIZATION (0-23)......_
PLAN (65=FLSH,66=FREE).._ OFFSET#.._
CHANGE PHASE SEQUENCE PAGE (1-12)..._
CHANGE PHASE TIMING PAGE (1-4)......_
CHANGE PHASE CONTROL PAGE (1-4)....._
CHANGE OVERLAP CONTROL PAGE (1-4)..._
CHANGE INPUT PAGE (1-4)............._
OVERRIDE PHASE CONTROL FUNCTION (Y)._
DELAY TIME (0-25.5 SEC).............0.0
ASSIGNMENT SELECTION:
PEDESTRIAN DETECTOR (1-16).........._
PREEMPT (1-10)......................_
INVERTED PREEMPT (1-10)............._
STOP TIME (Y/N)....................._
FLASH SENSE (Y/N)..................._
DOOR OPEN (Y/N)....................._
MANUAL CONTROL ENABLE (Y/N)........._
MANUAL CONTROL ADVANCE (Y/N)........_
FORCE OFF RING (1-4)................_
HOLD PHASES (1-16).................._
CHANGE OUTPUT PAGE (1-4)............_
(program controller as shown below)
DELAY (0-255 SEC)
MIN CALLS/DIAGNOSTIC PERIOD (0-255).0
EXTENSION DISABLE TIME (0-255 SEC)..0
MODE 2 STOP BAR.....................N
DUPLICATING DETECTOR................N
ENABLE FULL TIME DELAY..............N
IF FAILED, SET MAX2 RECALL?.........N
SPEED TRAP DISTANCE (0-255 FT)
STOP BAR TIME (0-255 SEC)
SPEED TRAP..........................N
SWITCHING DETECTOR..................N
PHASE# 12345678910111213141516
SWITCH/DUPLICATE
LOOP SIZE (0-255 FT)
STRETCH (0-25.5 SEC)................0.0
MAX OCCUPANCY (0-100%)
PHASES ASSIGNED
SETTING: (Y/N)
IF FAILED, SET MIN RECALL?..........N
IF FAILED, SET MAX1 RECALL?.........N
VEHICLE DETECTOR #55 SETTINGS (+-,1-64)
ENABLE DETECTOR.....................N
ENABLE LOGGING......................N
ENABLE DIAGNOSTICS..................N
CALL DETECTOR.......................Y
EXTENSION DETECTOR..................Y
QUEUE MAX OCCUPANCY TIME (0-255)
QUEUE GAP RESET TIME (0-25.5).......0.0
MAX CALLS/MIN (0-255)
PREEMPTION INDEX FOR QUEUE (0-10)...0
MIN CALLS/DIAGNOSTIC PERIOD (0-255).0
EXTENSION DISABLE TIME (0-255 SEC)..0
MODE 2 STOP BAR.....................N
DUPLICATING DETECTOR................N
ENABLE FULL TIME DELAY..............N
IF FAILED, SET MAX2 RECALL?.........N
SPEED TRAP DISTANCE (0-255 FT)
STOP BAR TIME (0-255 SEC)
SPEED TRAP..........................N
SWITCHING DETECTOR..................N
PHASE# 12345678910111213141516
SWITCH/DUPLICATE
LOOP SIZE (0-255 FT)
STRETCH (0-25.5 SEC)................0.0
MAX OCCUPANCY (0-100%)
PHASES ASSIGNED
SETTING: (Y/N)
IF FAILED, SET MIN RECALL?..........N
IF FAILED, SET MAX1 RECALL?.........N
X
VEHICLE DETECTOR #55 SETTINGS (+-,1-64)
ENABLE DETECTOR.....................Y
ENABLE LOGGING......................N
ENABLE DIAGNOSTICS..................N
CALL DETECTOR.......................Y
EXTENSION DETECTOR..................Y
QUEUE MAX OCCUPANCY TIME (0-255)
QUEUE GAP RESET TIME (0-25.5).......0.0
MAX CALLS/MIN (0-255)
PREEMPTION INDEX FOR QUEUE (0-10)...0
DETECTOR PROGRAMMING COMPLETE
ENTER 'Y' FOR ENABLE DETECTOR
ENTER '5' FOR PHASES ASSIGNED
ENSURE DELAY IS '0' DELAY (0-255 SEC)
INPUT ASSIGNMENT #
VEHICLE DETECTOR (1-64)
PAGE: 2 C1 PIN:47 VEHICLE DETECTOR
INPUT ASSIGNMENT #..................9 INPUT ASSIGNMENT #
PAGE: 2 C1 PIN:55 VEHICLE DETECTOR
INPUT ASSIGNMENT #
VEHICLE DETECTOR (1-64)
ALTERNATE PED DETECTOR (1-16)......._
PROGRAMMING COMPLETE
HOLD-OVER TIME (0-25.5 SEC).........0.0
PAGE: 2 C1 PIN:47 NOT ENABLED
NOT ENABLED (Y/N)...................Y NOT ENABLED (Y/N)...................Y
VEHICLE DETECTOR (1-64)............._
NOT ENABLED (Y/N)..................._ NOT ENABLED (Y/N)..................._ENTER A 'Y' FOR NOT ENABLED
UNTIL 'NOT ENABLED' IS ENTERED.
