1374744dwg07of27_Vol1-Sht 77-90.pdf
PDF 17 MB Posted
- Solicitation number
- N4008519R9146
About this file
This document provides details on a federal solicitation for a construction project. The solicitation is number N4008519R9146 and is for a firm-fixed price design-bid-build contract to complete Birch Street Road Improvements and Birch Street North at Marine Corps Base Camp Lejeune in North Carolina. The work includes road improvements and construction at the specified locations. The solicitation was issued by the Department of the Navy Naval Facilities Engineering Command and interested parties should review it for additional requirement details. The closing date is not specified in this document.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
.0
21.
.00
.0
.0
21.
25.0
20.00
.0
24.
24.
23.
22.
21.0021.
.0
23.00
23.
22.0
23.00
24.00
20.00 20.00 20.00 20.00
.0
22.0
.0
24.
.00
23.00
22.00 21.00 20.00 19.00
20.00
21.00
22.00
18.00
17.00
.0
18.0
.0
.0
21.00
18.00
19.00
20.00
21.00
20.0021.0022.0023.0024.0025.00
20.00
22.00
23.00
R
C
P
R
C
P
R
C
P
R
C
P
R
C
P
R
C
P
R
C P
R
C P
R
C P
R
C
P
R
C P
SF
OP
IP
C
D
I
P
OP
SF
SF
SF
IP
IP
IP
CIP
IP
IP
OP
B/M
PS
B/M
PS
200A
B
I
R
C
H
S
T
R
E
E
T
CD
PS
PS
23.00
23.00
22.00 21.00
21.00
.0
20.00
24.00
24.00
23.00
22.00
21.0020.00
22.00 23.00
22.00 .0
.0
23.00
22.00
21.00
24.00
23.00
22.00
22.00
.0
SF
SF
SF
SF
OP
B/M
PS
B/M
PS
BIRCH STREET
W A
L L A
E
R E
K
D
SF
CD
SOIL
STABILIZATION
BLANKET
B/M
CONCRETE
WASH AREA
SF
CE
CWA
IP
OUTLET
PROTECTION
SPEC 6.41
OP
CHECK DAM
SPEC 6.87
CD
PERMANENT
SODDING
PS
PS
B/M
4" TOPSOIL AND CENTIPEDE SOD
LIMIT OF DISTURBANCE
INLET
PROTECTION
SPEC 6.52
CONSTRUCTION
ENTRANCE
SPEC 6.06
SILT FENCE
TITLE KEY SYMBOL
CULVERT INLET
PROTECTION
CIP
A2
CC502
A3
CC501
A4
CC505
A1
CC501
A4
CC503
A1
CC503
A4
CC504
B2
CC504
DETAIL
DRAINAGE FLOW ARROW
M c
H
U
G
H
C
C
C
C
C
C
C
C
C
C
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
FY
P -1
0B
B
IR
C H
S
TR
E E
T R
O A
D
IM
P R
O V
E M
E N
TS
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
PORTDAVEN
HOME OFFICE
WINSTON-SALEM, NC 27101
336.744.1636 www.davenportworld.com
NCBELS FIRM LICENSE NO. C-2522
119 BROOKSTOWN AVE. SUITE PH1
PLAN
NORTH
C1
EROSION AND SEDIMENT CONTROL PLAN - BIRCH STREET STA. 212+50 TO 217+50
PLAN
NORTH
A1
EROSION AND SEDIMENT CONTROL PLAN - BIRCH STREET STA. 217+50 TO 222+50
PLAN
NORTH
KEY PLAN
GENERAL NOTES
1. SEE SHEET C-023 TO C-026 FOR SURVEY NOTES
AND C-002 FOR SURVEY LEGEND.
2. SEE SHEET CC500 FOR EROSION AND
SEDIMENT CONTROL NOTES.
3. SEE SHEETS CP101 FOR NEW ROADWAY PLAN.
4. ALL AREAS OF DISTURBANCE OUTSIDE THE
LIMITS OF NEW PAVEMENT SHALL BE
PERMANENTLY RESTORED WITH 4 INCHES OF
TOPSOIL AND PERMANENT SOD. EROSION
CONTROL BLANKET SHALL BE USED
WHEREVER FINISHED GRADE SLOPE IS 3H:1V
OR GREATER.
5. EROSION AND SEDIMENT CONTROL FOR
UTILITY CONSTRUCTION SHALL BE PROVIDED IN
ACCORDANCE WITH APPROVED PLANS. UTILITY
CONSTRUCTION SHALL ONLY BE FOR AREAS
WITHIN THE DELINEATED LIMIT OF
DISTURBANCE. WHEN SAME DAY
STABILIZATION IS APPROVED:
A. EXCAVATED TRENCH MATERIAL SHALL BE
PLACED ON THE HIGH SIDE OF THE TRENCH.
B. TRENCHES FOR UTILITY INSTALLATION SHALL
BE BACKFILLED, COMPACTED, AND
STABILIZED AT THE END OF EACH WORKING
DAY.
6. FOLLOWING INITIAL SOIL DISTURBANCE OR
RE-DISTURBANCE, PERMANENT OR
TEMPORARY STABILIZATION SHALL BE
COMPLETED WITHIN:
A. THREE (3) CALENDAR DAYS AS TO THE
SURFACE OF ALL PERIMETER CONTROLS,
DITCHES AND SLOPES 3H:1V OR STEEPER;
AND
B. SEVEN (7) CALENDAR DAYS IF DISTURBED
AREAS ARE NOT UNDER ACTIVE GRADING.
LEGEND
SCALE IN FEET
20' 40'
SCALE IN FEET
20' 40'
1" = 20'
1" = 20'
CC101
C
C
23.00
22.00 21.00
20.00 19.00
18.00
.0
16.
15.
14.0
.0
.0
11.00 10.00
6.
7.
8.
00 9.
.0
21.00
22.00
22.00 23.00
24.00
24.00
23.00
22.00
.0
.0
15.00
10.00
5.00
.0
.0 .0
.0
.0
.0
.0
.0
24.00
24.00
21.0
R
C
P
R
C
P
18"RCP
R
C P
"R
C P
R
C
P
R
C P
R
C
P
R
C P
"R
C P
R
C P
"R
C P
SF
IP
SF
OP
IP
IP
B/M
PS
B
I R
R
E
E
T
SF
SF
SF
OP
RR
RR
CD
CD
PS
PS
PS
IP
IP
IP
IP
IP
PS
PS
SF
B/M
CD
RR
24.00
19.00
20.00
21.00
22.00
23.00
24.00
23.00
22.00
24.00
24.00
24.00
.0
24.00
24.00
22.00
21.00
20.00
19.00
.0
18.0019.00 20.00
R
C
P
R
C P
R
C
P
R
C
P
IP
SF
SF
BIR
CH S
TREET
SF
SF
PS
PS
PS
IP
IP
SF
SOIL
STABILIZATION
BLANKET
B/M
CONCRETE
WASH AREA
SF
CE
CWA
IP
OUTLET
PROTECTION
SPEC 6.41
OP
CHECK DAM
SPEC 6.87
CD
PERMANENT
SODDING
PS
PS
B/M
4" TOPSOIL AND CENTIPEDE SOD
LIMIT OF DISTURBANCE
INLET
PROTECTION
SPEC 6.52
CONSTRUCTION
ENTRANCE
SPEC 6.06
SILT FENCE
TITLE KEY SYMBOL
CULVERT INLET
PROTECTION
CIP
A2
CC502
A3
CC501
A4
CC505
A1
CC501
A4
CC503
A1
CC503
A4
CC504
B2
CC504
DETAIL
DRAINAGE FLOW ARROW
B
I
R
C
H
C
C
C
C
C
C
C
C
C
C
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
FY
P -1
0B
B
IR
C H
S
TR
E E
T R
O A
D
IM
P R
O V
E M
E N
TS
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
PORTDAVEN
HOME OFFICE
WINSTON-SALEM, NC 27101
336.744.1636 www.davenportworld.com
NCBELS FIRM LICENSE NO. C-2522
119 BROOKSTOWN AVE. SUITE PH1
PLAN
NORTH
C1
EROSION AND SEDIMENT CONTROL PLAN - BIRCH STREET STA. 222+50 TO 227+50
PLAN
NORTH
A1
EROSION AND SEDIMENT CONTROL PLAN - BIRCH STREET STA. 227+50 TO 232+50
PLAN
NORTH
KEY PLAN
GENERAL NOTES
1. SEE SHEET C-023 TO C-026 FOR SURVEY NOTES
AND C-002 FOR SURVEY LEGEND.
