Amendment_0004_01_33_00a_Submittal_Register.pdf

PDF 600 KB Posted

Attached to
Design-Bid-Build, P-106, Submarine Propulsor Manufacturing Support Facility Philadelphia Navy Yard, Philadelphia, PA
Solicitation number
N4008519R9057
Issued by

About this file

Amendment_0004_01_33_00a_Submittal_Register.pdf

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 111 PAGES

P-106 Manufacturing Support Facility

01 14 00 SD-01 Preconstruction Submittals

1.3.4 GPersonnel List

1.3.4 GVehicle List

1.3.9Accident Report Plan

01 20 00.00 20 SD-01 Preconstruction Submittals

1.3 GEarned Value Report

01 30 01.00 22 SD-02 Shop Drawings

1.5.3 G IDPreliminary (Pre-Final) FF&E

Package

1.5.9 G IDFinal FF&E Package

1.4.3 G IDBest Value Determinations

1.4.3 G IDAudio Visual Package

SD-07 Certificates

1.4.1 G IDContractor's Interior Designer's

Qualifications 01 31 23.13 20 SD-01 Preconstruction Submittals

1.4.2 GList of Contractor's Personnel

01 32 17.00 20 SD-01 Preconstruction Submittals

1.5 GQualifications

1.3 GBaseline Network Analysis

Schedule SD-07 Certificates

1.7.1 GMonthly Network Analysis

SD-11 Closeout Submittals

1.7.2 GAs-Built Schedule

01 33 00 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 111 PAGES

01 33 00 1.9 GSubmittal Register 01 33 29 SD-01 Preconstruction Submittals

1.5.3.1 GPreliminary High Performance

and Sustainable Building Checklist

1.4.1 GSustainability Action Plan

1.5.3.1 GPreliminary Sustainability

eNotebook SD-11 Closeout Submittals

1.5.3.1 G SFinal High Performance and

Sustainable Building Checklist

1.5.3.1 G SFinal Sustainability eNotebook

1.5.3.1 G SAmended Final Sustainability

eNotebook

1.5.3.1 G SAmended Final High

Performance and Sustainable Building Checklist

3.2 G SThird Party Certification

Certificates or Validation

01 35 26 SD-01 Preconstruction Submittals

1.7 GAccident Prevention Plan (APP)

SD-06 Test Reports 1.12Notifications and Reports

1.12.2 GAccident Reports

1.12.3LHE Inspection Reports

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 111 PAGES

01 35 26 1.4Contractor Safety Self-Evaluation Checklist

1.6.1.5Crane Operators/Riggers

1.7.2.2 GStandard Lift Plan

1.7.2.3 GCritical Lift Plan

1.7.2.3 GNaval Architecture Analysis

1.8Activity Hazard Analysis (AHA) 1.9.1Confined Space Entry Permit 1.9.1Hot Work Permit 1.12.4Certificate of Compliance 1.12.5Third Party Certification of