DEFAULT DETECTOR NUMBER WILL REMAIN
PAGE: 2 C1 PIN:55 VEHICLE DETECTOR
PRESS '+' TO ADVANCE TO INPUT 17
FOR THIS INPUT
THE VEHICLE DETECTOR
ENTER '55' TO REASSIGN
GET TO VEHICLE DETECTOR #55.
'1' FOR VEHICLE DETECTORS. PRESS THE '-' KEY TO
FROM MAIN MENU PRESS '7' (DETECTORS), THEN PRESS
VEHICLE DETECTOR (1-64)
(LOOP 5A - PHASE 2) (LOOP 5A - PHASE 5)
INPUT PAGE 2 ASSIGNMENT PROGRAMMING DETAIL FOR ALTERNATE PHASING - LOOP 5A
'+' KEY UNTIL INPUT 9 IS REACHED.
'NEXT' TO GET TO INPUT PAGE '2'. PRESS THE
FROM MAIN MENU PRESS '5' (INPUTS), THEN PRESS
SPECIAL DETECTOR PROGRAMMING DETAIL - LOOP 5A (ALT.)
DURING ALTERNATE PHASING OPERATION.
DEFAULT SETTINGS. THIS PROGRAMMING IS NECESSARY FOR PROPER DETECTOR OPERATION
NOTES: 1. THIS PROGRAMMING APPLIES FOR INPUT PAGE 2 ONLY. INPUT PAGE 1 WILL USE STANDARD
INPUT #17 SO THAT THE DELAY ON LOOP 5A CAN BE REDUCED FROM 15 SECONDS TO 0 SECONDS.
THE SECOND TASK THIS PROGRAMMING ACCOMPLISHES IS THAT IT REASSIGNS DETECTOR 55 TO
SO THAT A VEHICLE CALL WILL NOT BE PLACED TO PHASE 2 DURING ALTERNATE PHASING OPERATION.
2. THE FIRST TASK THIS PROGRAMMING ACCOMPLISHES IS THE DISABLING OF INPUT #9 (DETECTOR 22)
THIS ELECTRICAL DETAIL IS FOR
REVISED:
THE SIGNAL DESIGN: Birch/Service Rd
REVISED: N/A
SEALED:
CHART SHOWN ON SHEET CZ-302.
INPUT FILE CONNECTION AND PROGRAMMING
NOTE: DETECTOR IS PROGRAMMED PER THE
B
IR
R E
R V
E
C T
R
IC
T
E E
CZ306
12816842
DESIGNED: June 2020
N O
R
T
H CAROL
I
P
ISSE
L
A
R
EENIGN
E
030912
SEAL
REYOB .M I
RO
L
AS SHOWN
RText (RText)
N A
V A
L F
A C
IL
IT
IE
S E
N G
IN
E E
R
IN
G C
O M
M A
N D M
ID
-A
T L
A N
T
IC
M
ID
L A
C O
R E
N A
V
A T
IO
R F
O L
K
CHIEF ENG/ARCH
FIRE PROTECTION
S Y
M D
E S
C R
IP
T
P -1
B B
IR
C H S
T R
E E
T R
O A
D I
M P
R O
V E
M E
N T S
M
J E
U N
E C
A
J E
U N
E
N
M D
E S
C R
IP
T
IO
N
IS
S U
N S
T R
U C
T
IO
N
D E
P A
R T
M E
V Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N A
V
C
IL
IT
G
IN
E E
R
M M
A N
D
DES DRW
S Y
M D
E S
C R
IP
T
IO
N D
A T E
A P
P R
DRAWFORM REVISION: 07 AUG 2018
CHK
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
UNCLASSIFIED
U N
C L
A S
S
IF
IE
D
UNCLASSIFIED
SGL/CLS
DLB
EJA
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
PORTDAVEN
HOME OFFICE
WINSTON-SALEM, NC 27101
336.744.1636 www.davenportworld.com
NCBELS FIRM LICENSE NO. C-2522
119 BROOKSTOWN AVE. SUITE PH1
TSW TSW LMB
6/12/2020
AT MCB CAMP LEJEUNE. VIA EMAIL
DIRECTOR, INSTALLATION DEVELOPMENT
ACTIVE PAGES REQUIRED TO RUN DEFAULT PHASING
EVENTS. IF PAGE 1 IS USED, NO EVENT PROGRAMMING IS NECESSARY
ALTERNATE PHASING ACTIVATION DETAIL
INPUTS PAGE
PHASING
2 2
FOR THAT PARTICULAR PAGE.
ACTIVE PAGES REQUIRED TO RUN ALTERNATE PHASING
WITHIN COORDINATION PLAN PROGRAMMING.
TO RUN ALT. PHASING DURING COORDINATION - SELECT ALL PAGE CHANGES (AS SHOWN BELOW)
TO RUN ALT. PHASING DURING FREE RUN - PROGRAM PAGE CHANGES (SHOWN BELOW) IN SEPARATE TIME OF DAY
NOTE: PAGES NOT SHOWN (i.e. sequence, phase control, etc.) SHOULD REMAIN AS '1', OR AS DEFINED BY TIMING ENGINEER.
VICE-VERSA).
(EX. FREE RUN PAGE CHANGE EVENT SHOULD END BEFORE COORDINATION PLAN EVENT STARTS AND
PAGE CHANGE EVENTS CONCURRENTLY WITH COORDINATION PLAN EVENTS IN THE EVENT SCHEDULER.
