SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 111 PAGES
P-106 Manufacturing Support Facility
01 14 00 SD-01 Preconstruction Submittals
1.3.4 GPersonnel List
1.3.4 GVehicle List
1.3.9Accident Report Plan
01 20 00.00 20 SD-01 Preconstruction Submittals
1.3 GEarned Value Report
01 30 01.00 22 SD-02 Shop Drawings
1.5.3 G IDPreliminary (Pre-Final) FF&E
Package
1.5.9 G IDFinal FF&E Package
1.4.3 G IDBest Value Determinations
1.4.3 G IDAudio Visual Package
SD-07 Certificates
1.4.1 G IDContractor's Interior Designer's
Qualifications 01 31 23.13 20 SD-01 Preconstruction Submittals
1.4.2 GList of Contractor's Personnel
01 32 17.00 20 SD-01 Preconstruction Submittals
1.5 GQualifications
1.3 GBaseline Network Analysis
Schedule SD-07 Certificates
1.7.1 GMonthly Network Analysis
SD-11 Closeout Submittals
1.7.2 GAs-Built Schedule
01 33 00 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 111 PAGES
01 33 00 1.9 GSubmittal Register 01 33 29 SD-01 Preconstruction Submittals
1.5.3.1 GPreliminary High Performance
and Sustainable Building Checklist
1.4.1 GSustainability Action Plan
1.5.3.1 GPreliminary Sustainability
eNotebook SD-11 Closeout Submittals
1.5.3.1 G SFinal High Performance and
Sustainable Building Checklist
1.5.3.1 G SFinal Sustainability eNotebook
1.5.3.1 G SAmended Final Sustainability
eNotebook
1.5.3.1 G SAmended Final High
Performance and Sustainable Building Checklist
3.2 G SThird Party Certification
Certificates or Validation
01 35 26 SD-01 Preconstruction Submittals
1.7 GAccident Prevention Plan (APP)
SD-06 Test Reports 1.12Notifications and Reports
1.12.2 GAccident Reports
1.12.3LHE Inspection Reports
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 111 PAGES
01 35 26 1.4Contractor Safety Self-Evaluation Checklist
1.6.1.5Crane Operators/Riggers
1.7.2.2 GStandard Lift Plan
1.7.2.3 GCritical Lift Plan
1.7.2.3 GNaval Architecture Analysis
1.8Activity Hazard Analysis (AHA) 1.9.1Confined Space Entry Permit 1.9.1Hot Work Permit 1.12.4Certificate of Compliance 1.12.5Third Party Certification of
Barge-Mounted Mobile Cranes 3.8.2License Certificates
01 45 00.00 20 SD-01 Preconstruction Submittals
1.6.1 GConstruction Quality Control (QC)
Plan
1.16 GIndoor Air Quality (IAQ)
Management Plan 01 45 35 SD-01 Preconstruction Submittals
3.1.2Written Practices 3.1.2NDT Procedures and Equipment
Calibration Records SD-06 Test Reports
3.1.2Daily Reports 3.1.1Biweekly Reports
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 111 PAGES
01 45 35 2.1Fabrication Plant 2.1Certified Plant 2.1Certificate of Compliance
1.5 GSpecial Inspector
3.1.2Qualification Records
SD-11 Closeout Submittals 3.1.2Interim Final Report
3.1.2 GComprehensive Final Report
01 50 00 SD-01 Preconstruction Submittals
1.3 GConstruction Site Plan
3.4.1 GTraffic Control Plan
2.2.1 GHaul Road Plan
2.4 GTemporary Fencing Panel for
NFPC Fenced Perimeter
2.4 GTemporary Fence Plan
SD-03 Product Data
1.4 GBackflow Preventers
SD-06 Test Reports 2.6Backflow Preventer Tests
SD-07 Certificates 1.4.1Backflow Tester 1.4Backflow Preventers
01 57 19 SD-01 Preconstruction Submittals 1.6.1Preconstruction Survey
1.10 GSolid Waste Management Permit
1.6.2 GRegulatory Notifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 111 PAGES
01 57 19 1.7 GEnvironmental Protection Plan
3.1.1.2 GStormwater Notice of Intent
1.7.6.1 GDirt and Dust Control Plan
1.6.5 GEmployee Training Records
1.6.4 GEnvironmental Manager
Qualifications SD-06 Test Reports
3.5.1.1.2Laboratory Analysis 3.1.1.3Inspection Reports
3.5.2.1 GSolid Waste Management Report
SD-07 Certificates
1.6.5 GEmployee Training Records
1.4.1.2 GECATTS Certificate Of
Completion 1.6.5Erosion and Sediment Control
Inspector SD-11 Closeout Submittals
3.1.1.4 GStormwater Pollution Prevention
Plan Compliance Notebook