2. SEE SHEET CC500 FOR EROSION AND
SEDIMENT CONTROL NOTES.
3. SEE SHEETS CP102 FOR NEW ROADWAY PLAN.
4. ALL AREAS OF DISTURBANCE OUTSIDE THE
LIMITS OF NEW PAVEMENT SHALL BE
PERMANENTLY RESTORED WITH 4 INCHES OF
TOPSOIL AND PERMANENT SOD. EROSION
CONTROL BLANKET SHALL BE USED
WHEREVER FINISHED GRADE SLOPE IS 3H:1V
OR GREATER.
5. EROSION AND SEDIMENT CONTROL FOR
UTILITY CONSTRUCTION SHALL BE PROVIDED IN
ACCORDANCE WITH APPROVED PLANS. UTILITY
CONSTRUCTION SHALL ONLY BE FOR AREAS
WITHIN THE DELINEATED LIMIT OF
DISTURBANCE. WHEN SAME DAY
STABILIZATION IS APPROVED:
A. EXCAVATED TRENCH MATERIAL SHALL BE
PLACED ON THE HIGH SIDE OF THE TRENCH.
B. TRENCHES FOR UTILITY INSTALLATION SHALL
BE BACKFILLED, COMPACTED, AND
STABILIZED AT THE END OF EACH WORKING
DAY.
6. FOLLOWING INITIAL SOIL DISTURBANCE OR
RE-DISTURBANCE, PERMANENT OR
TEMPORARY STABILIZATION SHALL BE
COMPLETED WITHIN:
A. THREE (3) CALENDAR DAYS AS TO THE
SURFACE OF ALL PERIMETER CONTROLS,
DITCHES AND SLOPES 3H:1V OR STEEPER;
AND
B. SEVEN (7) CALENDAR DAYS IF DISTURBED
AREAS ARE NOT UNDER ACTIVE GRADING.
LEGEND
SCALE IN FEET
20' 40'
SCALE IN FEET
20' 40'
1" = 20'
1" = 20'
RIP-RAP ARMORED
SLOPE
RR
A1
CC226
CC102
C
C
TASK 1300
REPAIR EXISTING EROSION
UPON REMOVAL OF SEDIMENT IN THE VICINITY
OF THE FOOT BRIDGE, THE CONTRACTOR SHALL
COORDINATE AN INSPECTION OF THE FOOT
BRIDGE WITH THE CONTRACTING OFFICER FOR
REVIEW AND FURTHER ACTION.
PROVIDE 26 TONS RIP-RAP STONE
AT 2' THICK SECTION. INLET
PROTECTION SHALL BE SET FLUSH
WITH STREAM BED, NOT BUILT UP.
INLET AND OUTLET PROTECTION
SHALL BE SET FLUSH WITH
STREAM BED, NOT BUILT UP.
SF
SF
SF
B
IR
C H
S
TR
E E
T
P
S
P
S
12.00
13.00 14 .0
15.00
.00
16.00
15.00
OP
CIP
SF
SF
SF
SF
BIRCH STREET
PS
PS
SOIL
STABILIZATION
BLANKET
B/M
CONCRETE
WASH AREA
SF
CE
CWA
IP
OUTLET
PROTECTION
SPEC 6.41
OP
CHECK DAM
SPEC 6.87
CD
PERMANENT
SODDING
PS
PS
B/M
4" TOPSOIL AND CENTIPEDE SOD
LIMIT OF DISTURBANCE
INLET
PROTECTION
SPEC 6.52
CONSTRUCTION
ENTRANCE
SPEC 6.06
SILT FENCE
TITLE KEY SYMBOL
CULVERT INLET
PROTECTION
CIP
A2
CC502
A3
CC501
A4
CC505
A1
CC501
A4
CC503
A1
CC503
A4
CC504
B2
CC504
DETAIL
DRAINAGE FLOW ARROW
B
E
A
V
E
R
B
I
R
C
H
S
T
R
E
E
T
B E A R H
E
A
D
C
C
C
C
C
C
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
FY
P -1
0B
B
IR
C H
S
TR
E E
T R
O A
D
IM
P R
O V
E M
E N
TS
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
PORTDAVEN
HOME OFFICE
WINSTON-SALEM, NC 27101
336.744.1636 www.davenportworld.com
NCBELS FIRM LICENSE NO. C-2522
119 BROOKSTOWN AVE. SUITE PH1
PLAN
NORTH
C1
EROSION AND SEDIMENT CONTROL PLAN - BIRCH STREET STA. 232+50 TO 237+50
PLAN
NORTH
A1
EROSION AND SEDIMENT CONTROL PLAN - BIRCH STREET STA. 237+50 TO 242+50
PLAN
NORTH
KEY PLAN
GENERAL NOTES
1. SEE SHEET C-023 TO C-026 FOR SURVEY NOTES
AND C-002 FOR SURVEY LEGEND.
2. SEE SHEET CC500 FOR EROSION AND
SEDIMENT CONTROL NOTES.
3. SEE SHEETS CP103 FOR NEW ROADWAY PLAN.
4. ALL AREAS OF DISTURBANCE OUTSIDE THE
LIMITS OF NEW PAVEMENT SHALL BE
PERMANENTLY RESTORED WITH 4 INCHES OF
TOPSOIL AND PERMANENT SOD. EROSION
CONTROL BLANKET SHALL BE USED
WHEREVER FINISHED GRADE SLOPE IS 3H:1V
OR GREATER.
5. EROSION AND SEDIMENT CONTROL FOR
UTILITY CONSTRUCTION SHALL BE PROVIDED IN
ACCORDANCE WITH APPROVED PLANS. UTILITY
CONSTRUCTION SHALL ONLY BE FOR AREAS
WITHIN THE DELINEATED LIMIT OF
DISTURBANCE. WHEN SAME DAY
STABILIZATION IS APPROVED:
A. EXCAVATED TRENCH MATERIAL SHALL BE
PLACED ON THE HIGH SIDE OF THE TRENCH.
B. TRENCHES FOR UTILITY INSTALLATION SHALL
BE BACKFILLED, COMPACTED, AND
STABILIZED AT THE END OF EACH WORKING
DAY.
6. FOLLOWING INITIAL SOIL DISTURBANCE OR
RE-DISTURBANCE, PERMANENT OR
TEMPORARY STABILIZATION SHALL BE
COMPLETED WITHIN:
A. THREE (3) CALENDAR DAYS AS TO THE
SURFACE OF ALL PERIMETER CONTROLS,
DITCHES AND SLOPES 3H:1V OR STEEPER;
AND
B. SEVEN (7) CALENDAR DAYS IF DISTURBED
AREAS ARE NOT UNDER ACTIVE GRADING.
LEGEND
SCALE IN FEET
20' 40'
SCALE IN FEET
20' 40'
1" = 20'
1" = 20'
CC103
C
C
OP CIP
SF
SF
BIRCH STREET
PS
PS
.0
20.
20.00
19.00
.0
.0
.0
.0
.00
.00
.0
.0
.0
.0 0 21.00
.0
.0
1.
22.00
20.00
21.00
21.00
20.00 19.00
18.00
19.00
.0 020.00
15.00
16.
.0
17.00 18.00
19.00
20.00
20.00
20.00
21.00
23.00
19.00 18.00
17.00
19.0019.00
18"R
CP
CIP
SF
SF
SF
OP
CIP
BIRCH STREET
PS
PS
P A
R A
C H
U T
E
T O
W E
R
R
D
B/M
B/M
SOIL
STABILIZATION
BLANKET
B/M
CONCRETE
WASH AREA
SF
CE
CWA
IP
OUTLET
PROTECTION
SPEC 6.41
OP
CHECK DAM
SPEC 6.87
CD
PERMANENT
SODDING
PS
PS
B/M
4" TOPSOIL AND CENTIPEDE SOD
LIMIT OF DISTURBANCE
INLET
PROTECTION
SPEC 6.52
CONSTRUCTION
ENTRANCE
SPEC 6.06
SILT FENCE
TITLE KEY SYMBOL
CULVERT INLET
PROTECTION
CIP
A2
CC502
A3
CC501
A4
CC505
A1
CC501
A4
CC503
A1
CC503
A4
CC504
B2
CC504
DETAIL
DRAINAGE FLOW ARROW
B
E
A
V
E
R
D
A
M
B
I
R
C
H
S
T
R
E
E
T
B E A R
C
R
E
E
K
H
E
A
D
C
C
C
C
C
C
4 N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
FY
P -1
0B
B
IR
C H
S
TR
E E
T R
O A
D
IM
P R
O V
E M
E N
TS
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
PORTDAVEN
HOME OFFICE
WINSTON-SALEM, NC 27101
336.744.1636 www.davenportworld.com
NCBELS FIRM LICENSE NO. C-2522
119 BROOKSTOWN AVE. SUITE PH1
PLAN
NORTH
C1
EROSION AND SEDIMENT CONTROL PLAN - BIRCH STREET STA. 242+50 TO 247+50
A1
EROSION AND SEDIMENT CONTROL PLAN - BIRCH STREET STA. 247+50 TO 252+50
PLAN
NORTH
PLAN
NORTH
KEY PLAN
GENERAL NOTES
1. SEE SHEET C-023 TO C-026 FOR SURVEY NOTES
AND C-002 FOR SURVEY LEGEND.