IMPORTANT: IF ALT. PHASING IS USED DURING FREE RUN AND COORDINATION, DO NOT OPERATE TIME OF DAY
OVERLAPS PAGE
THIS ELECTRICAL DETAIL IS FOR
REVISED:
call on loop 1A to 0 seconds.
and reduces delay time for phase 1
INPUTS PAGE 2: Disables phase 6 call on loop 1A call on loop 5A to 0 seconds.
and reduces delay time for phase 5
Disables phase 2 call on loop 5A
THE FOLLOWING IS A SUMMARY OF WHAT TAKES PLACE WHEN
ALTERNATE PHASING PAGE CHANGE SUMMARY
"ALTERNATE PHASING":
THESE OVERLAP/INPUT PAGE CHANGES ACTIVATE TO CALL THE
THE SIGNAL DESIGN: Birch/Service Rd
REVISED: N/A
SEALED:
COUNTDOWN PEDESTRIAN SIGNAL OPERATION
for instructions on selecting this feature.
Ped Clearance Interval. Consult Ped Signal Module user's manual
Countdown Ped Signals are required to display timing only during protected turns only.
for heads 11 and 51 to run
OVERLAPS PAGE 2: Modifies overlap parent phases
CZ307
B
IR
R E
R V
E
C T
R
IC
T
E E
12816843
DESIGNED: June 2020
N O
R
T
H CAROL
I
P
ISSE
L
A
R
EENIGN
E
030912
SEAL
REYOB .M I
RO
L
AS SHOWN
RText (RText)
N A
V A
L F
A C
IL
IT
IE
S E
N G
IN
E E
R
IN
G C
O M
M A
N D M
ID
-A
T L
A N
T
IC
M
ID
L A
C O
R E
N A
V
A T
IO
R F
O L
K
CHIEF ENG/ARCH
FIRE PROTECTION
S Y
M D
E S
C R
IP
T
P -1
B B
IR
C H S
T R
E E
T R
O A
D I
M P
R O
V E
M E
N T S
M
J E
U N
E C
A
J E
U N
E
N
M D
E S
C R
IP
T
IO
N
IS
S U
N S
T R
U C
T
IO
N
D E
P A
R T
M E
V Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N A
V
C
IL
IT
G
IN
E E
R
M M
A N
D
DES DRW
S Y
M D
E S
C R
IP
T
IO
N D
A T E
A P
P R
DRAWFORM REVISION: 07 AUG 2018
CHK
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
UNCLASSIFIED
U N
C L
A S
S
IF
IE
D
UNCLASSIFIED
SGL/CLS
DLB
EJA
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
PORTDAVEN
HOME OFFICE
WINSTON-SALEM, NC 27101
336.744.1636 www.davenportworld.com
NCBELS FIRM LICENSE NO. C-2522
119 BROOKSTOWN AVE. SUITE PH1
TSW TSW LMB
6/12/2020
AT MCB CAMP LEJEUNE. VIA EMAIL
DIRECTOR, INSTALLATION DEVELOPMENT
Attachment (H1)
Elevation Data for Mast Arm project survey data.
by field measurement or from available elevation data below which was obtained shop drawings for approval. Verify from the roadway before submitting final will provide the "Design Height" clearance that the mast arm attachment height (H1)
The contractor is responsible for verifying
See Note 6
POLE RADIAL ORIENTATION
Elevation Differences for:
High point of roadway surface Elevation difference at
Edge of travelway or face of curb Elevation difference at
Baseline reference point at
4"
Plate width
B.C.
Direction
Mast Arm
LC
(T yp
B.C.
Direction
Mast Arm
T yp
CLLC
CL
LC Foundation @ ground level
SYMBOL
LOADING
8 BOLT BASE PLATE DETAIL
SPECIAL NOTE
For 8 Bolt Base Plate
LOCK PLATE DETAIL
BASE PLATE TEMPLATE & ANCHOR BOLT
MAST ARM LOADING SCHEDULE
NOTES
Design Loading for METAL POLE NO. 1
Elevation View
@ 180
Compartment
Terminal
Note 7
See
Design Loading for METAL POLE NO. 2
34'
Design Height 18 ft
Elevation View
Note 8
See
C Pole L
Maximum 25.6 ft.
Roadway Clearance
Minimum 16.5 ft.
High Point of Roadway Surface
See Note 7e
See Note 7d
L C Foundation
H2
4 & 5
See Notes
22.4 ft. 23.3 ft.
Pole 1 Pole 2
+1.9 ft.
+1.5 ft.
Street Name
+0.1 ft.
+0.1 ft.
6' 15'
Note 7
See
45'
Design Height 18 ft
Note 8
See
C Pole L
Maximum 25.6 ft.
Roadway Clearance
Minimum 16.5 ft.
High Point of Roadway Surface
See Note 7e
See Note 7d
L C Foundation
H2
4 & 5
See Notes
Street Name
6' 20'
Pedestrian Head
16" Countdown
Max=10'
Min=7'
12"-3 SECTION-WITH BACKPLATE
RIGID MOUNTED SIGNAL HEAD
9.3 S.F.
52.5" L X
25.5" W
60 LBS
RIGID MOUNTED
STREET NAME SIGN
16.0 S.F. 36 LBSStreet Name
96.0" L X
24.0" W
12"-4 SECTION-WITH BACKPLATE
RIGID MOUNTED SIGNAL HEAD
11.5 S.F.
66.0" L X
25.5" W
74 LBS
1'
1' manufacturer so site specific foundations can be designed.
