About this file

Amendment_0005.pdf

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SOLICITATION NO. N40085-19-R-9057 DESIGN-BID-BUILD (DBB) P-106 SUBMARINE PROPULSOR MANUFACTURING SUPPORT FACILITY, PHILADELPHIA NAVY YARD, PHILADELPHIA, PA

The purpose of this amendment is provide additional answ ers to Pre-Proposal Inquiries (PPI's). The proposal due date of Tuesday, 07 May 2019 NLT 2:00 PM EDT remains unchanged.

See Continuation Page(s).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 03-May-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008519R9057

X 9B. DATED (SEE ITEM 11)

21-Mar-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

03-May-2019

CODE

NAVFAC MID ATLANTIC

ACQUISITION CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008519R9057

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0005

Contractor

PPI#

Section of RFP or Page Number

Paragraph Reference

Drawing Number

Question RESPONSE

53 Volume 3 – Bldg.

3CD730 –

3CD741

Building 49. Provided photos show several pieces of office type furniture, equipment, materials. What is the Governments intent with these items? Are they to be moved and stored by the Contractor and discarded or protected? Or will these items be moved by the Government prior to construction?

Demolish with the building

54 Site Visit – General Bldg.

At the NAVFAC Site Walk held on April 12, 2019, attendees entered the southern gate to view the west elevation of Bldg.

#121, there appeared to be a considerable amount of material, debris and several trailers adjacent to the building.

Who will be responsible for removal / relocating the referenced items? If the awarded contractor is responsible, can a list of items be provided, designating which items are to be relocated and which items will need to be removed from the site? If the Government is responsible for removal of these items please confirm these items will be removed prior to construction.

The Government will be responsible for removal of the items. As noted on the site demolition drawings, all NFPC items within designated P‐106 work zones that are not to be disposed of by the Contractor and need to be removed from the site must be coordinated with the Contracting Officer a minimum of ten (10) working days in advance.

55 Volume 3 3C102 There is an existing guard shack located at gate 1. What is the extent of work at this location to accommodate new barriers?

Extent of work at existing guard house is as indicated on the Contract Documents.

56 Volume 1 1CD101 Note 9 states to remove railroad tracks, ties, and stone ballast. Is the Governments intent to only remove these items within the greyed area shown? Example, this would leave a 6’ piece of track at building 592.

Assuming removal of the remaining tracks will not affect existing conditions at 592, and if it is cost advantageous to the Navy to remove the remaining section of Track, ties and ballast vs.

cutting the rails, then remove the remaining portion of track.

57 Price proposal form/ Volume 1

CLIN 0001AF This item asks to price 28,720 LF of piles. Note 7 under foundations states to estimate pile length at 80’. Based on the given length of 28,720 LF on the price proposal form, this would equal 359 piles at 80’. Can you verify that count is correct compared to piles shown on 2S101?

361 piles are depicted on the drawings. Change quantity on Price Proposal Form to 28,880

LF.

2S001

2S101

58 Volume 1 Structural Drawings

The Structural Drawings indicate a compliance with UFC 4‐010‐01, date 9 February 2012, with change 1 dated 1 October 2013. The new UFC 4‐010‐01, dated 12 December 2018, supersedes UFC 4‐010‐01 Change 1, dated October 2013.

Is the contractor allowed, or is it even required to follow the new 12 December 2018 UFC code?

This would eliminate the need for reinforced building exterior walls and blast windows.

Contractor is required to follow and comply with the ATFP requirements included in the Contract Documents and in Appendix B of UFC 4‐ 010‐01 Change 1, dated October 2013. Minimum requirements, as described by the revised UFC (2018), are NOT applicable to this project or site.

59 Volume 2 Cybersecurity

Per this section, UFGS 25 50

00.00 20 is to be used for cybersecurity. This UFGS has been superseded by UFGS 25 05

11. Please confirm the cybersecurity UFGS in use for this contract.

Comply with the specification included in the solicitation.

60 Volume 1 Drawings

1CD101 Has the ballast under the RR tracks and the subgrade been tested for existing contaminants? Is this soil free of any environmental contaminants?

Refer to the Environmental Chemical Analysis provided in Specification Section 31 23 00.00 20a ‐ Soil Information for locations of where environmental borings were taken and summary of test results

61 Attachment H Price Proposal

CLIN 0001AR‐

DTE

Please provide the name and contact information for the DTE individual handling the work associated with bid item CLIN 0001AR‐DTE Work

[Rudy Terry, PIDC, 215.218.2846, rterry@PIDCphila.com, NAVFAC to confirm that this is the appropriate contact.]

62 Attachment H Price Proposal

CLIN 009 and

CLIN 0010

Amendment 2 – Attachment H does not provide for Option Item No. 7‐ Additional Stormwater Management Structure MP‐1.

Option Item No. 7 on the original Attachment H was removed in its entirety. Therefore the new Option Item No. 7 is "Alternate telecom entry into existing Building 4".

Total of 12 CLINS.

Should CLIN 009 correspond with Option Item No. 8 and CLIN 10 correspond with Option Item No. 10? If so, please reissue Attachment H.

63 Bonding co having issues with high Liquidated Damages cited.

Will Govt. consider more traditional LD’s ?

Liquidated Damages will remain unchanged.

64 1M601, 2M601

Please confirm the new building automation system for P‐106 shall be a seamless extension of the existing Automated Logic BACnet WebCTRL system

The DDC system must be capable of fully integrating with the existing DDC system, and should interface with that system to provide all control and monitoring.

The system is not sole‐ sourced.

65 1M604 Please confirm the HVAC shutdown switch is a binary input and HVAC shutdowns are performed via software programming

The switch referred to in control sequences as "Emergency HVAC Shutoff Switch" is a digital input to the DDC system which shuts down the terminal equipment and restores it to normal operation through logic.

66 23 09 13 Page 7 2.4.7 Regarding Pressure Independent Control Valves (PICV), in which system applications are PICV valves to be included in the scope?

Consider using PICVs for the following (ref Control Valve Schedule):

VOL 1 ‐ none

VOL 2 ‐ V‐5, V‐6, V‐7

67 23 09 13 Page

2.6.6 Are combination

temperature/CO2 sensor, acceptable for locations requiring CO2 monitoring?

No. Provide separate devices as specified.

68 1M606, 2M602

Detail B1 – are cabinet unit heaters to be controlled through local thermostat or BACnet DDC Controller visible on the BAS user interface?

Cabinet Unit Heaters are controlled by local thermostat. They do not need to be visible on the DDC system.

69 26 20 00 Page

3.1.4.1 Is it acceptable to install low

voltage control and network cable for the building automation system in EMT conduit within the Maintenance Building following locations:

Maintenance Parts 118, Receiving 116, Inventory 119, Flatbed Area 117?

EMT is permitted to be installed in the areas indicated at heights higher than 10'‐0" AFF in order to avoid physical damage.

70 Attachment H CLIN 0001AQ In review of the specifications and TA drawings the A/V package appears to be fully designed. Please clarify what costs should be included in CLIN 0001AQ A/V Design? All tasks described in that CLIN appear to have been completed.

The design that is shown is the basis of design.

Contractor is to provide a design based on their A/V system.

(End of Summary of Changes)