1374744dwg08of27_Vol1-Sht 91-101.pdf
PDF 19 MB Posted
- Solicitation number
- N4008519R9146
About this file
This document provides details on a federal solicitation for construction services. The solicitation is number N4008519R9146 from the Department of the Navy Naval Facilities Engineering Command for a firm-fixed price design-bid-build construction contract. The project involves road improvements to Birch Street and Birch Street North at Marine Corps Base Camp Lejeune in North Carolina. Interested offerors should review the solicitation for additional requirement details such as response dates, pricing terms, and any set-aside provisions. The scope of work includes construction services to improve the specified roads at the Marine Corps base as a DBB project.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOIL
STABILIZATION
BLANKET
B/M
CONCRETE
WASH AREA
SF
CE
CWA
IP
OUTLET
PROTECTION
SPEC 6.41
OP
CHECK DAM
SPEC 6.87
CD
PERMANENT
SODDING
PS
PS
B/M
4" TOPSOIL AND CENTIPEDE SOD
LIMIT OF DISTURBANCE
INLET
PROTECTION
SPEC 6.52
CONSTRUCTION
ENTRANCE
SPEC 6.06
SILT FENCE
TITLE KEY SYMBOL
CULVERT INLET
PROTECTION
CIP
A2
CC502
A3
CC501
A4
CC505
A1
CC501
A4
CC503
A1
CC503
A4
CC504
B2
CC504
DETAIL
DRAINAGE FLOW ARROW
C
R
E
E
K
N
E
W
S
E
R
V
I
C
E
R
O
A
D
H
O
L
C
O
M
B
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
10.00
25.00
24.00
23.00
22.00
23.00
.0 021.00
22.00
21.00
20.00
23.00
23.00
.0 0 15.00
S
E
R
V
I
C
E
R
O
A
D
S
E
R
V
I
A
D
OP
SF
IP
IP
I P
I P
SF
B
M
P
S
B
M
P
S
B
M
P
S
OP
I P
R
C
P
R
C
P
R
C
P
SF
.00
.0
22.00
10.00
15.00
20.00
10.00
15.00
20.00
25.00
20.00
25.00
SERVICE ROAD
IP
IP
B/M
PS
P
S
IP
SF
IP
IP
IP
IP
IP
OP
SF
PS
PS
S
F
R
C
P
R
C
P
R
C
P
R
C
P
R
C
P
24"RCP
R
C P
R
C
P
R
C
P
SF
IP
B/M
B/M
B/M
B/M
B/M
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
FY
P -1
0B
B
IR
C H
S
TR
E E
T R
O A
D
IM
P R
O V
E M
E N
TS
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
PORTDAVEN
HOME OFFICE
WINSTON-SALEM, NC 27101
336.744.1636 www.davenportworld.com
NCBELS FIRM LICENSE NO. C-2522
119 BROOKSTOWN AVE. SUITE PH1
B1
A1
EROSION AND SEDIMENT CONTROL PLAN - SERVICE RD. STA. 604+90 TO 609+00
KEY PLAN
GENERAL NOTES
1. SEE SHEET C-023 TO C-026 FOR SURVEY NOTES
AND C-002 FOR SURVEY LEGEND.
2. SEE SHEET C-500 FOR EROSION AND SEDIMENT
CONTROL NOTES.
3. SEE SHEETS CP116 FOR NEW ROADWAY PLAN.
4. ALL AREAS OF DISTURBANCE OUTSIDE THE
LIMITS OF NEW PAVEMENT SHALL BE
PERMANENTLY RESTORED WITH 4 INCHES OF
TOPSOIL AND PERMANENT SOD. EROSION
CONTROL BLANKET SHALL BE USED
WHEREVER FINISHED GRADE SLOPE IS 3H:1V
OR GREATER.
5. EROSION AND SEDIMENT CONTROL FOR
UTILITY CONSTRUCTION SHALL BE PROVIDED IN
ACCORDANCE WITH APPROVED PLANS. UTILITY
CONSTRUCTION SHALL ONLY BE FOR AREAS
WITHIN THE DELINEATED LIMIT OF
DISTURBANCE. WHEN SAME DAY
STABILIZATION IS APPROVED:
A. EXCAVATED TRENCH MATERIAL SHALL BE
PLACED ON THE HIGH SIDE OF THE TRENCH.
B. TRENCHES FOR UTILITY INSTALLATION SHALL
BE BACKFILLED, COMPACTED, AND
STABILIZED AT THE END OF EACH WORKING
DAY.
6. FOLLOWING INITIAL SOIL DISTURBANCE OR
RE-DISTURBANCE, PERMANENT OR
TEMPORARY STABILIZATION SHALL BE
COMPLETED WITHIN:
A. THREE (3) CALENDAR DAYS AS TO THE
SURFACE OF ALL PERIMETER CONTROLS,
DITCHES AND SLOPES 3H:1V OR STEEPER;
AND
B. SEVEN (7) CALENDAR DAYS IF DISTURBED
AREAS ARE NOT UNDER ACTIVE GRADING.
LEGEND
PLAN
NORTH
SCALE IN FEET
20' 40'
SCALE IN FEET
20' 40'
1" = 20'
1" = 20'
CC115
EROSION AND SEDIMENT CONTROL PLAN - SERVICE RD. STA. 600+90 TO 604+90
C
C
STABILIZE DISTURBED
PORTION OF CHANNEL WITH
STABILIZATION MATTING
UPON REMOVAL OF
EXISTING SLUICE GATE AND
GRADING OPERATIONS.
BLANKET
B/M
CONCRETE
WASH AREA
SF
CE
CWA
IP
OUTLET
PROTECTION
SPEC 6.41
OP
CHECK DAM
SPEC 6.87
CD
PERMANENT
SODDING
PS
PS
B/M
4" TOPSOIL AND CENTIPEDE SOD
LIMIT OF DISTURBANCE
INLET
PROTECTION
SPEC 6.52
CONSTRUCTION
ENTRANCE
SPEC 6.06
SILT FENCE
TITLE KEY SYMBOL
CULVERT INLET
PROTECTION
CIP
A2
CC502
A3
CC501
A4
CC505
A1
CC501
A4
CC503
A1
CC503
A4
CC504
B2
CC504
DETAIL
DRAINAGE FLOW ARROW
D
A
M
C
R
E
E
K
N
E
W
S
E
R
V
I
C
E
R
O
A
D
H
O
L
C
O
M
B
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
.00
20.00
15.00
15.00
20.00
25.00
25.00
12.00
15.00
15.00
20.00
20.00
24.00
12.00
12.00
.0
15.0016.00
15.00
20.00
SERVICE ROAD
S
F
SF
SF
OP
B/M
PS
SF
SF
SF
SF
S
F
B
M
B
M
B/M
15.00 16.00
15.00
20.00
20.00
16.00
16.00
19.00
.0
.0
19.00
.0
.0
.0
21.00
22.00
23.00
24.00
25.00
20.00
19.00
16.00
S
E
R
V
I
A
D
OP
OP
CE
CE
SF
SF
CD
CIP
OP
OP
CWA
IP
IP
IP
IP
SF
SF
B/M
PS
SF
SF
R
C
P
R
C
P
66"R C
P
R
C P
R
C P
R
C
P
R
C
P
R
C
P
"R
C P
R
C P
B/M
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
FY
P -1
0B
B
IR
C H
S
TR
E E
T R
O A
D
IM
P R
O V
E M
E N
TS
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
PORTDAVEN
HOME OFFICE
WINSTON-SALEM, NC 27101
336.744.1636 www.davenportworld.com
NCBELS FIRM LICENSE NO. C-2522
119 BROOKSTOWN AVE. SUITE PH1
C1
EROSION AND SEDIMENT CONTROL PLAN - SERVICE RD. STA. 609+00 TO 613+50
A1
EROSION AND SEDIMENT CONTROL PLAN - SERVICE RD. STA. 613+50 TO 617+35
KEY PLAN
GENERAL NOTES
1. SEE SHEET C-023 TO C-026 FOR SURVEY NOTES
AND C-002 FOR SURVEY LEGEND.
2. SEE SHEET C-500 FOR EROSION AND SEDIMENT
CONTROL NOTES.