The contractor is responsible for providing soil penetration testing data (SPT) to the pole11.
proper positioning of the signal heads over the roadway.
The contractor is responsible for verifying that the mast arm length shown will allow10.
Contracting Officer as this may affect the mast arm lengths and arm attachment heights.
If pole location adjustments are required, the contractor must gain approval from the9.
H1 plus 1/2 of the total height of the mast arm attachment assembly plus 1 foot.
Mast arm attachment height (H1) plus 2 feet, or the following:
The pole manufacturer will determine the total height (H2) of each pole using the greater of 8.
foundation ground level and the high point of the roadway.
Refer to the Elevation Data Chart for the elevation differences between the proposede.
The top of the pole base plate is 0.75 feet above the ground elevation.d.
The roadway clearance height for design is as shown in the elevation views.c.
Signal heads are rigidly mounted and vertically centered on the mast arm.b.
height as they are assumed to offset each other.
Mast arm slope and deflection are not considered in determining the arm attachmenta.
The mast arm attachment height (H1) shown is based on the following design assumptions:7.
Design base plate with 8 anchor bolt holes. Provide 2 inch x 60 inch anchor bolts.6.
determine appropriate arm connection points.
requirements. This requires staggering the connections. Use elevation data for each arm to stiffened box connection shown as long as the connection meets all of the design
A clamp-type bolted mast arm-to-pole connection may be used instead of the welded ring5.
horizontal when fully loaded.
pitched arch where the tip or the free end of the mast arm does not deflect below
The camber design for the mast arm deflection should provide an appearance of a low4.
Design all signal supports using stress ratios that do not exceed 0.9.3.
traffic signal plans for the actual loads that will be applied at the time of the installation.
loads that will be applied at the time of the installation. The contractor should refer to the views. These are anticipated worst case "design loads" and may not represent the actual
Design the traffic signal structure using the loading conditions shown in the elevation2.
DESIGN REQUIREMENTS
https://connect.ncdot.gov/resources/safety/Pages/ITS-Design-Resources.aspx
The NCDOT "Metal Pole Standards" located at the following NCDOT website:
The traffic signal project plans and special provisions.
The 2018 NCDOT Roadway Standard Drawings.
the specifications can be found in the traffic signal project special provisions.
The 2018 NCDOT "Standard Specifications for Roads and Structures." The latest addenda to
Signs, Luminaires, and Traffic Signals, including all of the latest interim revisions.
The 6th Edition 2013 AASHTO "Standard Specifications for Structural Supports for Highway
Design the traffic signal structure and foundation in accordance with:1.
DESIGN REFERENCE MATERIAL
H1= 20.5'
WITH MOUNTING HARDWARE
PEDESTRIAN SIGNAL HEAD
2.2 S.F.
17.0" L X
18.5" W
21 LBS
4' 4' 4'
1.0 S.F. 5 LBSOPTICAL DETECTOR
12.0" L
X 12.0" W
6' 6' 6'
METAL POLE No. 1 and 2
H1= 22'
Base line reference elev. = 22.4'
Base line reference elev. = 23.3'
DESCRIPTION AREA SIZE WEIGHT
CZ308
S H
E E
B
IR
R E
R V
T
A D
IA
G R
12816844
O
R
T
H CAROL
I
P
ISSE
L
A
R
EENIGN
E
030912
SEAL
REYOB .M I
RO
L
AS SHOWN
RText (RText)
N A
V A
L F
A C
IL
IT
IE
S E
N G
IN
E E
R
IN
G C
O M
M A
N D M
ID
-A
T L
A N
T
IC
M
ID
L A
C O
R E
N A
V
A T
IO
R F
O L
K
CHIEF ENG/ARCH
FIRE PROTECTION
S Y
M D
E S
C R
IP
T
P -1
B B
IR
C H S
T R
E E
T R
O A
D I
M P
R O
V E
M E
N T S
M
J E
U N
E C
A
J E
U N
E
N
M D
E S
C R
IP
T
IO
N
IS
S U
N S
T R
U C
T
IO
N
D E
P A
R T
M E
V Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N A
V
C
IL
IT
G
IN
E E
R
M M
A N
D
DES DRW
S Y
M D
E S
C R
IP
T
IO
N D
A T E
A P
P R
DRAWFORM REVISION: 07 AUG 2018
CHK
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
UNCLASSIFIED
U N
C L
A S
S
IF
IE
D
UNCLASSIFIED
SGL/CLS
DLB
EJA
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
PORTDAVEN
HOME OFFICE
WINSTON-SALEM, NC 27101
336.744.1636 www.davenportworld.com
NCBELS FIRM LICENSE NO. C-2522
119 BROOKSTOWN AVE. SUITE PH1
TSW TSW LMB
6/12/2020
AT MCB CAMP LEJEUNE. VIA EMAIL
DIRECTOR, INSTALLATION DEVELOPMENT
Attachment (H1)
Elevation Data for Mast Arm project survey data.
by field measurement or from available elevation data below which was obtained shop drawings for approval. Verify from the roadway before submitting final will provide the "Design Height" clearance that the mast arm attachment height (H1)
The contractor is responsible for verifying
See Note 6
POLE RADIAL ORIENTATION
Elevation Differences for:
High point of roadway surface Elevation difference at
Edge of travelway or face of curb Elevation difference at
Baseline reference point at
4"
Plate width
B.C.