Barge-Mounted Mobile Cranes 3.8.2License Certificates

01 45 00.00 20 SD-01 Preconstruction Submittals

1.6.1 GConstruction Quality Control (QC)

Plan

1.16 GIndoor Air Quality (IAQ)

Management Plan 01 45 35 SD-01 Preconstruction Submittals

3.1.2Written Practices 3.1.2NDT Procedures and Equipment

Calibration Records SD-06 Test Reports

3.1.2Daily Reports 3.1.1Biweekly Reports

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 111 PAGES

01 45 35 2.1Fabrication Plant 2.1Certified Plant 2.1Certificate of Compliance

1.5 GSpecial Inspector

3.1.2Qualification Records

SD-11 Closeout Submittals 3.1.2Interim Final Report

3.1.2 GComprehensive Final Report

01 50 00 SD-01 Preconstruction Submittals

1.3 GConstruction Site Plan

3.4.1 GTraffic Control Plan

2.2.1 GHaul Road Plan

2.4 GTemporary Fencing Panel for

NFPC Fenced Perimeter

2.4 GTemporary Fence Plan

SD-03 Product Data

1.4 GBackflow Preventers

SD-06 Test Reports 2.6Backflow Preventer Tests

SD-07 Certificates 1.4.1Backflow Tester 1.4Backflow Preventers

01 57 19 SD-01 Preconstruction Submittals 1.6.1Preconstruction Survey

1.10 GSolid Waste Management Permit

1.6.2 GRegulatory Notifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 111 PAGES

01 57 19 1.7 GEnvironmental Protection Plan

3.1.1.2 GStormwater Notice of Intent

1.7.6.1 GDirt and Dust Control Plan

1.6.5 GEmployee Training Records

1.6.4 GEnvironmental Manager

Qualifications SD-06 Test Reports

3.5.1.1.2Laboratory Analysis 3.1.1.3Inspection Reports

3.5.2.1 GSolid Waste Management Report

SD-07 Certificates

1.6.5 GEmployee Training Records

1.4.1.2 GECATTS Certificate Of

Completion 1.6.5Erosion and Sediment Control

Inspector SD-11 Closeout Submittals

3.1.1.4 GStormwater Pollution Prevention

Plan Compliance Notebook

3.1.1.5 GStormwater Notice of Termination

3.5.1 GWaste Determination

Documentation

3.5.3.6 GDisposal Documentation for

Hazardous and Regulated Waste

1.6.5 GAssembled Employee Training

Records

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 111 PAGES

01 57 19 1.10 GSolid Waste Management Permit

3.5.2.1 GSolid Waste Management Report

3.6.1 GContractor Hazardous Material

Inventory Log

3.5.3.1 GHazardous Waste/Debris

Management

1.6.2 GRegulatory Notifications

3.5.2.1 GSales Documentation

3.5.2.1Contractor Certification

01 58 00 SD-02 Shop Drawings

1.3.1 GPreliminary Drawing Indicating

Layout And Text Content 01 74 19 SD-01 Preconstruction Submittals

1.5 GWaste Management Plan

SD-11 Closeout Submittals

1.6Records 01 78 00 SD-03 Product Data

1.3.2As-Built Record of Equipment and Materials

1.7.1Warranty Management Plan 1.7.5Warranty Tags 1.9Final Cleaning 1.4Spare Parts Data

SD-08 Manufacturer’s Instructions 1.5Preventative Maintenance

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 111 PAGES

01 78 00 1.5Condition Monitoring (Predictive Testing)

1.5Inspection 1.7.1Instructions

SD-10 Operation and Maintenance Data

1.8 GOperation and Maintenance

Manuals

SD-11 Closeout Submittals

1.3.1 GRecord Drawings

1.6 GCertification of EPA Designated

Items

1.10 GInterim Form DD1354

1.10 GChecklist for Form DD1354

1.11 GNAVFAC Sustainable & Energy

Data Record Card 01 78 23 SD-10 Operation and Maintenance

Data

3.1.1 GTraining Plan

3.1.3 GTraining Outline

3.1.2 GTraining Content

SD-11 Closeout Submittals

3.1.4 GTraining Video Recording

3.1.6 GValidation of Training Completion

01 78 24.00 20 SD-11 Closeout Submittals

1.4.1 GeOMSI, Progress Submittal

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 111 PAGES

01 78 24.00 20 1.4.2 GeOMSI, Prefinal Submittal

1.4.3 GeOMSI, Final Submittal

01 91 00.15 22 SD-06 Test Reports

3.1.4.2 GCompleted Building Envelope

Inspection Checklists

3.1.4.3 GCompleted Pre-Functional

Checklists SD-07 Certificates

1.9 GCertificate of Readiness

SD-10 Operation and Maintenance Data

3.1.5 GTraining Plan

3.1.5 GTraining Attendance Rosters

3.1.6 GSystems Manual

02 41 00 SD-01 Preconstruction Submittals

1.2.1 GDemolition Plan

1.8 GExisting Conditions

1.9.1 GPile Cap Survey

1.9.2 GPile Survey

SD-07 Certificates

1.6 GNotification

SD-11 Closeout Submittals 3.3.2Receipts

02 82 16.00 20 SD-03 Product Data 3.1.4Local Exhaust Equipment 3.1.5Vacuums

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 111 PAGES

02 82 16.00 20 3.1.1.1Respirators 3.1.4Pressure Differential Automatic

Recording Instrument 1.2.2Amended Water 3.1.7Glovebags

1.3.8 GSafety Data Sheets (SDS) For All

Materials

2.1 GEncapsulants

SD-06 Test Reports

1.5.5 GAir Sampling Results

1.5.6Pressure Differential Recordings

For Local Exhaust System

3.3.3.2 GAsbestos Disposal Quantity

Report

3.2.6.3 GClearance Sampling

SD-07 Certificates 1.3.9Asbestos Hazard Abatement

Plan 1.3.10Testing Laboratory 1.5.1Private Qualified Person

Documentation 1.5.4Contractor's License 1.5.2Competent Person 1.5.3Worker's License

1.3.11 GLandfill Approval

1.3.3Employee Training

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 111 PAGES

02 82 16.00 20 1.3.12Medical Certification

1.3.11 GWaste Shipment Records

1.3.6Respiratory Protection Program

1.3.11 GDelivery Tickets

3.1.5Vacuums 3.1.2.3Water Filtration Equipment 3.1.5Ventilation Systems 3.1Equipment Used To Contain

Airborne Asbestos Fibers 2.1Encapsulants 1.3.4Notifications

SD-11 Closeout Submittals

1.3.4 GNotifications

1.6.1Rental Equipment 1.3.6.1Respirator Program Records

1.3.4 GPermits and Licenses

02 83 13.00 20 SD-01 Preconstruction Submittals 1.5.1.1Competent Person 1.5.1.2Training Certification