3.1.1.5 GStormwater Notice of Termination
3.5.1 GWaste Determination
Documentation
3.5.3.6 GDisposal Documentation for
Hazardous and Regulated Waste
1.6.5 GAssembled Employee Training
Records
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 111 PAGES
01 57 19 1.10 GSolid Waste Management Permit
3.5.2.1 GSolid Waste Management Report
3.6.1 GContractor Hazardous Material
Inventory Log
3.5.3.1 GHazardous Waste/Debris
Management
1.6.2 GRegulatory Notifications
3.5.2.1 GSales Documentation
3.5.2.1Contractor Certification
01 58 00 SD-02 Shop Drawings
1.3.1 GPreliminary Drawing Indicating
Layout And Text Content 01 74 19 SD-01 Preconstruction Submittals
1.5 GWaste Management Plan
SD-11 Closeout Submittals
1.6Records 01 78 00 SD-03 Product Data
1.3.2As-Built Record of Equipment and Materials
1.7.1Warranty Management Plan 1.7.5Warranty Tags 1.9Final Cleaning 1.4Spare Parts Data
SD-08 Manufacturer’s Instructions 1.5Preventative Maintenance
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 111 PAGES
01 78 00 1.5Condition Monitoring (Predictive Testing)
1.5Inspection 1.7.1Instructions
SD-10 Operation and Maintenance Data
1.8 GOperation and Maintenance
Manuals
SD-11 Closeout Submittals
1.3.1 GRecord Drawings
1.6 GCertification of EPA Designated
Items
1.10 GInterim Form DD1354
1.10 GChecklist for Form DD1354
1.11 GNAVFAC Sustainable & Energy
Data Record Card 01 78 23 SD-10 Operation and Maintenance
Data
3.1.1 GTraining Plan
3.1.3 GTraining Outline
3.1.2 GTraining Content
SD-11 Closeout Submittals
3.1.4 GTraining Video Recording
3.1.6 GValidation of Training Completion
01 78 24.00 20 SD-11 Closeout Submittals
1.4.1 GeOMSI, Progress Submittal
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 111 PAGES
01 78 24.00 20 1.4.2 GeOMSI, Prefinal Submittal
1.4.3 GeOMSI, Final Submittal
01 91 00.15 22 SD-06 Test Reports
3.1.4.2 GCompleted Building Envelope
Inspection Checklists
3.1.4.3 GCompleted Pre-Functional
Checklists SD-07 Certificates
1.9 GCertificate of Readiness
SD-10 Operation and Maintenance Data
3.1.5 GTraining Plan
3.1.5 GTraining Attendance Rosters
3.1.6 GSystems Manual
02 41 00 SD-01 Preconstruction Submittals
1.2.1 GDemolition Plan
1.8 GExisting Conditions
1.9.1 GPile Cap Survey
1.9.2 GPile Survey
SD-07 Certificates
1.6 GNotification
SD-11 Closeout Submittals 3.3.2Receipts
02 82 16.00 20 SD-03 Product Data 3.1.4Local Exhaust Equipment 3.1.5Vacuums
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 111 PAGES
02 82 16.00 20 3.1.1.1Respirators 3.1.4Pressure Differential Automatic
Recording Instrument 1.2.2Amended Water 3.1.7Glovebags
1.3.8 GSafety Data Sheets (SDS) For All
Materials
2.1 GEncapsulants
SD-06 Test Reports
1.5.5 GAir Sampling Results
1.5.6Pressure Differential Recordings
For Local Exhaust System
3.3.3.2 GAsbestos Disposal Quantity
Report
3.2.6.3 GClearance Sampling
SD-07 Certificates 1.3.9Asbestos Hazard Abatement
Plan 1.3.10Testing Laboratory 1.5.1Private Qualified Person
Documentation 1.5.4Contractor's License 1.5.2Competent Person 1.5.3Worker's License
1.3.11 GLandfill Approval
1.3.3Employee Training
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 111 PAGES
02 82 16.00 20 1.3.12Medical Certification
1.3.11 GWaste Shipment Records
1.3.6Respiratory Protection Program
1.3.11 GDelivery Tickets
3.1.5Vacuums 3.1.2.3Water Filtration Equipment 3.1.5Ventilation Systems 3.1Equipment Used To Contain
Airborne Asbestos Fibers 2.1Encapsulants 1.3.4Notifications
SD-11 Closeout Submittals
1.3.4 GNotifications
1.6.1Rental Equipment 1.3.6.1Respirator Program Records
1.3.4 GPermits and Licenses
02 83 13.00 20 SD-01 Preconstruction Submittals 1.5.1.1Competent Person 1.5.1.2Training Certification
1.5.2.2 GLead Compliance Plan
1.5.2.3 GOccupational And Environmental
Assessment Data Report 1.5.2.4Medical Examinations