3. SEE SHEETS CP116 FOR NEW ROADWAY PLAN.
4. ALL AREAS OF DISTURBANCE OUTSIDE THE
LIMITS OF NEW PAVEMENT SHALL BE
PERMANENTLY RESTORED WITH 4 INCHES OF
TOPSOIL AND PERMANENT SOD. EROSION
CONTROL BLANKET SHALL BE USED
WHEREVER FINISHED GRADE SLOPE IS 3H:1V
OR GREATER.
5. EROSION AND SEDIMENT CONTROL FOR
UTILITY CONSTRUCTION SHALL BE PROVIDED IN
ACCORDANCE WITH APPROVED PLANS. UTILITY
CONSTRUCTION SHALL ONLY BE FOR AREAS
WITHIN THE DELINEATED LIMIT OF
DISTURBANCE. WHEN SAME DAY
STABILIZATION IS APPROVED:
A. EXCAVATED TRENCH MATERIAL SHALL BE
PLACED ON THE HIGH SIDE OF THE TRENCH.
B. TRENCHES FOR UTILITY INSTALLATION SHALL
BE BACKFILLED, COMPACTED, AND
STABILIZED AT THE END OF EACH WORKING
DAY.
6. FOLLOWING INITIAL SOIL DISTURBANCE OR
RE-DISTURBANCE, PERMANENT OR
TEMPORARY STABILIZATION SHALL BE
COMPLETED WITHIN:
A. THREE (3) CALENDAR DAYS AS TO THE
SURFACE OF ALL PERIMETER CONTROLS,
DITCHES AND SLOPES 3H:1V OR STEEPER;
AND
B. SEVEN (7) CALENDAR DAYS IF DISTURBED
AREAS ARE NOT UNDER ACTIVE GRADING.
LEGEND
PLAN
NORTH
1" = 20'
1" = 20'
CC116
GENERAL NOTES
1. PROVIDE A 2' WIDE X 1' DEEP AASHTO NO. 57
STONE STRIP (WITH GEOTEXTILE FABRIC ON 3
SIDES), FLUSH WITH GRADE AT BASE OF
RETAINING WALLS.
C
C
STABILIZE DISTURBED PORTION OF
CHANNEL WITH STABILIZATION MATTING
UPON REMOVAL OF EXISTING SLUICE
GATE AND GRADING OPERATIONS.
BLANKET
B/M
CONCRETE
WASH AREA
SF
CE
CWA
IP
OUTLET
PROTECTION
SPEC 6.41
OP
CHECK DAM
SPEC 6.87
CD
PERMANENT
SODDING
PS
PS
B/M
4" TOPSOIL AND CENTIPEDE SOD
LIMIT OF DISTURBANCE
INLET
PROTECTION
SPEC 6.52
CONSTRUCTION
ENTRANCE
SPEC 6.06
SILT FENCE
TITLE KEY SYMBOL
CULVERT INLET
PROTECTION
CIP
A2
CC502
A3
CC501
A4
CC505
A1
CC501
A4
CC503
A1
CC503
A4
CC504
B2
CC504
DETAIL
DRAINAGE FLOW ARROW
S
E
R
V
I
C
E
R
O
A
D
H
O
L
C
O
M
B
B
I
R
H
S
T
R
E
E
T
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
30"RCP
HOLCOMB BLVD.
SF
OP
IP
PS
STA: 701+75
BEGIN PROJECT
15"RCP
R
C P
R
C P
16.00
HOLCOMB BLVD.
IP
IP
IP
IP
SF
CWA
CE
OP
OP
IP
IP
OP
IP
SF
IP
IP
SF
PS
PS
PS
STA: 711+02.30
END PROJECT
15"RCP
15"RCP
12"RCP
26.00
26.00
25.00
25.00
25.00
25.00
25.00
HOLCOMB BLVD.
SF
IP
SF
SF
IP
IP
IP
PS
PS
PS
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
FY
P -1
0B
B
IR
C H
S
TR
E E
T R
O A
D
IM
P R
O V
E M
E N
TS
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
PORTDAVEN
HOME OFFICE
WINSTON-SALEM, NC 27101
336.744.1636 www.davenportworld.com
NCBELS FIRM LICENSE NO. C-2522
119 BROOKSTOWN AVE. SUITE PH1
C1
EROSION AND SEDIMENT CONTROL PLAN - HOLCOMB BLVD. STA. 701+50 TO 702+06 AND 703+75 TO 706+50
A1
EROSION AND SEDIMENT CONTROL PLAN - HOLCOMB BLVD. STA. 706+50 TO 711+02.30
KEY PLAN
GENERAL NOTES
1. SEE SHEET C-023 TO C-026 FOR SURVEY NOTES
AND C-002 FOR SURVEY LEGEND.
2. SEE SHEET C-500 FOR EROSION AND SEDIMENT
CONTROL NOTES.
3. SEE SHEETS CP117 FOR NEW ROADWAY PLAN.
4. ALL AREAS OF DISTURBANCE OUTSIDE THE
LIMITS OF NEW PAVEMENT SHALL BE
PERMANENTLY RESTORED WITH 4 INCHES OF
TOPSOIL AND PERMANENT SOD. EROSION
CONTROL BLANKET SHALL BE USED
WHEREVER FINISHED GRADE SLOPE IS 3H:1V
OR GREATER.
5. EROSION AND SEDIMENT CONTROL FOR
UTILITY CONSTRUCTION SHALL BE PROVIDED IN
ACCORDANCE WITH APPROVED PLANS. UTILITY
CONSTRUCTION SHALL ONLY BE FOR AREAS
WITHIN THE DELINEATED LIMIT OF
DISTURBANCE. WHEN SAME DAY
STABILIZATION IS APPROVED:
A. EXCAVATED TRENCH MATERIAL SHALL BE
PLACED ON THE HIGH SIDE OF THE TRENCH.
B. TRENCHES FOR UTILITY INSTALLATION SHALL
BE BACKFILLED, COMPACTED, AND
STABILIZED AT THE END OF EACH WORKING
DAY.
6. FOLLOWING INITIAL SOIL DISTURBANCE OR
RE-DISTURBANCE, PERMANENT OR
TEMPORARY STABILIZATION SHALL BE
COMPLETED WITHIN:
A. THREE (3) CALENDAR DAYS AS TO THE
SURFACE OF ALL PERIMETER CONTROLS,
DITCHES AND SLOPES 3H:1V OR STEEPER;
AND
B. SEVEN (7) CALENDAR DAYS IF DISTURBED
AREAS ARE NOT UNDER ACTIVE GRADING.
LEGEND
1" = 20'
1" = 20'
CC117
C
C
R
C P
R
C P
15"RCP
R
C P
21.00
25.00
.0
25.
26.00 25.0
24.00
DUNCAN STREET
STA: 800+74.60
BEGIN PROJECT
R
C P
R
C
P
.00
25.00
26.00
27.00
28.00
30.00
28.00
.00
26.00
26.00
27.00
28.00
26.00
27.00
28.00
DUNCAN STREET
SOIL
STABILIZATION
BLANKET
B/M
CONCRETE
WASH AREA
SF
CE
CWA
IP
OUTLET
PROTECTION
SPEC 6.41
OP
CHECK DAM
SPEC 6.87
CD
PERMANENT
SODDING
PS
PS
B/M
4" TOPSOIL AND CENTIPEDE SOD
LIMIT OF DISTURBANCE
INLET
PROTECTION
SPEC 6.52
CONSTRUCTION
ENTRANCE
SPEC 6.06
SILT FENCE
TITLE KEY SYMBOL
CULVERT INLET
PROTECTION
CIP
A2
CC502
A3
CC501
A4
CC505
A1
CC501
A4
CC503
A1
CC503
A4
CC504
B2
CC504
DETAIL
DRAINAGE FLOW ARROW
D
U
N
C
A
N
C
C
C
C
C
C
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
FY
P -1
0B
B
IR
C H
S
TR
E E
T R
O A
D
IM
P R
O V
E M
E N
TS
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
PORTDAVEN
HOME OFFICE
WINSTON-SALEM, NC 27101
336.744.1636 www.davenportworld.com
NCBELS FIRM LICENSE NO. C-2522
119 BROOKSTOWN AVE. SUITE PH1
KEY PLAN
C1
EROSION AND SEDIMENT CONTROL PLAN - STA. 800+50 TO 804+00
A1
PLAN
NORTH
PLAN
NORTH
EROSION AND SEDIMENT CONTROL PLAN - STA. 804+00 TO 808+50
GENERAL NOTES
1. SEE SHEET C-023 TO C-026 FOR SURVEY NOTES
AND C-002 FOR SURVEY LEGEND.