1.5.2.2 GLead Compliance Plan

1.5.2.3 GOccupational And Environmental

Assessment Data Report 1.5.2.4Medical Examinations

1.5.2.8 GLead Waste Management Plan

3.5.2.1 GWritten Evidence

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 111 PAGES

02 83 13.00 20 1.5.2.3 GSampling Results

1.5.2.3 GOccupational and Environmental

Assessment Data Report SD-07 Certificates

1.5.1.3Testing Laboratory 1.5.1.4Third Party Consultant

Qualifications

3.5.1.1 GClearance Certification

SD-11 Closeout Submittals

3.5.2.1 GDisposal Documentation

02 84 16 SD-07 Certificates 1.8.1Qualifications of CIH 1.8.1Training Certification

1.8.2 GPCB and Lamp Removal Work

Plan

1.8.3 GPCB and Lamp Disposal Plan

SD-11 Closeout Submittals

3.5.2 GTransporter certification

3.2.4 GCertification of Decontamination

3.5.2.1 GCertificate of Disposal and/or

recycling

3.5.3 GDD Form 1348-1

03 30 00 SD-01 Preconstruction Submittals 1.6.3.1Concrete Curing Plan

1.6.5 GQuality Control Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 111 PAGES

03 30 00 1.6.6Quality Control Personnel Certifications

1.6.6Quality Control Organizational Chart

1.6.8Laboratory Accreditation 1.6.2.1Form Removal Schedule

SD-02 Shop Drawings 1.6.2.1Formwork

1.6.2.2 GReinforcing Steel

SD-03 Product Data 2.4.8Joint Sealants 2.4.7Joint Filler 2.1Materials for Forms 2.4.1Cementitious Materials 2.4.6Vapor Retarder 2.3.3Concrete Curing Materials 2.5Reinforcement 2.6.1Liquid Chemical Floor Hardener 2.4.5Admixtures 2.5.2Mechanical Reinforcing Bar

Connectors 2.2.1Waterstops 1.8.1Local/Regional Materials 1.6.3.2Pumping Concrete 1.6.3.3Finishing Plan

SD-05 Design Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 111 PAGES

03 30 00 2.3.1 GMix Design SD-06 Test Reports

1.6.1.1 GConcrete Mix Design

1.6.4.1Fly Ash 1.6.4.1Pozzolan 1.6.4.2Ground Granulated

Blast-Furnace Slag 2.4.3Aggregates 3.10.2.1Tolerance Report

3.14.2.3 GCompressive Strength Tests

3.14.2.5Unit Weight of Structural

Concrete 3.14.2.6Ion Concentration 3.14.2.4Air Content 3.14.2.1Slump Tests 2.4.2Water

SD-07 Certificates 2.5.1Reinforcing Bars 1.9Welder Qualifications 1.6.3.4VOC Content for Form Release

Agents, Curing Compounds, and Concrete Penetrating Sealers

1.6.3.5Safety Data Sheets 1.6.6.2Field Testing Technician and

Testing Agency SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 111 PAGES

03 30 00 2.6.1Liquid Chemical Floor Hardener 2.3.3Curing Compound

04 20 00 SD-02 Shop Drawings

2.8 GCast Stone Detail Drawings

3.4.1.1 GDetail Drawings

SD-03 Product Data

1.5.1 GHot Weather Procedures

1.5.2 GCold Weather Procedures

2.2.2 GClay or Shale Brick

3.8 GCast Stone

2.2.3.2.1 GCement

2.5.1.1 GCementitious Materials

2.9.8 G SInsulation

SD-04 Samples

1.3.1.1 GMock-Up Panel

2.2.2 GClay or Shale Brick

2.2.3.2 GConcrete Masonry Units (CMU)

3.8 GCast Stone

2.5.1.4 GAdmixtures for Masonry Mortar

2.9.2 GAnchors, Ties, and Bar

Positioners

2.9.3 GJoint Reinforcement

2.9.6 GClay Masonry Expansion-Joint

Materials

2.9.8 G SInsulation

SD-05 Design Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 111 PAGES

04 20 00 2.1.2 GMasonry Compressive Strength 2.2.3.3Fire-Rated Concrete Masonry

Units

3.2.5 GBracing Calculations

SD-06 Test Reports 2.2.2.1.3Efflorescence Test 2.2.3.3Fire-Rated Concrete Masonry

Units 3.6.1.1Field Testing of Mortar 3.6.1.2Field Testing of Grout 3.6.1.4Prism Tests

SD-07 Certificates 1.3.2Special Masonry Inspector

Qualifications 2.2.2Clay or Shale Brick 2.2.3.2Concrete Masonry Units (CMU) 2.5.1.1Cementitious Materials 2.5.1.4Admixtures for Masonry Mortar 2.5.2.2Admixtures for Grout 2.9.2Anchors, Ties, and Bar

Positioners 2.9.3Joint Reinforcement 2.9.8Insulation

SD-08 Manufacturer’s Instructions 2.5.1.4Admixtures for Masonry Mortar 2.5.2.2Admixtures for Grout