2. SEE SHEET CC500 FOR EROSION AND
SEDIMENT CONTROL NOTES.
3. SEE SHEETS CP104 FOR NEW ROADWAY PLAN.
4. ALL AREAS OF DISTURBANCE OUTSIDE THE
LIMITS OF NEW PAVEMENT SHALL BE
PERMANENTLY RESTORED WITH 4 INCHES OF
TOPSOIL AND PERMANENT SOD. EROSION
CONTROL BLANKET SHALL BE USED
WHEREVER FINISHED GRADE SLOPE IS 3H:1V
OR GREATER.
5. EROSION AND SEDIMENT CONTROL FOR
UTILITY CONSTRUCTION SHALL BE PROVIDED IN
ACCORDANCE WITH APPROVED PLANS. UTILITY
CONSTRUCTION SHALL ONLY BE FOR AREAS
WITHIN THE DELINEATED LIMIT OF
DISTURBANCE. WHEN SAME DAY
STABILIZATION IS APPROVED:
A. EXCAVATED TRENCH MATERIAL SHALL BE
PLACED ON THE HIGH SIDE OF THE TRENCH.
B. TRENCHES FOR UTILITY INSTALLATION SHALL
BE BACKFILLED, COMPACTED, AND
STABILIZED AT THE END OF EACH WORKING
DAY.
6. FOLLOWING INITIAL SOIL DISTURBANCE OR
RE-DISTURBANCE, PERMANENT OR
TEMPORARY STABILIZATION SHALL BE
COMPLETED WITHIN:
A. THREE (3) CALENDAR DAYS AS TO THE
SURFACE OF ALL PERIMETER CONTROLS,
DITCHES AND SLOPES 3H:1V OR STEEPER;
AND
B. SEVEN (7) CALENDAR DAYS IF DISTURBED
AREAS ARE NOT UNDER ACTIVE GRADING.
LEGEND
SCALE IN FEET
20' 40'
SCALE IN FEET
20' 40'
1" = 20'
1" = 20'
CC104
C
C
SOIL
STABILIZATION
BLANKET
B/M
CONCRETE
WASH AREA
SF
CE
CWA
IP
OUTLET
PROTECTION
SPEC 6.41
OP
CHECK DAM
SPEC 6.87
CD
PERMANENT
SODDING
PS
PS
B/M
4" TOPSOIL AND CENTIPEDE SOD
LIMIT OF DISTURBANCE
INLET
PROTECTION
SPEC 6.52
CONSTRUCTION
ENTRANCE
SPEC 6.06
SILT FENCE
TITLE KEY SYMBOL
CULVERT INLET
PROTECTION
CIP
A2
CC502
A3
CC501
A4
CC505
A1
CC501
A4
CC503
A1
CC503
A4
CC504
B2
CC504
DETAIL
DRAINAGE FLOW ARROW
D
A
M
N
E
W
S
E
R
V
I
C
E
C
R
E
E
K
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
22.00
25.00
26.00
25.00
24.00
23.00
23.00
24.00
25.00
24.00
25.00
23.00
24.00
24.00
24.00
23.00
24.00
23.00
24.00
23.00
24.00
25.00
25.00
26.00
26.00
25.00
25.00
R
C
P
R
C
P
15"RCP
R
C
P
R
C
P
R
C P
R
C P
R
C
P
R
C
P
IP
I
P
IP
I P
SF
I P
BIR
CH S
TREET
I P
PS
PS
PS
P
S
P
S
SF
PS
PS
25.00
24.00
23.00
22.00
23.00
.0 021.0
22.00
21.00 19.00
22.00
21.00
20.0 019.0018.00
22.00
.0
21.00
22.
23.00
22.00
21.00
21.00
22.00
23.00
.0
24.00
23.00 22.00
24.00
22.00
22.00
24.00
24.00
R
C P
SF
IP
IP
SF
SF
SF
BIR
CH S
TREET
S
E
R
V
I
O
A
D
S
E
R
V
I
A
D
PS
PS
CWA
CE
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
FY
P -1
0B
B
IR
C H
S
TR
E E
T R
O A
D
IM
P R
O V
E M
E N
TS
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
PORTDAVEN
HOME OFFICE
WINSTON-SALEM, NC 27101
336.744.1636 www.davenportworld.com
NCBELS FIRM LICENSE NO. C-2522
119 BROOKSTOWN AVE. SUITE PH1
PLAN
NORTH
A1
KEY PLAN
GENERAL NOTES
1. SEE SHEET C-023 TO C-026 FOR SURVEY NOTES
AND C-002 FOR SURVEY LEGEND.
2. SEE SHEET CC500 FOR EROSION AND
SEDIMENT CONTROL NOTES.
3. SEE SHEETS CP105 FOR NEW ROADWAY PLAN.
4. ALL AREAS OF DISTURBANCE OUTSIDE THE
LIMITS OF NEW PAVEMENT SHALL BE
PERMANENTLY RESTORED WITH 4 INCHES OF
TOPSOIL AND PERMANENT SOD. EROSION
CONTROL BLANKET SHALL BE USED
WHEREVER FINISHED GRADE SLOPE IS 3H:1V
OR GREATER.
5. EROSION AND SEDIMENT CONTROL FOR
UTILITY CONSTRUCTION SHALL BE PROVIDED IN
ACCORDANCE WITH APPROVED PLANS. UTILITY
CONSTRUCTION SHALL ONLY BE FOR AREAS
WITHIN THE DELINEATED LIMIT OF
DISTURBANCE. WHEN SAME DAY
STABILIZATION IS APPROVED:
A. EXCAVATED TRENCH MATERIAL SHALL BE
PLACED ON THE HIGH SIDE OF THE TRENCH.
B. TRENCHES FOR UTILITY INSTALLATION SHALL
BE BACKFILLED, COMPACTED, AND
STABILIZED AT THE END OF EACH WORKING
DAY.
6. FOLLOWING INITIAL SOIL DISTURBANCE OR
RE-DISTURBANCE, PERMANENT OR
TEMPORARY STABILIZATION SHALL BE
COMPLETED WITHIN:
A. THREE (3) CALENDAR DAYS AS TO THE
SURFACE OF ALL PERIMETER CONTROLS,
DITCHES AND SLOPES 3H:1V OR STEEPER;
AND
B. SEVEN (7) CALENDAR DAYS IF DISTURBED
AREAS ARE NOT UNDER ACTIVE GRADING.
LEGEND
PLAN
NORTH
C1
EROSION AND SEDIMENT CONTROL PLAN - BIRCH STREET STA. 252+50 TO 257+50
PLAN
NORTH
SCALE IN FEET
20' 40'
A1A1
EROSION AND SEDIMENT CONTROL PLAN - BIRCH STREET STA. 257+50 TO 262+50
PLAN
NORTH
SCALE IN FEET
20' 40'
1" = 20'
1" = 20'
CC105
C
C
BLANKET
B/M
CONCRETE
WASH AREA
SF
CE
CWA
IP
OUTLET
PROTECTION
SPEC 6.41
OP
CHECK DAM
SPEC 6.87
CD
PERMANENT
SODDING
PS
PS
B/M
4" TOPSOIL AND CENTIPEDE SOD
LIMIT OF DISTURBANCE
INLET
PROTECTION
SPEC 6.52
CONSTRUCTION
ENTRANCE
SPEC 6.06
SILT FENCE
TITLE KEY SYMBOL
CULVERT INLET
PROTECTION
CIP
A2
CC502
A3
CC501
A4
CC505
A1
CC501
A4
CC503
A1
CC503
A4
CC504
B2
CC504
DETAIL
DRAINAGE FLOW ARROW
D
A
M
C
R
E
E
K
N
E
W
S
E
R
V
I
C
E
R
O
A
D
H
O
L
C
O
M
B
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
25.00
25.00
24.00
21.00 22.00
23.00
24.00
24.00
24.00
25.00
24.00
24.00
23.00
25.00
25.