1.5.2.8 GLead Waste Management Plan
3.5.2.1 GWritten Evidence
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 111 PAGES
02 83 13.00 20 1.5.2.3 GSampling Results
1.5.2.3 GOccupational and Environmental
Assessment Data Report SD-07 Certificates
1.5.1.3Testing Laboratory 1.5.1.4Third Party Consultant
Qualifications
3.5.1.1 GClearance Certification
SD-11 Closeout Submittals
3.5.2.1 GDisposal Documentation
02 84 16 SD-07 Certificates 1.8.1Qualifications of CIH 1.8.1Training Certification
1.8.2 GPCB and Lamp Removal Work
Plan
1.8.3 GPCB and Lamp Disposal Plan
SD-11 Closeout Submittals
3.5.2 GTransporter certification
3.2.4 GCertification of Decontamination
3.5.2.1 GCertificate of Disposal and/or
recycling
3.5.3 GDD Form 1348-1
03 30 00 SD-01 Preconstruction Submittals 1.6.3.1Concrete Curing Plan
1.6.5 GQuality Control Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 111 PAGES
03 30 00 1.6.6Quality Control Personnel Certifications
1.6.6Quality Control Organizational Chart
1.6.8Laboratory Accreditation 1.6.2.1Form Removal Schedule
SD-02 Shop Drawings 1.6.2.1Formwork
1.6.2.2 GReinforcing Steel
SD-03 Product Data 2.4.8Joint Sealants 2.4.7Joint Filler 2.1Materials for Forms 2.4.1Cementitious Materials 2.4.6Vapor Retarder 2.3.3Concrete Curing Materials 2.5Reinforcement 2.6.1Liquid Chemical Floor Hardener 2.4.5Admixtures 2.5.2Mechanical Reinforcing Bar
Connectors 2.2.1Waterstops 1.8.1Local/Regional Materials 1.6.3.2Pumping Concrete 1.6.3.3Finishing Plan
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 111 PAGES
03 30 00 2.3.1 GMix Design SD-06 Test Reports
1.6.1.1 GConcrete Mix Design
1.6.4.1Fly Ash 1.6.4.1Pozzolan 1.6.4.2Ground Granulated
Blast-Furnace Slag 2.4.3Aggregates 3.10.2.1Tolerance Report
3.14.2.3 GCompressive Strength Tests
3.14.2.5Unit Weight of Structural
Concrete 3.14.2.6Ion Concentration 3.14.2.4Air Content 3.14.2.1Slump Tests 2.4.2Water
SD-07 Certificates 2.5.1Reinforcing Bars 1.9Welder Qualifications 1.6.3.4VOC Content for Form Release
Agents, Curing Compounds, and Concrete Penetrating Sealers
1.6.3.5Safety Data Sheets 1.6.6.2Field Testing Technician and
Testing Agency SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 111 PAGES
03 30 00 2.6.1Liquid Chemical Floor Hardener 2.3.3Curing Compound
04 20 00 SD-02 Shop Drawings
2.8 GCast Stone Detail Drawings
3.4.1.1 GDetail Drawings
SD-03 Product Data
1.5.1 GHot Weather Procedures
1.5.2 GCold Weather Procedures
2.2.2 GClay or Shale Brick
3.8 GCast Stone
2.2.3.2.1 GCement
2.5.1.1 GCementitious Materials
2.9.8 G SInsulation
SD-04 Samples
1.3.1.1 GMock-Up Panel
2.2.2 GClay or Shale Brick
2.2.3.2 GConcrete Masonry Units (CMU)
3.8 GCast Stone
2.5.1.4 GAdmixtures for Masonry Mortar
2.9.2 GAnchors, Ties, and Bar
Positioners
2.9.3 GJoint Reinforcement
2.9.6 GClay Masonry Expansion-Joint
Materials
2.9.8 G SInsulation
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 111 PAGES
04 20 00 2.1.2 GMasonry Compressive Strength 2.2.3.3Fire-Rated Concrete Masonry
Units
3.2.5 GBracing Calculations
SD-06 Test Reports 2.2.2.1.3Efflorescence Test 2.2.3.3Fire-Rated Concrete Masonry
Units 3.6.1.1Field Testing of Mortar 3.6.1.2Field Testing of Grout 3.6.1.4Prism Tests
SD-07 Certificates 1.3.2Special Masonry Inspector
Qualifications 2.2.2Clay or Shale Brick 2.2.3.2Concrete Masonry Units (CMU) 2.5.1.1Cementitious Materials 2.5.1.4Admixtures for Masonry Mortar 2.5.2.2Admixtures for Grout 2.9.2Anchors, Ties, and Bar
Positioners 2.9.3Joint Reinforcement 2.9.8Insulation
SD-08 Manufacturer’s Instructions 2.5.1.4Admixtures for Masonry Mortar 2.5.2.2Admixtures for Grout
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 111 PAGES
04 20 00 SD-10 Operation and Maintenance Data
3.10Take-Back Program 05 12 00 SD-01 Preconstruction Submittals