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 111 PAGES

04 20 00 SD-10 Operation and Maintenance Data

3.10Take-Back Program 05 12 00 SD-01 Preconstruction Submittals

1.4.1.1 GErection Drawings

SD-02 Shop Drawings

1.4.2 GFabrication Drawings

3.3Signed and Sealed Construction

Design Calculations

2.8 GCrane Rail

SD-03 Product Data 2.6.2Shop Primer 2.4.1Welding Electrodes and Rods

2.3.1.3 GDirect Tension Indicator Washers

2.4.2Non-Shrink Grout 2.3.2Tension Control Bolts

2.8 GCrane Rail

2.4.4Blind Bolts

SD-06 Test Reports 2.6.2Class B Coating 2.3Bolts, Nuts, and Washers 3.8.1.2Weld Inspection Reports 3.8.2.1Direct Tension Indicator Washer

Inspection Reports 3.2.2Direct Tension Indicator Washer

Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 111 PAGES

05 12 00 3.8.3.1Bolt Testing Reports 3.8.4Embrittlement Test Reports

SD-07 Certificates 2.2Steel 2.3Bolts, Nuts, and Washers 2.5Galvanizing 1.3AISC Fabrication Plant Quality

Certification 1.3AISC Erector Quality Certification 1.4.3.1Welding Procedures and

Qualifications 2.4.1Welding Electrodes and Rods

SD-11 Closeout Submittals

3.9 GCrane Rail Survey

05 30 00 SD-02 Shop Drawings

1.3.5 GFabrication Drawings

SD-03 Product Data 2.2Accessories 2.1Deck Units 2.1.5Galvanizing Repair Paint 2.2.16Mechanical Fasteners 2.1.5Touch-Up Paint 1.3.3Welding Equipment 1.3.3Welding Rods and Accessories

SD-04 Samples 2.1.1Metal Roof Deck Units

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 111 PAGES

05 30 00 2.2.4Flexible Closure Strips SD-05 Design Data

2.1 GDeck Units

SD-07 Certificates

1.3.2Powder-Actuated Tool Operator 1.3.3Welder Qualifications 1.3.3Welding Procedures 1.3.4.1Fire Safety 1.3.4.2Wind Storm Resistance 1.3.1Manufacturer's Certificate 2.2.11Stud Manufacture's Certification 2.2.11Stud Manufacture's Test Reports

SD-11 Closeout Submittals

2.1 SRecycled Content of Steel

Products 05 40 00 SD-02 Shop Drawings

1.5.1 GFraming Components

SD-03 Product Data

2.1Studs SD-05 Design Data

1.5.2 GMetal Framing Calculations

SD-07 Certificates

1.4Load-Bearing Cold-Formed Metal Framing

3.1.1Welds SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 111 PAGES

05 40 00 2.1 SRecycled Content of Steel Products

05 50 13 SD-02 Shop Drawings 2.6Structural Steel Door Frames

2.6 GOverhead Door Framing

2.4 GGuard Posts

2.5 GAngles and Plates

SD-03 Product Data

2.7 GSafety Nosings

2.6Structural Steel Door Frames

2.6 GOverhead Door Framing

2.8 GSecurity Bars

2.1 GCertificates of Compliance

2.2 GCertified Mill

2.1 SRecycled Content

05 51 00 SD-02 Shop Drawings

2.1 GSteel Shapes, Plates, Bars, and

Strips

2.2.2 GSteel Pan Stairs

2.1 GIron and Steel Hardware

2.3.1.1 GCalculations and Shop Drawings

signed and sealed by a Professional Engineer

SD-03 Product Data

2.4.1 GStructural-Steel Plates, Shapes, and Bars

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 111 PAGES

05 51 00 2.4.2 GStructural-Steel Tubing

2.2.3 GProtective Coating

2.2.2 GSteel Pan Stairs

SD-07 Certificates

1.3.1 GWelding Procedures

SD-08 Manufacturer’s Instructions

2.4.1 GStructural-Steel Plates, Shapes, and Bars

2.4.2 GStructural-Steel Tubing

2.2.3 GProtective Coating

05 51 33 SD-02 Shop Drawings 2.3Ladders 2.3.1Ship's Ladder

SD-03 Product Data 2.3Ladders 2.3.1Ship's Ladder

SD-07 Certificates 1.3Fabricator Certification for Ladder

Assembly 1.3Fabricator Certification for Ships

Ladder Assembly 05 52 00 SD-02 Shop Drawings

3.2 GIron and Steel Hardware

3.2 GSteel Shapes, Plates, Bars and

Strips

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 111 PAGES

05 52 00 2.2.9 GCalculations And Fabrication Drawings Signed And Sealed By A Professional Engineer

SD-03 Product Data

2.2.1 GStructural-Steel Plates, Shapes, and Bars

2.2.2 GStructural-Steel Tubing

2.2.4 GCold-Finished Steel Bars

2.2.3 GHot-Rolled Carbon Steel Bars

2.2.5 GCold-Drawn Steel Tubing

2.2.7 GMasonry Anchorage Devices

2.1.2 GProtective Coating

2.2.9 GSteel Railings and Handrails

SD-07 Certificates

1.3.1 GWelding Procedures

1.3.2 GWelder Qualification

SD-08 Manufacturer’s Instructions 3.2Installation Instructions

06 10 00 SD-02 Shop Drawings

2.3.1 G SNailing Strips

SD-03 Product Data 1.8Fire-retardant Treatment 2.4Structural-Use 2.4Oriented Strand Board 2.5.3Adhesives

