1374744dwg03of27_Vol1-Sht 31-34.pdf
PDF 20 MB Posted
- Solicitation number
- N4008519R9146
About this file
This document provides details on a federal solicitation for construction services. The solicitation is number N4008519R9146 issued by the Department of the Navy Naval Facilities Engineering Command for a firm-fixed price design-bid-build construction contract. The project involves road improvements to Birch Street and Birch Street North at Marine Corps Base Camp Lejeune in North Carolina. Interested offerors should review the solicitation for additional requirement details. The closing date is not specified in this document.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
FY
P -1
0B
B
IR
C H
S
TR
E E
T R
O A
D
IM
P R
O V
E M
E N
TS
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
PORTDAVEN
HOME OFFICE
WINSTON-SALEM, NC 27101
336.744.1636 www.davenportworld.com
NCBELS FIRM LICENSE NO. C-2522
119 BROOKSTOWN AVE. SUITE PH1
GENERAL BORING NOTES:
1. BORING LOCATIONS ARE SHOWN ON DRAWINGS CE-100 TO
CE-203.
2. THE BORING LOGS AND RELATED INFORMATION, INCLUDING
WATER LEVELS, DEPICT CONDITIONS ONLY AT THE SPECIFIC
LOCATIONS AND AT THE PARTICULAR DATE DESIGNATED ON
THE LOGS.
3. SOIL CONDITIONS AT OTHER LOCATIONS MAY DIFFER FROM
CONDITIONS OCCURING AT THESE SPECIFIC BORING LOCTIONS.
ANY ATTEMPT TO INTERPOLATE THE STRATIGRAPHIC
CONDITIONS BETWEEN BORINGS IS AT THE CONTRACTOR'S
RISK.
4. FLUCTUATIONS OR CHANGES IN WATER LEVELS AND
GROUNDWATER CONDITIONS CAN BE INFLUENCED BY SOURCES
OUTSIDE THE AREAS OF THE SITE INVESTIGATED, BY SEASONAL
RAINFALL, AND BY CHANGES IN DRAINAGE CONDITIONS IN AND
AROUND THE SITE. FLUCTUATIONS CAN OCCUR AND SHOULD
BE ANTICIPATED BETWEEN THE TIME OF INVESTIGATION AND
THE TIME OF CONSTRUCTION.
5. THE LOGS REFLECT BOTH THE VISUAL OBSERVATIONS DURING
DRILLING ACTIVITIES AND THE MORE DEFINITIVE RESULTS
OBTAINED FROM THE LABORATORY TESTING.
6. STRATIFICATION BOUNDARIES INDICATED ON THE BORING LOGS
WERE BASED ON OBSERVATIONS DURING DRILLING, AN
EXTRAPOLATION OF INFORMATION OBTAINED BY INSPECTING
SAMPLES FROM THE BORINGS AND COMPARISONS OF SOILS
WITH SIMILAR ENGINEERING CHARACTERISTICS. LOCATIONS OF
THESE BOUNDARIES ARE APPROXIMATE AND THE TRANSITIONS
BETWEEN SOIL TYPES MAY BE GRADUAL RATHER THAN
CLEARLY DEFINED.
7. SOIL BORINGS WERE MADE AND LOGGED ON THEIR RESPECTIVE
DATE(S) BY PERSONNEL AS IDENTIFIED ON THE BORINGS BY
GET SOLUTIONS, INC. PER APPLICABLE ASTM STANDARDS.
8. “N” VALUE REPRESENTS THE NUMBER OF BLOWS REQUIRED TO
ADVANCE A STANDARD PENETRATION TEST (SPT) , SPLIT-SPOON
SAMPLER INTO THE SOIL. THE STANDARD PENETRATION
RESISTANCE OR "N-VALUE" IS THE SUM OF THE NUMBER OF
BLOWS REQUIRED TO DRIVE THE SPT SAMPLER OVER THE
DEPTH INTERVAL OF 6 TO 18 INCHES PER ASTM D1586.
9. THE ELEVATION AND LOCATION COORDINATES OF THE
BORINGS, WATER LEVELS, AND SOIL/ROCK LAYERING ARE
APPROXIMATE TO THE DEGREE OF ACCURACY IMPLIED WITH
THE METHODS EMPLOYED OF SURVEYING AND MEASUREMENT.