26.00
24.00
25.00
25.00
R
C
P
18"R C
P
15"RCP
R
C
P
SF
SF
IP
IP
IP
IP
IP
IP
IP
IP
IP
BIRCH STREET
IP
PS
PS
PS
PS
PS
24.00
25.00
25.00
24.00
24.00
.00
23.00
24.00
25.
24.00
24.00
24.00
.0
.0
.0
.0
24.00
25.
25.0
.0
.0
12"RCP
R
C P
R
C P
R
C P
R
C
P
R
C
P
R
C P
15"RCP
15"RCP
R
C
P
I P
I P
IP
IP
IP
IP
IP
SF
SF
IP
IP
BIRCH STREET
H O
L C
O M
B
B
L V
D
PS
PS
PS
P S
PS
PS
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
FY
P -1
0B
B
IR
C H
S
TR
E E
T R
O A
D
IM
P R
O V
E M
E N
TS
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
PORTDAVEN
HOME OFFICE
WINSTON-SALEM, NC 27101
336.744.1636 www.davenportworld.com
NCBELS FIRM LICENSE NO. C-2522
119 BROOKSTOWN AVE. SUITE PH1
PLAN
NORTH
KEY PLAN
GENERAL NOTES
1. SEE SHEET C-023 TO C-026 FOR SURVEY NOTES
AND C-002 FOR SURVEY LEGEND.
2. SEE SHEET CC500 FOR EROSION AND
SEDIMENT CONTROL NOTES.
3. SEE SHEETS CP106 FOR NEW ROADWAY PLAN.
4. ALL AREAS OF DISTURBANCE OUTSIDE THE
LIMITS OF NEW PAVEMENT SHALL BE
PERMANENTLY RESTORED WITH 4 INCHES OF
TOPSOIL AND PERMANENT SOD. EROSION
CONTROL BLANKET SHALL BE USED
WHEREVER FINISHED GRADE SLOPE IS 3H:1V
OR GREATER.
5. EROSION AND SEDIMENT CONTROL FOR
UTILITY CONSTRUCTION SHALL BE PROVIDED IN
ACCORDANCE WITH APPROVED PLANS. UTILITY
CONSTRUCTION SHALL ONLY BE FOR AREAS
WITHIN THE DELINEATED LIMIT OF
DISTURBANCE. WHEN SAME DAY
STABILIZATION IS APPROVED:
A. EXCAVATED TRENCH MATERIAL SHALL BE
PLACED ON THE HIGH SIDE OF THE TRENCH.
B. TRENCHES FOR UTILITY INSTALLATION SHALL
BE BACKFILLED, COMPACTED, AND
STABILIZED AT THE END OF EACH WORKING
DAY.
6. FOLLOWING INITIAL SOIL DISTURBANCE OR
RE-DISTURBANCE, PERMANENT OR
TEMPORARY STABILIZATION SHALL BE
COMPLETED WITHIN:
A. THREE (3) CALENDAR DAYS AS TO THE
SURFACE OF ALL PERIMETER CONTROLS,
DITCHES AND SLOPES 3H:1V OR STEEPER;
AND
B. SEVEN (7) CALENDAR DAYS IF DISTURBED
AREAS ARE NOT UNDER ACTIVE GRADING.
LEGEND
C1
EROSION AND SEDIMENT CONTROL PLAN - BIRCH STREET STA. 262+50 TO 267+50
PLAN
NORTH
SCALE IN FEET
20' 40'
A1
EROSION AND SEDIMENT CONTROL PLAN - BIRCH STREET STA. 267+50 TO 272+50
0 20' 40'
PLAN
NORTH
SCALE IN FEET
1" = 20'
1" = 20'
CC106
C
C
R
P
BLANKET
B/M
CONCRETE
WASH AREA
SF
CE
CWA
IP
OUTLET
PROTECTION
SPEC 6.41
OP
CHECK DAM
SPEC 6.87
CD
PERMANENT
SODDING
PS
PS
B/M
4" TOPSOIL AND CENTIPEDE SOD
LIMIT OF DISTURBANCE
INLET
PROTECTION
SPEC 6.52
CONSTRUCTION
ENTRANCE
SPEC 6.06
SILT FENCE
TITLE KEY SYMBOL
CULVERT INLET
PROTECTION
CIP
A2
CC502
A3
CC501
A4
CC505
A1
CC501
A4
CC503
A1
CC503
A4
CC504
B2
CC504
DETAIL
DRAINAGE FLOW ARROW
C
S
X
C
S
X
R
O
A
D
H
O
L
C
O
M
B
B
I
R
R
E
E
T
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
25.00
25.00
.0
.0
25.00
25.00
24.00 23.00
24.00
25.00
.0
25.00
.0
25.00
26.00
26.00
26.00
26.00
.00
25.00
25.00
25.00
.0
R
C
P
R
C
P
R
C
P
R
C P
30"RCP
15"RCP
15"RCP
R
C P
"R
C P
R
C
P
30"RCP
R
C P
IP
SF
IP
IP
IP
IP
IP
IP
CIP
SF
SF
SF
SF
SF
CIP
OP
OP
IP
B/M
PS
CIP
OP
BIRCH STREET
W E
A
D
IP
IP
IP
IP
PS
PS
PS
CIP
26.00
.00
26.00
27.00
.0
.0
.0
.0
26.00
26.00
27.00
27.00
27.00
27.00
26.00
.0
R
C P
15"RCP
IP
IP
IP
IP
IP
IP
SF
SF
BIRCH STREET
C E
N T
A
D
PS
PS
PS
PS
PS
G I B
B
R
D
G I B
B
R
D
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
FY
P -1
0B
B
IR
C H
S
TR
E E
T R
O A
D
IM
P R
O V
E M
E N
TS
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
PORTDAVEN
HOME OFFICE
WINSTON-SALEM, NC 27101
336.744.1636 www.davenportworld.com
NCBELS FIRM LICENSE NO. C-2522
119 BROOKSTOWN AVE. SUITE PH1
PLAN
NORTH
C1
EROSION AND SEDIMENT CONTROL PLAN - BIRCH STREET STA. 272+50 TO 277+50
A1
EROSION AND SEDIMENT CONTROL PLAN - BIRCH STREET STA. 277+50 TO 282+50
PLAN
NORTH
PLAN
NORTH
KEY PLAN
GENERAL NOTES
1. SEE SHEET C-023 TO C-026 FOR SURVEY NOTES
AND C-002 FOR SURVEY LEGEND.
2. SEE SHEET CC500 FOR EROSION AND
SEDIMENT CONTROL NOTES.
3. SEE SHEETS CP107 FOR NEW ROADWAY PLAN.
4. ALL AREAS OF DISTURBANCE OUTSIDE THE
LIMITS OF NEW PAVEMENT SHALL BE
PERMANENTLY RESTORED WITH 4 INCHES OF
TOPSOIL AND PERMANENT SOD. EROSION
CONTROL BLANKET SHALL BE USED
WHEREVER FINISHED GRADE SLOPE IS 3H:1V
OR GREATER.
5. EROSION AND SEDIMENT CONTROL FOR
UTILITY CONSTRUCTION SHALL BE PROVIDED IN
ACCORDANCE WITH APPROVED PLANS. UTILITY
CONSTRUCTION SHALL ONLY BE FOR AREAS
WITHIN THE DELINEATED LIMIT OF
DISTURBANCE. WHEN SAME DAY
STABILIZATION IS APPROVED:
A. EXCAVATED TRENCH MATERIAL SHALL BE
PLACED ON THE HIGH SIDE OF THE TRENCH.
B. TRENCHES FOR UTILITY INSTALLATION SHALL
BE BACKFILLED, COMPACTED, AND
STABILIZED AT THE END OF EACH WORKING
DAY.
6. FOLLOWING INITIAL SOIL DISTURBANCE OR
RE-DISTURBANCE, PERMANENT OR
TEMPORARY STABILIZATION SHALL BE
COMPLETED WITHIN:
A. THREE (3) CALENDAR DAYS AS TO THE
SURFACE OF ALL PERIMETER CONTROLS,
DITCHES AND SLOPES 3H:1V OR STEEPER;
AND
B. SEVEN (7) CALENDAR DAYS IF DISTURBED
AREAS ARE NOT UNDER ACTIVE GRADING.