1.4.1.1 GErection Drawings
SD-02 Shop Drawings
1.4.2 GFabrication Drawings
3.3Signed and Sealed Construction
Design Calculations
2.8 GCrane Rail
SD-03 Product Data 2.6.2Shop Primer 2.4.1Welding Electrodes and Rods
2.3.1.3 GDirect Tension Indicator Washers
2.4.2Non-Shrink Grout 2.3.2Tension Control Bolts
2.8 GCrane Rail
2.4.4Blind Bolts
SD-06 Test Reports 2.6.2Class B Coating 2.3Bolts, Nuts, and Washers 3.8.1.2Weld Inspection Reports 3.8.2.1Direct Tension Indicator Washer
Inspection Reports 3.2.2Direct Tension Indicator Washer
Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 111 PAGES
05 12 00 3.8.3.1Bolt Testing Reports 3.8.4Embrittlement Test Reports
SD-07 Certificates 2.2Steel 2.3Bolts, Nuts, and Washers 2.5Galvanizing 1.3AISC Fabrication Plant Quality
Certification 1.3AISC Erector Quality Certification 1.4.3.1Welding Procedures and
Qualifications 2.4.1Welding Electrodes and Rods
SD-11 Closeout Submittals
3.9 GCrane Rail Survey
05 30 00 SD-02 Shop Drawings
1.3.5 GFabrication Drawings
SD-03 Product Data 2.2Accessories 2.1Deck Units 2.1.5Galvanizing Repair Paint 2.2.16Mechanical Fasteners 2.1.5Touch-Up Paint 1.3.3Welding Equipment 1.3.3Welding Rods and Accessories
SD-04 Samples 2.1.1Metal Roof Deck Units
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 111 PAGES
05 30 00 2.2.4Flexible Closure Strips SD-05 Design Data
2.1 GDeck Units
SD-07 Certificates
1.3.2Powder-Actuated Tool Operator 1.3.3Welder Qualifications 1.3.3Welding Procedures 1.3.4.1Fire Safety 1.3.4.2Wind Storm Resistance 1.3.1Manufacturer's Certificate 2.2.11Stud Manufacture's Certification 2.2.11Stud Manufacture's Test Reports
SD-11 Closeout Submittals
2.1 SRecycled Content of Steel
Products 05 40 00 SD-02 Shop Drawings
1.5.1 GFraming Components
SD-03 Product Data
2.1Studs SD-05 Design Data
1.5.2 GMetal Framing Calculations
SD-07 Certificates
1.4Load-Bearing Cold-Formed Metal Framing
3.1.1Welds SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 111 PAGES
05 40 00 2.1 SRecycled Content of Steel Products
05 50 13 SD-02 Shop Drawings 2.6Structural Steel Door Frames
2.6 GOverhead Door Framing
2.4 GGuard Posts
2.5 GAngles and Plates
SD-03 Product Data
2.7 GSafety Nosings
2.6Structural Steel Door Frames
2.6 GOverhead Door Framing
2.8 GSecurity Bars
2.1 GCertificates of Compliance
2.2 GCertified Mill
2.1 SRecycled Content
05 51 00 SD-02 Shop Drawings
2.1 GSteel Shapes, Plates, Bars, and
Strips
2.2.2 GSteel Pan Stairs
2.1 GIron and Steel Hardware
2.3.1.1 GCalculations and Shop Drawings
signed and sealed by a Professional Engineer
SD-03 Product Data
2.4.1 GStructural-Steel Plates, Shapes, and Bars
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 111 PAGES
05 51 00 2.4.2 GStructural-Steel Tubing
2.2.3 GProtective Coating
2.2.2 GSteel Pan Stairs
SD-07 Certificates
1.3.1 GWelding Procedures
SD-08 Manufacturer’s Instructions
2.4.1 GStructural-Steel Plates, Shapes, and Bars
2.4.2 GStructural-Steel Tubing
2.2.3 GProtective Coating
05 51 33 SD-02 Shop Drawings 2.3Ladders 2.3.1Ship's Ladder
SD-03 Product Data 2.3Ladders 2.3.1Ship's Ladder
SD-07 Certificates 1.3Fabricator Certification for Ladder
Assembly 1.3Fabricator Certification for Ships
Ladder Assembly 05 52 00 SD-02 Shop Drawings
3.2 GIron and Steel Hardware
3.2 GSteel Shapes, Plates, Bars and
Strips
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 111 PAGES
05 52 00 2.2.9 GCalculations And Fabrication Drawings Signed And Sealed By A Professional Engineer
SD-03 Product Data
2.2.1 GStructural-Steel Plates, Shapes, and Bars
2.2.2 GStructural-Steel Tubing
2.2.4 GCold-Finished Steel Bars
2.2.3 GHot-Rolled Carbon Steel Bars
2.2.5 GCold-Drawn Steel Tubing
2.2.7 GMasonry Anchorage Devices
2.1.2 GProtective Coating
2.2.9 GSteel Railings and Handrails
SD-07 Certificates
1.3.1 GWelding Procedures