10. THE INFORMATION MAY NOT BE COMPLETE OR ADEQUATE FOR
CONTRACTORS USE IN DETERMINING CONSTRUCTION MEANS,
METHODS, SEQUENCES OR COSTS, AND THEREFORE NO
REPRESENTATION OR WARRANTIES ARE INTENDED OR MAY BE
IMPLIED IN THAT REGARD.
11. BORINGS ARE NOT SHOWN TO SCALE.
B-001
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
FY
P -1
0B
B
IR
C H
S
TR
E E
T R
O A
D
IM
P R
O V
E M
E N
TS
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
PORTDAVEN
HOME OFFICE
WINSTON-SALEM, NC 27101
336.744.1636 www.davenportworld.com
NCBELS FIRM LICENSE NO. C-2522
119 BROOKSTOWN AVE. SUITE PH1
B-002
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
FY
P -1
0B
B
IR
C H
S
TR
E E
T R
O A
D
IM
P R
O V
E M
E N
TS
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
PORTDAVEN
HOME OFFICE
WINSTON-SALEM, NC 27101
336.744.1636 www.davenportworld.com
NCBELS FIRM LICENSE NO. C-2522
119 BROOKSTOWN AVE. SUITE PH1
B-003
M c
H
U
G
H
C
E
C
E
C
E
C
E
C
E
BORING LOCATION
10.00
15.00
20.00
19.00
19.00
18.00
18.00
19.00
15.00
19.
21.00
19.0
18.00
.0
20.00
20.00
20.00
CROSS STREET
C
R
O
S
T
STA: 203+54.82
BEGIN PROJECT
20.00
18.00
20.00
20.00 19.00
18.00
19.00 19.00
.0
1.0
.0
.0
.0
21.00
23.00
22.00
23.
.0
22.
23.
23.00
22.0
1.0
.0
21.00
21.00
18.00
17.00 23.00
23.00
.0
21.00
19.00 18.00
18.00
21.00
19.0
19.00
CROSS STREET
M C
H U
G H
B
L V
D
B
IR
C H
S T
R E
E T
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
FY
P -1
0B
B
IR
C H
S
TR
E E
T R
O A
D
IM
P R
O V
E M
E N
TS
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
PORTDAVEN
HOME OFFICE
WINSTON-SALEM, NC 27101
336.744.1636 www.davenportworld.com
NCBELS FIRM LICENSE NO. C-2522
119 BROOKSTOWN AVE. SUITE PH1
C1
EXISTING CONDITIONS PLAN - BIRCH STREET STA. 203+00 TO 207+50
PLAN
NORTH
A1
EXISTING CONDITIONS PLAN - BIRCH STREET STA. 207+50 TO 212+50
PLAN
NORTH
KEY PLAN
GENERAL NOTES
1. SEE SHEET C-023 TO C-026 FOR SURVEY
NOTES AND C-002 FOR SURVEY LEGEND.
2. SEE SHEET C-001 FOR GENERAL SITE NOTES.
3. SEE SHEETS CP100 FOR NEW ROADWAY
PLAN.
PLAN
NORTH
SCALE IN FEET
20' 40'
SCALE IN FEET
20' 40'
WORK NOTES
1. PC-1
2. HA-5
3. PC-2
4. P-1
5. PC-6
LEGEND
1" = 20'
CE100
C
E
| B-001 - BORING LOGS |
| B-002 - BORING LOGS |
| B-003 - BORING LOGS |
| CE100 - EXISTING CONDITIONS PLAN - STA 203+00 TO 212+50 |
2020-06-12T09:46:00-0400
2020-06-12T09:46:09-0400
2020-06-12T09:46:10-0400
2020-06-12T09:46:12-0400
| 2020-06-19T10:10:37-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-06-19T10:10:52-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-06-19T10:10:59-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-06-19T10:11:00-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-06-19T10:11:23-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-06-19T10:11:41-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-06-19T10:11:42-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-06-19T10:11:43-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
File details come from the government source that posted it. Updated .