2. SEE SHEET C-500 FOR EROSION AND SEDIMENT
CONTROL NOTES.
3. SEE SHEETS CP118 FOR NEW ROADWAY PLAN.
4. ALL AREAS OF DISTURBANCE OUTSIDE THE
LIMITS OF NEW PAVEMENT SHALL BE
PERMANENTLY RESTORED WITH 4 INCHES OF
TOPSOIL AND PERMANENT SOD. EROSION
CONTROL BLANKET SHALL BE USED
WHEREVER FINISHED GRADE SLOPE IS 3H:1V
OR GREATER.
5. EROSION AND SEDIMENT CONTROL FOR
UTILITY CONSTRUCTION SHALL BE PROVIDED IN
ACCORDANCE WITH APPROVED PLANS. UTILITY
CONSTRUCTION SHALL ONLY BE FOR AREAS
WITHIN THE DELINEATED LIMIT OF
DISTURBANCE. WHEN SAME DAY
STABILIZATION IS APPROVED:
A. EXCAVATED TRENCH MATERIAL SHALL BE
PLACED ON THE HIGH SIDE OF THE TRENCH.
B. TRENCHES FOR UTILITY INSTALLATION SHALL
BE BACKFILLED, COMPACTED, AND
STABILIZED AT THE END OF EACH WORKING
DAY.
6. FOLLOWING INITIAL SOIL DISTURBANCE OR
RE-DISTURBANCE, PERMANENT OR
TEMPORARY STABILIZATION SHALL BE
COMPLETED WITHIN:
A. THREE (3) CALENDAR DAYS AS TO THE
SURFACE OF ALL PERIMETER CONTROLS,
DITCHES AND SLOPES 3H:1V OR STEEPER;
AND
B. SEVEN (7) CALENDAR DAYS IF DISTURBED
AREAS ARE NOT UNDER ACTIVE GRADING.
LEGEND
SF
CE
SF
SF
SF
IP
IP
IP
IP
IP
IP
IP
IP
IP
PLAN
NORTH
PLAN
NORTH
PLAN
NORTH
PLAN
NORTH
IP
SCALE IN FEET
20' 40'
SCALE IN FEET
20' 40'
1" = 20'
1" = 20'
CWA
CC118
PS
PS
PS
PS
PS
PS
PS
C
C
"R
C P
R
C P
30.00
29.00
31.00
29.00
28.00
.0
28.00
29.00
27.0
27.00 28.00
28.00
28.00
29.00 30.00
31.00 32.00
DUNCAN STREET
R
C P
"R
C P
29.00
.00
31.00
32.00
30.00
30.
30.00
29.00
30.00
30.00
30.00
30.00
DUNCAN STREET
SOIL
STABILIZATION
BLANKET
B/M
CONCRETE
WASH AREA
SF
CE
CWA
IP
OUTLET
PROTECTION
SPEC 6.41
OP
CHECK DAM
SPEC 6.87
CD
PERMANENT
SODDING
PS
PS
B/M
4" TOPSOIL AND CENTIPEDE SOD
LIMIT OF DISTURBANCE
INLET
PROTECTION
SPEC 6.52
CONSTRUCTION
ENTRANCE
SPEC 6.06
SILT FENCE
TITLE KEY SYMBOL
CULVERT INLET
PROTECTION
CIP
A2
CC502
A3
CC501
A4
CC505
A1
CC501
A4
CC503
A1
CC503
A4
CC504
B2
CC504
DETAIL
DRAINAGE FLOW ARROW
D
U
N
C
A
N C
C
C
C
CC120
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
FY
P -1
0B
B
IR
C H
S
TR
E E
T R
O A
D
IM
P R
O V
E M
E N
TS
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
PORTDAVEN
HOME OFFICE
WINSTON-SALEM, NC 27101
336.744.1636 www.davenportworld.com
NCBELS FIRM LICENSE NO. C-2522
119 BROOKSTOWN AVE. SUITE PH1
KEY PLAN
C1
EROSION AND SEDIMENT CONTROL PLAN - STA. 808+50 TO 813+50
A1
PLAN
NORTH
PLAN
NORTH
EROSION AND SEDIMENT CONTROL PLAN - STA. 813+50 TO 818+00
GENERAL NOTES
1. SEE SHEET C-023 TO C-026 FOR SURVEY NOTES
AND C-002 FOR SURVEY LEGEND.
2. SEE SHEET C-500 FOR EROSION AND SEDIMENT
CONTROL NOTES.
3. SEE SHEETS CP119 FOR NEW ROADWAY PLAN.
4. ALL AREAS OF DISTURBANCE OUTSIDE THE
LIMITS OF NEW PAVEMENT SHALL BE
PERMANENTLY RESTORED WITH 4 INCHES OF
TOPSOIL AND PERMANENT SOD. EROSION
CONTROL BLANKET SHALL BE USED
WHEREVER FINISHED GRADE SLOPE IS 3H:1V
OR GREATER.
5. EROSION AND SEDIMENT CONTROL FOR
UTILITY CONSTRUCTION SHALL BE PROVIDED IN
ACCORDANCE WITH APPROVED PLANS. UTILITY
CONSTRUCTION SHALL ONLY BE FOR AREAS
WITHIN THE DELINEATED LIMIT OF
DISTURBANCE. WHEN SAME DAY
STABILIZATION IS APPROVED:
A. EXCAVATED TRENCH MATERIAL SHALL BE
PLACED ON THE HIGH SIDE OF THE TRENCH.
B. TRENCHES FOR UTILITY INSTALLATION SHALL
BE BACKFILLED, COMPACTED, AND
STABILIZED AT THE END OF EACH WORKING
DAY.
6. FOLLOWING INITIAL SOIL DISTURBANCE OR
RE-DISTURBANCE, PERMANENT OR
TEMPORARY STABILIZATION SHALL BE
COMPLETED WITHIN:
A. THREE (3) CALENDAR DAYS AS TO THE
SURFACE OF ALL PERIMETER CONTROLS,
DITCHES AND SLOPES 3H:1V OR STEEPER;
AND
B. SEVEN (7) CALENDAR DAYS IF DISTURBED
AREAS ARE NOT UNDER ACTIVE GRADING.
LEGEND
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
SF
SF
SF
SF
SF
SF
PLAN
NORTH
PLAN
NORTH
PLAN
NORTH
SCALE IN FEET
20' 40'
SCALE IN FEET
20' 40'
1" = 20'
1" = 20'
IP
CC119
PS
PS
PS
PS
PS
PS
C
C
R
C P
29.00
.00
29.00
.0
.0
.0
.0
30.00
30.00
29.00
29.0
.00
29.
28.
DUNCAN STREET
PS
PS
PS
SOIL
STABILIZATION
BLANKET
B/M
CONCRETE
WASH AREA
SF
CE
CWA
IP
OUTLET
PROTECTION
SPEC 6.41
OP
CHECK DAM
SPEC 6.87
CD
PERMANENT
SODDING
PS
PS
B/M
4" TOPSOIL AND CENTIPEDE SOD
LIMIT OF DISTURBANCE
INLET
PROTECTION
SPEC 6.52
CONSTRUCTION
ENTRANCE
SPEC 6.06
SILT FENCE
TITLE KEY SYMBOL
CULVERT INLET
PROTECTION
CIP
A2
CC502
A3
CC501
A4
CC505
A1
CC501
A4
CC503
A1
CC503
A4
CC504
B2
CC504
DETAIL
DRAINAGE FLOW ARROW
DUCAN
D
U
N
C
A
N C
C
C
C
CC120
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
FY
P -1
0B
B
IR
C H
S
TR
E E
T R
O A
D
IM
P R
O V
E M
E N
TS
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
PORTDAVEN
HOME OFFICE
WINSTON-SALEM, NC 27101
336.744.1636 www.davenportworld.com
NCBELS FIRM LICENSE NO. C-2522
119 BROOKSTOWN AVE. SUITE PH1
KEY PLAN
PLAN
NORTH
C1
EROSION AND SEDIMENT CONTROL PLAN - STA. 818+00 TO 820+97.81
PLAN
NORTH
PLAN
NORTH
PLAN
NORTH
PLAN
NORTH
GENERAL NOTES
1. SEE SHEET C-023 TO C-026 FOR SURVEY NOTES
AND C-002 FOR SURVEY LEGEND.