LEGEND
SCALE IN FEET
20' 40'
SCALE IN FEET
20' 40'
1" = 20'
1" = 20'
CC107
C
C
BLANKET
B/M
CONCRETE
WASH AREA
SF
CE
CWA
IP
OUTLET
PROTECTION
SPEC 6.41
OP
CHECK DAM
SPEC 6.87
CD
PERMANENT
SODDING
PS
PS
B/M
4" TOPSOIL AND CENTIPEDE SOD
LIMIT OF DISTURBANCE
INLET
PROTECTION
SPEC 6.52
CONSTRUCTION
ENTRANCE
SPEC 6.06
SILT FENCE
TITLE KEY SYMBOL
CULVERT INLET
PROTECTION
CIP
A2
CC502
A3
CC501
A4
CC505
A1
CC501
A4
CC503
A1
CC503
A4
CC504
B2
CC504
DETAIL
DRAINAGE FLOW ARROW
C
S
X
C
S
X
B
I
R
R
E
E
T
C
C
C
C
C
C
27.00
27.
.0
.00
27.00
28.0
29.00
.00
.0
.0
.0
.0
29.
29.00
29.00
28.00
28.00
29.0
.0
29.00
SF
SF
SF
SF
SF
SF
SF
CIP
CIP
OP
IP
BIRCH STREET
E A
A
D
SF
PS
PS
PS
29.0
28.00
.0
.0
.0
29.00
28.00
28.00
27.00
29.00
29.
28.
.00
29.00
29.
29.00 28.00
.0
.0
28.00
29.00
28.00
.0
29.00
29.0
.0
29.00
29.00
CIP
SF
SF
SF
SF
SF
SF
SF
SF
IP
CIP
CIP
OP
OP
OP
BIRCH STREET
H A
M M
O N
D
R
O A
D
M I C
H A
L
A
D
SF
PS
PS
PS
PS
PS
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
FY
P -1
0B
B
IR
C H
S
TR
E E
T R
O A
D
IM
P R
O V
E M
E N
TS
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
PORTDAVEN
HOME OFFICE
WINSTON-SALEM, NC 27101
336.744.1636 www.davenportworld.com
NCBELS FIRM LICENSE NO. C-2522
119 BROOKSTOWN AVE. SUITE PH1
PLAN
NORTH
C1
EROSION AND SEDIMENT CONTROL PLAN - BIRCH STREET STA. 282+50 TO 287+50
A1
EROSION AND SEDIMENT CONTROL PLAN - BIRCH STREET STA. 287+50 TO 292+50
PLAN
NORTH
PLAN
NORTH
KEY PLAN
GENERAL NOTES
1. SEE SHEET C-023 TO C-026 FOR SURVEY NOTES
AND C-002 FOR SURVEY LEGEND.
2. SEE SHEET CC500 FOR EROSION AND
SEDIMENT CONTROL NOTES.
3. SEE SHEETS CP108 FOR NEW ROADWAY PLAN.
4. ALL AREAS OF DISTURBANCE OUTSIDE THE
LIMITS OF NEW PAVEMENT SHALL BE
PERMANENTLY RESTORED WITH 4 INCHES OF
TOPSOIL AND PERMANENT SOD. EROSION
CONTROL BLANKET SHALL BE USED
WHEREVER FINISHED GRADE SLOPE IS 3H:1V
OR GREATER.
5. EROSION AND SEDIMENT CONTROL FOR
UTILITY CONSTRUCTION SHALL BE PROVIDED IN
ACCORDANCE WITH APPROVED PLANS. UTILITY
CONSTRUCTION SHALL ONLY BE FOR AREAS
WITHIN THE DELINEATED LIMIT OF
DISTURBANCE. WHEN SAME DAY
STABILIZATION IS APPROVED:
A. EXCAVATED TRENCH MATERIAL SHALL BE
PLACED ON THE HIGH SIDE OF THE TRENCH.
B. TRENCHES FOR UTILITY INSTALLATION SHALL
BE BACKFILLED, COMPACTED, AND
STABILIZED AT THE END OF EACH WORKING
DAY.
6. FOLLOWING INITIAL SOIL DISTURBANCE OR
RE-DISTURBANCE, PERMANENT OR
TEMPORARY STABILIZATION SHALL BE
COMPLETED WITHIN:
A. THREE (3) CALENDAR DAYS AS TO THE
SURFACE OF ALL PERIMETER CONTROLS,
DITCHES AND SLOPES 3H:1V OR STEEPER;
AND
B. SEVEN (7) CALENDAR DAYS IF DISTURBED
AREAS ARE NOT UNDER ACTIVE GRADING.
LEGEND
SCALE IN FEET
20' 40'
SCALE IN FEET
20' 40'
1" = 20'
1" = 20'
CC108
C
C
BLANKET
B/M
CONCRETE
WASH AREA
SF
CE
CWA
IP
OUTLET
PROTECTION
SPEC 6.41
OP
CHECK DAM
SPEC 6.87
CD
PERMANENT
SODDING
PS
PS
B/M
4" TOPSOIL AND CENTIPEDE SOD
LIMIT OF DISTURBANCE
INLET
PROTECTION
SPEC 6.52
CONSTRUCTION
ENTRANCE
SPEC 6.06
SILT FENCE
TITLE KEY SYMBOL
CULVERT INLET
PROTECTION
CIP
A2
CC502
A3
CC501
A4
CC505
A1
CC501
A4
CC503
A1
CC503
A4
CC504
B2
CC504
DETAIL
DRAINAGE FLOW ARROW
B
I
R
R
E
E
T
C
C
C
C
C
C
C
C
28.00
29.00
28.0
28.00
29.00
28.00
27.00
28.00
29.00
28.00
29.00
29.00
28.00
28.00
R
C
P
IP
SF
SF
SF
SF
BIRCH STREET
IP
PS
PS
.00
.0
8.
8.
.0
.00
30.00
29.00
28.00
27.00
27.00
27.00
28.00
.0
30.0029.00
30.00
.0
.00
29.0
27.00
28.
28.00
29.00
.0
29.00 .0
.0
R
C P
18"RCP
R
C P
R
C P
R
C P
R
C
P
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
OP
SF
SF
BIRCH STREET
L O
U I
A
D
F R
A N
K L
I N
R
E E
T
SF
PS
PS
PS
PS
PS
IP
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
FY
P -1
0B
B
IR
C H
S
TR
E E
T R
O A
D
IM
P R
O V
E M
E N
TS
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
PORTDAVEN
HOME OFFICE
WINSTON-SALEM, NC 27101
336.744.1636 www.davenportworld.com
NCBELS FIRM LICENSE NO. C-2522
119 BROOKSTOWN AVE. SUITE PH1
PLAN
NORTH
C1
EROSION AND SEDIMENT CONTROL PLAN - BIRCH STREET STA. 292+50 TO 296+50
A1
EROSION AND SEDIMENT CONTROL PLAN - BIRCH STREET STA. 296+50 TO 301+50
PLAN
NORTH
PLAN
NORTH
KEY PLAN
GENERAL NOTES
1. SEE SHEET C-023 TO C-026 FOR SURVEY NOTES
AND C-002 FOR SURVEY LEGEND.
2. SEE SHEET CC500 FOR EROSION AND
SEDIMENT CONTROL NOTES.
3. SEE SHEETS CP109 FOR NEW ROADWAY PLAN.
4. ALL AREAS OF DISTURBANCE OUTSIDE THE
LIMITS OF NEW PAVEMENT SHALL BE
PERMANENTLY RESTORED WITH 4 INCHES OF
TOPSOIL AND PERMANENT SOD. EROSION
CONTROL BLANKET SHALL BE USED
WHEREVER FINISHED GRADE SLOPE IS 3H:1V
OR GREATER.
5. EROSION AND SEDIMENT CONTROL FOR
UTILITY CONSTRUCTION SHALL BE PROVIDED IN
ACCORDANCE WITH APPROVED PLANS. UTILITY
CONSTRUCTION SHALL ONLY BE FOR AREAS
WITHIN THE DELINEATED LIMIT OF
DISTURBANCE. WHEN SAME DAY
STABILIZATION IS APPROVED:
A. EXCAVATED TRENCH MATERIAL SHALL BE
PLACED ON THE HIGH SIDE OF THE TRENCH.
B. TRENCHES FOR UTILITY INSTALLATION SHALL
BE BACKFILLED, COMPACTED, AND
STABILIZED AT THE END OF EACH WORKING
DAY.