1.3.2 GWelder Qualification
SD-08 Manufacturer’s Instructions 3.2Installation Instructions
06 10 00 SD-02 Shop Drawings
2.3.1 G SNailing Strips
SD-03 Product Data 1.8Fire-retardant Treatment 2.4Structural-Use 2.4Oriented Strand Board 2.5.3Adhesives
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 111 PAGES
06 10 00 1.4.3Preservative-treated SD-07 Certificates
1.10.1Certificates of Grade
1.10.2 G SCertified Sustainably Harvested
Wood 1.7Preservative Treatment
1.10.3 SIndoor Air Quality
2.5.3 SIndoor Air Quality for Aerosol
Adhesives SD-11 Closeout Submittals
2.2.1 SCertified Sustainably Harvested
Virgin Lumber
2.3.1 SCertified Sustainably Harvested
Framing Lumber
2.4.1.2 SCertified Sustainably Harvested
Plywood for Structural-Use and OSB Panels
2.4.1.1 SCertified Sustainably Harvested
Plywood for Other Uses
06 20 00 SD-02 Shop Drawings
1.3 GDetail Drawings Indicating All
Wood Assemblies SD-03 Product Data
2.6 GHardware and Accessories
1.4 GWood Products
2.2 GWood Products
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 111 PAGES
06 20 00 2.6.1 GSteel Channel Support System
2.6.2 GTable Leg
SD-07 Certificates
1.6.1.2 GCertified Sustainably Harvested
Wood
1.6.1.3 GIndoor Air Quality
1.6.1.1 GCertificates of Grade
SD-11 Closeout Submittals
2.2.3 SCertified Sustainably Harvested
Wood for Trim and Frames
2.2.4 SCertified Sustainably Harvested
Softwood Plywood
2.2.5 SCertified Sustainably Harvested
Hardwood Plywood
1.6.1.2 SCertified Sustainably Harvested
Wood
2.2.4 SVOC Content for Softwood
Plywood
2.2.5 SVOC Content for Hardwood
Plywood
2.7.1.2 SIndoor Air Quality for Non-aerosol
Adhesives
2.7.1.2 SIndoor Air Quality for Aerosol
Adhesives 06 41 16.00 10 SD-02 Shop Drawings
2.11 GShop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 111 PAGES
06 41 16.00 10 3.1Installation SD-03 Product Data
2.1 SWood Materials
2.9 SWood Finishes
2.11.7.3Finish Schedule
SD-04 Samples
2.3 GPlastic Laminates
2.6 GCabinet Hardware
SD-07 Certificates 1.5Quality Assurance 2.9Laminate Clad Casework 3.1Laminate Clad Casework
06 61 16 SD-02 Shop Drawings
2.3.4 GWindow Stools
2.3.5 GCounter and Vanity Tops
2.3.5 GCounter and Vanity Tops
2.3.7 GAcrylic Shower System
SD-03 Product Data 2.1Solid Polymer Material
2.3.7 GAcrylic Shower System
1.5.1Qualifications 2.3Fabrications 1.5.2Certification 1.5.2VOC Content
SD-04 Samples
2.1 GMaterial
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 111 PAGES
06 61 16 SD-06 Test Reports 2.1Solid Polymer Material
SD-07 Certificates 2.3Fabrications 1.5.1Qualifications
SD-10 Operation and Maintenance Data
3.2Clean-up 07 05 23 SD-01 Preconstruction Submittals
1.4 GWork Plan
SD-03 Product Data
2.2 GThermal Imaging Camera
SD-05 Design Data
3.2 GEnvelope Surface Area
Calculations
SD-07 Certificates 1.6.2.1Pressure Test Agency 1.6.2.2Thermographer Qualifications 1.6.3Test Instruments 1.6.3Date Of Last Calibration
SD-06 Test Reports
3.5 GPressure Test Procedures
3.5.6 GAir Leakage Test Report
3.6.5 GDiagnostic Test Report
07 11 13 SD-07 Certificates 1.3Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 111 PAGES
07 17 00 SD-03 Product Data
2.1 GBentonite Materials
2.1.3 GBentonite Panels
1.3 GAccessories
SD-08 Manufacturer’s Instructions 3.2Application 3.3Protection
3.5 GCorrections
07 21 13 SD-03 Product Data
1.3 GManufacturer's Standard Details
2.2 G SBlock or Board Insulation
2.3 G SVapor Retarder
2.4 GPressure Sensitive Tape
1.4 GProtection Board or Coatings
2.5 GAccessories
SD-07 Certificates
2.2 GBlock or Board Insulation
2.3 GVapor Retarder
3.4.3 GProtection Board or Coating
1.8 GSpecial Warranties
1.8 GSpecial Warranties
1.5 G SULE Greenguard
SD-08 Manufacturer’s Instructions 2.2Block or Board Insulation 2.5.1Adhesive
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 111 PAGES