Direction
Mast Arm
LC
(T yp
B.C.
Direction
Mast Arm
T yp
CLLC
CL
LC Foundation @ ground level
SYMBOL
LOADING
8 BOLT BASE PLATE DETAIL
SPECIAL NOTE
For 8 Bolt Base Plate
LOCK PLATE DETAIL
BASE PLATE TEMPLATE & ANCHOR BOLT
DESCRIPTION AREA SIZE WEIGHT
MAST ARM LOADING SCHEDULE
NOTES
12"-3 SECTION-WITH BACKPLATE
RIGID MOUNTED SIGNAL HEAD
9.3 S.F.
52.5" L X
25.5" W
60 LBS
RIGID MOUNTED
STREET NAME SIGN
16.0 S.F. 36 LBSStreet Name
96.0" L X
24.0" W
Design Loading for METAL POLE NO. 3
Elevation View
@ 180
Compartment
Terminal
Note 7
See
Design Loading for METAL POLE NO. 4
55'
Design Height 18 ft
Elevation View
Note 8
See
C Pole L
1'
Maximum 25.6 ft.
Roadway Clearance
Minimum 16.5 ft.
High Point of Roadway Surface
See Note 7e
See Note 7d
L C Foundation
H2
4 & 5
See Notes
23.2 ft. 22.8 ft.
Pole 3 Pole 4
+1.9 ft.
+1.0 ft.
Street Name
+1.9 ft.
+1.9 ft.
7' 30'
Pedestrian Head
16" Countdown
Max=10'
Min=7'
12"-4 SECTION-WITH BACKPLATE
RIGID MOUNTED SIGNAL HEAD
11.5 S.F.
66.0" L X
25.5" W
74 LBS
HOME OFFICE
RText (RText)
Note 7
See
39'
Design Height 18 ft
Note 8
See
C Pole L
Maximum 25.6 ft.
Roadway Clearance
Minimum 16.5 ft.
High Point of Roadway Surface
See Note 7e
See Note 7d
L C Foundation
H2
4 & 5
See Notes
Street Name
4 21'
Pedestrian Head
16" Countdown
Max=10'
Min=7'
1' manufacturer so site specific foundations can be designed.
The contractor is responsible for providing soil penetration testing data (SPT) to the pole11.
proper positioning of the signal heads over the roadway.
The contractor is responsible for verifying that the mast arm length shown will allow10.
Contracting Officer as this may affect the mast arm lengths and arm attachment heights.
If pole location adjustments are required, the contractor must gain approval from the9.
H1 plus 1/2 of the total height of the mast arm attachment assembly plus 1 foot.
Mast arm attachment height (H1) plus 2 feet, or the following:
The pole manufacturer will determine the total height (H2) of each pole using the greater of 8.
foundation ground level and the high point of the roadway.
Refer to the Elevation Data Chart for the elevation differences between the proposede.
The top of the pole base plate is 0.75 feet above the ground elevation.d.
The roadway clearance height for design is as shown in the elevation views.c.
Signal heads are rigidly mounted and vertically centered on the mast arm.b.
height as they are assumed to offset each other.
Mast arm slope and deflection are not considered in determining the arm attachmenta.
The mast arm attachment height (H1) shown is based on the following design assumptions:7.
Design base plate with 8 anchor bolt holes. Provide 2 inch x 60 inch anchor bolts.6.
determine appropriate arm connection points.
requirements. This requires staggering the connections. Use elevation data for each arm to stiffened box connection shown as long as the connection meets all of the design
A clamp-type bolted mast arm-to-pole connection may be used instead of the welded ring5.
horizontal when fully loaded.
pitched arch where the tip or the free end of the mast arm does not deflect below
The camber design for the mast arm deflection should provide an appearance of a low4.
Design all signal supports using stress ratios that do not exceed 0.9.3.
traffic signal plans for the actual loads that will be applied at the time of the installation.
loads that will be applied at the time of the installation. The contractor should refer to the views. These are anticipated worst case "design loads" and may not represent the actual
Design the traffic signal structure using the loading conditions shown in the elevation2.
DESIGN REQUIREMENTS
https://connect.ncdot.gov/resources/safety/Pages/ITS-Design-Resources.aspx
The NCDOT "Metal Pole Standards" located at the following NCDOT website:
The traffic signal project plans and special provisions.
The 2018 NCDOT Roadway Standard Drawings.
the specifications can be found in the traffic signal project special provisions.
The 2018 NCDOT "Standard Specifications for Roads and Structures." The latest addenda to
Signs, Luminaires, and Traffic Signals, including all of the latest interim revisions.
The 6th Edition 2013 AASHTO "Standard Specifications for Structural Supports for Highway
Design the traffic signal structure and foundation in accordance with:1.