6. FOLLOWING INITIAL SOIL DISTURBANCE OR
RE-DISTURBANCE, PERMANENT OR
TEMPORARY STABILIZATION SHALL BE
COMPLETED WITHIN:
A. THREE (3) CALENDAR DAYS AS TO THE
SURFACE OF ALL PERIMETER CONTROLS,
DITCHES AND SLOPES 3H:1V OR STEEPER;
AND
B. SEVEN (7) CALENDAR DAYS IF DISTURBED
AREAS ARE NOT UNDER ACTIVE GRADING.
LEGEND
SCALE IN FEET
20' 40'
SCALE IN FEET
20' 40'
1" = 20'
1" = 20'
CC109
C
C
BLANKET
B/M
CONCRETE
WASH AREA
SF
CE
CWA
IP
OUTLET
PROTECTION
SPEC 6.41
OP
CHECK DAM
SPEC 6.87
CD
PERMANENT
SODDING
PS
PS
B/M
4" TOPSOIL AND CENTIPEDE SOD
LIMIT OF DISTURBANCE
INLET
PROTECTION
SPEC 6.52
CONSTRUCTION
ENTRANCE
SPEC 6.06
SILT FENCE
TITLE KEY SYMBOL
CULVERT INLET
PROTECTION
CIP
A2
CC502
A3
CC501
A4
CC505
A1
CC501
A4
CC503
A1
CC503
A4
CC504
B2
CC504
DETAIL
DRAINAGE FLOW ARROW
D
U
N
C
A
N
C
C
C
C
C
C
25.00
26.00
.0
.0
27.00
27.00
28.00
.0
26.00
.0
27.00
27.00
R
C
P
R
C P
R
C P
R
C P
IP
IP
IP
IP
IP
SF
SF
SF
SF
SF
BIRCH STREET
O
S
T R
E E
T
PS
PS
PS
25.00
25.
.00
24.
.00
.0
.0
23.00
22.00
21.00
21.00
.0
24.0
25.00
22.00
23.00
23.00 24.00
25.00
26.
.0
26.00
22.00
.0 7.
23.00
24.00
25.00
.00
R
C P
IP
CE
IP
OP
SF
CWA
BIRCH STREET
D U
N C
A N
R
E E
T
SF
SF
SF
SF
PS
PS
STA: 309+05.20
END PROJECT
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
FY
P -1
0B
B
IR
C H
S
TR
E E
T R
O A
D
IM
P R
O V
E M
E N
TS
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
PORTDAVEN
HOME OFFICE
WINSTON-SALEM, NC 27101
336.744.1636 www.davenportworld.com
NCBELS FIRM LICENSE NO. C-2522
119 BROOKSTOWN AVE. SUITE PH1
PLAN
NORTH
C1
EROSION AND SEDIMENT CONTROL PLAN - BIRCH STREET STA. 301+50 TO 306+50
A1
EROSION AND SEDIMENT CONTROL PLAN - BIRCH STREET STA. 306+50 TO 311+50
PLAN
NORTH
PLAN
NORTH
KEY PLAN
GENERAL NOTES
1. SEE SHEET C-023 TO C-026 FOR SURVEY NOTES
AND C-002 FOR SURVEY LEGEND.
2. SEE SHEET CC500 FOR EROSION AND
SEDIMENT CONTROL NOTES.
3. SEE SHEETS CP110 FOR NEW ROADWAY PLAN.
4. ALL AREAS OF DISTURBANCE OUTSIDE THE
LIMITS OF NEW PAVEMENT SHALL BE
PERMANENTLY RESTORED WITH 4 INCHES OF
TOPSOIL AND PERMANENT SOD. EROSION
CONTROL BLANKET SHALL BE USED
WHEREVER FINISHED GRADE SLOPE IS 3H:1V
OR GREATER.
5. EROSION AND SEDIMENT CONTROL FOR
UTILITY CONSTRUCTION SHALL BE PROVIDED IN
ACCORDANCE WITH APPROVED PLANS. UTILITY
CONSTRUCTION SHALL ONLY BE FOR AREAS
WITHIN THE DELINEATED LIMIT OF
DISTURBANCE. WHEN SAME DAY
STABILIZATION IS APPROVED:
A. EXCAVATED TRENCH MATERIAL SHALL BE
PLACED ON THE HIGH SIDE OF THE TRENCH.
B. TRENCHES FOR UTILITY INSTALLATION SHALL
BE BACKFILLED, COMPACTED, AND
STABILIZED AT THE END OF EACH WORKING
DAY.
6. FOLLOWING INITIAL SOIL DISTURBANCE OR
RE-DISTURBANCE, PERMANENT OR
TEMPORARY STABILIZATION SHALL BE
COMPLETED WITHIN:
A. THREE (3) CALENDAR DAYS AS TO THE
SURFACE OF ALL PERIMETER CONTROLS,
DITCHES AND SLOPES 3H:1V OR STEEPER;
AND
B. SEVEN (7) CALENDAR DAYS IF DISTURBED
AREAS ARE NOT UNDER ACTIVE GRADING.
LEGEND
SCALE IN FEET
20' 40'
SCALE IN FEET
20' 40'
1" = 20'
1" = 20'
CC110
C
C
BLANKET
B/M
CONCRETE
WASH AREA
SF
CE
CWA
IP
OUTLET
PROTECTION
SPEC 6.41
OP
CHECK DAM
SPEC 6.87
CD
PERMANENT
SODDING
PS
PS
B/M
4" TOPSOIL AND CENTIPEDE SOD
LIMIT OF DISTURBANCE
INLET
PROTECTION
SPEC 6.52
CONSTRUCTION
ENTRANCE
SPEC 6.06
SILT FENCE
TITLE KEY SYMBOL
CULVERT INLET
PROTECTION
CIP
A2
CC502
A3
CC501
A4
CC505
A1
CC501
A4
CC503
A1
CC503
A4
CC504
B2
CC504
DETAIL
DRAINAGE FLOW ARROW
M c
H
U
G
H
CC100
C
C
C
C
C
C
15"RCP
15"RCP
MCHUGH BLVD
18.00
.2
W
OR
K
PO
IN
T
.15
W
OR
K
PO
IN
T
.9
*U
TI
LI
TY
P
OL
E
.13
W
OR
K
PO
IN
T
FO
W
PF
IB
ER
O
PT
IC
W
IT
NE
SS
P
OS
T
.3
W
OR
K
PO
IN
T
18.00 19.00
20.
20.00
18.00
19.00
20.00
20.00
19.00
20.00
20.00
19.00
SF
SF
OP
PS
PS
IP
IP
STA: 406+56.60
BEGIN PROJECT
CD
MCHUGH BLVD
21.00
21.0
20.00
21.00
20.00 19.00
19.00
20.00
21.00
20.00
19.00
21.0021.0021.00
21.00
22.00
21.00
20.00
21.00
22.0
18.00
SF
SF
SF
SF
OP
CIP
CD
CD
PS
PS
PS
IP
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
FY
P -1
0B
B
IR
C H
S
TR
E E
T R
O A
D
IM
P R
O V
E M
E N
TS
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
PORTDAVEN
HOME OFFICE
WINSTON-SALEM, NC 27101
336.744.1636 www.davenportworld.com
NCBELS FIRM LICENSE NO. C-2522
119 BROOKSTOWN AVE. SUITE PH1
C1
EROSION AND SEDIMENT CONTROL PLAN - MCHUGH BLVD. STA. 405+00 TO 409+75
A1
EROSION AND SEDIMENT CONTROL PLAN - MCHUGH BLVD. STA. 409+75 TO 414+75
KEY PLAN
GENERAL NOTES
1. SEE SHEET C-023 TO C-026 FOR SURVEY NOTES
AND C-002 FOR SURVEY LEGEND.
2. SEE SHEET C-500 FOR EROSION AND SEDIMENT
CONTROL NOTES.
3. SEE SHEETS CP111 FOR NEW ROADWAY PLAN.
4. ALL AREAS OF DISTURBANCE OUTSIDE THE
LIMITS OF NEW PAVEMENT SHALL BE
PERMANENTLY RESTORED WITH 4 INCHES OF
TOPSOIL AND PERMANENT SOD. EROSION
CONTROL BLANKET SHALL BE USED
WHEREVER FINISHED GRADE SLOPE IS 3H:1V
OR GREATER.
