About this file

This document contains a past performance questionnaire template for use in evaluating contractors on federal projects. The template requests information on previous contracts including the client, contract details, performance ratings in areas such as quality, schedule, management, and safety. Ratings are to be provided using an adjective scale defined as exceptional, very good, satisfactory, marginal, and unsatisfactory. The client is asked to provide ratings for quality, schedule, customer satisfaction, management, cost, and safety/security based on the contractor's performance on the relevant previous contract.

The related federal contract opportunity is a solicitation for a firm-fixed-price construction contract from the Naval Facilities Engineering Command. The project involves road improvements on Birch Street at Marine Corps Base Camp Lejeune in North Carolina. The solicitation number and additional details on the scope of work are provided.

View the file

Other files

File Type Posted
N4008519R914600004.pdf PDF
N4008519R914600003.pdf PDF
Copy of P1346B-1280B-PPI 28 31 Amend 3 Attach 2.xlsx XLSX spreadsheet
01 78 30.00 22 _ July2020 Amend3 Attach 1.pdf PDF
(2) P1346B-1280B-Pre-Proposal-Inquiry-Log.xlsx XLSX spreadsheet
N4008519R914600002.pdf PDF
P1346B-1280B-Pre-Proposal-Inquiry-Log.xlsx XLSX spreadsheet
P1280B Site Visit Sign-In.pdf PDF
GI111.pdf PDF
P1346B-1280B-Pre-Proposal-Inquiry-Log MASTER Thru 1200 - 8-10-2020 w PM.xlsx XLSX spreadsheet
GI110.pdf PDF
CP705.pdf PDF
N4008519R9146P00001.pdf PDF
1374744dwg08of27_Vol1-Sht 91-101.pdf PDF
1374744dwg11of27_Vol1-Sht 161-180.pdf PDF
1374744dwg17of27_Vol2-Sht 232-240.pdf PDF
1374744dwg24of27_Vol3-Sht 389-425.pdf PDF
1374744dwg16of27_Vol2-Sht 213-231.pdf PDF
1374744dwg18of27_Vol2-Sht 241-246.pdf PDF
1374744dwg26of27_Vol3-Sht 466-508.pdf PDF
1374744dwg21of27_Vol2-Sht 282-330.pdf PDF
1374744dwg01of27_Vol1-Sht 1-13.pdf PDF
1374744dwg13of27_Vol2-Sht 190-195.pdf PDF
1374744spc01of01.pdf PDF
1374744dwg12of27_Vol1-Sht 181-189.pdf PDF
1374744dwg06of27_Vol1-Sht 64-76.pdf PDF
1374744dwg22of27_Vol2-Sht 331-370.pdf PDF
1374744dwg03of27_Vol1-Sht 31-34.pdf PDF
1374744dwg07of27_Vol1-Sht 77-90.pdf PDF
1374744dwg23of27_Vol2-Sht 371-388.pdf PDF
1374744dwg27of27_Vol3-Sht 509-547.pdf PDF
1374744dwg05of27_Vol1-Sht 50-63.pdf PDF
1374744dwg25of27_Vol3-Sht 426-465.pdf PDF
1374744dwg04of27_Vol1-Sht 35-49.pdf PDF
1374744dwg19of27_Vol2-Sht 247-252.pdf PDF
1374744dwg14of27_Vol2-Sht 196-201.pdf PDF
1374744dwg15of27_Vol2-Sht 202-212.pdf PDF
1374744dwg02of27_Vol1-Sht 14-30.pdf PDF
1374744dwg09of27_Vol1-Sht 102-123.pdf PDF
1374744dwg20of27_Vol2-Sht 253-281.pdf PDF
1374744dwg10of27_Vol1-Sht 124-160.pdf PDF
Attachment D Price Proposal Form.docx DOCX document
RFP N4008519R9146.pdf PDF
Attachment A Pre-Proposal Inquiry Log.xls XLS spreadsheet
2ATTACHMENT B Construction Design Exp.docx DOCX document
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOURCE SELECTION SENSITIVE INFORMATION