2. SEE SHEET C-500 FOR EROSION AND SEDIMENT
CONTROL NOTES.
3. SEE SHEETS CP120 FOR NEW ROADWAY PLAN.
4. ALL AREAS OF DISTURBANCE OUTSIDE THE
LIMITS OF NEW PAVEMENT SHALL BE
PERMANENTLY RESTORED WITH 4 INCHES OF
TOPSOIL AND PERMANENT SOD. EROSION
CONTROL BLANKET SHALL BE USED
WHEREVER FINISHED GRADE SLOPE IS 3H:1V
OR GREATER.
5. EROSION AND SEDIMENT CONTROL FOR
UTILITY CONSTRUCTION SHALL BE PROVIDED IN
ACCORDANCE WITH APPROVED PLANS. UTILITY
CONSTRUCTION SHALL ONLY BE FOR AREAS
WITHIN THE DELINEATED LIMIT OF
DISTURBANCE. WHEN SAME DAY
STABILIZATION IS APPROVED:
A. EXCAVATED TRENCH MATERIAL SHALL BE
PLACED ON THE HIGH SIDE OF THE TRENCH.
B. TRENCHES FOR UTILITY INSTALLATION SHALL
BE BACKFILLED, COMPACTED, AND
STABILIZED AT THE END OF EACH WORKING
DAY.
6. FOLLOWING INITIAL SOIL DISTURBANCE OR
RE-DISTURBANCE, PERMANENT OR
TEMPORARY STABILIZATION SHALL BE
COMPLETED WITHIN:
A. THREE (3) CALENDAR DAYS AS TO THE
SURFACE OF ALL PERIMETER CONTROLS,
DITCHES AND SLOPES 3H:1V OR STEEPER;
AND
B. SEVEN (7) CALENDAR DAYS IF DISTURBED
AREAS ARE NOT UNDER ACTIVE GRADING.
LEGEND
OP
IP
CIP
STA. 820+97.80
END PROJECT
SCALE IN FEET
20' 40'
1" = 20'
SF
SF
CC120
CC120
EROSION AND SEDIMENT
CONTROL NOTES
1. CONSTRUCTION MATERIALS THAT POSE A POTENTIAL CONTAMINATION THREAT TO STORM
WATER SHALL BE MANAGED TO MINIMIZE EXPOSURE TO STORM WATER. MATERIALS SHALL
BE KEPT IN SECURE CONTAINERS AND PROPERLY LABELED. SOLID AND LIQUID WASTE AND
OTHER WASTES SHALL BE DISPOSED OF PROPERLY IN ACCORDANCE WITH APPLICABLE
FEDERAL, STATE AND LOCAL DISPOSAL REQUIREMENTS. DISPOSAL SHALL BE CONSISTENT
WITH APPLICABLE STATE AND/OR LOCAL WASTE DISPOSAL, SANITARY SEWER OR SEPTIC
SYSTEM REGULATIONS AND SHALL PROVIDE FOR THE PROPER DISPOSAL OF
CONTAMINATED SOILS TO THE EXTENT THESE ARE LOCATED WITHIN THE PERMITTED AREA.
2. HANDLING CONSTRUCTION CHEMICALS. MIXING, PUMPING, TRANSFERRING OR OTHER
HANDLING OF CONSTRUCTION CHEMICALS SUCH AS FERTILIZER, LIME, ASPHALT,
CONCRETE DRYING COMPOUNDS, AND ALL OTHER POTENTIALLY HAZARDOUS MATERIALS
SHALL BE PERFORMED IN AN AREA AWAY FROM ANY WATERCOURSE, DITCH OR STORM
DRAIN.
3. THE FOLLOWING GOOD HOUSEKEEPING PRACTICES WILL BE FOLLOWED ON SITE DURING
THE CONSTRUCTION PROJECT:
A. AN EFFORT WILL BE MADE TO STORE ONLY ENOUGH PRODUCT REQUIRED TO DO THE
JOB.
B. ALL MATERIALS STORED ON SITE WILL BE STORED IN A NEAT, ORDERLY MANNER IN THEIR
APPROPRIATE CONTAINERS AND, IF POSSIBLE, UNDER A ROOF OR OTHER ENCLOSURE.
C. PRODUCTS WILL BE KEPT IN THEIR ORIGINAL CONTAINERS WITH THE MANUFACTURER'S
LABEL. SUBSTANCES WILL NOT BE MIXED WITH ONE ANOTHER UNLESS RECOMMENDED
BY THE MANUFACTURER.
D. WHENEVER POSSIBLE, ALL OF A PRODUCT WILL BE USED UP BEFORE DISPOSING OF THE
CONTAINER.
E. THE MANUFACTURER'S RECOMMENDATIONS FOR PROPER USE AND DISPOSAL WILL BE
FOLLOWED.
4. AT NO TIME SHALL CONSTRUCTION VEHICLES BE ALLOWED TO ENTER AREAS OUTSIDE THE
LIMIT OF DISTURBANCE BOUNDARIES SHOWN ON THE PLAN MAPS. THESE AREAS MUST BE
CLEARLY MARKED AND FENCED OFF BEFORE CLEARING AND GRUBBING OPERATIONS
BEGIN.
5. UNTIL THE SITE IS PERMANENTLY STABILIZED, ALL EROSION AND SEDIMENT BMPS SHALL
BE MAINTAINED PROPERLY. MAINTENANCE SHALL INCLUDE INSPECTIONS OF ALL EROSION
& SEDIMENT BMPS AFTER EACH RUNOFF EVENT AND ON A WEEKLY BASIS. ALL
PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEANOUT, REPAIR,
RE-PLACEMENT, RE-GRADING, RE-SEEDING, RE-MULCHING, AND RE-NETTING MUST BE
PERFORMED IMMEDIATELY. IF THE E&S BMPS FAIL TO PERFORM AS EXPECTED,
REPLACEMENT BMPS, OR MODIFICATION OF THOSE INSTALLED WILL BE REQUIRED.
6. IMMEDIATELY UPON DISCOVERING UNFORESEEN CIRCUMSTANCES POSING THE POTENTIAL
FOR ACCELERATED EROSION AND/OR SEDIMENT POLLUTION, THE CONTRACTOR SHALL
IMPLEMENT APPROPRIATE BEST MANAGEMENT PRACTICES TO ELIMINATE THE POTENTIAL
FOR ACCELERATED EROSION AND/OR SEDIMENT POLLUTION.
7. THE CONTRACTOR SHALL KEEP A SUPPLY OF EROSION CONTROL MATERIAL (SILT FENCE,
JUTE MESH, RIP RAP, ETC.) ON-SITE FOR MAINTENANCE AND EMERGENCY REPAIRS.
8. ALL REGULATORY AGENCY PERMITS REQUIRED FOR THE SITE SHALL BE OBTAINED PRIOR
TO SITE WORK COMMENCES.
9. CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL UNDERGROUND UTILITIES.
CONTRACTOR SHALL USE A THIRD PARTY FOR PRIVATE UTILITY LOCATING AS NECESSARY.
SILT FENCE TO BE PLACED OFFSET FROM UTILITY LOCATIONS.
10. PERMANENTLY STABILIZE BY SEEDING PER PLANS. SPOILS TO BE PLACED AROUND
EXISTING STRUCTURES AND EQUIPMENT.
11. ANY OFF-SITE BORROW AND WASTE REQUIRED FOR THIS PROJECT MUST COME FROM A
SITE WITH AN APPROVED EROSION CONTROL PLAN, A SITE REGULATED UNDER THE MINING
ACT OF 1971, OR A LANDFILL REGULATED BY THE DIVISION OF SOLID WASTE MANAGEMENT.
TRASH/DEBRIS FROM DEMOLITION ACTIVITIES OR GENERATED BY ANY ACTIVITIES ON SITE
MUST BE DISPOSED OF AT A FACILITY REGULATED BY THE DIVISION OF SOLID WASTE
MANAGEMENT OR PER DIVISION OF SOLID WASTE MANAGEMENT OR DIVISION OF WATER
RESOURCES RULES AND REGULATIONS.