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 111 PAGES

06 10 00 1.4.3Preservative-treated SD-07 Certificates

1.10.1Certificates of Grade

1.10.2 G SCertified Sustainably Harvested

Wood 1.7Preservative Treatment

1.10.3 SIndoor Air Quality

2.5.3 SIndoor Air Quality for Aerosol

Adhesives SD-11 Closeout Submittals

2.2.1 SCertified Sustainably Harvested

Virgin Lumber

2.3.1 SCertified Sustainably Harvested

Framing Lumber

2.4.1.2 SCertified Sustainably Harvested

Plywood for Structural-Use and OSB Panels

2.4.1.1 SCertified Sustainably Harvested

Plywood for Other Uses

06 20 00 SD-02 Shop Drawings

1.3 GDetail Drawings Indicating All

Wood Assemblies SD-03 Product Data

2.6 GHardware and Accessories

1.4 GWood Products

2.2 GWood Products

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 111 PAGES

06 20 00 2.6.1 GSteel Channel Support System

2.6.2 GTable Leg

SD-07 Certificates

1.6.1.2 GCertified Sustainably Harvested

Wood

1.6.1.3 GIndoor Air Quality

1.6.1.1 GCertificates of Grade

SD-11 Closeout Submittals

2.2.3 SCertified Sustainably Harvested

Wood for Trim and Frames

2.2.4 SCertified Sustainably Harvested

Softwood Plywood

2.2.5 SCertified Sustainably Harvested

Hardwood Plywood

1.6.1.2 SCertified Sustainably Harvested

Wood

2.2.4 SVOC Content for Softwood

Plywood

2.2.5 SVOC Content for Hardwood

Plywood

2.7.1.2 SIndoor Air Quality for Non-aerosol

Adhesives

2.7.1.2 SIndoor Air Quality for Aerosol

Adhesives 06 41 16.00 10 SD-02 Shop Drawings

2.11 GShop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 111 PAGES

06 41 16.00 10 3.1Installation SD-03 Product Data

2.1 SWood Materials

2.9 SWood Finishes

2.11.7.3Finish Schedule

SD-04 Samples

2.3 GPlastic Laminates

2.6 GCabinet Hardware

SD-07 Certificates 1.5Quality Assurance 2.9Laminate Clad Casework 3.1Laminate Clad Casework

06 61 16 SD-02 Shop Drawings

2.3.4 GWindow Stools

2.3.5 GCounter and Vanity Tops

2.3.5 GCounter and Vanity Tops

2.3.7 GAcrylic Shower System

SD-03 Product Data 2.1Solid Polymer Material

2.3.7 GAcrylic Shower System

1.5.1Qualifications 2.3Fabrications 1.5.2Certification 1.5.2VOC Content

SD-04 Samples

2.1 GMaterial

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 111 PAGES

06 61 16 SD-06 Test Reports 2.1Solid Polymer Material

SD-07 Certificates 2.3Fabrications 1.5.1Qualifications

SD-10 Operation and Maintenance Data

3.2Clean-up 07 05 23 SD-01 Preconstruction Submittals

1.4 GWork Plan

SD-03 Product Data

2.2 GThermal Imaging Camera

SD-05 Design Data

3.2 GEnvelope Surface Area

Calculations

SD-07 Certificates 1.6.2.1Pressure Test Agency 1.6.2.2Thermographer Qualifications 1.6.3Test Instruments 1.6.3Date Of Last Calibration

SD-06 Test Reports

3.5 GPressure Test Procedures

3.5.6 GAir Leakage Test Report

3.6.5 GDiagnostic Test Report

07 11 13 SD-07 Certificates 1.3Materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 111 PAGES