DESIGN REFERENCE MATERIAL
5' 4'
WITH MOUNTING HARDWARE
PEDESTRIAN SIGNAL HEAD
2.2 S.F.
17.0" L X
18.5" W
21 LBS
1.0 S.F. 5 LBSOPTICAL DETECTOR
12.0" L
X 12.0" W
4'
6' 5' 6'
METAL POLE No. 3 and 4
H1= 22'
Base line reference elev. = 23.2'
H1= 22'
Base line reference elev. = 22.8'
S H
E E
B
IR
R E
R V
T
A D
IA
G R
CZ309
12816845
N O
R
T
H CAROL
I
P
ISSE
L
A
R
EENIGN
E
030912
SEAL
REYOB .M I
RO
L
AS SHOWN
RText (RText)
N A
V A
L F
A C
IL
IT
IE
S E
N G
IN
E E
R
IN
G C
O M
M A
N D M
ID
-A
T L
A N
T
IC
M
ID
L A
C O
R E
N A
V
A T
IO
R F
O L
K
CHIEF ENG/ARCH
FIRE PROTECTION
S Y
M D
E S
C R
IP
T
P -1
B B
IR
C H S
T R
E E
T R
O A
D I
M P
R O
V E
M E
N T S
M
J E
U N
E C
A
J E
U N
E
N
M D
E S
C R
IP
T
IO
N
IS
S U
N S
T R
U C
T
IO
N
D E
P A
R T
M E
V Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N A
V
C
IL
IT
G
IN
E E
R
M M
A N
D
DES DRW
S Y
M D
E S
C R
IP
T
IO
N D
A T E
A P
P R
DRAWFORM REVISION: 07 AUG 2018
CHK
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
UNCLASSIFIED
U N
C L
A S
S
IF
IE
D
UNCLASSIFIED
SGL/CLS
DLB
EJA
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
PORTDAVEN
HOME OFFICE
WINSTON-SALEM, NC 27101
336.744.1636 www.davenportworld.com
NCBELS FIRM LICENSE NO. C-2522
119 BROOKSTOWN AVE. SUITE PH1
TSW TSW LMB
6/12/2020
AT MCB CAMP LEJEUNE. VIA EMAIL
PLAN
NORTH
1 INCH = 30 FEET
30 30 60
HOLCOMB BOULEVARD AT BIRCH STREET
SCALE: 1" = 30'
Directional Arrow
Controller & Cabinet
Signal Pole with Guy
With Push Button & Sign
Signal Pole with Sidewalk Guy
Inductive Loop Detector
Traffic Signal Head
Pedestrian Signal Head
2-in Underground Conduit
LEGEND
PROPOSED EXISTING
Sign
Modified Signal Head N/A
Junction Box
N/A Right of Way
Metal Pole with Mastarm existing existing
Directional Arrow
Controller & Cabinet
Signal Pole with Guy
With Push Button & Sign
Signal Pole with Sidewalk Guy
Inductive Loop Detector
Traffic Signal Head
Pedestrian Signal Head
2-in Underground Conduit
LEGEND
PROPOSED EXISTING
Sign
Modified Signal Head N/A
Junction Box
N/A Right of Way
Metal Pole with Mastarm existing existing
N/ADirectional Drill exType II Signal Pedestal
Oversized Junction Box
FEATURE
PHASE
1 2 3 4 5 6
MIN RECALL MIN RECALL
YELLOW YELLOW
ON ON
7 7 7 7
15 60 30 30 15 60
12 12
- - 28 - -
- - - -15 15
30 30
3.0 3.9 3.9 3.04.2 4.2
ON ON ON ON
OASIS 2070 TIMING CHART
Min Green 1 *
Extension 1
Max Green 1 *
Yellow Clearance
Red Clearance
Walk 1 *
Don't Walk 1
Seconds Per Actuation *
Max Variable Initial *
Time Before Reduction *
Time To Reduce *
Minimum Gap
Recall Mode
Vehicle Call Memory
Dual Entry
Simultaneous Gap
2.0 6.0 2.0 2.0 2.0 6.0
4.0 2.8 2.6 2.5 3.2 2.8
30 -is shown. Min Green for all other phases should not be lower than 4 seconds.
* These values may be field adjusted. Do not adjust Min Green and Extension times for phases 2 and 6 lower than what
1.5 1.5
3.0 3.0
TURNS
INDUCTIVE LOOPS
PHASE
DETECTOR PROGRAMMING
LOOP
TIME
DELAY
(FT)
STOPBAR
FROM
DISTANCE
(FT)
SIZE
TIME
STRETCH
N
W
R D
N
W
O P
F U
L L
T
IM
L A
Y
E X T E
N S
IO
N
C A
L L
IN
G
S Y S T
O P
Y
Y
OASIS 2070 LOOP & DETECTOR INSTALLATION CHART
2A 250 Y Y - - - - Y2
4A 6X40 0 Y Y - - - - Y4
Y4B 6X40 Y Y - - - - Y4
Y Y Y - - - Y
5A 6X40
Y Y Y - 3 - Y
Y6B 6X6 Y Y - - - - Y6
* 15
2#
Y Y Y - - - Y
1A 6X40
Y Y Y - 3 - Y
* 15
6#
Y4C 6X40 Y Y - - -40 Y-
6X6
Y3A 6X40 0 Y Y - - - - Y3
Y3B 6X40 0 Y Y - - - - Y3
Y3C 6X40 0 Y Y - - - - Y3
2-4-2
2-4-2
2-4-2
Y5B 6X40 Y Y - - 1550 Y-
2-4-2
2-4-2
2-4-2
2-4-2
Y6A 6X6 Y Y - - - - Y65
2-4-2
2-4-2
Phasing Operation.
# Disable Phase call for this loop during Alternate
* Disable delay during Alternate Phasing Operation.
Y2B 250 Y Y - - - - Y26X6 5
KEY NOTES
SIGNAL FACE I.D.