07 21 13 1.5 SULE Greenguard
2.1.1 SVolatile Organic Compound
(VOC) Content
2.1.2 SRecycled Content
07 21 16 SD-03 Product Data
2.2 G SBlanket Insulation
2.4.2 GPressure Sensitive Tape
2.3.5 GInsulation Finishing System
2.4Accessories
SD-08 Manufacturer’s Instructions 3.3.1Insulation
SD-11 Closeout Submittals
2.1.1 SRecycled Content for Insulation
Materials
2.1.2 SReduce Volatile Organic
Compounds (VOC) 07 22 00 SD-02 Shop Drawings
1.3 GInsulation Board Layout
1.3Verification of Existing Conditions
SD-03 Product Data
2.2 G SInsulation
1.4 G SCover Board
2.5 GFasteners
2.4.1 GVapor Retarder
SD-06 Test Reports
1.8.1 GFlame Spread Rating
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 111 PAGES
07 22 00 SD-07 Certificates
1.9 GVolatile Organic Compounds
(VOC) Content
1.6 GInstaller Qualifications
SD-08 Manufacturer’s Instructions
2.5 GFasteners
2.2 GInsulation
07 27 10.00 10 SD-04 Samples
3.1.2 GMock-Up
SD-06 Test Reports
1.8 G DODesign Review Report
3.1.3 G ROTesting and Inspection
SD-07 Certificates
1.7 G ROAir Barrier Inspector
07 27 26 SD-01 Preconstruction Submittals
1.9.1 GQualifications of Manufacturer
1.9.2 GQualifications of Installer
SD-02 Shop Drawings
1.4 G SFluid-Applied Membrane Air
Barrier SD-03 Product Data
1.4 G SFluid-Applied Membrane Air
Barrier
2.4 G STransition Membrane
2.3 GPrimers, Adhesives, and Mastics
2.7 GReinforcement
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 111 PAGES
07 27 26 1.4.2Safety Data Sheets SD-04 Samples
1.4.3 GMockup
SD-06 Test Reports
1.6 GCapillary Moisture Test
1.4.4 GField Peel Adhesion Test
1.4.4 GFlame Propagation of Wall
Assemblies
1.4.4 GFlame Spread and Smoke
Developed Index Ratings
3.4.1 GSite Inspections
SD-07 Certificates
1.4 GFluid-Applied Membrane Air
Barrier
2.4 GTransition Membrane
1.9.1 GQualifications of Manufacturer
1.9.2 GQualifications of Installer
SD-08 Manufacturer’s Instructions
1.4 GFluid-Applied Membrane Air
Barrier
2.4 GTransition Membrane
2.3 GPrimers, Adhesives, and Mastics
SD-11 Closeout Submittals
2.1 SVolatile Organic Compound
(VOC) Content 07 42 13 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 111 PAGES
07 42 13 1.5.3 GQualification of Manufacturer
1.5.4 GQualification of Installation
Contractor
1.8 GWarranty
SD-02 Shop Drawings
1.5.1.1 GInstallation Drawings
1.5.1.1 GInstallation Drawings
1.5.1.1 GInstallation Drawings
1.5.1.1 GInstallation Drawings
SD-03 Product Data
2.1 G SRecycled Content
2.2.1 GWall Panels
2.4 GWall Panels
2.2.2Factory Color Finish 2.5Factory Color Finish 1.5.5Closure Materials 2.7.4.3Pressure Sensitive Tape 2.7.4.1Sealants and Caulking 1.5.3.1Galvanizing Repair Paint 1.5.3.1Enamel Repair Paint 1.5.5Accessories 2.7Accessories
SD-04 Samples
2.2.1 GWall Panels
2.4 GWall Panels
1.5.3.1 GFasteners
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 111 PAGES
07 42 13 2.7.3 GMetal Closure Strips
2.2.2 GColor chart
SD-05 Design Data
1.5.1.2 GWind load design analysis
SD-06 Test Reports
3.7.2 GLeakage Tests
1.3.2 GWind Load Tests
2.2.2.4 GCoating
2.5.4 GCoating
2.2.2.4 GChalking
2.5.4 GChalking
1.3.2 GSeismic Tests
SD-07 Certificates
1.5.3.1 GCoil Stock
1.5.3.1 GFasteners
1.5.3.1 GGalvanizing Repair Paint
1.5.3.1 GEnamel Repair Paint
SD-08 Manufacturer’s Instructions
3.3 GInstallation
SD-09 Manufacturer’s Field Reports
3.8.1 GManufacturer's Field Reports
SD-11 Closeout Submittals
1.8 GWarranty
1.5.6 GMaintenance Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 111 PAGES
07 42 13 1.8.120 year 'No Dollar Limit' warranty for labor and material
07 42 16 SD-01 Preconstruction Submittals
1.4.10 GBuy American Act Certification
1.6.3 GInstaller Qualifications
SD-02 Shop Drawings
2.1 GInsulated Metal Wall Panels
2.3 GInsulated Metal Wall Panels
SD-03 Product Data
2.1 GInsulated Metal Wall Panels