07 17 00 SD-03 Product Data

2.1 GBentonite Materials

2.1.3 GBentonite Panels

1.3 GAccessories

SD-08 Manufacturer’s Instructions 3.2Application 3.3Protection

3.5 GCorrections

07 21 13 SD-03 Product Data

1.3 GManufacturer's Standard Details

2.2 G SBlock or Board Insulation

2.3 G SVapor Retarder

2.4 GPressure Sensitive Tape

1.4 GProtection Board or Coatings

2.5 GAccessories

SD-07 Certificates

2.2 GBlock or Board Insulation

2.3 GVapor Retarder

3.4.3 GProtection Board or Coating

1.8 GSpecial Warranties

1.8 GSpecial Warranties

1.5 G SULE Greenguard

SD-08 Manufacturer’s Instructions 2.2Block or Board Insulation 2.5.1Adhesive

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 111 PAGES

07 21 13 1.5 SULE Greenguard

2.1.1 SVolatile Organic Compound

(VOC) Content

2.1.2 SRecycled Content

07 21 16 SD-03 Product Data

2.2 G SBlanket Insulation

2.4.2 GPressure Sensitive Tape

2.3.5 GInsulation Finishing System

2.4Accessories

SD-08 Manufacturer’s Instructions 3.3.1Insulation

SD-11 Closeout Submittals

2.1.1 SRecycled Content for Insulation

Materials

2.1.2 SReduce Volatile Organic

Compounds (VOC) 07 22 00 SD-02 Shop Drawings

1.3 GInsulation Board Layout

1.3Verification of Existing Conditions

SD-03 Product Data

2.2 G SInsulation

1.4 G SCover Board

2.5 GFasteners

2.4.1 GVapor Retarder

SD-06 Test Reports

1.8.1 GFlame Spread Rating

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 111 PAGES

07 22 00 SD-07 Certificates

1.9 GVolatile Organic Compounds

(VOC) Content

1.6 GInstaller Qualifications

SD-08 Manufacturer’s Instructions

2.5 GFasteners

2.2 GInsulation

07 27 10.00 10 SD-04 Samples

3.1.2 GMock-Up

SD-06 Test Reports

1.8 G DODesign Review Report

3.1.3 G ROTesting and Inspection

SD-07 Certificates

1.7 G ROAir Barrier Inspector

07 27 26 SD-01 Preconstruction Submittals

1.9.1 GQualifications of Manufacturer

1.9.2 GQualifications of Installer

SD-02 Shop Drawings

1.4 G SFluid-Applied Membrane Air

Barrier SD-03 Product Data

1.4 G SFluid-Applied Membrane Air

Barrier

2.4 G STransition Membrane

2.3 GPrimers, Adhesives, and Mastics

2.7 GReinforcement

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 111 PAGES

07 27 26 1.4.2Safety Data Sheets SD-04 Samples

1.4.3 GMockup

SD-06 Test Reports

1.6 GCapillary Moisture Test

1.4.4 GField Peel Adhesion Test

1.4.4 GFlame Propagation of Wall

Assemblies

1.4.4 GFlame Spread and Smoke

Developed Index Ratings

3.4.1 GSite Inspections

SD-07 Certificates

1.4 GFluid-Applied Membrane Air

Barrier

2.4 GTransition Membrane

1.9.1 GQualifications of Manufacturer

1.9.2 GQualifications of Installer

SD-08 Manufacturer’s Instructions

1.4 GFluid-Applied Membrane Air

Barrier

2.4 GTransition Membrane

2.3 GPrimers, Adhesives, and Mastics

SD-11 Closeout Submittals

2.1 SVolatile Organic Compound

(VOC) Content 07 42 13 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 111 PAGES

07 42 13 1.5.3 GQualification of Manufacturer

1.5.4 GQualification of Installation

Contractor

1.8 GWarranty

SD-02 Shop Drawings

1.5.1.1 GInstallation Drawings

1.5.1.1 GInstallation Drawings

1.5.1.1 GInstallation Drawings

1.5.1.1 GInstallation Drawings

SD-03 Product Data

2.1 G SRecycled Content

2.2.1 GWall Panels

2.4 GWall Panels

2.2.2Factory Color Finish 2.5Factory Color Finish 1.5.5Closure Materials 2.7.4.3Pressure Sensitive Tape 2.7.4.1Sealants and Caulking 1.5.3.1Galvanizing Repair Paint 1.5.3.1Enamel Repair Paint 1.5.5Accessories 2.7Accessories

SD-04 Samples

2.2.1 GWall Panels

2.4 GWall Panels

1.5.3.1 GFasteners

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 111 PAGES

07 42 13 2.7.3 GMetal Closure Strips

2.2.2 GColor chart

SD-05 Design Data

1.5.1.2 GWind load design analysis

SD-06 Test Reports

3.7.2 GLeakage Tests

1.3.2 GWind Load Tests

2.2.2.4 GCoating

2.5.4 GCoating

2.2.2.4 GChalking

2.5.4 GChalking

1.3.2 GSeismic Tests

SD-07 Certificates

1.5.3.1 GCoil Stock

1.5.3.1 GFasteners

1.5.3.1 GGalvanizing Repair Paint

1.5.3.1 GEnamel Repair Paint

SD-08 Manufacturer’s Instructions

3.3 GInstallation

SD-09 Manufacturer’s Field Reports

3.8.1 GManufacturer's Field Reports

SD-11 Closeout Submittals

1.8 GWarranty

1.5.6 GMaintenance Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 111 PAGES

07 42 13 1.8.120 year 'No Dollar Limit' warranty for labor and material

07 42 16 SD-01 Preconstruction Submittals

1.4.10 GBuy American Act Certification

1.6.3 GInstaller Qualifications

SD-02 Shop Drawings

2.1 GInsulated Metal Wall Panels

2.3 GInsulated Metal Wall Panels

SD-03 Product Data

2.1 GInsulated Metal Wall Panels

2.3 GInsulated Metal Wall Panels

1.3.1 G SCradle to Cradle Certification

SD-04 Samples

2.1 GInsulated Metal Wall Panels

2.3 GInsulated Metal Wall Panels

SD-06 Test Reports

2.1 GInsulated Metal Wall Panels

2.3 GInsulated Metal Wall Panels

SD-11 Closeout Submittals

1.9.1 GManufacturer's Warranty

3.4.2 GManufacturer Field Service

07 53 23 SD-02 Shop Drawings 1.3.1Roof Plan Drawing 1.3.1Wind Load Calculations 1.3.1Boundaries of Enhanced