12. ADDITIONAL MEASURES MAY BE REQUIRED. THE CONTRACTOR IS RESPONSIBLE FOR THE
CONTROL OF SEDIMENT ON-SITE. IF THE APPROVED EROSION AND SEDIMENTATION
CONTROL MEASURES PROVE INSUFFICIENT, THE CONTRACTOR MUST TAKE THOSE
ADDITIONAL STEPS NECESSARY TO STOP SEDIMENT FROM LEAVING THIS SITE.
13. EROSION AND SEDIMENT CONTROL FOR UTILITY CONSTRUCTION SHALL BE PROVIDED IN
ACCORDANCE WITH APPROVED PLANS. UTILITY CONSTRUCTION SHALL ONLY BE FOR
AREAS WITHIN THE DELINEATED LIMITS OF WORK. CALL “MISS UTILITY” AT 1-800-632-4949 48
HOURS PRIOR TO THE START OF WORK. WHEN SAME DAY STABILIZATION IS APPROVED:
A. EXCAVATED TRENCH MATERIAL SHALL BE PLACED ON THE HIGH SIDE OF THE TRENCH.
B. TRENCHES FOR UTILITY INSTALLATION SHALL BE BACKFILLED, COMPACTED, AND
STABILIZED AT THE END OF EACH WORKING DAY. NO MORE TRENCH SHALL BE OPENED
THAN CAN BE COMPLETED THE SAME DAY.
14. FOLLOWING INITIAL SOIL DISTURBANCE OR RE-DISTURBANCE, PERMANENT OR
TEMPORARY STABILIZATION SHALL BE COMPLETED WITHIN:
A. THREE (3) CALENDAR DAYS AS TO THE SURFACE OF ALL PERIMETER CONTROLS, DIKES,
SWALES, DITCHES, PERIMETER SLOPES, AND ALL SLOPES STEEPER THAN 3 HORIZONTAL
TO 1 VERTICAL (3:1); AND
B. SEVEN (7) CALENDAR DAYS AS TO ALL OTHER DISTURBED OR GRADED AREAS ON THE
PROJECT SITE NOT UNDER ACTIVE GRADING.
1. TEMPORARY GROUND COVER TO BE INSTALLED WITHIN SEVEN DAYS
OF STOPPING GRADING ACTIVITY AT ANY PHASE OF CONSTRUCTION.
1.1. MAY - JULY: GERMAN MILLET
1.2. AUGUST - APRIL: RYE GRAIN (NOT ANNUAL RYE GRASS)
2. PERMANENT GROUND COVER TO BE INSTALLED WITHIN SEVEN DAYS
OF COMPLETION OF FINAL GRADING.
2.1. PREFERRED APPLICATION IS CENTIPEDE SOD. HOWEVER, THE
FOLLOWING SOD SPECIFICATION MAY BE USED:
2.1.1. JANUARY - MARCH: MIXTURE (40% FESCUE, 40% UNHULLED
BERMUDA, 20% CENTIPEDE)
2.1.2. APRIL - AUGUST: MIXTURE (50% HULLED BERMUDA, 30%
CENTIPEDE, 20% BAHIA)
2.1.3. SEPTEMBER - DECEMBER: MIXTURE (60% FESCUE, 40%
UNHULLED BERMUDA)
3. TEMPORARY SEEDING SHALL BE FERTILIZED AS REQUIRED BY AN
INDEPENDENT SOIL ANALYSIS. INSPECT SEED WEEKLY AND PROVIDE
WATER AS NEEDED FOR GERMINATION. AFTER GERMINATION, WATER
AT 1-INCH PER WEEK UNTIL FIRST MOWING.
4. EXAMINE AREAS TO RECEIVE SEED FOR COMPLIANCE WITH
REQUIREMENTS AND FOR CONDITIONS AFFECTING PERFORMANCE OF
WORK AND ESTABLISHMENT. DO NOT PROCEED WITH INSTALLATION
UNTIL UNSATISFACTORY CONDITIONS HAVE BEEN CORRECTED.
5. DISPOSE OF ANY GROWTH, ROCKS, OR OTHER OBSTRUCTIONS WHICH
MIGHT INTERFERE WITH SEEDING OR LATER MAINTENANCE
OPERATIONS. REMOVE STONES OVER 38MM (1 1/2 INCHES) IN ANY
DIMENSION AND STICKS, ROOTS, RUBBISH, AND OTHER EXTRANEOUS
MATTER.
6. GRADE SEED AREAS TO A SMOOTH, EVEN SURFACE WITH LOOSE,
UNIFORMLY FINE TEXTURE. ROLL AND RAKE, REMOVE RIDGES AND
FILL DEPRESSIONS TO MEET FINISH GRADES. DO NOT USE WET SEED
OR SEED WHICH IS MOLDY OR OTHERWISE DAMAGED IN TRANSIT OR
STORAGE.
7. SOW SEED WITH A BRILLION TYPE SEEDING MACHINE OR WHERE
APPLICABLE AND RESTRICTED BY STEEP SLOPES OR OTHER AREAS
NOT ACCESSIBLE TO THE SEEDING MACHINE, BROADCAST OR DROP
SEED METHODS MAY BE USED. DO NOT BROADCAST OR DROP SEED
WHEN WIND VELOCITY EXCEEDS 5 MPH. EVENLY DISTRIBUTE SEED BY
SOWING EQUAL QUANTITIES IN 2 DIRECTIONS AT RIGHT ANGLES TO
EACH OTHER, AND 3 DIRECTIONS IN HIGH MAINTENANCE AREAS.
8. RAKE, HARROW OR OTHERWISE WORK THE SEED INTO THE SOIL 1/4"
TO 1/2" DEEP. KEEP THE AREA WELL- WATERED UNTIL THE SEEDS
GERMINATE AND THE SEEDLINGS HAVE GROWN SUFFICIENTLY TO
ESTABLISH A LAWN, THEN WATER AS NEEDED.
9. MOW GRASS TO A HEIGHT OF 50MM (2 INCHES) AS SOON AS THERE IS
ENOUGH TOP GROWTH TO CUT WITH MOWER. REMOVE NO MORE
THAN 40% OF GRASS LEAF GROWTH IN INITIAL OR SUBSEQUENT
MOWINGS. DO NOT DELAY MOWING UNTIL GRASS BLADES BEND OVER
AND BECOME MATTED.
PERMANENT/TEMPORARY SEEDING,
FERTILIZING AND MULCHING NOTES
1. INSTALL EROSION AND SEDIMENT CONTROL (E&SC) DEVICES IN
ACCORDANCE WITH THE PLAN DRAWINGS.
2. THE NPDES CONSTRUCTION PERMIT REQUIRES EROSION CONTROL
DEVICES AND STORM WATER OUTFALLS BE INSPECTED WEEKLY (EVERY
7 CALENDAR DAYS) AND WITHIN 24 HRS. OF A 0.5 INCH RAIN EVENT. IT
WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO CONDUCT THESE
INSPECTIONS AND MAINTAIN RECORDS UNTIL THE AREA HAS STABILIZED
EVIDENT BY 95% VEGETATIVE GROWTH FOR AREAS PROVIDED SEEDING.
TO FACILITATE RAINFALL MONITORING, A RAIN GAUGE IS REQUIRED TO
BE ON SITE. ADDITIONALLY THE CONTRACTOR IS RESPONSIBLE FOR
CONDUCTING "SELF-INSPECTIONS INDICATING THE DATE BMPS ARE
INSTALLED AND STABILIZATION MEASURES (SEEDING/MULCHING/ OR
SOD) ARE INITIATED. THE "SELF- INSPECTIONS" RECORDS WILL BE
MAINTAINED ALONG WITH THE NPDES INSPECTION REPORTS. ONCE
STABILIZATION HAS BEEN ACCOMPLISHED INSPECTION RECORDS ARE TO
BE FORWARDED TO EAD AND ALL TEMPORARY EROSION/SEDIMENTATION
CONTROL DEVICES REMOVED. THE CONTRACTOR IS RESPONSIBLE FOR
MAINTAINING COMPLIANCE WITH ALL PERMITS AND PLANS, ANY CHANGES
WILL BE APPROVED BY THE STATE PRIOR TO EXECUTION. A COPY OF
THE EROSION AND SEDIMENTATION CONTROL PLAN, LETTER OF
APPROVAL AND NPDES CONSTRUCTION PERMIT WILL BE MAINTAINED BY
THE CONTRACTOR AT THE ONSITE OFFICE. IF SOIL IS REMOVED FROM
OR BROUGHT ONSITE, THE APPLICABLE EROSION SEDIMENTATION
PERMIT NUMBER OR MINE PERMIT NUMBER WILL BE DISCLOSED.