All Heads L.E.D.
12"
R
Y
R
Y
G
12"
R
Y
G
12"
R
Y
F Y
12"
R
Y Y
G
12"
16"
P21,P22
41,42
61,62
P41,P42 7 7
Yield Sign (R1-2) AA
S
IG
N
E
O L
C O
U L E
V A
IR
R E
E T
(BIRCH STREET SIGNAL SYSTEM)
FULLY ACTUATED
6 PHASE
Y5C 6X6 Y Y - - 1550 Y-2-4-2
Y1B 6X40 0 Y Y - - 15 - Y12-4-2 exOptical Detector
ONLY. COORDINATED SIGNAL SYSTEM TIMING VALUES SUPERSEDE THESE VALUES.
12. MAXIMUM TIMES SHOWN IN TIMING CHART ARE FOR FREE-RUN OPERATION
LOCATIONS OF OPTICAL DETECTORS ARE CONCEPTUAL ONLY.
11. THIS INTERSECTION FEATURES AN OPTICAL PREEMPTION SYSTEM. SHOWN
CONFLICTS PRIOR TO ORDERING MATERIALS.
10. VERIFY CANTILEVER POLE FOUNDATION LOCATIONS DO NOT HAVE UTILITY
1530-1730
1030-1200
0600-0800
BLVD, MONDAY-FRIDAY, DURING THE FOLLOWING TIMES:
9. SIGNAL SHALL BE OPERATED IN PROTECTED ONLY PHASING ON HOLCOMB
ONLY. SEE SHEET CZ-600-CZ-602 FOR PUSHBUTTON LOCATION DETAILS.
8. PEDESTRIAN PEDESTALS ARE CONCEPTUAL AND SHOWN FOR REFERENCE
TIME ONLY.
7. PROGRAM PEDESTRIAN HEADS TO COUNTDOWN THE FLASHING "DON'T WALK"
6. OMIT "WALK" AND FLASHING "DON'T WALK" WITH NO PEDESTRIAN CALLS.
5. SET ALL DETECTOR UNITS TO PRESENCE MODE.
4. THE ORDER OF PHASE 3 AND PHASE 4 MAY BE REVERSED.
3. PHASE 1 AND / OR 5 MAY BE LAGGED.
OTHERWISE DIRECTED BY THE CONTRACTING OFFICER.
2. DO NOT PROGRAM SIGNAL FOR LATE NIGHT FLASHING OPERATION UNLESS
RESOURCES.ASPX
HTTP://CONNECT.NCDOT.GOV/RESOURCES/SAFETY/PAGES/ITS-DESIGN-
CAN BE DOWNLOADED FROM NCDOT WEBSITE:
CONTROL DEVICES (MUTCD). THE GENERIC PROJECT SPECIAL PROVISIONS
ROADWAY STANDARD DRAWINGS,AND THE FHWA MANUAL ON UNIFORM TRAFFIC
AND STRUCTURES, NCDOT GENERIC PROJECT SPECIAL PROVISIONS, NCDOT
WITH THE LATEST VERSIONS OF NCDOT STANDARD SPECIFICATIONS FOR ROADS
1. ALL WORK FOR THE TRAFFIC SIGNALS IS TO BE PERFORMED IN ACCORDANCE
CZ400
H O
L C
O
U L E
V A
R E
IG
N
E
12816846
N O
R
T
H CAROL
I
P
ISSE
L
A
R
EENIGN
E
030912
SEAL
REYOB .M I
RO
L
5A
3A
4B 4A
1A11
P42
HOLCOMB BOULEVARD
HOLCOMB BOULEVARD
B
IR
R E
E T
A D
E
B
IR
R E
E T
3B 3C ex
4C5B
44434241P41 P21
P22
2A
6A
6B
A D
E
(40 MPH DESIGN SPEED)
35 MPH 0% GRADE
(40 MPH DESIGN SPEED)
35 MPH -1% GRADE
2B
A
METAL POLE #1
METAL POLE #2
METAL POLE #3
METAL POLE #4
PRE 6
PRE 5
PRE 3
PRE 5
5C
1B
PROPOSED POLE, STOP BAR, CROSSWALK LOCATION DIAGRAM
NOT TO SCALE
9'
4'
10'
10'
4'
35'
43'
18'
34'
36'
21'
49'
12'
58'
9' 6'
Existing Stop Bar
Proposed Stop Bar
8'
12'
AS SHOWN
RText (RText)
N A
V A
L F
A C
IL
IT
IE
S E
N G
IN
E E
R
IN
G C
O M
M A
N D M
ID
-A
T L
A N
T
IC
M
ID
L A
C O
R E
N A
V
A T
IO
R F
O L
K
CHIEF ENG/ARCH
FIRE PROTECTION
S Y
M D
E S
C R
IP
T
P -1
B B
IR
C H S
T R
E E
T R
O A
D I
M P
R O
V E
M E
N T S
M
J E
U N
E C
A
J E
U N
E
N
M D
E S
C R
IP
T
IO
N
IS
S U
N S
T R
U C
T
IO
N
D E
P A
R T
M E
V Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N A
V
C
IL
IT
G
IN
E E
R
M M
A N
D
DES DRW
S Y
M D
E S
C R
IP
T
IO
N D
A T E
A P
P R
DRAWFORM REVISION: 07 AUG 2018
CHK
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
UNCLASSIFIED
U N
C L
A S
S
IF
IE
D
UNCLASSIFIED
SGL/CLS
DLB
EJA
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
PORTDAVEN
HOME OFFICE
WINSTON-SALEM, NC 27101
336.744.1636 www.davenportworld.com
NCBELS FIRM LICENSE NO. C-2522
119 BROOKSTOWN AVE. SUITE PH1
TSW TSW LMB
6/12/2020
AT MCB CAMP LEJEUNE. VIA EMAIL
PEDESTRIAN MOVEMENT
UNSIGNALIZED MOVEMENT
UNDETECTED MOVEMENT (OVERLAP)
DETECTED MOVEMENT
PHASING DIAGRAM DETECTION LEGEND
02+6
02+5
01+6
01+5
DEFAULT PHASING DIAGRAM
FACE
SIGNAL
PHASE
F L A S H
61,62
P21,P22
TABLE OF OPERATION
DEFAULT PHASING
DRKDWDWDW
F
Y
F
Y
F
Y
F
Y
R
G G
G G
G
G G
R R R R R R
R R
R R
R R R R
R R R
GR R R R R R
R R R R R R
R R R R R R
R R R R
W
Y
Y
Y
Y
Y
02+6
02+5
01+6
01+5
ALTERNATE PHASING DIAGRAM
SIGNAL FACE I.D.