Perimeter

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 111 PAGES

07 53 23 1.3.1 GCorner Attachments of Roof System Components

1.3.1Spacing of Perimeter, Corner, and Infield Fasteners

1.3.1Slopes and Drain Locations SD-03 Product Data

2.2Cement

2.1.1 G SEPDM Sheet

2.1.2Seam Tape 2.1.4Bonding Adhesive 2.1.3Lap Splice Adhesive 2.1.6Water Cutoff Mastic/Water Block 2.1.5Lap Cleaner, Lap Sealant, and

Edge Treatment 3.3Flashings 2.1.7Flashing Accessories 2.1.7.1Flashing Tape 2.1.8Fasteners and Plates 2.1.10Rubber Walkboards 2.1.9Pre-Manufactured Accessories

1.8 Gwarranty

SD-05 Design Data

1.4.4 GWind Uplift Calculations

SD-07 Certificates 1.4.1Qualification of Manufacturer 1.4.2Qualification of Applicator

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 111 PAGES

07 53 23 1.4.4 GWind Uplift Resistance

1.4.3 GFire Resistance

SD-08 Manufacturer’s Instructions

3.2 GApplication

3.2.3 GApplication Method

3.3.2 GMembrane Flashing

2.1.2Seam Tape 3.2.5Perimeter Attachment 3.2.4Primer 3.2.6Fasteners 2.1.10Rubber Walkboards 2.1.9Pre-Manufactured Accessories

1.6 GCold Weather

SD-11 Closeout Submittals 1.8Warranty 3.10Information Card 3.9Instructions To Government