5. EROSION AND SEDIMENT CONTROL FOR
UTILITY CONSTRUCTION SHALL BE PROVIDED IN
ACCORDANCE WITH APPROVED PLANS. UTILITY
CONSTRUCTION SHALL ONLY BE FOR AREAS
WITHIN THE DELINEATED LIMIT OF
DISTURBANCE. WHEN SAME DAY
STABILIZATION IS APPROVED:
A. EXCAVATED TRENCH MATERIAL SHALL BE
PLACED ON THE HIGH SIDE OF THE TRENCH.
B. TRENCHES FOR UTILITY INSTALLATION SHALL
BE BACKFILLED, COMPACTED, AND
STABILIZED AT THE END OF EACH WORKING
DAY.
6. FOLLOWING INITIAL SOIL DISTURBANCE OR
RE-DISTURBANCE, PERMANENT OR
TEMPORARY STABILIZATION SHALL BE
COMPLETED WITHIN:
A. THREE (3) CALENDAR DAYS AS TO THE
SURFACE OF ALL PERIMETER CONTROLS,
DITCHES AND SLOPES 3H:1V OR STEEPER;
AND
B. SEVEN (7) CALENDAR DAYS IF DISTURBED
AREAS ARE NOT UNDER ACTIVE GRADING.
LEGEND
SCALE IN FEET
20' 40'
SCALE IN FEET
20' 40'
1" = 20'
1" = 20'
CC111
C
C
BLANKET
B/M
CONCRETE
WASH AREA
SF
CE
CWA
IP
OUTLET
PROTECTION
SPEC 6.41
OP
CHECK DAM
SPEC 6.87
CD
PERMANENT
SODDING
PS
PS
B/M
4" TOPSOIL AND CENTIPEDE SOD
LIMIT OF DISTURBANCE
INLET
PROTECTION
SPEC 6.52
CONSTRUCTION
ENTRANCE
SPEC 6.06
SILT FENCE
TITLE KEY SYMBOL
CULVERT INLET
PROTECTION
CIP
A2
CC502
A3
CC501
A4
CC505
A1
CC501
A4
CC503
A1
CC503
A4
CC504
B2
CC504
DETAIL
DRAINAGE FLOW ARROW
M c
H
U
G
H
CC100
C
C
C
C
C
C
C
C
MCHUGH BLVD
23.0
23.00
22.00
23.00
24.00
SF
OP
CIP
CD
CD
B/M
PS
B/M
PS
MCHUGH BLVD
24.00
23.00
23.00
21.00
22.00
20.00
25.0
26.0
.0
SF
CIP
B/M
PS
PS
STA: 420+60.16
END PROJECT
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
FY
P -1
0B
B
IR
C H
S
TR
E E
T R
O A
D
IM
P R
O V
E M
E N
TS
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
PORTDAVEN
HOME OFFICE
WINSTON-SALEM, NC 27101
336.744.1636 www.davenportworld.com
NCBELS FIRM LICENSE NO. C-2522
119 BROOKSTOWN AVE. SUITE PH1
C1
EROSION AND SEDIMENT CONTROL PLAN - MCHUGH BLVD. STA. 416+40 TO 419+00
A1
EROSION AND SEDIMENT CONTROL PLAN - MCHUGH BLVD. STA. 419+00 TO 420+60.16
KEY PLAN
GENERAL NOTES
1. SEE SHEET C-023 TO C-026 FOR SURVEY NOTES
AND C-002 FOR SURVEY LEGEND.
2. SEE SHEET C-500 FOR EROSION AND SEDIMENT
CONTROL NOTES.
3. SEE SHEETS CP112 FOR NEW ROADWAY PLAN.
4. ALL AREAS OF DISTURBANCE OUTSIDE THE
LIMITS OF NEW PAVEMENT SHALL BE
PERMANENTLY RESTORED WITH 4 INCHES OF
TOPSOIL AND PERMANENT SOD. EROSION
CONTROL BLANKET SHALL BE USED
WHEREVER FINISHED GRADE SLOPE IS 3H:1V
OR GREATER.
5. EROSION AND SEDIMENT CONTROL FOR
UTILITY CONSTRUCTION SHALL BE PROVIDED IN
ACCORDANCE WITH APPROVED PLANS. UTILITY
CONSTRUCTION SHALL ONLY BE FOR AREAS
WITHIN THE DELINEATED LIMIT OF
DISTURBANCE. WHEN SAME DAY
STABILIZATION IS APPROVED:
A. EXCAVATED TRENCH MATERIAL SHALL BE
PLACED ON THE HIGH SIDE OF THE TRENCH.
B. TRENCHES FOR UTILITY INSTALLATION SHALL
BE BACKFILLED, COMPACTED, AND
STABILIZED AT THE END OF EACH WORKING
DAY.
6. FOLLOWING INITIAL SOIL DISTURBANCE OR
RE-DISTURBANCE, PERMANENT OR
TEMPORARY STABILIZATION SHALL BE
COMPLETED WITHIN:
A. THREE (3) CALENDAR DAYS AS TO THE
SURFACE OF ALL PERIMETER CONTROLS,
DITCHES AND SLOPES 3H:1V OR STEEPER;
AND
B. SEVEN (7) CALENDAR DAYS IF DISTURBED
AREAS ARE NOT UNDER ACTIVE GRADING.
LEGEND
PLAN
NORTH
SCALE IN FEET
20' 40'
SCALE IN FEET
20' 40'
1" = 20'
1" = 20'
CC112
C
C
BLANKET
B/M
CONCRETE
WASH AREA
SF
CE
CWA
IP
OUTLET
PROTECTION
SPEC 6.41
OP
CHECK DAM
SPEC 6.87
CD
PERMANENT
SODDING
PS
PS
B/M
4" TOPSOIL AND CENTIPEDE SOD
LIMIT OF DISTURBANCE
INLET
PROTECTION
SPEC 6.52
CONSTRUCTION
ENTRANCE
SPEC 6.06
SILT FENCE
TITLE KEY SYMBOL
CULVERT INLET
PROTECTION
CIP
A2
CC502
A3
CC501
A4
CC505
A1
CC501
A4
CC503
A1
CC503
A4
CC504
B2
CC504
DETAIL
DRAINAGE FLOW ARROW
B
I
R
C
H
C
C
C
C
C
C
C
C
WALLACE CREEK RD.
WALLACE CREEK RD.
.0
.0
23.00
22.00
21.00 21.00
20.00
20.00 21.00 22.00
SF
SF
PS
PS
SF
PS
WALLACE CREEK RD.
22.00
1.0
.0
.00
.0
20.00 21.00
22.00
19.00
19.00
19.00
19.00 18.00
17.00 16.00
15.00
15.00
16.00 17.00
16.00 14.00
14.00
18.00
18.00
SF
SF
B/M
PS
SF
CD
B/M
PS
SF
SF
SF
PS
PS
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
FY
P -1
0B
B
IR
C H
S
TR
E E
T R
O A
D
IM
P R
O V
E M
E N
TS
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
PORTDAVEN
HOME OFFICE
WINSTON-SALEM, NC 27101
336.744.1636 www.davenportworld.com
NCBELS FIRM LICENSE NO. C-2522
119 BROOKSTOWN AVE. SUITE PH1
C1
EROSION AND SEDIMENT CONTROL PLAN - WALLACE CREEK RD. STA. 500+50 TO 502+50
A1
EROSION AND SEDIMENT CONTROL PLAN - WALLACE CREEK RD. STA. 502+50 TO 507+50
KEY PLAN
LEGEND
PLAN
NORTH
SCALE IN FEET
20' 40'
SCALE IN FEET
20' 40'
1" = 20'
1" = 20'
CC113
C
C
GENERAL NOTES
1. SEE SHEET C-023 TO C-0326 FOR SURVEY
NOTES AND C-002 FOR SURVEY LEGEND.
2. SEE SHEET C-500 FOR EROSION AND SEDIMENT
CONTROL NOTES.
3. SEE SHEETS CP113 FOR NEW ROADWAY PLAN.
4. ALL AREAS OF DISTURBANCE OUTSIDE THE
LIMITS OF NEW PAVEMENT SHALL BE
PERMANENTLY RESTORED WITH 4 INCHES OF
TOPSOIL AND PERMANENT SOD. EROSION
CONTROL BLANKET SHALL BE USED
WHEREVER FINISHED GRADE SLOPE IS 3H:1V
OR GREATER.
5. EROSION AND SEDIMENT CONTROL FOR
UTILITY CONSTRUCTION SHALL BE PROVIDED IN
ACCORDANCE WITH APPROVED PLANS. UTILITY
CONSTRUCTION SHALL ONLY BE FOR AREAS
WITHIN THE DELINEATED LIMIT OF
DISTURBANCE. WHEN SAME DAY
STABILIZATION IS APPROVED:
A. EXCAVATED TRENCH MATERIAL SHALL BE
PLACED ON THE HIGH SIDE OF THE TRENCH.