3. REPAIR OR REPLACE INEFFECTIVE E&SC MEASURES IMMEDIATELY AFTER
IDENTIFICATION OR AS SOON AS WEATHER CONDITIONS ALLOW.
4. IDENTIFY AND INSTALL ADDITIONAL TEMPORARY E&SC DEVICES IN AREAS
DEEMED IN NEED OF PROTECTION.
5. REMOVE SEDIMENT FROM INLET PROTECTION DEVICES ONCE SEDIMENT
HAS REACHED 1/3 THE HEIGHT OF THE STRUCTURE.
6. REMOVE SEDIMENT FROM BEHIND SILT FENCE AS NECESSARY TO
PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO
REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING
THE FENCE DURING CLEANOUT.
7. REMOVE SEDIMENT AND RESTORE SEDIMENT TRAPS TO ORIGINAL
DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE-HALF
THE DESIGN DEPTH OF THE TRAP. PLACE SEDIMENT IN DESIGNATED
DISPOSAL AREA, AND REPLACE GRAVEL FACING THAT IS IMPAIRED BY
SEDIMENT. CHECK THE STRUCTURE FOR DAMAGE FROM EROSION OR
PIPING. ENSURE SPILLWAY REMAINS A MINIMUM OF 1.5 FEET BELOW THE
EMBANKMENT LOW POINT. REPLACE DISPLACED RIPRAP IMMEDIATELY.
REMOVE STRUCTURE AND ALL UNSTABLE SEDIMENT AFTER PERMANENT
STABILIZATION, AND SMOOTH AREA TO BLEND WITH ADJOINING AREAS.
8. PERFORM DAILY INSPECTIONS AND REMOVAL OF TRACKED MATERIAL
FROM THE PROJECT SITE ONTO ADJACENT ROADS.
9. MAINTAIN WRITTEN INSPECTION AND REPAIR OR REPLACEMENT FORMS
ON SITE AT ALL TIMES FOR E&SC MEASURES.
10. A COPY OF THE EROSION AND SEDIMENT CONTROL PLAN, LETTER OF
APPROVAL, AND NPDES CONSTRUCTION PERMIT WILL BE MAINTAINED ON
SITE AT ALL TIMES.
11. MAINTAIN THE GRAVEL CONSTRUCTION ENTRANCE IN A CONDITION TO
PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE.
THIS MAY REQUIRE PERIODIC TOPDRESSING WITH 2-INCH STONE. AFTER
EACH RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT
AND CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL
OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO
PUBLIC ROADWAYS.
12. ADDITIONALLY THE CONTRACTOR IS RESPONSIBLE FOR CONDUCTING
"SELF INSPECTIONS" INDICATING THE DATE BMPs ARE INSTALLED AND
STABILIZATION MEASURES (SEEDING/MULCHING OR SOD) ARE INITIATED.
THE "SELF INSPECTION" REPORTS WILL BE MAINTAINED ALONG WITH THE
"NPDES" INSPECTION REPORTS. ONCE STABILIZATION HAS BEEN
ACCOMPLISHED INSPECTION RECORDS ARE TO BE FORWARDED TO EAD
AND ALL TEMPORARY EROSION/SEDIMENTATION CONTROL DEVICES
REMOVED.
13. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING COMPLIANCE WITH
ALL PERMITS AND PLANS, ANY CHANGES WILL BE APPROVED BY THE
STATE PRIOR TO EXECUTION. A COPY OF THE EROSIOIN AND
SEDIMENTATION CONTROL PLAN, LETTER OF APPROVAL, AND NPDES
CONSTRUCTION PERMIT WILL BE MAINTAINED BY THE CONTRACTOR AT
THE ONSITE OFFICE. IF SOIL IS REMOVED FROM OR BROUGHT ONSITE,
THE APPLICABLE SOLID WASTE MANAGEMENT PERMIT NUMBER, EROSION
SEDIMENTATION PERMIT NUMBER OR MINE PERMIT NUMBER WILL BE
DISCLOSED.
MAINTENANCE AND INSPECTION NOTES
1. OBTAIN APPROVAL OF PLAN AND ANY NECESSARY
PERMITS, AND HOLD A PRE-CONSTRUCTION CONFERENCE
PRIOR TO COMMENCING ANY WORK.
2. FLAG THE WORK LIMITS AND MARK THE 100' WETLAND
BUFFER FOR PROTECTION.
3. STAKE OUT ROADS AND STORM DRAINAGE STRUCTURES
FOR PRELIMINARY GRADING.
4. INSTALL GRAVEL CONSTRUCTION ENTRANCES.
5. CLEAR AND GRUB EXISTING SITE.
6. INSTALL SILT FENCING AS SHOWN ON PLAN.
7. CONSTRUCT CHANNELS AND ANY OTHER SEDIMENT
CONTROL PRACTICES SHOWN, PRIOR TO ROUGH GRADING
ROADWAYS, SITE AND STOCKPILING TOPSOIL AS
NECESSARY.
8. INSTALL STORM SEWER CONVEYANCE PIPE AND
STRUCTURES.
9. FINAL GRADE, INSTALL ALL OTHER UTILITIES, INCLUDING
BUT NOT LIMITED TO WATER, ELECTRICAL POWER AND
SITE LIGHTING. VEGETATIVELY STABILIZE AREAS WHERE
BUILDING CONSTRUCTION IS NOT IMMIMENT.
10. ONCE FINAL GRADE HAS BEEN ESTABLISHED AND
NON-PAVED AREAS HAVE BEEN STABILIZED, STORM DRAIN
NETWORK CAN BE FLUSHED OF SEDIMENT.
11. UPON COMPLETION OF CONSTRUCTION, THE ROADWAY,
PARKING AND CIRCULATION AREAS ARE TO BE PAVED, AND
ALL AREAS PERMANENTLY VEGETATIVELY STABILIZED
WITH CENTIPEDE SOD. AFTER SITE STABILIZATION,
TEMPORARY EROSION AND SEDIMENT CONTROL
MEASURES ARE TO BE REMOVED.
SEQUENCE OF CONSTRUCTION
TEMPORARY STABILIZATION
AREAS REQUIRING TEMPORARY STABILIZATION TIME FRAME TO APPLY EROSION CONTROLS:
ANY DISTURBED AREA WITHIN FIFTY (50) FEET WITHIN TWO (2) DAYS OF THE MOST RECENT
OF A STREAM AND NOT AT FINAL GRADE. DISTURBANCE IF THAT AREA WILL REMAIN IDLE
FOR MORE THAN FOURTEEN (14) DAYS.
FOR ALL CONSTRUCTION ACTIVITIES, ANY
DISTURBED AREA, INCLUDING SOIL STOCKPILES WITHIN SEVEN (7) DAYS OF THE MOST RECENT
THAT WILL BE DORMANT FOR MORE THAN DISTURBANCE WITHIN THE AREA.
FOURTEEN (14) DAYS BUT LESS THAN NINETY (90)
DAYS, AND NOT WITHIN FIFTY (50) FEET OF A STREAM.
DISTURBED AREA THAT WILL BE PRIOR TO THE ONSET OF WINTER
IDLE OVER WINTER WEATHER/NOVEMBER 1ST.
NOTES:
WHERE VEGETATIVE STABILIZATION TECHNIQUES MAY CAUSE STRUCTURAL INSTABILITY OR ARE OTHERWISE UNOBTAINABLE, ALTERNATIVE STABILIZATION TECHNIQUES MUST BE EMPLOYED. THESE TECHNIQUES MAY INCLUDE MULCHING OR EROSION MATTING.OR
NO MORE THAN 90 CALENDAR DAYS (WHICHEVER IS SHORTER).