All Heads L.E.D.
12"
R
Y
R
Y
G
12"
R
Y
G
12"
R
Y
F Y
12"
R
Y Y
G
12"
16"
P21,P22
R R
P41,P42 DRKDWDWDWDWDW W
41,42
G
G
W DW
41,42
61,62
P41,P42
R R R R
KEY NOTES
(ISOLATED)
FULLY ACTUATED
6 PHASE
S
IG
N
E
O L
C O
U L E
V A
R E
E T
GR R R R
33 R R
PREEMPT PHASES
DEFAULT EV
PREEMPT PHASES
ALTERNATE EV
Interval 1 - Dwell Green
Interval 1 - Dwell Yellow
Interval 1 - Dwell Red
Interval 5 - Exit Green
Delay Time
Min Green Before Pre
Ped Clear Before Pre
Yellow Clear Before Pre
Red Clear Before Pre
Dwell Min Time
Enable Backup Protection
Ped Clear Through Yellow
Interval 5 - Yellow
Interval 5 - Red
FUNCTION PRE 3
0.0
0.0
0.0
0.0
PRE 4
0.0
0.0
0.0
0.0
0.0
0.0
0.0
PRE 5
0.0
0.0
0.0
0.0
PRE 6
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Priority
2 2
Exit Phase(s)
Omit Overlaps
Preempt Extend**
OASIS 2070 EV PREEMPT
0.0
0.0
0.0
MED
0.0
N
Y
0.0
0.0
0.0
MED
0.0
N
Y
MED MED
2+6
(2+5)
PRE 3
(04)
PRE 6
(1+6)
PRE 4
Y Y
N N
12 7
0.0
0.0
2 22 2
2+6 4
** Program Timing on Optical Detection Unit
* Time defaults to time used for phase during normal operation
P
Y
G
G
R
R
R
R
R
R
DW
R
R
R
R
R
R
R
F
Y
G
DW
DW
R
R
G
G
G
R
R
R
R
R
DW
DW
R
R
R
R
R
R
R
G
G
DW
R
(03)
PRE 5
(2+5)
PRE 3
(1+6)
PRE 4
(03)
PRE 5
(04)
PRE 6
FACE
SIGNAL
PHASE
F L A S H
61,62
P21,P22
TABLE OF OPERATION
DRKDWDWDW
R
G G
G G
G
G G
R R R R R R
R R
R R
R R R R
R R R
GR R R R R R
R R R R R R
R R R R R R
R R R R
W
Y
Y
Y
Y
Y
R R
P41,P42 DRKDWDWDWDWDW W
41,42
G
G
W DW
R R R R
GR R R R
33 R R
P
G
R
R
R
R
R
R
DW
R
R
R
R
R
R
G
DW
DW
R
R
G
G
G
R
R
R
R
R
DW
DW
R
R
R
R
R
R
R
G
G
DW
R
ALTERNATE PHASING
Dwell Max Time (MINUTES)
DW
DW
DW
DW
R
F
RR
R R
R
R
R R
R
R
R
D B
R
ONLY. COORDINATED SIGNAL SYSTEM TIMING VALUES SUPERSEDE THESE VALUES.
12. MAXIMUM TIMES SHOWN IN TIMING CHART ARE FOR FREE-RUN OPERATION
LOCATIONS OF OPTICAL DETECTORS ARE CONCEPTUAL ONLY.
11. THIS INTERSECTION FEATURES AN OPTICAL PREEMPTION SYSTEM. SHOWN
CONFLICTS PRIOR TO ORDERING MATERIALS.
10. VERIFY CANTILEVER POLE FOUNDATION LOCATIONS DO NOT HAVE UTILITY
1530-1730
1030-1200
0600-0800
BLVD, MONDAY-FRIDAY, DURING THE FOLLOWING TIMES:
9. SIGNAL SHALL BE OPERATED IN PROTECTED ONLY PHASING ON HOLCOMB
ONLY. SEE SHEET CZ-600-CZ-602 FOR PUSHBUTTON LOCATION…