Personnel 07 60 00 SD-02 Shop Drawings

2.2.1 GExposed Sheet Metal

3.1.15 GGutters

3.1.16 GDownspouts

3.1.20 GExpansion Joints

2.2.1 GGravel Stops and Fasciae

3.1.19 GSplash Pans

3.1.10 GBase Flashing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 111 PAGES

07 60 00 3.1.11 GCounterflashing

2.2.8 GReglets

3.1.17 GScuppers

3.1.21 GCopings

3.1.14 GDrip Edges

3.1.18 GConductor Heads

SD-04 Samples

1.4.2 GFinish Samples

SD-07 Certificates

2.1 GCertificates of Compliance

SD-08 Manufacturer’s Instructions

1.4.3 GInstructions for Installation

3.5 GQuality Control Plan

SD-10 Operation and Maintenance Data

1.4.3 GCleaning and Maintenance

SD-11 Closeout Submittals

2.1 SRecycled Content

07 81 00 SD-03 Product Data

3.3 GFireproofing Material

SD-04 Samples

2.1 GSpray-Applied Fireproofing

SD-06 Test Reports

1.2.2 GFire Resistance Rating

3.6 GField Tests

1.2.3 GEvaluation Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 111 PAGES

07 81 00 SD-07 Certificates

1.4.1 GInstaller Qualifications

3.1 GSurface Preparation Report

3.5.2 GManufacturer's Inspection Report

07 84 00 SD-02 Shop Drawings

2.1 GFirestopping System

SD-03 Product Data

2.2 GFirestopping Materials

SD-06 Test Reports

3.3 GInspection

SD-07 Certificates 1.5.2Inspector Qualifications 2.2Firestopping Materials

1.5.1 GInstaller Qualifications

07 92 00 SD-03 Product Data

2.2 GSealants

2.3 GPrimers

2.4 GBond Breakers

2.5 GBackstops

2.7 GExpansion Joint Cover

3.1 GField Adhesion

SD-07 Certificates

1.4.1 GIndoor Air Quality

2.2.1 GIndoor Air Quality for Interior

Sealants SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 111 PAGES

07 92 00 2.2.1 SIndoor Air Quality For Interior Sealants

2.2.3 SIndoor Air Quality For Interior

Floor Joint Sealants

2.2.4 SIndoor Air Quality For Interior

Acoustical Sealants

08 11 13 SD-02 Shop Drawings

2.1 GDoors

2.1 GDoors

2.5 GFrames

2.5 GFrames

2.3Accessories 2.7Weatherstripping

SD-03 Product Data

2.1 GDoors

2.5 GFrames

2.3Accessories

08 14 00 SD-02 Shop Drawings

2.2 GDoors

SD-03 Product Data

2.2 G SDoors

2.3Accessories 2.4.7Water-resistant Sealer 1.5Warranty

2.2.2 GFire Resistance Rating

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 111 PAGES

08 14 00 2.2Doors

2.4.6.3 GDoor Finish Colors

SD-06 Test Reports 2.5Cycle-Slam 2.5Hinge Loading Resistance

SD-07 Certificates 1.3.1Certificates of Grade

1.3.2 G SCertified Sustainably Harvested

Wood

1.3.3 G SIndoor Air Quality

SD-11 Closeout Submittals

1.3.2 SCertified Sustainably Harvested

Wood

2.2.1.1 SRecycled Content for Door Cores

2.2.1.1 SIndoor Air Quality for

Particleboard and Agrifiber Door Cores

1.5Warranty 08 31 00 SD-02 Shop Drawings

1.3 GAccess Doors And Panels

SD-03 Product Data

1.3 GAccess Doors And Panels

1.3.2 GHardware

2.2.7 GAccessories

SD-04 Samples

2.5 GFinishes

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 111 PAGES

08 31 00 SD-06 Test Reports

1.3.1 GFire-rating(s) of Assemblies

SD-11 Closeout Submittals

2.1 SRecycled Content

08 33 23 SD-02 Shop Drawings

2.2.1 GOverhead Coiling Doors

2.2.3 GCounterbalancing Mechanism

2.2.5.1 GEmergency Manual Operation

2.2.4 GElectric Door Operators

2.2.1.3 GBottom Bars

2.1.1.1 GGuides

2.2.3.1 GMounting Brackets

2.2.1.8 GOverhead Drum

3.3.2 GHood

2.1.1.1 GInstallation Drawings

SD-03 Product Data

2.2.1 GOverhead Coiling Doors

2.2.2 GHardware

2.2.3 GCounterbalancing Mechanism

2.2.5.1 GEmergency Manual Operation

2.2.4 GElectric Door Operators

SD-05 Design Data

2.2.1 GOverhead Coiling Doors

2.2.2 GHardware

2.2.3 GCounterbalancing Mechanism

2.2.5.1 GEmergency Manual Operation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 111 PAGES

08 33 23 2.2.4 GElectric Door Operators SD-10 Operation and Maintenance Data

3.3.2 GOperation and Maintenance

Manuals

3.3.2 GMaterials

3.3.2 GDevices

3.3.2 GProcedures

3.3.2 GManufacture's Brochures

3.3.2 GParts Lists

SD-11 Closeout Submittals

3.3.1 GWarranty

08 41 13 SD-01 Preconstruction Submittals

1.2.1 GSample Warranty

1.2.1 GList of Product Installations

SD-02 Shop Drawings

3.3 GInstallation Drawings

2.2 GFabrication Drawings

SD-03 Product Data

1.2.1 GManufacturer's Catalog Data

2.2.3 GFinish

SD-04 Samples

1.2.1 GFinish and Color Samples

SD-05 Design Data

1.5 GCalculations

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 111 PAGES

08 41 13 1.2.1 GCertified Test Reports 3.4.3Deflection 3.4.1Air Infiltration 3.4.4Condensation Resistance and

Thermal Transmittance 3.4.5Water Infiltration

SD-08 Manufacturer’s Instructions 3.3Manufacturer's Instructions

SD-11 Closeout Submittals 3.6Manufacturer's Product Warranty

08 44 00 SD-01 Preconstruction Submittals

1.4.1 GBlast Engineer Qualifications

1.5.7.2 GBlast Engineer's Design

Approach

1.10 GCurtain Wall Installer

Qualifications SD-02 Shop Drawings

1.5 GGlazed Curtain Wall System

2.7 GAluminum Doors in Curtain Wall

Frames 1.5.7.3.3blast pressure design information and criteria

1.12 GInstallation Drawings

2.5.2Shop-Painting Aluminum 2.5.3Shop-Painting Steel

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 111 PAGES

08 44 00 1.5 GGlazed Curtain Wall System

1.13 GPreventive Maintenance and

Inspection 2.3Metals For Fabrication 2.4Nonskinning Sealing Compound 2.5.1Metal Accessories

2.6 GCurtain Wall Framing Members

2.1.1 GAluminum Doors and Frames

2.8.1 GCurtain Wall Frame

2.9 GInsulated Panels

2.10 GThermal Insulation Materials

2.11 GSealants and Caulkings

2.12 GCurtain Wall Installation Materials

2.12.5 GMasonry Anchorage Devices

2.5.5.1 GHigh-Performance Organic Finish

2.5.5.1 GColor Chart of Full Range of

High-Performance Organic Finish

2.5.5.1 GSamples of High-Performance

Organic Finish Selected from Chart

1.8.1Warranties 1.8.1Warranties

SD-05 Design Data

1.3 GCalculations

1.5.6seismic calculations

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 43 OF 111 PAGES

08 44 00 1.5.7.2.1Dynamic Analysis Calculation Summary

1.5.7.3.4Glazing 1.5.7.2.4.1Mullions and Framing Members 2.9.2Panels 1.5.7.2.4.2Anchorage…