DISCLOSURE LIMITATIONS AS OUTLINED IN FAR 2.101 & 3.104 APPLY

ATTACHMENT C

NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0)

CONTRACT INFORMATION (Contractor to complete Blocks 1-4)

1. Contractor Information Firm Name: CAGE Code:

Address: DUNs Number:

Phone Number:

Email Address:

Point of Contact: Contact Phone Number:

2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of project work performed:

If subcontractor, who was the prime (Name/Phone #):

3. Contract Information Contract Number:

Delivery/Task Order Number (if applicable):

Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):

Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy):

Explain Differences:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable):

Explain Differences:

4. Project Description:

Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

CLIENT INFORMATION (Client to complete Blocks 5-8)

5. Client Information Name:

Title:

Phone Number:

Email Address:

6. Describe the client’s role in the project:

7. Date Questionnaire was completed (mm/dd/yy):

8. Client’s Signature:

NOTE: NAVFAC REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNAIRE AND

SUBMITS DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE

COMPLETED QUESTIONNAIRE TO NAVFAC WITH THEIR PROPOSAL, AND MAY

DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON NAVFAC

SOLICITATIONS. CLIENTS ARE HIGHLY ENCOURAGED TO SUBMIT QUESTIONNAIRES

DIRECTLY TO THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED

DIRECTLY TO NAVFAC. PLEASE CONTACT THE OFFEROR FOR NAVFAC POC

INFORMATION. THE GOVERNMENT RESERVES THE RIGHT TO VERIFY ANY AND ALL

INFORMATION ON THIS FORM.

ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE

RATING DEFINITION NOTE

(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner.

A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating.

Also, there should have been NO Significant Weaknesses identified.

(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no Significant Weaknesses identified.

(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract.

There should have been NO Significant Weaknesses identified.

Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.

(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.

A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.

(U) Unsatisfactory

Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.

An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.

(N) Not Applicable

No information or did not apply to your contract

Rating will be neither positive nor negative.

Contractor Information (Firm Name):

Client Information (Name):

TO BE COMPLETED BY CLIENT

PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.

1. QUALITY:

a) Quality of technical data/report preparation efforts

E VG S M U

N

b) Ability to meet quality standards specified for technical performance

E VG S M U

N

c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance

E VG S M U

N

d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)

E VG S M U

N

2. SCHEDULE/TIMELINESS OF PERFORMANCE:

a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)

E VG S M U

N

b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract

E VG S M U

N

3. CUSTOMER SATISFACTION:

a) To what extent were the end users satisfied with the project?

E VG S M U

N

b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports, businesslike and communication)

E VG S M U

N

c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?

E VG S M U

N

d) Overall customer satisfaction

E VG S M U

N

4. MANAGEMENT/ PERSONNEL/LABOR

a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?

E VG S M U

N

b) Ability to hire, apply, and retain a qualified workforce to this effort

E VG S M U

N

c) Government Property Control

E VG S M U

N

d) Knowledge/expertise demonstrated by contractor personnel

E VG S M U

N

e) Utilization of Small Business concerns

E VG S M U

N

f) Ability to simultaneously manage multiple projects with multiple disciplines

E VG S M U

N

g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes

E VG S M U

N

h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)

E VG S M U

N

5. COST/FINANCIAL MANAGEMENT

a) Ability to meet the terms and conditions within the contractually agreed price(s)?

E VG S M U

N

Contractor Information (Firm Name): ________________________________________________ Client Information (Name): ________________________________________________________

b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client

E VG S M U

N

c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)

E VG S M U

N

d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.

Yes No

e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.

Yes No

f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below.

Yes No

6. SAFETY/SECURITY

a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)

E VG S M U

N

b) Contractor complied with all security requirements for the project and personnel security requirements.

E VG S M U

N

7. GENERAL

a) Ability to successfully respond to emergency and/or surge E VG S M U

File details come from the government source that posted it. Updated .