1. THESE DRAWINGS WERE PREPARED IN ACCORDANCE WITH THE NORTH
CAROLINA EROSION & SEDIMENT CONTROL PLANNING AND DESIGN
MANUAL.
2. THE CONTRACTOR IS RESPONSIBLE FOR PERFORMING ENVIRONMENTAL
DUE DILIGENCE AND DETERMINING THAT ALL IMPORTED FILL MEETS THE
EPA & STATE DEQ DEFINITION OF CLEAN FILL. CLEAN FILL MEANS THAT THE
FILL MATERIAL IS NOT CONTAMINATED BY SOLID WASTES, INFECTIOUS
WASTES, HAZARDOUS WASTES OR CONSTRUCTION AND DEMOLITION
DEBRIS (C&DD). IF THESE TYPES OF WASTE ARE COMMINGLED WITH CLEAN
HARD FILL, ALL OF THE MATERIALS MUST BE HANDLED AND DISPOSED OF
AS SOLID WASTE, INFECTIOUS WASTE, HAZARDOUS WASTE OR C&DD.
3. ENVIRONMENTAL DUE DILIGENCE IS DEFINED AS INVESTIGATIVE
TECHNIQUES, INCLUDING, BUT NOT LIMITED TO, VISUAL PROPERTY
INSPECTIONS, ELECTRONIC DATA BASE SEARCHES, REVIEW OF PROPERTY
USE HISTORY, SANBORN MAPS, ENVIRONMENTAL QUESTIONNAIRES,
TRANSACTION SCREENS, ANALYTICAL TESTING, ENVIRONMENTAL
ASSESSMENTS OR AUDITS. ANALYTICAL TESTING IS NOT A REQUIRED PART
OF DUE DILIGENCE UNLESS VISUAL INSPECTION AND/OR REVIEW OF THE
PAST LAND USE OF THE PROPERTY INDICATES THAT THE FILL MAY HAVE
BEEN SUBJECTED TO A SPILL OR RELEASE OF REGULATED SUBSTANCE. IF
THE FILL MAY HAVE BEEN AFFECTED BY A SPILL OR RELEASE OF A
REGULATED SUBSTANCE, IT MUST BE TESTED TO DETERMINE IF IT
QUALIFIES AS CLEAN FILL.
4. SILT FENCE IS SHOWN IN THE APPROXIMATE LOCATION OF PLACEMENT.
ADDITIONAL SILT FENCE SHALL BE PLACED TO PROTECT ANY ADDITIONAL
AREAS DISTURBED DURING CONSTRUCTION.
5. SILT FENCE SHALL BE INSTALLED PRIOR TO LAND DISTURBANCE. SILT
FENCE SHALL BE MAINTAINED DURING CONSTRUCTION AND ONLY
REMOVED WHEN A UNIFORM 80% VEGETATIVE COVER HAS BEEN
ESTABLISHED AND APPROVED BY OWNER.
6. ALL WASTE MATERIAL SHALL BE PROPERLY RECYCLED OR DISPOSED OF
PER LOCAL OR STATE REQUIREMENTS.
7. CONTRACTOR SHALL PLACE 6" TOPSOIL AND SEED ON ALL CUT AND FILL
SLOPES AS SPECIFIED UNLESS ANOTHER SURFACE MATERIAL IS
INDICATED. A NORTH AMERICAN GREEN SC150 OR ENGINEER APPROVED
EQUAL EROSION CONTROL BLANKET SHALL BE PLACED OVER THE SEEDED
SIDE SLOPES 3:1 OR GREATER.
8. ALL SLOPES GREATER THAN 3:1 OR AS INDICATED ON THE PLANS SHALL BE
STABILIZED WITH EROSION CONTROL BLANKETS IMMEDIATELY UPON
COMPLETION OF GRADING ACTIVITIES.
9. TOP SOIL STOCKPILE, CONCRETE WASHOUT AND WASTE DISPOSAL AREAS
MAY BE PLACED IN A CENTRAL LOCATION WITHIN THE LIMITS OF
DISTURBANCE TO ACCOMMODATE CONSTRUCTION AND MATERIAL
LAYDOWN REQUIREMENTS.
10. PERIMETER SEDIMENT CONTROL MEASURES (SILT FENCE) SHALL BE
IMPLEMENTED AS THE FIRST STEP OF GRADING AND WITHIN SEVEN (7)
DAYS FROM THE START OF GRUBBING AND SHALL CONTINUE TO FUNCTION
UNTIL UPSLOPE AREAS DRAINING TO THEM ARE PERMANENTLY
STABILIZED.
11. STREETS DIRECTLY ADJACENT TO CONSTRUCTION ENTRANCES AND
RECEIVING TRAFFIC FROM THE DEVELOPMENT AREA, SHALL BE CLEANED
DAILY TO REMOVE SEDIMENT TRACKED OFF-SITE. IF APPLICABLE, THE
CATCH BASINS ON THESE STREETS NEAREST TO THE CONSTRUCTION
ENTRANCES SHALL ALSO BE CLEANED WEEKLY.
12. ALL EROSION AND SEDIMENT CONTROL PRACTICES SPECIFIED ON THIS
PLAN SHALL CONFORM WITH DETAILS AND SPECIFICATIONS OUTLINED IN
THE CURRENT VERSION OF THE NORTH CAROLINA EROSION & SEDIMENT
CONTROL PLANNING & DESIGN MANUAL OR OTHER STANDARDS
ACCEPTABLE TO NORTH CAROLINA DEQ.
13. EROSION AND SEDIMENT CONTROL PRACTICES NOT ALREADY SPECIFIED
ON THIS PLAN MAY BE NECESSARY DUE TO UNFORESEEN ENVIRONMENTAL
CONDITIONS AND/OR CHANGES IN DRAINAGE PATTERNS CAUSED BY
EARTH-MOVING ACTIVITY.
14. SOIL STOCKPILES, TOPSOIL OR OTHERWISE, SHALL BE SITUATED AWAY
FROM STREETS, SWALES, OR OTHER WATERWAYS AND SHALL BE SEEDED
AND/OR MULCHED IN ACCORDANCE WITH THE NORTH CAROLINA DEQ
TIMEFRAME FOR STABILIZATION.
15. ON-SITE PERSONNEL SHALL TAKE ALL NECESSARY MEASURES TO COMPLY
WITH APPLICABLE REGULATIONS REGARDING FUGITIVE DUST EMISSIONS.
16. CONCRETE WASH WATER SHALL NOT BE ALLOWED TO FLOW TO STREAMS,
DITCHES, STORM DRAINS, OR ANY OTHER WATER CONVEYANCE. A SUMP
OR PIT WITH NO POTENTIAL FOR DISCHARGE SHALL BE CONSTRUCTED IF
NEEDED TO CONTAIN CONCRETE WASH WATER. FIELD TILE OR OTHER
SUBSURFACE DRAINAGE STRUCTURES WITHIN 10 FT. OF THE SUMP SHALL
BE CUT AND PLUGGED. FOR SMALL PROJECTS, TRUCK CHUTES MAY BE
RINSED AWAY FROM ANY WATER CONVEYANCES.
EROSION AND SEDIMENT
CONTROL GENERAL NOTES
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
FY
P -1
0B
B
IR
C H
S
TR
E E
T R
O A
D
IM
P R
O V
E M
E N
TS
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
PORTDAVEN
HOME OFFICE
WINSTON-SALEM, NC 27101
336.744.1636 www.davenportworld.com
NCBELS FIRM LICENSE NO. C-2522
119 BROOKSTOWN AVE. SUITE PH1
CC500
CWA
A1
NOT TO SCALE
CONSTRUCTION ENTRANCE
NOT TO SCALE
A3
NOT TO SCALE NOT TO SCALE
NOT TO SCALE
CONCRETE
WASHOUT
B B
NOTES:
CONCRETE WASHOUT SIGN OR EQUIVALENTSTAPLE DETAIL
SECTION B-B
2'-0"
10'-0"
1. ACTUAL LAYOUT DETERMINED IN FIELD.
2. PREFABRICATED WASHOUT STATIONS MAY BE USED AT CONTRACTOR'S DISCRETION.
3. THE CONCRETE WASHOUT SIGN SHALL BE INSTALLED WITHIN 30 FT. OF THE TEMPORARY CONCRETE WASHOUT
FACILITY.