2.3 GInsulated Metal Wall Panels
1.3.1 G SCradle to Cradle Certification
SD-04 Samples
2.1 GInsulated Metal Wall Panels
2.3 GInsulated Metal Wall Panels
SD-06 Test Reports
2.1 GInsulated Metal Wall Panels
2.3 GInsulated Metal Wall Panels
SD-11 Closeout Submittals
1.9.1 GManufacturer's Warranty
3.4.2 GManufacturer Field Service
07 53 23 SD-02 Shop Drawings 1.3.1Roof Plan Drawing 1.3.1Wind Load Calculations 1.3.1Boundaries of Enhanced
Perimeter
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 111 PAGES
07 53 23 1.3.1 GCorner Attachments of Roof System Components
1.3.1Spacing of Perimeter, Corner, and Infield Fasteners
1.3.1Slopes and Drain Locations SD-03 Product Data
2.2Cement
2.1.1 G SEPDM Sheet
2.1.2Seam Tape 2.1.4Bonding Adhesive 2.1.3Lap Splice Adhesive 2.1.6Water Cutoff Mastic/Water Block 2.1.5Lap Cleaner, Lap Sealant, and
Edge Treatment 3.3Flashings 2.1.7Flashing Accessories 2.1.7.1Flashing Tape 2.1.8Fasteners and Plates 2.1.10Rubber Walkboards 2.1.9Pre-Manufactured Accessories
1.8 Gwarranty
SD-05 Design Data
1.4.4 GWind Uplift Calculations
SD-07 Certificates 1.4.1Qualification of Manufacturer 1.4.2Qualification of Applicator
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 111 PAGES
07 53 23 1.4.4 GWind Uplift Resistance
1.4.3 GFire Resistance
SD-08 Manufacturer’s Instructions
3.2 GApplication
3.2.3 GApplication Method
3.3.2 GMembrane Flashing
2.1.2Seam Tape 3.2.5Perimeter Attachment 3.2.4Primer 3.2.6Fasteners 2.1.10Rubber Walkboards 2.1.9Pre-Manufactured Accessories
1.6 GCold Weather
SD-11 Closeout Submittals 1.8Warranty 3.10Information Card 3.9Instructions To Government
Personnel 07 60 00 SD-02 Shop Drawings
2.2.1 GExposed Sheet Metal
3.1.15 GGutters
3.1.16 GDownspouts
3.1.20 GExpansion Joints
2.2.1 GGravel Stops and Fasciae
3.1.19 GSplash Pans
3.1.10 GBase Flashing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 111 PAGES
07 60 00 3.1.11 GCounterflashing
2.2.8 GReglets
3.1.17 GScuppers
3.1.21 GCopings
3.1.14 GDrip Edges
3.1.18 GConductor Heads
SD-04 Samples
1.4.2 GFinish Samples
SD-07 Certificates
2.1 GCertificates of Compliance
SD-08 Manufacturer’s Instructions
1.4.3 GInstructions for Installation
3.5 GQuality Control Plan
SD-10 Operation and Maintenance Data
1.4.3 GCleaning and Maintenance
SD-11 Closeout Submittals
2.1 SRecycled Content
07 81 00 SD-03 Product Data
3.3 GFireproofing Material
SD-04 Samples
2.1 GSpray-Applied Fireproofing
SD-06 Test Reports
1.2.2 GFire Resistance Rating
3.6 GField Tests
1.2.3 GEvaluation Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 111 PAGES
07 81 00 SD-07 Certificates
1.4.1 GInstaller Qualifications
3.1 GSurface Preparation Report
3.5.2 GManufacturer's Inspection Report
07 84 00 SD-02 Shop Drawings
2.1 GFirestopping System
SD-03 Product Data
2.2 GFirestopping Materials
SD-06 Test Reports
3.3 GInspection
SD-07 Certificates 1.5.2Inspector Qualifications 2.2Firestopping Materials
1.5.1 GInstaller Qualifications
07 92 00 SD-03 Product Data
2.2 GSealants
2.3 GPrimers
2.4 GBond Breakers
2.5 GBackstops
2.7 GExpansion Joint Cover
3.1 GField Adhesion
SD-07 Certificates
1.4.1 GIndoor Air Quality
2.2.1 GIndoor Air Quality for Interior
Sealants SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 111 PAGES
07 92 00 2.2.1 SIndoor Air Quality For Interior Sealants
2.2.3 SIndoor Air Quality For Interior
Floor Joint Sealants
2.2.4 SIndoor Air Quality For Interior
Acoustical Sealants
08 11 13 SD-02 Shop Drawings
2.1 GDoors
2.1 GDoors
2.5 GFrames
2.5 GFrames
2.3Accessories 2.7Weatherstripping
SD-03 Product Data
2.1 GDoors
2.5 GFrames
2.3Accessories
08 14 00 SD-02 Shop Drawings
2.2 GDoors
SD-03 Product Data
2.2 G SDoors
2.3Accessories 2.4.7Water-resistant Sealer 1.5Warranty
2.2.2 GFire Resistance Rating
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 111 PAGES