B. TRENCHES FOR UTILITY INSTALLATION SHALL
BE BACKFILLED, COMPACTED, AND
STABILIZED AT THE END OF EACH WORKING
DAY.
6. FOLLOWING INITIAL SOIL DISTURBANCE OR
RE-DISTURBANCE, PERMANENT OR
TEMPORARY STABILIZATION SHALL BE
COMPLETED WITHIN:
A. THREE (3) CALENDAR DAYS AS TO THE
SURFACE OF ALL PERIMETER CONTROLS,
DITCHES AND SLOPES 3H:1V OR STEEPER;
AND
B. SEVEN (7) CALENDAR DAYS IF DISTURBED
AREAS ARE NOT UNDER ACTIVE GRADING.
ROADSIDE DITCH IMPROVEMENTS TO BE
PERFORMED AND STABILIZED WITH P-4042
MEDICAL DENTAL FACILITY PROJECT (TYP)
ROADSIDE DITCH IMPROVEMENTS TO BE
PERFORMED AND STABILIZED WITH P-4042
MEDICAL DENTAL FACILITY PROJECT (TYP)
BLANKET
B/M
CONCRETE
WASH AREA
SF
CE
CWA
IP
OUTLET
PROTECTION
SPEC 6.41
OP
CHECK DAM
SPEC 6.87
CD
PERMANENT
SODDING
PS
PS
B/M
4" TOPSOIL AND CENTIPEDE SOD
LIMIT OF DISTURBANCE
INLET
PROTECTION
SPEC 6.52
CONSTRUCTION
ENTRANCE
SPEC 6.06
SILT FENCE
TITLE KEY SYMBOL
CULVERT INLET
PROTECTION
CIP
A2
CC502
A3
CC501
A4
CC505
A1
CC501
A4
CC503
A1
CC503
A4
CC504
B2
CC504
DETAIL
DRAINAGE FLOW ARROW
W
A
L
L
A
E
K
D
13.00
12.00
15.00
.00
SF
SF
B/M
PS
B
M
P
S
C
D
CD
STA: 509+55.15
END PROJECT
S
F
S
F
C
R
E
E
K
N
E
W
S
E
R
V
I
C
E
R
O
A
D
C
C
C
C
C
C
C
C
C
C
C
C
C
C
23.0
24.00
24.00
22.00
24.00
S
F
SF
SF
B
I
R
C
H
C
C
C
C
C
C
C
C
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
FY
P -1
0B
B
IR
C H
S
TR
E E
T R
O A
D
IM
P R
O V
E M
E N
TS
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
PORTDAVEN
HOME OFFICE
WINSTON-SALEM, NC 27101
336.744.1636 www.davenportworld.com
NCBELS FIRM LICENSE NO. C-2522
119 BROOKSTOWN AVE. SUITE PH1
C1
EROSION AND SEDIMENT CONTROL PLAN - WALLACE CREEK RD. STA. 507+50 TO 509+55.15
GENERAL NOTES
1. SEE SHEET C-023 TO C-0326 FOR SURVEY
NOTES AND C-002 FOR SURVEY LEGEND.
2. SEE SHEET C-500 FOR EROSION AND SEDIMENT
CONTROL NOTES.
3. SEE SHEETS CP112 FOR NEW ROADWAY PLAN.
4. ALL AREAS OF DISTURBANCE OUTSIDE THE
LIMITS OF NEW PAVEMENT SHALL BE
PERMANENTLY RESTORED WITH 4 INCHES OF
TOPSOIL AND PERMANENT SOD. EROSION
CONTROL BLANKET SHALL BE USED
WHEREVER FINISHED GRADE SLOPE IS 3H:1V
OR GREATER.
5. EROSION AND SEDIMENT CONTROL FOR
UTILITY CONSTRUCTION SHALL BE PROVIDED IN
ACCORDANCE WITH APPROVED PLANS. UTILITY
CONSTRUCTION SHALL ONLY BE FOR AREAS
WITHIN THE DELINEATED LIMIT OF
DISTURBANCE. WHEN SAME DAY
STABILIZATION IS APPROVED:
A. EXCAVATED TRENCH MATERIAL SHALL BE
PLACED ON THE HIGH SIDE OF THE TRENCH.
B. TRENCHES FOR UTILITY INSTALLATION SHALL
BE BACKFILLED, COMPACTED, AND
STABILIZED AT THE END OF EACH WORKING
DAY.
6. FOLLOWING INITIAL SOIL DISTURBANCE OR
RE-DISTURBANCE, PERMANENT OR
TEMPORARY STABILIZATION SHALL BE
COMPLETED WITHIN:
A. THREE (3) CALENDAR DAYS AS TO THE
SURFACE OF ALL PERIMETER CONTROLS,
DITCHES AND SLOPES 3H:1V OR STEEPER;
AND
B. SEVEN (7) CALENDAR DAYS IF DISTURBED
AREAS ARE NOT UNDER ACTIVE GRADING.
LEGEND
SCALE IN FEET
20' 40'
KEY PLAN
PLAN
NORTH
A1
EROSION AND SEDIMENT CONTROL PLAN - EXCHANGE DRIVEWAY STA. 1000+00 TO 1002+11.55
SCALE IN FEET
20' 40'
PLAN
NORTH
1" = 20'
1" = 20'
KEY PLAN
CC114
C
C
C
C
| CC101 - EROSION AND SEDIMENT CONTROL PLAN - STA 212+50 TO 222+50 |
| CC102 - EROSION AND SEDIMENT CONTROL PLAN - STA 222+50 TO 232+50 |
| CC103 - EROSION AND SEDIMENT CONTROL PLAN - STA 232+50 TO 242+50 |
| CC104 - EROSION AND SEDIMENT CONTROL PLAN - STA 242+50 TO 252+50 |
| CC105 - EROSION AND SEDIMENT CONTROL PLAN - STA 252+50 TO 262+50 |
| CC106 - EROSION AND SEDIMENT CONTROL PLAN - STA 262+50 TO 272+50 |
| CC107 - EROSION AND SEDIMENT CONTROL PLAN - STA 272+50 TO 282+50 |
| CC108 - EROSION AND SEDIMENT CONTROL PLAN - STA 282+50 TO 292+50 |
| CC109 - EROSION AND SEDIMENT CONTROL PLAN - STA 292+50 TO 301+50 |
| CC110 - EROSION AND SEDIMENT CONTROL PLAN - STA 301+50 TO 311+50 |
| CC111 - EROSION AND SEDIMENT CONTROL PLAN - STA 405+00 TO 414+75 |
| CC112 - EROSION AND SEDIMENT CONTROL PLAN - STA 416+40 TO 420+60.16 |
| CC113 - EROSION AND SEDIMENT CONTROL PLAN - STA 500+50 TO 507+50 |
| CC114 - EROSION AND SEDIMENT CONTROL PLAN - STA 507+50 TO 509+55.15 |
2020-06-12T09:20:00-0400
2020-06-12T09:20:10-0400
2020-06-12T09:20:11-0400
2020-06-12T09:20:11-0400
2020-06-12T09:20:12-0400
2020-06-12T09:20:13-0400
2020-06-12T09:20:17-0400
2020-06-12T09:20:18-0400
2020-06-12T09:20:19-0400
2020-06-12T09:20:20-0400
2020-06-12T09:20:21-0400
2020-06-12T09:20:22-0400
2020-06-12T09:20:23-0400
2020-06-12T09:20:24-0400
| 2020-06-19T11:47:38-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-06-19T11:47:52-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-06-19T11:48:38-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-06-19T11:49:57-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-06-19T11:49:58-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-06-19T11:49:59-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-06-19T11:50:00-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-06-19T11:50:01-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-06-19T11:50:02-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-06-19T11:50:03-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-06-19T11:50:05-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-06-19T11:50:06-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-06-19T11:50:07-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-06-19T11:50:08-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-06-19T11:52:05-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-06-19T11:52:22-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-06-19T11:52:23-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-06-19T11:52:24-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-06-19T11:52:25-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-06-19T11:52:27-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-06-19T11:52:28-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-06-19T11:52:29-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-06-19T11:52:30-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-06-19T11:52:32-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-06-19T11:52:33-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-06-19T11:52:35-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-06-19T11:52:36-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-06-19T11:52:37-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
File details come from the government source that posted it. Updated .