MIN
PLYWOOD
48" X 24"
PAINTED WHITE
BLACK LETTERS
6" HEIGHT
0.5" LAG SCREWS
WOOD POST
3" X 3" X 8'
STAKE
(TYP)
ABOVE GRADE
STRAW BALE
(TYP)
10 MIL
PLASTIC LINING
WOOD OR METAL
STAKES
(2 PER BALE)
STRAW BALE
BINDING WIRE
10 MIL
PLASTIC LINING
NATIVE
MATERIAL
(OPTIONAL)
STAPLES
(2 PER BALE)
1/8" DIA.
STEEL WIRE
CONCRETE WASHOUT AREA
CE
TABLE 1 - DEMOLITION SUMMARY
MATERIAL UNIT QUANTITY
PAVEMENT SAW CUT LINEAR FEET
19,701
UTILITY REMOVAL LINEAR FEET
1,651
CURB & GUTTER REMOVAL LINEAR FEET
7,152
DRAINAGE STRUCTURE REMOVAL EACH 25
TREE REMOVAL EACH 36
CLEAR AND GRUB SQUARE YARD
8,914
ASPHALT REMOVAL SQUARE YARD
30,227
CONCRETE REMOVAL SQUARE YARD 695
ASPHALT MILL/OVERLAY SQUARE YARD
16,133
TABLE 2 - EROSION & SEDIMENT CONTROL SUMMARY - 36.67 AC OF DISTURBANCE
MATERIAL UNIT QUANTITY
SILT FENCE LINEAR FEET
29,100
CONSTRUCTION ENTRANCE SQUARE YARD 567
INLET PROTECTION EACH 164
OUTLET PROTECTION EACH 31
CULVERT PROTECTION EACH 25
CHECK DAM EACH 20
PERMANENT SODDING SQUARE YARD
54,458
SOIL STABILIZATION BLANKET SQUARE YARD
15,230
RIP-RAP ARMORED SLOPE SQUARE YARD 750
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
FY
P -1
0B
B
IR
C H
S
TR
E E
T R
O A
D
IM
P R
O V
E M
E N
TS
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
PORTDAVEN
HOME OFFICE
WINSTON-SALEM, NC 27101
336.744.1636 www.davenportworld.com
NCBELS FIRM LICENSE NO. C-2522
CC501
IPINLET PROTECTION - BLOCK & GRAVEL
NOT TO SCALE
A2
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
FY
P -1
0B
B
IR
C H
S
TR
E E
T R
O A
D
IM
P R
O V
E M
E N
TS
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
PORTDAVEN
HOME OFFICE
WINSTON-SALEM, NC 27101
336.744.1636 www.davenportworld.com
NCBELS FIRM LICENSE NO. C-2522
CC502
CIPCULVERT INLET PROTECTION
NOT TO SCALE
A1
OPOUTLET PROTECTION
NOT TO SCALE
A4
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
FY
P -1
0B
B
IR
C H
S
TR
E E
T R
O A
D
IM
P R
O V
E M
E N
TS
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
PORTDAVEN
HOME OFFICE
WINSTON-SALEM, NC 27101
336.744.1636 www.davenportworld.com
NCBELS FIRM LICENSE NO. C-2522
119 BROOKSTOWN AVE. SUITE PH1
RIP RAP DESIGN CALCULATION TABLE
Upstream
Structure
Downstream
Structure
Pipe Diameter
(ft)
Max Q (ft3/s) TW (ft) Gravity (ft/s2) D50 Calc (in) D50 (in) Apron Length (ft) Apron Depth (in) Width at Start of Apron (ft) Width at End of Apron (1:3 Angle) (ft)
112 110 1.25 2.56 0.5 32.2 1.23 5 5.0 17.5 3.75 7.08 116 114 1.25 3.56 0.5 32.2 1.91 5 5.0 17.5 3.75 7.08 200 200A 3 29.35 1.2 32.2 4.13 5 12.0 17.5 9.00 17.00 302 300 1.5 5.56 0.6 32.2 2.27 5 6.0 17.5 4.50 8.50 406 404 1.25 2.28 0.5 32.2 1.06 5 5.0 17.5 3.75 7.08
410A 410B 1.5 9.7 0.6 32.2 4.76 5 6.0 17.5 4.50 8.50 808 800 1.25 1.97 0.5 32.2 0.87 5 5.0 17.5 3.75 7.08 816 814 1 1.29 0.4 32.2 0.83 5 4.0 17.5 3.00 5.67 510 514 1.25 5.87 1 32.2 1.86 5 5.0 17.5 3.75 7.08 522 900 6 211.83 2.4 32.2 11.44 14 36.0 30.8 18.00 42.00 712 713 1.25 2.86 0.5 32.2 1.43 5 5.0 17.5 3.75 7.08
713A 713B 1.25 0.19 0.5 32.2 0.04 5 5.0 17.5 3.75 7.08 800H 800I 4 65.31 1.6 32.2 6.14 10 20.0 24.0 12.00 25.33 906 904 5.5 206.94 2.2 32.2 13.59 14 33.0 30.8 16.50 38.50 916 914 2 9.98 0.8 32.2 2.53 5 8.0 17.5 6.00 11.33
918 1.5 5.94 0.6 32.2 2.48 5 6.0 17.5 4.50 8.50 2B 2 5 138 2 32.2 9.89 10 25.0 24.0 15.00 31.67
*1112 *1110 1.25 0.44 0.5 32.2 0.12 5 5.0 17.5 3.75 7.08 *Pipe is assumed to be flowing full -
CC503
CD
ROCK CHECK DAM
NOT TO SCALE
A4
B/M
SOIL STABILIZATION BLANKET
NOT TO SCALE
B2
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
FY
P -1
0B
B
IR
C H
S
TR
E E
T R
O A
D
IM
P R
O V
E M
E N
TS
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
PORTDAVEN
HOME OFFICE
WINSTON-SALEM, NC 27101
336.744.1636 www.davenportworld.com
NCBELS FIRM LICENSE NO. C-2522
CC504
| CC115 - EROSION AND SEDIMENT CONTROL PLAN - STA 600+90 TO 609+00 |
| CC116 - EROSION AND SEDIMENT CONTROL PLAN - STA 609+00 TO 617+35 |
| CC117 - EROSION AND SEDIMENT CONTROL PLAN - STA 701+50 TO 711+02.30 |
| CC118 - EROSION AND SEDIMENT CONTROL PLAN - STA 800+50 TO 808+50 |
| CC119 - EROSION AND SEDIMENT CONTROL PLAN - STA 808+50 TO 818+00 |
| CC120 - EROSION AND SEDIMENT CONTROL PLAN - STA 818+00 TO 820+97.81 |
| CC500 - EROSION AND SEDIMENT CONTROL DETAILS |
| CC501 - EROSION AND SEDIMENT CONTROL DETAILS |
| CC502 - EROSION AND SEDIMENT CONTROL DETAILS |
| CC503 - EROSION AND SEDIMENT CONTROL DETAILS |
| CC504 - EROSION AND SEDIMENT CONTROL DETAILS |
2020-06-12T09:18:50-0400
2020-06-12T09:19:01-0400
2020-06-12T09:19:02-0400
2020-06-12T09:19:03-0400
2020-06-12T09:19:07-0400
2020-06-12T09:19:08-0400
2020-06-12T09:19:09-0400
2020-06-12T09:19:10-0400
2020-06-12T09:19:11-0400
2020-06-12T09:19:12-0400
2020-06-12T09:19:13-0400
| 2020-06-19T11:54:59-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-06-19T11:55:14-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-06-19T11:55:15-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-06-19T11:55:16-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-06-19T11:55:17-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-06-19T11:55:50-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-06-19T11:56:27-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-06-19T11:56:56-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-06-19T11:57:35-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-06-19T11:58:02-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-06-19T11:58:03-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-06-19T12:09:13-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-06-19T12:09:30-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-06-19T12:09:31-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-06-19T12:09:33-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-06-19T12:09:34-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-06-19T12:09:35-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-06-19T12:09:36-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-06-19T12:09:37-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-06-19T12:09:39-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-06-19T12:09:40-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-06-19T12:09:41-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
File details come from the government source that posted it. Updated .