08 14 00 2.2Doors
2.4.6.3 GDoor Finish Colors
SD-06 Test Reports 2.5Cycle-Slam 2.5Hinge Loading Resistance
SD-07 Certificates 1.3.1Certificates of Grade
1.3.2 G SCertified Sustainably Harvested
Wood
1.3.3 G SIndoor Air Quality
SD-11 Closeout Submittals
1.3.2 SCertified Sustainably Harvested
Wood
2.2.1.1 SRecycled Content for Door Cores
2.2.1.1 SIndoor Air Quality for
Particleboard and Agrifiber Door Cores
1.5Warranty 08 31 00 SD-02 Shop Drawings
1.3 GAccess Doors And Panels
SD-03 Product Data
1.3 GAccess Doors And Panels
1.3.2 GHardware
2.2.7 GAccessories
SD-04 Samples
2.5 GFinishes
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 111 PAGES
08 31 00 SD-06 Test Reports
1.3.1 GFire-rating(s) of Assemblies
SD-11 Closeout Submittals
2.1 SRecycled Content
08 33 23 SD-02 Shop Drawings
2.2.1 GOverhead Coiling Doors
2.2.3 GCounterbalancing Mechanism
2.2.5.1 GEmergency Manual Operation
2.2.4 GElectric Door Operators
2.2.1.3 GBottom Bars
2.1.1.1 GGuides
2.2.3.1 GMounting Brackets
2.2.1.8 GOverhead Drum
3.3.2 GHood
2.1.1.1 GInstallation Drawings
SD-03 Product Data
2.2.1 GOverhead Coiling Doors
2.2.2 GHardware
2.2.3 GCounterbalancing Mechanism
2.2.5.1 GEmergency Manual Operation
2.2.4 GElectric Door Operators
SD-05 Design Data
2.2.1 GOverhead Coiling Doors
2.2.2 GHardware
2.2.3 GCounterbalancing Mechanism
2.2.5.1 GEmergency Manual Operation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 111 PAGES
08 33 23 2.2.4 GElectric Door Operators SD-10 Operation and Maintenance Data
3.3.2 GOperation and Maintenance
Manuals
3.3.2 GMaterials
3.3.2 GDevices
3.3.2 GProcedures
3.3.2 GManufacture's Brochures
3.3.2 GParts Lists
SD-11 Closeout Submittals
3.3.1 GWarranty
08 41 13 SD-01 Preconstruction Submittals
1.2.1 GSample Warranty
1.2.1 GList of Product Installations
SD-02 Shop Drawings
3.3 GInstallation Drawings
2.2 GFabrication Drawings
SD-03 Product Data
1.2.1 GManufacturer's Catalog Data
2.2.3 GFinish
SD-04 Samples
1.2.1 GFinish and Color Samples
SD-05 Design Data
1.5 GCalculations
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 111 PAGES
08 41 13 1.2.1 GCertified Test Reports 3.4.3Deflection 3.4.1Air Infiltration 3.4.4Condensation Resistance and
Thermal Transmittance 3.4.5Water Infiltration
SD-08 Manufacturer’s Instructions 3.3Manufacturer's Instructions
SD-11 Closeout Submittals 3.6Manufacturer's Product Warranty
08 44 00 SD-01 Preconstruction Submittals
1.4.1 GBlast Engineer Qualifications
1.5.7.2 GBlast Engineer's Design
Approach
1.10 GCurtain Wall Installer
Qualifications SD-02 Shop Drawings
1.5 GGlazed Curtain Wall System
2.7 GAluminum Doors in Curtain Wall
Frames 1.5.7.3.3blast pressure design information and criteria
1.12 GInstallation Drawings
2.5.2Shop-Painting Aluminum 2.5.3Shop-Painting Steel
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 111 PAGES
08 44 00 1.5 GGlazed Curtain Wall System
1.13 GPreventive Maintenance and
Inspection 2.3Metals For Fabrication 2.4Nonskinning Sealing Compound 2.5.1Metal Accessories
2.6 GCurtain Wall Framing Members
2.1.1 GAluminum Doors and Frames
2.8.1 GCurtain Wall Frame
2.9 GInsulated Panels
2.10 GThermal Insulation Materials
2.11 GSealants and Caulkings
2.12 GCurtain Wall Installation Materials
2.12.5 GMasonry Anchorage Devices
2.5.5.1 GHigh-Performance Organic Finish
2.5.5.1 GColor Chart of Full Range of
High-Performance Organic Finish
2.5.5.1 GSamples of High-Performance
Organic Finish Selected from Chart
1.8.1Warranties 1.8.1Warranties
SD-05 Design Data
1.3 GCalculations
1.5.6seismic calculations
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 43 OF 111 PAGES
08 44 00 1.5.7.2.1Dynamic Analysis Calculation Summary
1.5.7.3.4Glazing 1.5.7.2.4.1Mullions and Framing Members 2.9.2Panels 1.5.7.2.4.2Anchorage…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.